工程变更通知单范本

工程变更通知单范本

工程项目变更单

产品变更通知单模版

供应商填写 制造商名称 Supplier 提交日期 Submission Date 通知单版本 PCN Version 供应商联系人 Supplier Interface 电话 Tel Email 变更主题 PCN Topic 变更评审成员 Chang Review Team (供应商内部) (From Supplier) 名字(Name)/职责(Position) 产品变更类 型 Change Type [ ]物料停产(Discontinue production) [ ]设计变更(Design change) [ ]规格及性能参数(Specification and performance parameter) [ ]生产制程(Process change) [ ]质量/可靠性(Quality /Reliability) [ ]重要器件和物料(Key component and material) [ ]外观(Form) [ ]包装/运输(Package/Shopping) [ ] 生产地Manufacture Area transfer [ ]标识Label [ ]其它(Other) 厂家型号是 否变更 Manufacture Model Change or Not [ ] Yes 变更前型号 Manufacture Model Before Change 变更后型号 Manufacture Model After Change [ ]No 器件规格书是 否更新Product Specification change or not [ ] Yes [ ] No 产品净重是否 变更 Product weight Change or Not [ ] Yes 变更后产品净重(净重变更超过3%需体现) product weight after change (only for Weight change over 3%) [ ] No 受影响的华为 编码(编码过多 可附清单) Affected Huawei part number(or attachment if necessary) 序号 No. 华为编码 HUAWEI part Number 厂家型号 Manufacture Model 序号 No. 华为编码 HUAWEI part Number 厂家型号 Manufacture Model 1 4 2 5 3 6 一、变更原因(Change Reason): 二、变更前后对比(Detailed Change Description): 变更前(必要时可附档说明)Before Change ( attachment if necessary)变更后(必要时可附档说明,在此给出PCN生效,最后接单,最后出货三个时间) After Change (attachment if necessary, Please clarify change effective date. The last order receipt date and last delivery date ) 三、影响度分析Affected Analysis:

设计变更通知单1

设计变更通知单 工程名称陈蛮庄煤矿福利楼与副井井口 房间连廊工程 专业名称 设计单位名称济宁视线广告装饰有限公司日期2012.1.1 序号图号变更内容 在施工过程中,根据矿方安全生产需要,应甲方要求,原连廊造型、 结构、装饰装修、全部更改。 后附变更前后设计详图。 施工 单位 项目负责人:(公章) 建设 单位 现场监管负责人 项目负责人:(公章)

工程签证单 工程名称:陈蛮庄煤矿福利楼与副井井口房间连廊工程 内容: 1、应甲方要求设计图纸变更,原图纸所用玻璃材料已经定做完毕共计305m2,全部不能使用 2、应甲方要求设计图纸变更,原图纸所用型钢材料已经全部到场其中250*150*8mm为7支,150*150*8mm为16支,150*200*8mm为5支,150*100*6mm为18支,100*100*6mm 为15支,更改后型钢材料所用量是150*150*8mm为20支,150*100*6mm为10支,150*200*8mm为5支,作废250*150*8mm 材料7支,150*100*6mm 8支,100*100*6mm 15支,增加150*150*8mm材料4支。 3、应甲方要求设计图纸变更,原工程量完成为:型钢框架全部焊接安装完成,连接底梁焊接安装完成,横梁全部下料完成,所有型钢刚才两遍除锈完成,两遍防锈漆喷涂完成。 4、应甲方要求设计图纸变更,拆除量为:原型钢框架拆除、切割下料。 5、因甲方副井井口房防渗水回填土窝工市场价人工9人*2.5天。 6、因甲方提出方案更改窝工市场价人工9人*3天。 建设单位: (公章) 年月日监理单位: (公章) 年月日 施工单位: (公章) 年月日

设计变更通知单

设计变更通知单设计变更通知单 工程名称:昆明子君山生态旅游运动及配套工程项目办公用房建设工程 建设单位:云南宗逸置业有限公司 施工单位:华泰建设工程有限公司 变更缘故和内容: 1、圆形花池高度调整为360mm ,宽度调整为370mm 。 2、方形树池高度300mm 调整为240mm 。 3、屋顶横向山墙(1-10 轴)圈梁处,砖砌体向上提高180mm ,构造柱相应提高,构造柱钢筋焊接锚入上部圈梁钢筋,浇筑圈梁砼高度可进行微调,以便檩条在同一水平面上。 4、(1)-(2)轴B轴处取消门安装,门洞口保留,(2 )A-B轴处砌筑120 砖墙至窗顶,抹灰刷白(同室内饰面)。 5、原瓷砖800800 部分(包含其他公司办公室),除大厅及走廊不变,其余部分改为木地板,木地板踢足线相应改为木质踢足线,木地板铺设预留厚度为15mm 。800800 瓷砖四周边设波打砖。 6、茶水间瓷砖改为800800。 施工单位意见:________________ ___ 年__ 月 __ 日 设计单位意见:________________ ___ 年__ 月 __ 日 监理单位意见:________________ ___ 年__ 月 __ 日 建设单位意见:________________ ___ 年__ 月 __ 日

第二篇:设计变更通知 单 通知日期:年月日编号: 工程名称 建设单位 设计图号 施工单位

变更缘故: 变更内容: 设计变更人 项目设计负责人 设计单位 (签名) (签名) (公章) 年月日 第三篇:设计变更通知单 工程名称:编号:

项目名称 项目编码单项工程 建设单位单位工程 提出单位

设计变更通知单四篇

设计变更通知单四篇篇一:设计变更通知单 工程名称原施工图编号 变更部位变更设计图号 变更原因变更设计内容

设计单位:批准:(盖章) 审核: 设计: 年月日

篇二:设计变更通知单设计变更通知单 表C2—3 编号 05-C2-001 工程名称前门东区20XX年修缮工程专业名称 给排水及采 暖 设计单位名 称 北京建工建筑设计研究院日期20XX-10-26 序号图号变更内容 1、前门东区20XX年修缮工程大江胡同83号采暖 用管≥40使用热镀锌钢管,保温使用50mm聚氨酯, 外做玻璃钢保护层。 签 字 栏 建设单位监理单位设计单位施工单位

1、本表由建设单位、监理单位、施工单位和城建档案馆各保存一份。 2、涉及图纸修改的必须注明应修改图纸的图号。 3、不可将不同专业的设计变更办理在同一份变更上。 4、“专业名称”栏应按专业填写,如建筑、结构、给排水、电气、通风空调等。

篇三:设计变更通知单 工程名称漯河市双汇广场景观工程设计单位南京南华建筑设计事务所 变更部位篮球场结构施工单位河南水利建筑工程有限公司 变更原因和内容: 1、篮球场设计标高59.14m,其结构层厚24cm,也就是说结构层底标高应为58.90m,而实际原有地面(旧篮球场)高为58.82m,即现地面到结构层底还有8cm,其厚度不是一个结构层,为此基底采取加大碎石垫层的做法,即篮球场原设计为10cm 碎石垫层改为18cm厚碎石垫层。 2、另外考虑到混凝土基础极易受温度的变化而开裂、变形经甲方、现场监理、设计共同研究决定将篮球场砼基层改为沥青混凝土基层。 3、篮球场的东侧、北侧、西侧增加排水沟,南侧增设300×500×80厚砼路侧石。 4、排水沟在东西两侧用Ф150PVC管与主排水连接,长度分别为。 4、篮球场围网围在排水沟的外侧,结构不变,平面尺寸为52.66+52.66+37.66+37.66=180.64m。 5、增加灯光球场照明灯12盏,专用线路长米,配电箱一个。 6、双层坐凳观光台28米,两用垃圾箱6个。 其结构详见附图。

设计变更通知单

设计变更通知单 设计变更通知单 工程名称:昆明子君山生态旅游运动及配套工程项目办公用房建设工程 建设单位:云南宗逸置业有限公司 施工单位:华泰建设工程有限公司 变更缘故和内容: 1、圆形花池高度调整为360mm,宽度调整为370mm。 2、方形树池高度300mm调整为240mm。 3、屋顶横向山墙(1-10轴)圈梁处,砖砌体向上提高180mm,构造柱相应提高,构造柱钢筋焊接锚入上部圈梁钢筋,浇筑圈梁砼高度可进行微调,以便檩条在同一水平面上。 4、(1)-(2)轴B轴处取消门安装,门洞口保留,(2)A-B轴处砌筑120砖墙至窗顶,抹灰刷白(同室内饰面)。 5、原瓷砖800800部分(包含其他公司办公室),除大厅及走廊不变,其余部分改为木地板,木地板踢足线相应改为木质踢足线,木地板铺设预留厚度为15mm。800800瓷砖四周边设波打砖。 6、茶水间瓷砖改为800800。 施工单位意见:________________ ____年____月____日 设计单位意见:________________ ____年____月____日 监理单位意见:________________ ____年____月____日 建设单位意见:________________ ____年____月____日

第二篇:设计变更通知单 编号:通知日期:年月日工程名称 建设单位 设计图号 施工单位

变更缘故: 变更内容: 设计变更人 项目设计负责人设计单位 (签名) (签名) (公章) 年月日

第三篇:设计变更通知单 工程名称:编号: 项目名称 项目编码 单项工程 建设单位

工程变更通知单_中英文版

发行部门/Issued by: 创建日期/Created on: 工程变更通知单 Engineering Change Note 创建人/Created by: 主题/Subject: 版本/Edition: 1 Page 1/Total 1 Pages(s) 发布日期/Issuing date 实施日期/Implementation date 更改单号/Change doc No. 提出人/Raised by 产品名称/Item name 产品代号/Item No. 零部件名称/Component name 零部件代号/Component No. 更改原因/Change reason 更改项目/Change item □1.BOM □2.参数表/DB □3. 工艺/IE □4.图纸/drawing □5.材料/material □6.结构尺寸/structure size □7.电器件变更/change of electric parts □8.模具更改/tooling change □9.包装材料/packing material □10.质量标准/quality standard □11.其他/others____________ 变更内容/Change content 更改紧急程度/Degree of urgency □紧急/Urgent □非紧急/Not Urgent 物料处理建议/Recommendation of material disposal 成品/finished goods 在制品/goods in production 库存物料/material in stock 供应商库存/stock in supplier ERP系统是否更改/If ERP system need to be updated ERP系统审核及日期/Audit in ERP system and the date 旧版文件处理方式/Disposal of doc in old version 是否召开说明会议/If meeting needed 参会人员签名/Signature of participants 日期/Date: 其他/Others 更改送呈部门/Departments that should be informed of the change □创新中心/R&D □质量技术部/QA & Technical Support □生产部/Production □采购部/Purchasing □计划部/Planning □物流部/Logistics □市场部/Marketing □客服部/CS □财务部/Financial □其他部门/Other depts._____________________ 提示/Attention: 1.请认真研读以上内容,并与使用该文档的员工进行探讨/Please read up the contents above carefully and initiate discussion with persons who will use the ECN; 2.确认后请签名并返还本页给发布部门/Please sign after confirmation and then give it back to issuing dept; 3.此ECN仅以电子文档方式发放给您,请确认已经收到后再签名/The ECN will be sent to you only in electronic version. Please sign upon receipt. 我已经研读过以上内容,并同涉及的人员对此做了探讨。 I have read up the contents above and discussed with involved persons. 接收人/Received by: 接收日期/Received on: ECN签审栏/ Signature Column of ECN 编制/Made by: 审核/Reviewed by: 批准/Approved by: 备注说明/Remark

公司变更通知书模板

公司变更通知书模板 由于会司发展需要,公司会进行名称,地址等的变更,下面WTT小雅给大家带来公司变更通知书模板,供大家参考! 公司变更通知书模板范文一 尊敬的: 我司为了业务扩展的需求,经主管工商部门号《准予变更登记通知书》核准,在年月日将公司名称由“北京紫光天禾软件系统技术有限公司”变更为“【新公司全称】”。 一、公司的主体、法律地位不变:原北京紫光天禾软件系统技术有限公司与贵司间的合同、订单继续有效,贵我双方须继续遵守及履行; 二、我司银行基本户账户也进行了变更,【账号不变】。账户名称变更为:“【新公司全称】”。 三、贵司开给我司的税务发票,请于年月日起以【新公司全称】为付款单位,新的开票信息请于开票前确认。 四、我司开给贵司的发票,亦将以【新公司全称】为收款单位。 以上,谨此通知,敬祈配合及协助! 【新公司全称】 年月日 《公司名称变更通知函》回执

【新公司全称】: 我司已知悉并同意《公司名称变更通知函》有关事项。 公司变更通知书模板范文二 致: 承蒙贵公司多年来对我公司的鼎力支持与厚爱,使我公司得以良性持续发展,为适应公司战略发展需要,从20xx年月日起,将XXXXX有限公司变更为XXXXX有限公司,公司所有的债权债务和一切业务由变更后的公司接替,因公司名称的变更给你带来的不便,敬请谅解,公司将一如既往地为您提供优质的服务,谢谢合作。 顺祝商祺! XXXXX有限公司 年月日 变更前: 公司名称:XXXX有限公司(公章) 法人代表:(章) 公司地址:XXX省XX县XXXX号 开户行:XXXXXX 账号:XXXXXXXXX 变更后: 公司名称:XXXXX有限公司(公章) 法人代表:XXX(章) 公司地址:XXXXX

工程变更通知单

工程变更通知单 日期:年月日建设单位施工单位 监理单位设计单位 单位工程名称变更部位 变 更 内 容 变 更 附 件 序号变更附件名称页数说明 会签栏设计单位现场代表 项目公司工 程技术部 工程管理部总工项目经理 设计单位(盖章):建设单位(盖章):

工程签证单 日期:年月日建设单位施工单位 监理单位设计单位 签证名称 签 证 内 容 (后附详图) 附 件 明 细 序号附件名称页数说明 预 算 审 查 会签栏施工单位监理单位项目公司有关人员项目经理 (盖章)(盖章) 超出3000元成本管理部:分管经理: 建设单位(盖章):

工期顺延签证单 日期:年月日建设单位深圳市思肯三围数字化有限公司施工单位深圳市新创新建筑装饰工程有限公司监理单位无设计单位无 签证名称 签 证 内 容 签 证 原 因 及 见 证 性 资 料 施工单位监理单位项目公司有关人员工程管理部项目经理会 签 栏 (盖章)(盖章) 建设单位(盖章):

工程款支付申请表 工程名称:编号: 致: 我方已完成了 按施工合同的规定,建设单位应在年月日前支付该项工程款 共(大写)(小写:),现报上 工程付款申请表,请予以审查并开具工程款支付证书。 附: 1、工程量清单: 2、计算方法。 承包单位(章): 项目经理: 日期: 施工单位填写报监理公司

工程款支付证书 工程名称:编号: 致: 根据施工合同规定,经审核承包单位的付款申请和报表,并扣除有关款项,同意本期支付工程款共(大写)(小写:),请按合同规定及时付款。 其中: 1、承包单位申报款为: 2、经审核承包单位应得款为: 3、本期应扣款为: 4、本期应付款为: 附件: 1、承包单位的工程付款申请表及附件: 2、项目监理机构审查记录。 项目监理机构: 总监理工程师: 日期: 监理公司填写报项目公司

甲方变更通知单电子版

建筑变更通知单 备注:签字原件一式二份,建设单位、施工单位各一份。 河北建筑工程学院 校园规划处 二期工程管理统一用表 编号:HBJG-GCGL-2014 甲方通知单 建设单位 河北建筑工程学院 施工(监理)单位 工程名称 新校区二期工程 合同编号 致: 1、24#学生食堂外墙做法变更为:①基层满挂钢丝网,拉毛处理. ②抹20mm 厚1:2.5水泥砂浆找平层; ③50mm 厚挤塑板保温层(密度30kg/m3); ④面层为刷外墙涂料(同30#实验楼外墙做法) 2、30#实验楼A 区一层空架屋面增加4mm 厚SBS 防水,保护层为4mm 厚SBS 防水卷材带 颗粒的保护层。 3、30#实验楼工艺水池、调节池、中水贮水池内防水由图集号05J1 2/9的工程做法变更为: ①基层毛化处理 ②20mm 厚1:2.5防水砂浆找平层; ③2mm 厚环氧树脂防水涂料二道; ④保护层为20mm 厚1:2.5防水砂浆; 4、30#实验楼A 区、B 区走廊屋面在原设计上增加铺设200mm*200mm 砖做法。 5、30#实验楼小水沟采用型号302不锈钢篦子的做法。 6、30#实验楼工艺水池顶部上的井字梁及水泵房用防水腻子和防水涂料,工艺水池外围抹 20mm 厚1:2.5的防水砂浆,刮两遍防水腻子,刷两遍防水涂料。 发: 抄送: 总监理工程师: 项目经理: 年 月 日 本通知单附件明细: 1、纸质图纸:无 ■ / 有 □ 共 张,说明: 。 2、电子图纸:无 ■ / 有 □,说明: 。 3、其 他:无 ■ / 有 □,说明: 。 河北建筑工程学院 二期工程管理统一用表 编号:HBJG-GCGL-2014

设计变更通知单

编号:01 工程名称漯河市双汇广场景观工程设计单位南京南华建筑设计事务所 变更部位篮球场结构施工单位河南水利建筑工程有限公司 变更原因和内容: 1、篮球场设计标高59.14m,其结构层厚24cm,也就是说结构层底标高应为58.90m,而实际原有地面(旧篮球场)高为58.82m,即现地面到结构层底还有8cm,其厚度不是一个结构层,为此基底采取加大碎石垫层的做法,即篮球场原设计为10cm碎石垫层改为18cm厚碎石垫层。 2、另外考虑到混凝土基础极易受温度的变化而开裂、变形经甲方、现场监理、设计共同研究决定将篮球场砼基层改为沥青混凝土基层。 3、篮球场的东侧、北侧、西侧增加排水沟,南侧增设300×500×80厚砼路侧石。 4、排水沟在东西两侧用Ф150PVC管与主排水连接,长度分别为。 4、篮球场围网围在排水沟的外侧,结构不变,平面尺寸为52.66+52.66+37.66+37.66=180.64m。 5、增加灯光球场照明灯12盏,专用线路长米,配电箱一个。 6、双层坐凳观光台28米,两用垃圾箱6个。 其结构详见附图。 施工单位意见: 年月日设计单位意见: 年月日 监理单位意见: 年月日 建设单位意见: 年月日

工程名称漯河市双汇广场景观工程设计单位南京南华建筑设计事务所 变更部位健身器材场施工单位河南水利建筑工程有限公司 变更原因和内容: 原设计健身器材数量少,应广大市民的要求将健身器材场地扩大,增加健身器材种类和数量。 1、位置在篮球场的东侧向北延伸到主席台的南边沿。 2、场地面积㎡。 3、场地结构12㎝厚的砼垫层上铺6㎝厚的绿色舒布洛克砖。. 4、健身器材的数量和种类详见附表。 健身器材场地的结构详见附图。 施工单位意见: 年月日设计单位意见: 年月日 监理单位意见: 年月日 建设单位意见: 年月日

工程变更通知单模板

工程变更通知单模板 工程变更通知单模板1 ___人民政府: ____年__月,___发改局以《关于_____商务中心项目初步设计的批复》(温发改设计〔____〕__、__、__号)批准建设_____商务中心项目(___行政服务中心大楼项目)。该项目用地_____平方米,总建筑面积_____.__平方米,其中地上建筑面积_____.__平方米,地下建筑面积_____.__平方米,项目概算投资_____.__万元。项目自____年_月__日开工建设以来,在___委、_政府的高度重视下,在各相关部门的大力支持和帮助下,于____年_月__日通过竣工验收。____年_月_日,大楼交付使用。日前,该项目荣获____年度__省建设工程“钱江杯”奖(优质工程)称号。 大楼建设和试运行期间,受政策调整(___建设规划局限制使用预应力管桩)、使用功能调整(_党员服务中心、婚姻登记中心、__局出入境大队整体进驻行政服务中心)、功能增加(大楼亮化、自动扶梯、地下室入口坡道顶棚)、设计错误修正以及设计细化等因素影响,发生设计变更若干(见附件_),预计设计变更增加投资____.__万元,减少投资___.__万元,总计增加投资____.__万元,但没有超过批准概算投资额。____年__月__日,_发改革局

牵头___纪委、财政、审计、_场监管、建工及公管委等部门组成联审小组,对该项目的设计变更进行审核并通过变更意见。现根据《___人民政府关于印发___政府投资项目工程设计变更管理暂行规定的通知》(温政发〔____〕___号)规定,就相关设计变更意见报请_长办公会议或_政府常务会议研究确定。 特此请示,请予批复。 __ ____年__月__日 工程变更通知单模板2 江苏省国土资源厅、财政厅: 盐城东台市土地整治示范项目是江苏省15个土地整治示范项目之一,项目建设规模为3721.7466公顷,项目实施后新增耕地122.6256公顷,苏财建[20__]105号、苏财建[20__]313号文件批复下达经费13617万元。 在项目实施过程中,项目承担单位通过优化工程设计,合理制定实施方案,按照批准的规划方案基本完成了主体工程建设任务。为进一步提升项目形象,满足项目区农业产业结构调整的需要,充分发挥项目效益,给项目区群众带来更多的实惠,根据省国土厅、财政厅《关于加强省以上投资土地整治项目规划设计变更管理的通知》要求,在项目建设规模不变化,新增耕地面积不