Progresses in dye-sensitized solar cells

Materials Science and Engineering B 161(2009)2–7

Contents lists available at ScienceDirect

Materials Science and Engineering

B

j o u r n a l h o m e p a g e :w w w.e l s e v i e r.c o m /l o c a t e /m s e

b

Review

Progresses in dye-sensitized solar cells

Hong Lin ?,Xin Li,Yizhu Liu,Jianbao Li

The State Key Laboratory of New Ceramics and Fine Processing,Department of Materials Science and Engineering,Tsinghua University,Beijing 100084,PR China

a r t i c l e i n f o Article history:

Received 12June 2008

Received in revised form 13October 2008Accepted 22December 2008Keywords:

Dye-sensitized solar cells Nano-channel Flexible

a b s t r a c t

Recent progresses on the modi?cation of photoanodes and electrolytes related to the concept of oriented nano-channels,and the fabrication of ?exible cells aiming at practical application in dye-sensitized solar cells are reported.Some mechanisms of material preparation are analyzed,and perspectives are proposed.

?2008Elsevier B.V.All rights reserved.

Contents 1.Introduction............................................................................................................................................22.Titania nanoarrays in DSCs.............................................................................................................................33.

DSCs with composite liquid electrolytes and ionic https://www.360docs.net/doc/353703642.html,posite liquid https://www.360docs.net/doc/353703642.html,posite ionic liquids and corresponding quasi-solid DSCs.................................................................................54.Flexible DSCs with graded TiO 2?lm...................................................................................................................65.

Summary...............................................................................................................................................7Acknowledgements....................................................................................................................................7References .............................................................................................................................................

7

1.Introduction

Dye-sensitized solar cells (DSCs)have been widely investigated due to their low production cost and potentially high conversion ef?ciency ever since its invention almost two decades ago [1].In such a cell,sunlight is harvested by a sensitizer (dye)that is attached to the surface of a wide band gap semiconductor,typically an oxide such as TiO 2?lm.Photo-excitation of the dye results in the injec-tion of electrons into the conduction band of the oxide.The dye is regenerated by hole injection from an organic hole conductor or an electrolyte,such as an ionic liquid containing most frequently the iodide/triiodide couple as a redox system.The redox system is regenerated in turn by the reaction with the electrons at the counter electrode which have passed through the external circuit.The volt-age generated under illumination corresponds to the difference between the quasi-Fermi level of the electron in the oxide and the

?Corresponding author.

E-mail address:hong-lin@https://www.360docs.net/doc/353703642.html, (H.Lin).

redox potential of the electrolyte or the work function of the hole conductor.Thus,the device is regenerative,producing electricity from light without any permanent chemical transformation [2].The TiO 2photoanode and electrolytes play a key role in charge separation and transfer in DSCs,and the advances of these materials may greatly promote the photovoltaic performances by optimizing structural and electrochemical properties.On one hand,oriented nano-structures might provide channels for charge transfer,short-ening their diffusion courses and enhancing the conductivity of the cell.Such oriented nano-structures might not only exist in pho-toanodes as well-known nanowires [3]or nanotubes [4],but also potentially make sense in electrolytes,especially quasi-solid and solid-state ones,to help improve the comparatively lower conduc-tivity.On the other hand,updating of fabrication techniques might contribute to cells with greater practicability,such as ?exible cells.

Here,we report some of our recent work on (1)the modi?-cation of photoanodes and electrolytes related to the concept of oriented nano-channels and (2)the fabrication of cells aiming at practical application.Some mechanisms of material preparation are analyzed,and perspectives are proposed.

0921-5107/$–see front matter ?2008Elsevier B.V.All rights reserved.doi:10.1016/j.mseb.2008.12.030

H.Lin et al./Materials Science and Engineering B 161(2009)2–7

3

Fig.1.(a)Scanning electron microscopy image of the hydrogen titanate (H 2Ti 5O 11·H 2O)nanowire array synthesized by a hydrothermal reaction at 180?C for 4h;(b)transmission electron microscopy image of one nanowire;(c)SAED pattern for the nanowires of the array;(d)high-resolution transmission electron microscopy image of the end of one nanowire.

2.Titania nanoarrays in DSCs [5]

TiO 2(anatase)nanoarrays were obtained by direct hydrother-mal treatment of Ti substrates followed by ion exchange in HCl and post annealing.The as-prepared ?lms were composed of mono-clinic H 2Ti 5O 11·H 2O,which has been demonstrated by SEM images,HRTEM images and SAED patterns (Fig.1).

A postulated mechanism of the nanowire growth is illustrated in the model as shown in Fig.2.At the beginning,the Ti sub-strate reacted with the NaOH aqueous solution and many Na 2Ti 5O 11nanocrystallines were created and covered the plate.The nanocrys-tallines then transformed into a nucleus,from which the nanobelts begin to grow.The growth in the cross direction was inhibited because of the competitive growth from too many nuclei simul-taneously,whereas the growth in the direction perpendicular to the substrate was free.As a result,the nanobelts began to grow vertically on the substrate through a dissolution–recrystallization process,during which the dislocations caused the defect strain in the cross direction and thus increased with the nanobelt growth.When the nanobelt was long enough,the strain was large enough to suppress the nanobelt into a multilayer structure and then the mul-tilayer nanowire was formed.This mechanism was demonstrated in detail by SEM and HRTEM images of ?lms prepared under dif-ferent conditions [5].The Na 2Ti 5O 11nanowire array ?lm was then immersed into an HCl aqueous solution to exchange Na +into H +.The resulting H 2Ti 5O 11·H 2O nanowire array ?lm was postannealed and transformed into a TiO 2nanowire array ?lm.XRD patterns (Fig.3)showed that anatase began to form at 250?C (curve c)and H 2Ti 5O 11phase almost disappeared completely at 450?C (curve

e).

Fig.2.Mechanism of the nanowire growth.

4H.Lin et al./Materials Science and Engineering B 161(2009)

2–7

Fig.3.XRD patterns of TiO 2nanowire array ?lms sintered at different temperatures.(a)H 2Ti 5O 11;(b)200?C;(c)250?C;(d)400?C;(e)450?C;(f)700?

C.

Fig.4.Photocurrent–voltage characteristics of dye-sensitized solar cells prepared using (a)a TiO 2nanowire array synthesized by hydrothermal treatment at 180?C for 4h and postannealing at 450?C for 2h and (b)P25TiO 2powder.

The nanowire thin ?lm was shed from the plate as a membrane,pasted onto a conductive glass and assembled into a DSC.Fig.4shows the photocurrent–voltage (I –V )characteristics of DSCs pre-pared using TiO 2nanowire arrays and commercial TiO 2powder (P25,Degauss,Germany)[6,7].The short-circuit current density (J sc )increased from 13.5to 15.2mA/cm 2on using nanowire arrays with a thickness of 4.1?m as the photoanode compared to the tradi-

tional nanocrystalline ?lm (8?m thick)made of P25TiO 2powder despite of a much smaller thickness.The ef?ciency of DSC was also enhanced from 5.67%to 6.58%,which indicates that the structure of the TiO 2thin ?lm may affect the photocurrent of DSC.

For TiO 2nanoparticles,there are many defects in the bound-aries at the contacts between nanoparticles.These defects may act as electron traps that hamper the movement of electrons [8].How-ever,the oriented one-dimensional TiO 2nanowires may provide channels for fast electron transfer while maintain the merit of high speci?c surface area,which allows adequate loading of sensitizer and thus exhibited even higher energy conversion ef?ciency with thinner ?lms.This is potentially advantageous for quasi-solid and solid-state DSCs where the short diffusion length of injected exci-tons is always problematic due to poor wetting of the electrolyte.3.DSCs with composite liquid electrolytes and ionic liquids https://www.360docs.net/doc/353703642.html,posite liquid electrolytes

As a feature of our effort on electrolyte modi?cation,inor-ganic additives were adopted and their effects on enhancement of electrochemical properties of the electrolytes were investigated concerning with liquid electrolytes [9].Herein,layered ?-zirconium phosphate (?-ZrP)[10]was chosen and added in different weight content to iodine-based electrolyte containing 4-tert-butylpyridine (TBP)as an organic additive which has demonstrated to be able to improve markedly the open-circuit voltage by the suppression of the dark current [11].

Such composite electrolytes were assembled into thin-layer cells and subjected to electrochemical characterizations including electrochemical impedance spectroscopy (EIS)and cyclic voltam-metry (CV).The Nyquist diagram of thin-layer cells (Fig.5(a))showed that with the addition of ?-ZrP,the R ct value of thin-layer cell representing the charge transfer resistance of the counter electrode/electrolyte interface decreased markedly and reached its minimum at 9wt%?-ZrP content relative to the weight of TBP,while the R s value representing the ohmic serial resistance (resistance of electrolyte)had almost no change.This result is supported by cyclic voltammetry characterizations (Fig.5(b))where the diffusion coef-?cient of I 3?,D I 3?,proportional to j lim ,had its maximum value also at 9wt%?-ZrP content.

The enhancement of electrochemical properties was attributed to the intercalation of TBP molecules into ?-ZrP nano-layers and was demonstrated by the XRD patterns (Fig.6(a))of pure ?-ZrP and TBP-doped ZrP (T-ZrP).The (002)diffraction peak shifted from 11.66?to 6.96?,corresponding to the change of the interlayer dis-tance from 7.6to 12.7?(Fig.6(b)),with the difference of 5.1?coinciding with the molecular size of TBP.Meanwhile,the inter-layer gap was enlarged into 6.4?,exceeding both the diameter and length of I 3?ion in acetonitrile solution [12].Thus,I 3?

ions

Fig.5.(a)Nyquist diagram;(b)cyclic voltammogram of thin-layer cells.

H.Lin et al./Materials Science and Engineering B161(2009)2–7

5

Fig.6.(a)The XRD patterns of?-ZrP and T-ZrP;(b)illustration of intercalation of TBP into?-ZrP nano-layers. can transport freely in the interlayer of T-ZrP,which could pile up

and form“bridge”between the two electrodes,and therefore the

electrochemical properties can be greatly enhanced.

https://www.360docs.net/doc/353703642.html,posite ionic liquids and corresponding quasi-solid DSCs

The signi?cant enhancement of electrochemical properties of

liquid electrolytes by layered?-ZrP is highly indicative for initiating

a new?eld of electrolyte modi?cation by inorganic nano-layered

materials,within which the ef?cient modi?cation of ionic liq-

uids that have long been suffering low ion diffusion coef?cient is

expected.Thus,in our study,?-ZrP was also applied to prepare com-

posite ionic liquids and quasi-solid DSCs were assembled thereafter

based on their encouraging electrochemical properties improve-

ments[13].

?-ZrP was?rst added to TBP-containing1-methyl-3-

propylimidazolium dihydrophosphate(MPIDP)[14]ionic liquid

at different weight contents relative to TBP,and either thin-layer

cells or quasi-solid DSCs were fabricated and subjected to EIS and

photovoltaic performance characterizations.The Bode phase plots

of DSCs(Fig.7(a))re?ected the electron lifetime( s)in TiO2?lms

by the equation s=1/ωmid=1/2 f mid,whereωmid represented

the characteristic angle frequency of the midfrequency(f mid)peak.

f mid of the DSC with6%?-ZrP decreased to its minimum of11.13Hz

by a factor of9compared to the DSC without?-ZrP,suggesting

that s is lengthened signi?cantly.Meanwhile,the optimum of

electrochemical properties of composite ionic liquids at6wt%

of?-ZrP was demonstrated by thin-layer cell characterization,

when exchange current density I0and I3?diffusion coef?cient D I

3?

simultaneously reached their maximum respectively(Fig.7(b)). Photovoltaic performances of quasi-solid DSCs(Fig.8)

further

Fig.8.Photovoltaic performances of quasi-solid DSCs.

supported such results,that is,with the increase of?-ZrP content to6wt%,J sc and V oc were both enhanced,reaching their maximum of0.562V and11.38mA/cm2,respectively.An ef?ciencyáof2.61% was achieved,increasing by a factor of more than2compared to a DSC without?-ZrP.

The effect of?-ZrP on composite ionic liquids can be interpreted in a similar way with that in?-ZrP doped liquid electrolytes.How-ever,the optimal content of?-ZrP here is6wt%,rather than9wt%in composite liquid electrolytes,which is mainly due to the difference in the dispersion of?-ZrP in acetonitrile and ionic

liquids.

Fig.7.(a)Bode phase plots of DSCs;(b)dependence of exchange current density I0and I3?diffusion coef?cient D I

3

?on weight content of?-ZrP.

6H.Lin et al./Materials Science and Engineering B161(2009)

2–7

Fig.9.Photovoltaic performances of DSC with?-ZrP doped MPII.

Besides MPIDP ionic liquid,several other ionic liquids were also doped with?-ZrP to prepare various composite ionic liquids,among which?-ZrP-doped1-methyl-3-propylimidazolium iodide(MPII) exhibited4.7%light-to-energy conversion ef?ciency(Fig.9).

4.Flexible DSCs with graded TiO2?lm[15]

Three types of particles with average diameters of12,28,and 100nm were used to prepare graded TiO2pastes.The100nm-diameter large particles with pure anatase structure were used as the scattering particles,referred to as the large particles.The 28nm-diameter P25particles were accepted as the skeleton of the binary or ternary graded particles.The12nm-diameter small parti-cles obtained by hydrothermal methods[16]were also accepted as one part of the binary or ternary graded particles.Graded TiO2?lms with different component ratios were deposited on either rigid ITO-coated glass or?exible ITO-coated PEN substrate by simple doctor-blade technique,and were annealed under different temper-atures.They were then assembled into DSCs using N719sensitizer and4-tert-butylpyridine-doped LiI/I2electrolyte.

The optimal weight ratio of P25particles,the small particles, and the large particles in the graded?lm was determined as5:2:2 according to theoretical calculations combined with investigations of its in?uences on light-to-energy conversion ef?ciencies(Fig.10). To study the effect of heat-treatment temperature on cell perfor-mances,such a graded?lm was deposited on ITO-coated glass, calcined under different temperatures with otherwise same but unoptimized parameters and assembled into DSCs.The ef?ciency of the cell with150?C treated graded?lm was up to4.1%,which was just a little lower than that of the DSCs with a450?C treated

?lm.Fig.11.Dependence of the ef?ciency and the current density on the heat-treatment temperature.The line with solid circle symbols represents the ef?ciency and the line with triangle symbols represents the current

density.

Fig.12.I–V curves of the typical DSCS with the photoanode?lms treated at150?C: (1)DSC with the optimum graded structure?lm on an ITO/glass substrate;(2)DSC with the optimum graded structure?lm on an ITO/PEN substrate.

Even without any heat-treatment,the cell still showed an ef?ciency of2.6%(Fig.11).

To assemble a?exible DSC,the graded structure?lm was deposited on an ITO/PEN substrate treated at150?C.Fig.12shows the photovoltaic properties of the optimized DSCs with the graded structure?lm on an ITO/glass substrate and an ITO/PEN substrate. Under standard testing conditions,the cell based on the ITO/glass substrate gave a photocurrent density of J sc=11.68mA/cm2,an open-circuit voltage of V oc=0.73V,and a?ll factor of ff=

0.668 Fig.10.Dependence of light-to-energy conversion ef?ciencies on weight content of(a)the small particles and(b)the large particles.

H.Lin et al./Materials Science and Engineering B161(2009)2–77

yielding a 5.69%conversion ef?ciency as shown in curve(1). Meanwhile the cell based on the ITO/PEN substrate gave a pho-tocurrent density of J sc=9.8mA/cm2,an open-circuit potential of V oc=0.735V,and a?ll factor of ff=0.63,yielding a4.54%conver-sion ef?ciency as shown in curve(2).The ef?ciency of the former is just25.3%higher than that of the latter.

The good performance of the designed graded?lms at a low tem-perature may be attributed to the chemical sintering process[17] during the low-temperature treatment.The small particles were synthesized by hydrothermal method in an acid environment.The pH value of the resulting sols was ca.1[16],and there were many OH groups in the surfaces of the small particles.Once P25particles were mixed with the precursor,OH groups would be adsorbed by the sur-faces of P25particles.When such a graded structure was heated at a low temperature,OH groups on the small particles and P25particles would lead to the reaction of dehydration,as shown below:

Ti OH+HO Ti→Ti O Ti+H2O

The dehydration would increase the physical and chemical con-nections not only between the small particles and P25particles,but also between the small particles in the graded?lm,and then reduce the internal resistance of the?lm.This de?nitely improves the photovoltaic performance of the DSCs even with low temperature-treated photoanode?lms.At the same time,with the binding effect of the small particles and the appropriate pileup by the optimal ratio,the mechanical strength should be improved.That is to say, the concept of graded?lms opens a window for low-temperature treatment of TiO2photoanodes.This is especially crucial for the fab-rication of ef?cient?exible cells,and is believed to greatly enhance both their researches and commercialization.

5.Summary

One-dimensional oriented TiO2nanoarray photoanodes were prepared by simple hydrothermal oxidation of Ti substrates.DSCs assembled with such photoanodes exhibited signi?cantly promoted photovoltaic properties,which was attributed to the nano-channels resulted from the oriented nano-structures.A simi-lar concept was employed in the modi?cation of liquid electrolytes and ionic liquids with?-ZrP,which also constructed nano-channels facilitating I3?ion diffusion and promoted the ionic liquids to quite a practical level.Besides,the low-temperature sintering problems for?exible cells were overcome by the introduction of graded TiO2 photoanodes,which structurally solidi?ed the?lms and chemically enhanced the connection for reliable electron transfer. Acknowledgements

This work was?nancially supported by the National High Tech-nology Research and Development Program of China(863Program, 2006AA03Z218),NSF of China(50572051,50672041),and Beijing Natural Science Foundation(2062013).

References

[1]B.O’Regan,M.Gr?tzel,Nature353(1991)737–740.

[2]M.Gt?tzel,Prog.Photovolt.:Res.Appl.14(2006)429–442.

[3]https://www.360docs.net/doc/353703642.html,w,et al.,Nat.Mater.4(2005)455–459.

[4]K.Varghese,et al.,J.Mater.Res.18(2003)156–165.

[5]W.Wang,H.Lin,et al.,J.Am.Ceram.Soc.91(2008)628–631.

[6]A.Hagfeldt,M.Gr?tzel,Chem.Rev.95(1995)49–68.

[7]N.Wang,et al.,Appl.Phys.Lett.89(2006)194104.

[8]M.Adachi,et al.,J.Electrochem.Soc.150(2003)G488–G493.

[9]N.Wang,H.Lin,et al.,https://www.360docs.net/doc/353703642.html,mun.8(2006)946–950.

[10]A.Clear?eld,Prog.Inorg.Chem.Res.47(1998)371.

[11]S.A.Haque,M.Gr?tzel,et al.,J.Phys.Chem.B104(2000)538.

[12]H.Sakane,et al.,J.Synchrotron Radiat.8(2001)674.

[13]N.Wang,H.Lin,et al.,Appl.Phys.Lett.89(2006)194104.

[14]Y.Wang,et al.,https://www.360docs.net/doc/353703642.html,mun.17(2004)1938.

[15]X.Li,H.Lin,et al.,J.Photochem.Photobiol.A:Chem.195(2008)247–253.

[16]C.J.Barbe,et al.,J.Am.Ceram.Soc.80(1997)3157–3171.

[17]N.G.Park,et al.,Adv.Mater.17(2005)2349–2353.

项目工期目标控制方法和保证措施

高铁商务区安置房建设工程 进度管理与控制措施 一、工程进度管理控制要点 为了保证工程项目按计划实施,主要从以下几方面进行控制管理: (一)制订科学合理的工期总控计划; (二)制订科学合理的阶段目标控制计划; (三)制订周密细致的材料设备采购计划; (四)制订切实可行的专业分包进场计划; (五)施工过程中制订详细的月、周、日施工计划,并进行检查、监督和跟踪,确保每一个阶段目标的实现; (六)充分协调各参建单位之间的关系,包括业主方、设计、总包、分包、监理、跟踪审计、供货商之间的关系,从而使施工中的每一个单位都不拖延,每一个环节都按照既定的计划进行。 (七)严格按照设计文件和规标准施工,推行“样板作业法”,避免不必要的返工; 二、工期计划目标控制的方法与措施 (一)合同制约法。在签订总承包或施工合同时,明确工期目标和阶段性目标及对应的奖罚措施,对承包商完成的阶段性目标进行奖励或惩罚。 (二)三级计划管理法。在工程项目实施阶段将严格执行经审核的项目总控制进度计划(一级计划)、详细进度计划(二级计划)、月周进度计划(三级计划),指挥部和监理单位定期或不定期检查施工实际进度状况,与原进度比较找出进度偏差,通过对偏差产生的原因及影响工期程度的分析,监督承包商及时采取措施调整进度并执行。在计划执行中如此循环,直至工程竣工。 (三)施工顺序科学合理化。对项目施工顺序进行科学管理,推行流水化施工,达到资源科学合理使用,以达到建设项目总体进度要求,实现项目管理合同约定的工期目标。 (四)阶段目标控制法。项目一开始就制订阶段目标计划,保证每一个阶段目标的实现。实施阶段进度控制工作涉及对工程建设各阶段的工作容、工作程序、持续时间和衔接关系,根据进度总目标及资源优化配置的原则编制计划体系并付诸实施,然后在进度计划的实施过程中经常检查实际进度是否按计划要求进行,对出现的偏差情况进行分析,采取补救措施或调整、修改原计划后再付诸实施,

简述建筑工程施工管理的过程控制

简述建筑工程施工管理的过程控制 发表时间:2018-08-20T17:02:31.617Z 来源:《红地产》2017年8月作者:陶秀勇 [导读] 随着社会经济水平的不断提高,建筑行业也正处于如火如荼的关键期,人们对建筑质量的关注度也随之提高。引言:建筑施工最鲜明的特征就是全局性与系统性,施工过程是一个环环相扣的整体,而不是一个个分散的个体,囊括了规划、设计、施工、监理等多个环节和步骤,因此必须要将这些环节连接在一起,保障施工的紧密性和完整性。这对于提高企业的竞争力、巩固建筑物质量有着重要的作用。实践证明,在施工管理中进行全过程控制是十分明智的选择,这也是市场经济下企业壮大自身的必然选择。一、施工管理控制的必要性随着市场竞争压力的不断增大,很多建筑企业都将施工管理控制作为建筑工程的一项重要环节,因此施工管理控制的地位也在不断上升,逐渐占据着关键的一席之地,究其原因,主要有以下几点。(一)核心地位施工管理控制在多年的发展中逐渐成为建筑工程项目管理的核心关键,是企业的灵魂所在,占据地位的重要性可见一斑,在施工中首先可以规范工人和员工的行为,使他们能够尽量遵照正规的施工工序进行作业,使得工程的进程能够在合理的掌控中。一般建筑市场中的老牌企业或名牌企业都会在施工管理中展现出良好的专业水平,并且还会给企业本身带来十分可观的经济效益。(二)代表企业形象有效的施工管理能够提高建筑物的质量,为施工单位在业内赢得良好的声誉,并且巩固地位,使得员工的自信心与认同感得以提升,这种潜在的品牌效益是企业获得长远利益的必要保障。 二、施工管理控制中的问题(一)缺乏完善的制度保障由于施工现场管理不善,很多施工单位都出现内部权力交叉、职责不明的现象,这是导致施工管理水平较低的直接因素。目前建筑行业一般都采取的分包原则,每个分包单位在施工任务上没有明确的划分,因此存在普遍的权利较差现象,某些单位为了赶工期、降成本,擅自将原属于自身的工作留给下一任分包单位,因此使得管理工作的难度直线提升。这些现象一直没有得到妥善处理的原因就是因为目前我国在这方面没有出台明确的法律规定保障,现行法律的执法力度较小,或者只是流于表面,使得房屋建筑质量普遍便宜,造成严重的社会安全隐患,这与可持续发展的核心理念背道而驰。(二)管理方式不够科学施工管理的直接目的就是提高建筑物的质量,因此施工单位在建设的时候首先要保证的就是建筑物的安全性能,其次还要保证外形美观大方,建筑物的实用性较强。但是很多情况下质量管理都被严重忽视了,因此施工管理的方式也不够科学。很多人都有一个看法,施工质量与成本投入之间呈正比关系。事实上,这一看法十分片面,提高建筑物的质量可以从多方面入手,并不是仅凭一味地抬高成本投入便可达到的。(三)管理人员水平欠缺科学的管理队伍是保障工程质量、加快进度的有效基础,因此施工单位要重视对企业内员工管理水平的培养工作。就目前现状而言,大多数施工管理人员都不具备专业的理论知识,一般都是由经验老道的施工人员充当的,因此在施工中遇到问题的时候无法从管理者的角度进行思考,加大了工程中出现问题的概率。建筑业的蓬勃发展要求市场中必须要配备与之相配的高水平的人才,有效解决人才与市场之间供不应求的关系,提高建筑的质量水平,这是一个循环往复不断上升的过程。三、施工管理的过程控制(一)质量控制在正式施工之前,必须要加强对文件的审核工作,审核的内容必须要涵盖到图纸、方案、预算、工程概况的勘察分析等等,在审核的过程中必须要秉持着严谨、公正的态度,对各个环节都要进行细致的分析,确保各项文件的内容符合此次建筑工程的需求。在测量工作展开的时候,注意要进行全面且细致的测量,主是针对工程附近的建筑物、自然环境、地下岩层和管道线路等等,将测量得出的数据进行整合,如果发现有失误出现要及时进行纠正,以免造成后续工作出现麻烦。此外,还要重视对施工材料的管理,严格登记材料的出入库流程,可以有效提高材料的利用效率并且减少资源浪费现象,管理人员可以从登记册上及时查看材料的库存情况,根据使用情况进行及时的采购填充,避免出现大规模的浪费现象。在采购材料的时候应当进行多次对比,从中选出性价比最优的材料,从而促进成本支出与工程质量之间的关系趋于平衡。(二)进度控制施工过程是严格受到工期的限制的,因此在对施工进行管理的时候必须要以工程的目标为前提条件,然后划分出具体的作业阶段,派遣专门的监理师对每个阶段进行监管。在施工之前必须要制定出一份合理可行的计划,并且考虑到一切可能发生的意外事件,结合实际情况进行修改和补充,使得项目施工得以在规定的时间内完成。四、结束语综上所述,施工管理控制的重要性已经不言而喻,并且由于建筑工程自身的复杂性决定了施工管理也是一个长期贯穿的过程,工程各方都要做出努力,根据工程自身的特点和情况选择合适的施工技术,使得施工质量得到有效的保障,并且施工过程的安全性也得以维护。参考文献: [1] 王慎睿 . 浅谈建筑工程施工管理的过程控制 [J]. 汕头科技 , 2011(3):46-49. [2]吕鹏.谈建筑工程施工的全过程管理[J].中国房地产业:理论版 ,2012(8):23-23. [3] 朱海鹏 ,ZhuHaipeng. 建筑工程施工管理过程中的相关控制研究 [J]. 城市建筑 ,2014(23):172-172.

2020年中国风力发电行业现状及未来发展趋势分析

2017年中国风力发电行业现状及未来发展趋势分析 风能是一种淸洁而稳定的新能源,在环境污染和温室气体排放日益严重的今天,作为 全球公认可以有效减缓气候变化、提高能源安全、促进低碳经济增长的方案,得到各国政府、 机构和企业等的高度关注。此外,由于风电技术相对成熟,且具有更高的成本效益和资源有 效性,因此,风电也成为近年来世界上增长最快的能源之一。 1、全球发展概况 2016年的风电市场由中国、美国、徳国和印度引领,法国、上耳其和荷兰等国的表现 超过预 期,尽管在年新增装机上,2016年未能超过创纪录的2015年,但仍然达到了一 个相当令人满意的水平。根据全球风能理事会发布的《全球风电发展年报》显示,2016年 全球风电新增装机容量 54.600MW,同比下降14.2%,英中,中国风电新增装机容量达 23328MW (临时数据),占2016年全球 风电新增装机容量的42.7%o 到2016年年底, 全球风电累计装机容量达到486J49MW,累计同比增长 12.5%。其中,截至2016年底, 中国总量达到16&690MW (临时数据),占全球风电累计装机总量的34.7%。 2001-2016年全球风电装机置计容量 450.000 400.000 350.000 300.000 土 250.000 W 200.000 150,000 1W.OOO 50.000 数据来源:公开资料整理 ■ ■ ■ ■ ■ 11 nUr l ■蛊计装机容蚤

按照2016年底的风电累计装机容量计算,全球前五大风电市场依次为中国、美国、徳国、印度和西班牙,在2001年至2016年间,上述5个国家风电累计装机容量年均复合增长率如下表所示: 数据来源:公开资料整理 2、我国风电行业概况 目前,我国已经成为全球风力发电规模最大、增长最快的市场。根据全球风能理事会(Global Wind Energy Council)统讣数据,全球风电累计装机容量从截至2001年12月31 日的23.9OOMW增至截至2016年12月31日的486.749MW,年复合增长率为22.25%, 而同期我国风电累计装机容量的年复合增长率为49.53%,增长率位居全球第一:2016年,我国新增风电装机容量23328MW (临时数据),占当年全球新增装机容量的42.7%,位居全球第一。 (1)我国风能资源概况 我国幅员辽阔、海岸线长,陆地而积约为960万平方千米,海岸线(包括岛屿)达32,000 千米,拥有丰富的风能资源,并具有巨大的风能发展潜力。根据中国气象局2014年公布的最新评估结果,我国陆地70米高度风功率密度达到150瓦/平方米以上的风能资源技术可开发量为72亿千瓦,风功率密度达到200瓦/平方米以上的风能资源技术可开发量为50 亿千瓦;80米高度风功率密度达到150瓦/平方米以上的风能资源技术可开发量为102亿千瓦,达到200瓦/平方米以上的风能资源技术可开发量为75亿千瓦。 ①风能资源的地域分布 我国的风能资源分布广泛,苴中较为丰富的地区主要集中在东南沿海及附近岛屿以及北部(东北、华北、西北)地区,内陆也有个别风能丰富点。此外,近海风能资源也非常丰富。 A. 沿海及其岛屿地区风能丰富带:沿海及其岛屿地区包括山东、江苏、上海、浙江、福建、广东、广西和海南等省(市)沿海近10千米宽的地带,年风功率密度在200瓦/ 平方米以上,风功率密度线平行

项目管理知识要点

项目管理知识要点项目管理的两种观点 ? 技能组 ? 管理过程 作为一组技能的项目管理体系 技能 ? 项目综合管理 ? 项目范围管理 ? 项目时间管理 ? 项目成本管理 ? 项目质量管理 ? 项目人力资源管理 ? 项目沟通管理 ? 项目风险管理 ? 项目采购管理 管理三项限制条件 项目经理对于衡量工作表现的观点: ? 按时完成 ? 按预算完成 ? 按规格完成(质量) 作为一组过程的项目管理体系 项目的定义 ? 一次性任务 ? 有明确的开始和结束时间 ? 有明确的目标、范围和预算 ? 具有唯一性

项目管理定义 传统观点: ? 使项目按时、按预算以及按规格完成(更快、更好、更便宜)? 现代观点更加关注客户的角色 项目生命周期 范围管理 项目启始: 战略计划和项目筛选 ? 项目启始阶段的第一步是看一个组织的“大图画”或战略计划? 战略计划包括确定长期商业目标 ? 项目应支持战略和财政商业目标 筛选项目的方法 ? 通常供选择的项目比可用来执行它们的时间和资源多得多 ? 遵循一个合理的过程是非常重要的 ? 方法包括关注主要需求、将项目分类、财政方法和比较打分模式关注主要组织需求 项目的三个重要标准: ? 对该项目有需求 ? 有可利用的资金

? 有很强的使该项目成功的决心 需求–需要的生命周期 ? 需求出现 ? 需求识别 ? 需求明确 ? 功能要求的建立 ? 技术要求的明确 定义需求中的缺陷 ? 处理固有的模糊需求 - 动态需求 - 顾客对他们需求的无知 - 过早地确定解决方案 ? 需求没有针对相应的顾客 - 多个客户的需求必须分开 - 评估系统分析者的歪曲及客户需求的误报 - 镀金需求 - 对顾客需求的筛选过滤 - 通过识别和明白清晰地表达需求,从而真正了解客户需求

施工过程控制程序

施工过程控制程序 编制:版本号:B -1 审核:分发号: 批准:受控状态: 发布日期: 实施日期:

目录 目录---------------------------------------------------------------------------------------1 施工过程工作流程图------------------------------------------------------------------2 1、目的----------------------------------------------------------------------------------3 2、适用范围----------------------------------------------------------------------------3 3、相关文件----------------------------------------------------------------------------3 4、术语和定义-------------------------------------------------------------------------3 5、职责----------------------------------------------------------------------------------3 6、工作流程----------------------------------------------------------------------------5 7、工作程序----------------------------------------------------------------------------5 8、竣工后的服务工作-----------------------------------------------------------------14 9、程序实施情况检查----------------------------------------------------------------15 10、记录---------------------------------------------------------------------------------16 11、修订记录表-----------------------------------------------------------------------26

2020-2025年风力发电行业市场竞争格局和产业链报告

2020-2025年风力发电行业市场竞争格局和产业链报告

目录 第一章风力发电行业概述 (3) 第一节风力发电行业定义 (3) 第二节风力发电行业特点分析 (3) 一、风力发电行业周期性特征分析 (3) 二、风力发电行业区域性特征分析 (3) 三、风力发电行业季节性特征分析 (4) 第二章风力发电行业市场竞争格局分析 (5) 第一节我国风力发电行业竞争状况分析 (5) 第二节我国风力发电行业竞争对手分析 (6) 第三章风力发电行业产业链上下游市场运行分析 (9) 第一节风力发电行业产业链介绍 (9) 第二节风力发电上下游行业发展状况对行业发展的影响 (9)

第一章风力发电行业概述 第一节风力发电行业定义 风力发电行业属于电力工业链的发电环节,其工作原理和流程是将空气动能首先通过叶轮转化为机械能,再通过发电机将机械能转化为电能,发电机组输出的电能通过升压变电站升压后输送到电网中,电网再将电能送至各用电单位。 风能是一种清洁而稳定的可再生能源,在环境污染和温室气体排放日益严重的今天,风力发电作为全球公认可以有效减缓气候变化、提高能源安全、促进低碳经济增长的方案,得到各国政府、投融资机构、技术研发机构、项目运营企业等的高度关注。相应地,风电也成为近年来世界上增长最快的能源。 第二节风力发电行业特点分析 一、风力发电行业周期性特征分析 就行业周期性而言,影响风电行业发展的主要因素是风资源、国家政策和电网条件,现阶段本行业正处于持续稳定发展期,无明显的行业周期性。 二、风力发电行业区域性特征分析 就行业的区域性而言,我国风电场项目具有区域性的特点,主要集中于风资源比较丰富的内蒙古、新疆、甘肃、河北、山东等省份。未来,随着低风速风机的成熟和应用,本行业的区域性特征将进一步减弱。

项目管理9个要点

工程项目管理细节与执行力的思考 摘要:工程项目是企业生存最重要的载体,是企业发展最重要的根基。项目管理是一项周密,细致,全面的管理工作,施工中往往因为一些细微的工作或运作不当造成失误以至于影响项目工程终结成果,影响盈利的企业创出最大化。 关键词:工程项目项目管理执行力 多年来,经过施工企业的努力探讨和整合,项目管理已经有了较规范的管理办法。但是在项目细节管理和强化执行力方面依然存在一定的柔弱环节。众所周知,细节决定成败,细节说到底是执行力的问题,执行力就是系统是否规范和合理,人员素质和理解能力是否合拍的结果。细节是周密的制度、流程、计划环节的组成,是管理最终需要的结果。细节落实到管理工作中,其实就是过程制度化的具体表现。而管理部分中的涵盖的计划制定、组织实施、绩效考核即组成了完整的执行力部分。下面从项目微观管理角度的“九个到位”,阐述细节和执行力对搞好项目的重要作用。 一、项目管理制度、规范的运行规则要到位 建立起规范的项目管理机制和运行机制,用制度管理项目,这是夯实项目管理的基准点。应根据《工程项目管理标准》在一开始制定出合同管理、技术管理、质量管理、施工安全、设备管理、物资采购、验工计价、环境保护、员工培训及奖罚措施等一系列管理制度,从不同角度、不同侧面,规范了对施工生产过程的严格控制,使各工序、各岗位有章可循,有责可查,违章必究。 二、资源配置优化管理到位

注重人力资源的有效合理运用,精干,高效,一专多能,人员做到0冗员;机械做到0闲置。注重项目部是临时性的施工管理机构有三个一次性的特点,即:一次性的法人授权管理,一次性的组织机构管理,一次性的成本管理。以及工程项目的高速度、高效率的特点。对作业层实行的是劳务人员承包为主体管理,这种特殊的劳动关系,确定了必须按项目法进行组织管理,以契约性合同进行约束。首先经理部建立起以项目经理负责制为中心的集体领导体制,经理部对公司认真履行“内部成本责任制”,签订承包合同,并施行风险共担,采取风险抵押金制。根据成本和上缴款完成情况进行奖罚兑现;对业主认真履行中标合同,确保工期质量;项目经理内部管理层都施行了全员聘任制,由项目经理选聘,按岗设职,按职付酬,按政绩考核奖罚。对作业层视工程大小难易采取一级半管理或一级管理直插工班形式,按工程项目所需组织专业作业队,负责现场施工作业;所需设备均为租赁方式,按完成工程量对作业队承包。从而形成了“扁平化”、精干高效的管理制度。 三、外协施工队伍管理到位 选好合作队伍,在激活潜力上做文章,按工程所需外聘外协施工队伍。并把加强外协队伍的管理作为项目管理的重要内容之一,注意了以下几点原则。 第一、选择有一定资质和施工能力,又有信誉的整建制施工队伍,编入经理部纳入统一管理。逐步实现工人和民工的管理0差距。 第二、定好合同。必须坚持先签合同后进场原则,工程发包做到0水分,力求做到横向可比,纵向到底。根据中标合同总包价,提取一定的管理费用、税金、质量保证金,材料供应、设备租赁费用等若干比例,一次包死,签订合同,按工程进度、分期计价结算,工程完后及时清算退场。 第三、坚持“双赢”。按市场规律办事,确定“双赢”目标是经理部始终坚持的经营理念。项目管理的最终结果是获取盈利,而作为施工主体的外协队伍也必须有一定的盈利空间,否则既

建筑工程施工过程质量控制要点

工程施工过程质量控制点 A 结构工程质量控制点 A.1土方开挖工程 1.【控制点】 (1)对定位放线的控制 (2)基底超挖。 (3)基底未保护。 (4)施工顺序不合理。 (5)开挖尺寸不足,边坡过陡。 (6)未设置排水沟、集水井,或采用井点降水。 (7)基坑高边坡未保护。 (8)深基坑未编制专项施工方案。 2.【预防措施】 (1)对定位放线的控制 场地平整应经常测量和校核其平面位置、水平标高和边坡坡度是否符合设计要求。平面控制桩和水准控制点应采取可靠措施 加以保护,定期复测和检查;土方不应堆在边坡边缘。 (2)基底超挖 根据结构基础图绘制基坑开挖基底标高图,经审核无误方可使用,需要和设计管理部确认地面构造做法,避免总包单位施工 时由于超挖导致的回填。土方开挖过程中,特别是临近基底时, 派专业测量人员控制开挖标高。 (3)基底未保护 基坑开挖后尽量减少对基土的扰动,如基础不能及时施工时,应预留 30cm 土层不挖,待基础施工时再开挖。 (4)施工顺序不合理。

开挖时应严格按审核通过的施工方案规定的顺序进行,先从低处开挖,分层分段,依次进行,形成一定坡度,以利排水。 (5)开挖尺寸不足,边坡过陡 基底的开挖宽度和坡度,除考虑结构尺寸外,应根据施工实际要求增加工作面宽度,同时放坡坡度需要根据边坡土层(岩层) 的不同来确定坡率。 (6)未设置排水沟、集水井,或采用井点降水 在软土地区基坑开挖深度超过3m,尤其是地下水丰富或者水头较高的地区,一般就要用井点降水。开挖深度浅时,亦可边开挖边用排 水沟和集水井进行集水明排。 (7)基坑高边坡未保护 结合边坡土层(岩层)、施工周期及施工季节(是否雨季)确定高边坡的保护方案。常用基坑坡面保护方法有:1.薄膜覆盖或砂浆 覆盖法。2.挂网或挂网抹面法3. 喷射混凝土或混凝土护面法4. 土 袋或砌石压坡法 (8)深基坑未编制专项施工方案 根据现场情况和地勘设计提供的资料,编制深基坑专项施工方案, 该方案需要报监理和甲方审批。甲方需要结合项目实际情况,重 点把控成本、进度和安全。 A.2地下防水 1.【控制点】 (1)材料选择。 (2)空鼓。 (3)渗漏。 (4)施工缝位置处理 2.【预防措施】 (1)材料选择

建设项目成本控制要点最新版

建设项目成本控制要点 房地产业内的竞争不断加剧,利润空间日渐缩小,但投资总是期望获得最大回报,成本控制是达到总体回报非常重要的一个方面,有效的成本控制,已经成为提升企业竞争的核心来源,成本控制是项目管理的重中之重。现在项目管理的投资控制方面,最明显的一个缺点就是:成本控制的各个环节没有相应的控制措施或是措施不到位,致使工程项目在建设过程中无法进行投资偏差分析与控制,只是在工程竣工结算完成时才知道一个工程项目投入了多少,是否投资超限?不知谁知道;比如:某个开发项目,计划总投资是多少?其中的基础、主体、钢构、屋面、门窗、装饰、上下水、电器、暖通、市政配套、环境绿化等各个分项的计划投资、已完成投资、未完成投资各是多少?项目延期造成的成本增加额是多少?投资偏差是多少?如何进行纠偏?等等各个主要数据和控制环节,我们全公司又有谁能说个明白?全公司的开发项目又有哪几个项目做了投资估算、设计概算和施工图预算,以及项目实施过程中的纠偏行为,没有这些相关数据和相应的措施在项目实施过程中又何谈成本控制、预算管理?。我以项目开发的各个阶段来粗略说明项目成本控制的要点如下,望同仁们在项目的开发建设过程中得到一点借鉴,来弥补我们在成本控制方面细节管理不到位的缺陷。 一、项目投资决策阶段 1利用足够的时间按照正常程序细心进行项目可行性研究报告的编制工作,打破只是将报告作为资料报建、存档的坏习惯。此期间,需要充足的相关数据资料和工作时间,万万不可急于求成,不加细致的分析和优化,特别是其中的市场调查、技术方案、投资估算、融资方案、财务评价、风险分析方面的内容。 2科学开展项目投资估算的编制与审核工作。投资估算是拟建工程编制项目建议书、可行性研究报告的重要组成部分,同时是项目决策的重要依据之一。

施工过程管理控制程序(新编版)

( 安全管理 ) 单位:_________________________ 姓名:_________________________ 日期:_________________________ 精品文档 / Word文档 / 文字可改 施工过程管理控制程序(新编 版) Safety management is an important part of production management. Safety and production are in the implementation process

施工过程管理控制程序(新编版) 1.目的 对直接影响工程施工质量、环境、职业健康安全的施工管理全过程进行有效的控制,确保满足合同要求。 2.范围 本程序适用于公司所承建的工程项目施工过程的质量、环境、职业健康安全控制。 3.职责 3.1投标管理部负责工程合同交底; 3.2项目中心负责施工准备、施工过程、项目组建与收尾的检查、监督、组织、协调工作。 3.3项目监察部负责工程质量、环境安全、文明施工现场管理的检查与监督; 3.4劳务管理部负责劳务分包方的考评;

3.5采购管理部负责供应商、专业分包的考评; 3.6项目经理负责施工准备和施工过程的组织实施工作以及对分包方的管理。 4.工作程序 工作流程图:详见流程图一 4.1范围管理 4.1.1项目中标后按照公司招标文件、投标报价、投标承诺的内容进行项目交底,明确施工范围。 4.1.2项目部依据交底范围进行核对,识别投标范围与施工现场状况的不同,并及时进行沟通,采取相应措施予以补充或明确。 4.1.3项目部就施工范围进行分解,并制定范围控制措施,责任到人。 4.1.4项目部要进行范围变更管理。 4.2项目规划管理 4.2.1项目规划大纲由项目中心总经理组织相关部门进行编写。祥见项目管理手册《项目规划管理程序》

工程项目管理要点

工程项目管理要点 工程项目管理可简单概括为“四控、二管、一协调”七部分。 “四控”指“进度控制”、“质量控制”、“成本控制”、“安全文明施工管理控制”“二管”指“合同管理”、“信息管理”“一协调”指对“项目的协调管理”。 一、进度控制——进度控制目标、主要控制计划、进度控制措施1、进度控制目标根据项目发展计划及扩初设计图纸确定项目总控制目标、阶段控制目标。2、主要控制计划根据进度控制目标制定主要控制计划包括总进度控制计划、工程招标计划、物料采购计划、物料样板审定计划、承包商进场计划、施工图纸交付计划、甲供材料进场计划、资金使用计划、工程验收计划、工程报批报建计划的编制工作。3、进度控制措施根据总进度计划工程的实际进展要求承包商编制每周每月计划监督监理单位检查施工单位的进度计划及完成情况检查现场作业面劳动力、机械设备、材料的到位情况进度款是否专款专用对周、月及总进度控制计划与实体实际进度进行对比分析进度滞后的原因针对影响进度的因素前瞻性地采取措施及时报批报建、合理安排工序穿插解决图纸、限价、甲方分包、甲供材料等甲方需协助的问题。 二、质量控制——质量控制目标、质量控制措施1、质量控制目标在评审招标文件和合同条款中注意有关质量和现场配

合的条文的审核确立明确的质量目标。在施工过程中按照合同规定和规范的要求督促监理单位和施工单位严格履约实现质量目标。2、质量控制措施采取事前控制、过程监控、事后控制的管理措施a、事前控制根据工程特点、质量控制目标编制《工程管理指导书》对容易出现投诉的质量问题要编制有效预防措施。严格审查监理、承包商报审的《监理规划》、《监理细则》、《施工组织设计》以及重点分项工程的施工方案和技术措施。开工前督促监理单位组织施工图纸会审和技术交底组织向监理、施工单位作设计变更的技术交底和实施b、过程监控测量及定位放线的监控项目部负责向施工单位提供施工现场附近的国家定位放线基准坐标点及高程控制点并要求监理单位对施工单位的定位放线情况进行严格校核复验。重要材料、设备的质量监控对于甲供材料、设备必须严格审核招标文件和合同条款对于乙供材料必须在施工合同或限价过程中给予必要的质量要求描述。所有进场材料根据规范要求查看材料设备的准用证、合格证、检验报告监理对于部分材料必须进行有见证送检未经检验合格的材料不得使用。发现不合格品时予以退货并考虑向供应商索赔。隐蔽工程及重要和关键工序的监控项目部应坚持经常性的质量检查制度对隐蔽工程及重要和关键工序如桩基工程、重要部位的砼浇灌、防水工程、装修工程等要会同监理单位到施工现场进行检查。对不合格工程要求监理工程师填写《整改通知单》限期整改。施工中间验收监控在需进行中间验收的分部工程完工后项目部按

建筑工程施工管理过程中质量控制

浅谈建筑工程施工管理过程中的质量控制摘要:随着我国国民经济的发展,社会基础以及居民设施建设的不断增长,建筑工程施工质量问题得到社会普遍关注。本文将对建筑工程在施工管理的过程中质量问题进行较为深入探讨。 关键词:建筑工程;施工管理;质量 abstract: with the development of our national economy, the social basis of the construction of facilities and residents is constantly increasing, construction engineering construction quality problem get social universal attention. this paper will be of construction projects in the process of construction management quality problems are further discussed. keywords: building engineering; construction management; quality 中图分类号:tu71文献标识码:a 文章编号: 建筑工程中的质量问题是关系到民生的重大问题,其在工程中的设计、管理、实施等的任何一个小的细节都将影响整个工程的整体质量。随着建筑工程的项目的快速增长,施工队伍以及建筑材料生产企业的增长也得到了极大的推动。但是由于建筑水平和建筑项目本身就具有多样性和复杂性,面临各个施工队伍内部管理水平参差不齐,不能对建筑工程中的建筑质量问题和安全问题作出有效的

施工过程管理控制程序(标准版)

When the lives of employees or national property are endangered, production activities are stopped to rectify and eliminate dangerous factors. (安全管理) 单位:___________________ 姓名:___________________ 日期:___________________ 施工过程管理控制程序(标准版)

施工过程管理控制程序(标准版)导语:生产有了安全保障,才能持续、稳定发展。生产活动中事故层出不穷,生产势必陷于混乱、甚至瘫痪状态。当生产与安全发生矛盾、危及职工生命或国家财产时,生产活动停下来整治、消除危险因素以后,生产形势会变得更好。"安全第一" 的提法,决非把安全摆到生产之上;忽视安全自然是一种错误。 1.目的 对直接影响工程施工质量、环境、职业健康安全的施工管理全过程进行有效的控制,确保满足合同要求。 2.范围 本程序适用于公司所承建的工程项目施工过程的质量、环境、职业健康安全控制。 3.职责 3.1投标管理部负责工程合同交底; 3.2项目中心负责施工准备、施工过程、项目组建与收尾的检查、监督、组织、协调工作。 3.3项目监察部负责工程质量、环境安全、文明施工现场管理的检查与监督; 3.4劳务管理部负责劳务分包方的考评; 3.5采购管理部负责供应商、专业分包的考评;

3.6项目经理负责施工准备和施工过程的组织实施工作以及对分包方的管理。 4.工作程序 工作流程图:详见流程图一 4.1范围管理 4.1.1项目中标后按照公司招标文件、投标报价、投标承诺的内容进行项目交底,明确施工范围。 4.1.2项目部依据交底范围进行核对,识别投标范围与施工现场状况的不同,并及时进行沟通,采取相应措施予以补充或明确。 4.1.3项目部就施工范围进行分解,并制定范围控制措施,责任到人。 4.1.4项目部要进行范围变更管理。 4.2项目规划管理 4.2.1项目规划大纲由项目中心总经理组织相关部门进行编写。祥见项目管理手册《项目规划管理程序》 4.2.2项目实施规划是依据项目规划大纲要求进行编写,主要内容有:工程概况、项目组织、施工目标、经营管理规划、文明施工及临设布置、进度管理策划、技术质量策划、物质管理策划、安全管理策

施工过程安全管理控制程序正式版

Through the joint creation of clear rules, the establishment of common values, strengthen the code of conduct in individual learning, realize the value contribution to the organization.施工过程安全管理控制程 序正式版

施工过程安全管理控制程序正式版 下载提示:此管理制度资料适用于通过共同创造,促进集体发展的明文规则,建立共同的价值观、培 养团队精神、加强个人学习方面的行为准则,实现对自我,对组织的价值贡献。文档可以直接使用, 也可根据实际需要修订后使用。 1目的 为确保在施工程作业中的危害因素被有效控制,确保员工健康安全、财产不受损失。 2适用范围 本程序适用于工程处所有在施工和生产加工场所的现场作业安全监督。 3 职责 3.1技术发展科是本程序的主控部门,负责对施工过程安全措施、安全技术方案、安全技术交底进行审核。 3.2质量安全科对施工现场的安全生产

情况进行定期、不定期的检查和抽查。 3.3生产经营科负责外埠施工队伍的资质审查。 3.4人力资源科负责外埠施工队伍人员的教育培训。 3.5项目经理部负责制定本项目部施工现场的安全措施、安全技术方案的制定,并对职工进行安全技术交底,组织落实已批准的安全技术方案和安全措施。 4工作程序 4.1安全资质管理 4.1.1为确定承建者的安全生产能力,保证施工过程安全并符合法律要求,开工前或与相关方签订合同前必须进行资质审核。

工程管理过程控制程序.doc

工程管理过程控制程序 1 目的 通过对施工单位、监理单位以及外部接口单位的协调和控制,保证房地产开发如期完成,并确保施工质量、进度和成本等各项指标的实现。 2 适用范围 适用于房地产开发过程中工程施工过程的控制。 3 职责 3.1 项目工程部负责工程管理具体实施过程的控制。 3.2 总工程师办公室负责提供技术方面的指导和支持。 3.3 规划设计部、工程成本管理部等相关部门进行协助。 4 工作程序 4.1 施工准备 4.1.1 项目工程部须为施工做好以下准备工作: 4.1.1.1 在项目开工前委托勘探单位进行地质勘查,根据设计要求组织试成桩及静载试验,以便为设计提供技术参数; 4.1.1.2 负责委托施工现场的临时施工道路、施工用水、施工用电、场地排水的设计,设计方案须经集团公司总工程师办公室审核; 4.1.1.3组织实施临时工程并进行验收,验收须填写《临时工程施工质量验收记录》; 4.1.1.4 委托勘测单位进行定位、放线,委托规划部门进行灰线验收; 4.1.1.5 对小区总体控制的水准点、坐标点进行严格保护,记录技术参数,并定期检查水准点、坐标点的保护情况; 4.1.1.6 参与对监理、施工、材料等各供方的考察和评价工作,参与各分包合同的编制和评审工作。 4.1.2 项目工程部负责检查监理单位的施工准备工作。 4.1.2.1 根据监理单位提交的监理人员名单,检查其人员到位情况,是否已配备足够的各专业技术人员,并要求监理单位提供监理人员上岗证明复印件; 4.1.2.2 检查监理公司是否已针对分部、分项工程的施工特点拟定监理细则,审查监理提交的监理规划和监理细则,并将审查意见填写在《监理规划、监理细则审批表》上,以书面形式反馈给监理单位。监理细则由项目工程部负责人审批,监理规划须经集团公司总工程师办公室审核; 4.1.2.3 对监理单位施工前准备工作的检查结果须填写在《监理公司施工前准备情况检查表》上,后附监理人员上岗证明复印件。

中国风力发电的发展现状及未来前景.

中国风电发展现状及前景 前言 随着能源与环境问题的日益突出,世界各国正在把更多目光投向可再生能源,其中风能因其自身优势,作为可再生能源的重要类别,在地球上是最古老、最重要的能源之一,具有巨大蕴藏量、可再生、分布广、无污染的特性,成为全球普遍欢迎的清洁能源,风力发电成为目前最具规模化开发条件和商业化发展前景的可再生能源发电方式。 风,来无影、去无踪,是无污染、可再生能源。一台单机容量为1兆瓦的风电装机与同容量火电装机相比,每年可减排2000吨二氧化碳、10吨二氧化硫、6吨二氧化氮。随着《可再生能源法》的颁布,中国已把风能利用放在重要位置。 一、国内外风电市场现状 1.国外风机发展现状 随着世界各国对环境问题认识的不断深入,可再生能源综合利用的技术也在不断发展。在各国政府制订的相应政策支持和推动下,风力发电产业也在高速发展。截至2011年底,世界风电装机量达到237669MW,新增装机量43279MW,增长率22.3%,增速与2010年持平,低于2009年32%的增速。由表一,可以看出中国风电装机量62364MW,远远超过世界其他各国装机量,而德国依然是欧洲装机量最多的国家。从图表三中,很明显的看出,从2001年到2004年,风电装机增速是在下降的,2004年到2009年风电有处于一个快速发展期,直到近两年风电装机的增速又降为22%左右,可见风电的发展正处在一个由快速扩张到技术提

升的阶段。 图表 1 世界风电装机总量图 图表 2 世界近10年新增装机量示意图

图表 3 世界风电每年装机量增速

图表 4 总装机量各国所占份额

图表 5 2011年新增装机量各国所占份额 2.国内风电发展现状 中国的风电产业更是突飞猛进:2009年当年的装机容量已超过欧洲各国,名列世界第二。2010年将新增1892.7万kW,超越美国,成为世界第一。2011年装机总量到达惊人的62364MW。在图6中可以看出,中国风电正经历一个跨越式发展,这对世界风电的发展起到了至关重要的作用。然而,图8 中,我们能够清楚的看出自2007年以后,虽然新增装机量很大,但增速却明显下降,而其他国家,比如美国、德国,这些年维持着一个稳定的增速。由此,我们应该意识到,我国风电,尤其是陆上风电,正在进入一个转型期,从发展期进入成熟期,从量的追求进入到对质的提升。 图表 6 中国每年风电装机量示意图

施工过程控制管理

施工过程控制管理 一.质量控制点的设置及控制 首先由项目技术负责人将质量控制点的具体内容和要求向施工员、质检员及操作班组进行交底,然后操作班组严格按规范和质量控制点的具体控制要求进行施工。根据规范自检后,由质检员请监理、建设单位验收认可签字。 主要质量控制点的设置有: 钢筋绑扎工程的质量控制点设置、砌筑工程质量控制点设置 防水工程质量控制点设置 以上质量控制(管理)点的设置的具体如下: 钢筋绑扎工程质量控制点设置

屋面找平层质量控制点设置

屋面防水工程质量控制点设置 二.特殊过程质量控制 (一)轴线测量: 定位轴线测量采用FDTL2CL激光经伟仪,测量时沿建筑外围轴线进行闭合校核,定位轴线测设完毕后应请建设、监理、规划部门进行复核。 轴线定位后向基坑外引出轴线控制桩,对轴线控制桩进行可靠的保护,注意

控制桩的保护。 基础施工完后应及时将各主控轴线投测到一层楼面上并在一层楼面混凝土上弹放出和相关关键轴线。 上部楼面的轴线用激光经伟仪进行投测,减少误差,激光经伟仪安置于需引测的纵横向轴线相交点上,照准轴线相交点向上投测,上部各层轴线投测均以一层轴线为投测依据以免误差积累。 轴线投测后先弹出主控轴线,用钢卷尺对所引测的轴线间的距离测量是否符合设计尺寸或首层尺寸,符合后在进行基它轴线的划分。 仪器使用前应先检查其有无异常,以免产生误差,测量的钢卷尺妥善保管以免丢失或损坏,每一个单位工程自始至终使用同一把量具进行测量。 (二)水平标高测量: 长距离向施工现场内引测水准点时采用等视距法进行永久水准点的引测,并用回测法进行校核,在施工现场内设置永久水准点,采取可靠措施加强保护,以防破坏。 施工至±0.00后,根据现场内永久水准点的高程和±0.00高差,将±0.00高程测设于建筑物和施工段的两个不同部位,校核准确后作为向上引测的依据水准点。 每一施工楼层的标高均用钢卷尺从该两点向上传递至目标楼层后均需对此两个引测点进行控制,水准测量过程中以该两点为依据进行校核。 (三)砼配制强度: 对砼原材料进行严格把关,原材料进场后按建筑材料的检验规定进行检验,并按要求进行复试,合格合方可使用并做好检验状态的标识以免误用。

风力发电行业过去历史

风力发电行业过去历史、现状、未来趋势以及对社会的贡献、 危机 (第六组) 摘要;风能是近期内最具大规模开发利用价值的可再生能源,对环境保护和社会可持续发展有重要意义,每年以30%以上的速度增长。世界许多国家都投入了大量的人力和资金用于研制现代大功率风力机,中国也在国家科技攻关项目、产业化项目和“863”项目中列入,可以预计,风力发电将会有迅速的发展。风能利用有几千年的历史,但用科学的方法研制风力机还是近20年的事。本文从风力发电简史,风力发电的现状,风力发电中的科研,风力发电的发展趋势和贡献危机方面进 行了详细介绍和探讨。 风能是最具商业潜力、最具活力的可再生能源之一,使用清洁,成本较低,取用不尽。风力发电具有装机容量增长空间大,成本下降快,安全、能源永不耗竭等优势。风力发在为经济增长提供稳定电力供应的同时,可以有效缓解空气污染、水污染和全球变暖问题。在各类新能源开发中,风力发电是技术相对成熟、并具有大规模开发和商业开发条件的发电方式。风力发电可以减少化石燃料发电产生的大量的污染物和碳排放。大规模推广风电可以为节能减排做出积极贡献关键字;风力行业、发展、贡献、危机 一、风力发电广义定义

风力发电技术是把风能转变为电能的技术。通过风力发电机实现,利用风力带动风车叶片旋转,再透过增速机将旋转的速度提升,来促使发电机发电。 二、风力发电行业发展趋势 (一)风力发电过去历史发展 (二)风力发电现状 进入21世纪,全球可再生能源在不断发展,而在可再生能源中风能始终保持最快的增长态势,并成为继石油燃料、化土燃料之后的核心能源,目前世界风能发电厂以每年29%的增长速度在发展,根据全球风能协会(GWEC)的统计,至2009年底,全球风力发电机总装机容量达74.2GW,较2008年的59.1GW增长27%, 我国风电事业起步较晚,但是基于国家政策和资金的支持,风力发电得到了快速的发展。我国从70年代开始进行并网 型风力发电的尝试。1983年山东荣成引进3台丹麦55kW风力发电机组,开始了并网型风力发电技术的试验与示范;1986年,新疆达坂城安装了1台丹麦100kW风力发电机组;1989年安装了13台150kW风力发电机组;内蒙古安装了5台美国100kW风力发电机组,开始了我国风电场的运行实验与示范。 1996年底总装机容量为5.7676万kW;1997年在国家

相关文档
最新文档