lifting a wheelchair
Report Team5
Author: Yuan Chenxiao Chen Hao Qian Yizhou Wang Siyuan
He Xin
Title page Lifting a wheelchair
Report
Team name:Best Team members:
Mr Yuan 151********
Mr Chen 151********
Mr Qian 151********
Mr Wang 138********
Mr He 150********
SMU
2009.04.13
Shanghai
Table of contents Preface (4)
Formulation phase (5)
Concept design phase (6)
Functions&sub-functions (6)
Morphologic-view (7)
Concept design phase (continuation) (8)
Sketches of each concept (8)
Comparison (10)
Configuration design phase (11)
Parametric phase (12)
Team rules (13)
Appendix (14)
Preface
Nowadays, most of us are enjoying our happy life. Unfortunately, we see a large number of disabled around us. If a teacher had something wrong with legs, it would be so difficult for him or her to walk up to the platform. Especially the teacher has to move with a wheelchair, it will be more inconvenient. Just like Mr.Mouw. So, we think it is necessary and important to make a machine to lift a wheelchair. Below, we will introduce our designs.
Customer requirements
1 After service 5 Durable
2 Cheap 6 Convenient and light
3 Good quality 7 Multifunctional
4 Beauty out look 8 Environmental Company requirements
1 Low cost 5 Space saving
2 High profit 6 Environmental
3 Quantity production 7 Easy to transport
4 Satifited customers 8 Commercioganic
Functions&sub-functions
Morphologic-view
concept A concept B concept C
Solution 1 Solution 2
Solution 3
Starting mode Sound control
Remote control
Auto-induction
Lifting
Automatic lift
Slope Automatic pedrail Security Guardrail Skid
resistance surfacing
Padlock Installation Settled Underground Folding
Sketches of each concept
Underground
Skid resistance surfacing
Automatic lift B
Sound control
Slope
Fixed
Padlock
A
Remote control
Automatic pedrail
C
Folding
Skid resistance surfacing Auto induction
Comparison
Concept A Concept B Concept C Customer requirements (choose 5 points from page)
1.Low price 3 2 1
2.Good quality 2 3 1
3.Beauty outlook 1 3 2
4.Convenient 2 3 1
5.Durable 2 1 3 Company requirements (choose 5 points from page5)
1.low cost 1 2 3
2.High profit 1 2 3
3.Space saving 2 3 1
1 3 2
4.Quantity
production
https://www.360docs.net/doc/3612369272.html,mercioganic 2 3 1
Total points 17 25 18 Conclusion: concept B is the best
Configuration design phase
Parametric phase
Team rules
1.Everyone in the team should obey all the rules.
2.Don’t be late or absent.
3.Don’t be angry when discussing.
4.United and teamwork.
5.Learn from each other and help each other.
6.Behave as gentlemen.
7.No drinking and no smoking.
8.Time is aside during every meeting for rest.
9.Meeting should be finished on time.
Appendix Website for reference:
Special thanks:
Mr. Mouw
Ruud Baaijens