高速公路路基沉降观测现场工作要点

高速公路路基沉降观测现场工作要点
高速公路路基沉降观测现场工作要点

高速公路软基路基沉降观测及变形观测技术探讨

高速公路软基路基沉降观测及变形观测技术探讨 摘要:在沿海地区修建高速公路,常常会遇到软土地基问题。由于软土地基的压缩性高、透水性低以及固结变形持续时间长,因此软土地基沉降量及其速率的预估就成了工程施工中的主要问题。沉降量及其速率的预估是在沉降观测的基础上进行的,所以,我国所有的高速公路项目在修建过程中都必须进行沉降观测。 关键词:软基路基,路基沉降,变形观测 Abstract: in coastal areas built highway, often encounter problems of soft soil foundation. Because of the soft soil foundation, low permeability of high compactness and consolidation deformation lasted for a long time, so soft soil foundation settlement rate and its estimate of the engineering construction is the main problem. The settlement and its estimate of the rate in settlement observation is conducted on the basis of, so, our country all the highway project in the process of building to the settlement observation. Keywords: soft foundation of roadbed, embankment settlement, deformation observation

公路路基沉降观测方案总结

路基沉降变形观测专项方案 1.工程概况 *********工程起点位于**市外环路北端附近的国道321上,里程为K0+000~K6+624.054。K0+000~K1+400为市政道路,一般路基宽度为60m,跨***高速路的分离式立交桥宽为50米。在K0+700~K0+786.5处设置变宽段,此处压缩人行道和非机动车道的绿化带,渐变为50米宽,与桥梁宽度一致,车行道保持不变。K1+000 ~K1+200处设置渐变段,该路段内路幅宽度逐渐变化,路基宽度从50m渐变为24.5m。由于该路段正好处于圆曲线上,因此在K1+200~K1+400段设置过渡段,该路段范围内路幅宽度为24.5m,设计时速为60Km/h,过渡段后路段按一级公路设计,设计时速为80Km/h。线路通过区域有鱼塘、水田、菜地,地基沉载力较差,设计要求进行地基加固处理;路堑高边坡地段设计要求进行锚杆框架及方格浆砌片石防护处理。 为及时掌控路基填挖方的沉降、位移情况,指导路基施工过程,保证工后沉降满足设计要求和路基稳定性,有效控制路基工程质量,制定本方案。 2.编制依据 2.1《公路路基设计规范》 2.2《路基工程施工图设计》

2.3《工程测量规范》 2.4《公路路基横断面图》 3.路基沉降变形监测的目的 3.1控制和保证路基过程质量,确保工后沉降满足设计要求(一般地段不大于15cm,年沉降速率小于4cm/年,涵背过渡段不大于8cm)。 3.2.通过连续、正确、完整、系统的观测和分析,预测沉降趋势,验证和指导施工,正确控制路堤填筑速率,以确保路基和路面的完成时间。 3.3确保路基稳定和施工安全 4路基沉降变形观测方案 4.1 观测内容 根据设计及规范要求,确定观测的主要内容有:填方段的基底沉降观测、水平位移观测、路基本体沉降观测;挖方段的水平位移观测;路隧、桥涵、路堤的过渡段沉降观测。 4.2观测断面设置 4.2.1基底沉降观测 根据设计要求,沿线路方向每隔50m设置一个观测断面,路堤填筑施工前,在基底地面的线路中心线位置埋设一个沉降板,并进行首

公路路基沉降观测方案修订稿

公路路基沉降观测方案 WEIHUA system office room 【WEIHUA 16H-WEIHUA WEIHUA8Q8-

州群众服务中心一级主干道工程二标段路基沉降变形观测专项方案 编制: 审核: 日期:

1.工程概况 麻新城区群众服务中心一级主干道工程是黔东南苗族侗族自治州群众服务中心主要干道。本项目的建设将促进和拓展经济开发区和凯麻新城区的城市发展空间,为后续城市建设起到重要作用。凯麻新城区州群众服务中心一级主干道起于开司大道,于开司大道左侧相交90°。路线全长道路主干道标准建设,设计车速为60km/h。 为及时掌控路基填挖方的沉降、位移情况,指导路基施工过程,保证工后沉降满足设计要求和路基稳定性,有效控制路基工程质量,制定本方案。 2.编制依据 《公路路基设计规范》 《路基工程施工图设计》 《工程测量规范》 《路基横断面图》 3.路基沉降变形监测的目的 控制和保证路基过程质量,确保工后沉降满足设计要求(一般地段不大于15cm,年沉降速率小于4cm/年,涵背过渡段不大于 8cm)。

.通过连续、正确、完整、系统的观测和分析,预测沉降趋势,验证和指导施工,正确控制路堤填筑速率,以确保路基和路面的完成时间。 确保路基稳定和施工安全 4路基沉降变形观测方案 观测内容 根据设计及规范要求,确定观测的主要内容有:填方段的基底沉降观测、水平位移观测、路基本体沉降观测;涵洞、路堤的过渡段沉降观测。 观测断面设置 基底沉降观测 根据《公路路基施工技术规范》要求,沿线路方向每隔100~200m 设置一个观测断面,路堤填筑施工前,在基底地面的线路中心线位置埋设一个沉降板,并进行首次观测。 路堤水平位移观测 根据《公路路基施工技术规范》要求,沿线路方向每隔 100~200m,在路堤两侧坡脚外2m、10m处各设置水平位移观测桩,路基填筑前埋桩并进行首次观测。

路基沉降观测方案

目录 一、工程概况 (2) 二、编制说明 (2) 1.编制依据 (2) 2.编制原则 (2) 3.编制范围 (2) 三、监控测量组织体系机构 (3) 1.组织机构 (3) 2.监控量测管理 (3) 四、高填方路基位移与沉降观测 (3) 1.位置桩埋设及观测 (3) 2.水准点埋设及精度要求 (4) 3.观测频率 (4) 4.施工中观测控制标准 (5) 5.观测成果及成果整理要求 (5) 五、路基软基换填沉降观测 (5) 1.作业准备 (5) 2.技术要求 (6) 3.施工顺序 (6) 4.观测频率 (6) 5.测量成果统计及分析 (7) 六、高边坡沉降观测 (7) 七、观测实施流程 (8) 八、报警方法 (9) 1.稳定控制标准 (9) 2.报警流程 (10) 九、监测技术要求 (10) 1.人工巡视 (10) 2.裂缝监测 (10) 3.监测频率 (11) 十、监测设施保护 (11) 十一、安全管理 (11) 1.加强安全生产教育 (11) 2.做好监测施工现场安全措施 (12) 3.制定相关应急预案 (12)

高填方及高边坡位移、沉降观测方案 一、工程概况 本标段为广东省汕(头)至湛(江)高速揭博段T7标段,路线起于五华县梅林镇梅新水库下游,起点桩号为K132+020,路线向西在梅林镇琴口村附近跨琴江,设琴江大桥,其后在告岭村附近设梅林互通与县道X003连接,路线向西经锡古塘至曾洞,经鹅公塘至官洞,设官洞大桥跨龙华路,设华阳互通与省道S120和龙华路连接,路线终点位于华阳镇古塘角村,终点桩号为K142+000,路线全长9.980Km。 本合同段内路堑高边坡共计25段,其中主线有15段,梅林互通5段,华阳互通5段;设置沉降桩共有78个,其中主线40个,梅林互通23个,华阳互通15个。高填方路基共25段,其中主线内有15段,梅林互通5段,华阳互通5段,设置观测桩94个,其中主线51个,梅林互通20个,华阳互通23个,且大部分高填方处于软基换填位置。为掌握高边坡及高填方施工中的安全和稳定,另一方面能正确预测工后沉降,使沉降控制在允许范围之内(详见附表)。 二、编制说明 1.编制依据 1.1《广东省汕头至湛江高速公路揭西大溪至博罗石坝段第七合同段两阶段施工图设计》; 1.2《公路路基施工技术规范》(JTG F10-2006); 1.3《公路工程质量检验评定标准(第一册土建工程)》(JTG F80/1-2004); 1.4中交一公局多年高速公路施工经验。 2.编制原则 结合业主下发的设计图纸和本项目现场踏勘,充分满足工期、质量、安全、环保及文明施工等方面的规定和要求。合理安排施工顺序,做到布局合理、突出重点、全面展开、平行作业、科学组织、均衡生产、以保证施工连续均衡地进行。严格遵守合同文件明确的设计规范、施工规范和质量评定与验收标准。 3.编制范围 本施工方案适用于汕湛高速揭博项目T7标K132+020~K142+000段高填方路基、高边坡施工。

高速公路路基沉降观测方案

高速公路路基沉降观测方案 溆浦至怀化高速公路 (1-20合同段) 路基沉降与稳定观测方案 目录 1 目的和意义………………………………………………………… 1 2 沉降与稳定观测的依据…………………………………………… 2 3 观测内 容........................................................................3 4 沉降与稳定观测点的布设 (3) 4.1 布置原则.....................................................................3 4.2 沉降与稳定观测点布设步骤.............................................5 4.3沉降与稳定观测点布设方法 (6) 5 溆怀路重点观测断面的选择................................................9 6 沉降与稳定观测控制指标和精度 (10) 6.1 沉降观测..................................................................10 6.2稳定性观测 (11)

7 沉降与稳定观测的周期......................................................11 8 提交成果 (11) 8.1 提交的成果报告............................................................11 8.2 成果报告的应用 (11) 9项目的组织和管理 (12) 9.1 项目的组织结构及主要参加人员.......................................12 9.2 拟投入的仪器设备和计算软件..........................................13 9.3 有关部门的协调配合 (13) 10 项目经费预算………………………………………………………14 附表(溆怀高速公路路基沉降与稳定测点分布一览表) 溆怀高速公路路基沉降与稳定观测方案 1 目的和意义 复杂多变的地形、地貌、地质条件是高速公路路基施工和长期稳定所面临的共同课题,对这些问题的了解程度和处理成功与否将直到公路的整体质量,这其中,软土地基、特殊土路基、高填方路堤、半填半挖路堤、陡坡路接影响堤、岩溶地基、填切交界频繁等不利因素更是路基修筑的棘手问题。

公路工程路基沉降观测及变形观测实施方案

公路工程项目名称 路基沉降观测及变形观测实施方案 编制: 复核: 审批: 项目部 XXXX年XX月XX日

一、工程概况 XXXXXXXXXXXXXXX为新增国道主干线XXX胶南至海晏公路的重要关联路段,本项目起点位于XXX,终点位于XXX,路线全长XXXXkm,施工范围为:KXX+000~KXX+000,主线采用双向四车道一级公路标准建设,设计速度80公里/小时,路基宽度24.5米。桥涵设计汽车荷载采用公路-Ⅰ级。 本标段工程量主要有:路基主线XXXXkm、匝道XXXXkm,主线大桥XX座、通道桥XX座、匝道中桥XX座,涵洞XX道,分离式立交XX处,互通式立交XX处,服务区XX处。 二、编制及测量依据 1、《工程测量规范》(GB 50026-2007); 2、《公路勘测规范》(JTG C10-2007); 3、《国家三、四等水准测量规范》( GB/T 12898-2009); 4、《公路工程技术标准》(JTG B01-2011); 5、设计图纸; 6、设计院交桩成果; 7、控制点加密成果。 三、适用范围 适用于本标段所有高填深挖路段。 四、观测目的及范围 1、观测目的 为了确保工程施工质量,保证工程按预期目标顺利进行,必须对路基及高边坡进行沉降观测,以便充分了解边坡和路基的沉降值,沉降变化趋势和稳定情况,从而控制高填土和深挖方速率。在实际填筑中应严密监视各种埋设仪器的观测指标,及时进行综合分析而定。根据沉降量资料分析确定规定日期后沉降是否满足要求,根据沉降变化情况指导施工,确保全线施工质量。 2、观测范围 本标段的范围KXX+000-KXX+000,包括KXX+677-KXX+000,323M的高填土路基; KXX+000-KXX+659左侧深路堑;KXX+103-KXX+655右侧深路堑;KXX+755-KXX+019左侧深路堑;KXX+267-KXX+444左侧深路堑;KXX+469-KXX+589左侧深路堑; KXX+210-KXX+390左侧深路堑;KXX+703-KXX+906左侧深路堑;KXX+219-KXX+424右

路基沉降观测指导方案

路基沉降观测指导方案 (一)一般规定 1、观测的目的是通过沉降观测,利用沉降观测资料分析、预测工后沉降,提出加速路基沉降的措施,确定无碴轨道的铺设时间,评估路基工后沉降控制效果,确保无碴轨道结构的安全。 2、路基上无碴轨道铺设前,应对路基变形作系统的评估,确认路基的工后沉降和变形满足无碴轨道铺设要求。 3、路基填筑完成或施加预压荷载后应有不少于6个月的观测和调整期。观测数据不足以评估或工后沉降评估不能满足设计要求时,应延长观测或采取必要的加速或控制沉降的措施。 4、观测期内,路基沉降实测值超过设计值20%及以上时,应及时查明原因,必要时进行地质复查,并根据实测结果调整计算参数,对设计预测沉降进行修正或采取沉降控制措施。 5、评估时发现异常现象或对原始记录资料存在疑问,要进行必要的检查。 (二)观测的内容 1、路基沉降观测应以路基面沉降和地基沉降观测为主。 2、路堑沉降观测部位为基床表层的底面处。 3、路堤沉降是由路堤本体和地基组成,为了观测到路堤

的沉降与时间的关系,及沉降主要产生的部位,一般路堤观测的内容应为:基床底层顶面的路基总沉降和地基面处地基部分总沉降。 4、对于地基条件复杂和填土高度大的路堤,还包括如下内容:路堤中部的沉降观测;地基处理范围的下限处地基深部的沉降观测。 (三)观测断面和观测点的布置 1、观测断面布置 (1)沉降观测断面的间距一般不应大于50 m。地形、地质条件变化较大地段应适当加密(以设计文件为准),应 不大于25m布设一个断面。 (2)对地形横向坡度大或地层横向厚度变化的路基工点应布设不少于1个横向观测断面。 (3)一个沉降观测单元(连续路基沉降观测区段为一单元)应不少于2个观测断面。 2、观测点布置 (1)沉降观测可在线路两侧地基、路肩和线路中心设置观测桩或在线路中心设置沉降板。 (2)对于路堤观测断面,在线路中心线布设一组沉降板,路肩两侧布设变形观测桩。 (3)有预压土路堑地段,每个路堑断面在线路中心设沉降板一组,两侧路肩各设观测桩1个。无预压土路堑

公路路基沉降观测方案

州群众服务中心一级主干道工程二标段路基沉降变形观测专项方案 编制: 审核: 日期:

1.工程概况 麻新城区群众服务中心一级主干道工程是黔东南苗族侗族自治州群众服务中心主要干道。本项目的建设将促进和拓展经济开发区和凯麻新城区的城市发展空间,为后续城市建设起到重要作用。凯麻新城区州群众服务中心一级主干道起于开司大道,于开司大道左侧相交90°。路线全长3163.394道路主干道标准建设,设计车速为60km/h。 为及时掌控路基填挖方的沉降、位移情况,指导路基施工过程,保证工后沉降满足设计要求和路基稳定性,有效控制路基工程质量,制定本方案。 2.编制依据 2.1《公路路基设计规范》 2.2《路基工程施工图设计》 2.3《工程测量规范》 2.4《路基横断面图》 3.路基沉降变形监测的目的 3.1控制和保证路基过程质量,确保工后沉降满足设计要求(一般地段不大于15cm,年沉降速率小于4cm/年,涵背过渡段不大于8cm)。 3.2.通过连续、正确、完整、系统的观测和分析,预测沉降趋势,

验证和指导施工,正确控制路堤填筑速率,以确保路基和路面的完成时间。 3.3确保路基稳定和施工安全 4路基沉降变形观测方案 4.1 观测内容 根据设计及规范要求,确定观测的主要内容有:填方段的基底沉降观测、水平位移观测、路基本体沉降观测;涵洞、路堤的过渡段沉降观测。 4.2观测断面设置 4.2.1基底沉降观测 根据《公路路基施工技术规范》要求,沿线路方向每隔100~200m 设置一个观测断面,路堤填筑施工前,在基底地面的线路中心线位置埋设一个沉降板,并进行首次观测。 4.2.2路堤水平位移观测 根据《公路路基施工技术规范》要求,沿线路方向每隔100~200m,在路堤两侧坡脚外2m、10m处各设置水平位移观测桩,路基填筑前埋桩并进行首次观测。 4.2.3路基本体沉降观测

铁路沉降观测方案

新建成都至蒲江铁路站前工程CPZQ-3标段线下工程沉降观测实施方案 编制: 审核: 审批: 中铁十二局集团有限公司成都至蒲江铁路工程项目经理部 二○一三年十二月 目录 第一章总则 (1) 一、适用范围 (1) 二、工作依据 (1) 第二章组织管理 (2)

一、组织机构 (2) 二、职责分工 (2) (一)分部 (2) (二)各工区 (2) 三、设备机具配臵 (3) 四、工作程序 (3) 第三章建网要求 (4) 一、沉降变形测量等级及精度要求 (4) 二、沉降变形监测网主要技术要求及建网方式 (4) 三、沉降变形观测点的布臵要求 (6) 四、沉降变形监测测量工作基本要求 (7) 五、沉降变形监测观测具体要求 (8) 第四章路基工程 (11) 一、一般规定 (11) 二、路基地段沉降观测技术要求 (11) 三、观测元件埋设说明 (14) 四、观测方法、精度与要求 (16) 第五章桥涵工程 (20) 一、观测点的设臵原则 (20) 二、观测元件与埋设技术要求 (23) 第六章过渡段工程 (26) 一、观测断面和观测点的设臵原则 (26)

二、观测元件与埋设技术要求 (26) 三、观测技术要求 (26) 第七章隧道工程 (27) 一、观测断面和观测点的设臵原则 (27) 二、观测元件与埋设技术要求 (28) 三、观测技术要求 (29) 第八章数据的管理和沉降软件的使用 (30) 一、数据的管理 (30) 二、软件的使用软件 (32) 附件一:线下工程沉降变形观测及评估流程图 (38) 附件二:资料传递程序 (40) 附件三:附表 (41) 附表1 工程沉降变形观测准备工作检查记录表 (41) 附表2 工程沉降变形观测结果评估验收记录表 (42) 附表3电子水准测量记录手簿 (43) 附表4 路基沉降观测记录表(沉降观测桩) (44) 附表5 路基观测桩沉降量记录汇总表 (45) 附表6 路基沉降观测记录表(沉降板) (46) 附表7 路基沉降板观测记录汇总表(沉降板) (47) 附表8 路基沉降板观测记录表(剖面管) (48) 附表9 路基分层沉降观测记录表 (49) 附表10 路基分层沉降观测记录汇总表 (50)

路基沉降观测方案

新泾路东延工程(苏虞张~塘桥北环段) (K0+235~K4+) 沉降观测 施 工 方 案 新泾路东延工程项目经理部 2012年8月

沉降观测实施方案 一、总则: 为掌握路堤在施工期中的变形动态,道路的变形监测工作是评价道路路基处理方式适宜性的重要手段之一,由于该工程项目所处的区域和地质情况,需要客观、科学地了解和掌握路基沉降的原因、搞清填筑材料、填筑高度与路基沉降的关系、路基的沉降规律,为减少或消除路基沉降引起的质量病害和指导路基、路面施工提供依据,保证道路的正常施工与运营。 二、编制依据: 1、新泾路东延工程施工图设计要求; 2、《工程测量规范》,GB50026-2007; 3、《国家一、二等水准测量规范》,GBT12894-2006; 4、《公路路基施工技术规范》,JTGF10-2006; 三、路基沉降位移观测技术要求: 1、观测断面设置桩号: K1+200、K1+250、K1+300、K1+745、K1+795、K1+900(河塘)、K3+460、K3+560、K3+640、EK0+060(河塘)、FK0+280(河塘)、K2+054(箱涵) 、K2+407(箱涵) 、K2+924(箱涵) 、K4+020(箱涵) 、K0+594(箱涵),设置沉降板。 以上沉降断面的设定均根据本工程堆载预压段落设置。 本工程堆载预压段落为:

①、K1+180-K1+310、K1+735-K1+960、K3+460-K3+570、 K3+630-K3+700锡十一圩大桥及规划桥两侧高填方段落; ②、EK0+042-EK0+160、FK0+200-FK0+355互通区匝道段; ③、K2+054、K2+407、K2+924、K4+020等4道箱涵,堆载 至河道两侧河岸线外侧各5m; ④、K0+594(8*)箱涵,堆载范围为箱涵加两侧开挖回填 宽度。 以上堆载部位堆载高度。 2、沉降位移观测点布设 本工程路基沉降观测布设根据不同地质情况、不同部位变化情况设置3种断面类型: (a)断面一:一般堆载预压段,沉降观测板在每个断面设置3处,分别位于路中和两侧路肩位置处; (b)断面二:堆载预压段且为河塘部位,仅在路基中心布置一个观测沉降板; (c)断面三:箱涵位置的观测沉降板布置,在箱涵东侧路线中心和路线右侧路肩以及箱涵西侧左路肩这三处,离箱涵边3m台背位置各设置一处沉降观测板进行观测。另在箱涵顶面西南角和东北角各设置两处观测点,用于直接观测箱涵涵身的沉降情况。(详见箱涵位置沉降观测点布置平面示意图) 沉降板观测标、工作基点桩在观测期均必须采取有效措施加以保护,还应在标杆上有醒目的警示标志。

新软基处理沉降观测测量方案

目录 一、工程概况 ..................................................................................... - 2 - 二、编制依据 ..................................................................................... - 2 - 三、路基沉降观测断面的布置原则 .................................................. - 3 - 四、路基沉降观测内容...................................................................... - 3 - (一)路基沉降总体要求...................................................................................................- 3 - 1、沉降变形测量等级及精度要求 ...........................................................- 3 - 2、沉降变形监测网主要技术要求及建网方式 .......................................- 3 - 3、沉降变形测量点的布置要求 ...............................................................- 5 - 4、沉降变形监测测量工作基本要求 .......................................................- 6 - 5、沉降变形观测具体要求 .......................................................................- 7 - (二)路基沉降变形观测...................................................................................................- 9 - 1、路基沉降控制标准 ...............................................................................- 9 - 2、一般规定 ...............................................................................................- 9 - 3、路基地段沉降观测技术要求 ............................................................ - 10 - 4、地基土深层沉降监测 ........................................................................ - 10 - 5、监测断面布置形式 ............................................................................ - 13 - 6、断面观测的基本要求 ........................................................................ - 15 - 7、执行标准 ............................................................................................ - 16 - 8、成果的重测和取舍 ............................................................................ - 18 - 9、观测频率 ............................................................................................ - 18 - 10、统计、汇总 ...................................................................................... - 19 - 11、观测中的注意事项 .......................................................................... - 19 - 12、测点保护 ...........................................................................................- 20 - 五、监测数据分析 ....................................................................... - 20 -

公路路基沉降病害及施工控制技术 郭胜利

公路路基沉降病害及施工控制技术郭胜利 发表时间:2019-08-06T14:17:46.627Z 来源:《房地产世界》2019年4期作者:郭胜利 [导读] 在高速公路的施工阶段,需要全面提升工程施工技术,有效解决所存在的路基沉降问题,大大提升了公路工程的建设施工速度。济宁鲁南公路工程公司山东济宁 272000 摘要:路基沉降问题是当前高速工程中非常常见的病害问题,出现该问题之后,就会导致工程结构的稳定性下降,如果未能采取有效的措施来处理这一问题,就会导致工程无法正常进行,严重者会造成重大的滑塌事故,安全隐患比较大,建筑工程的施工也会受到很大影响。因此在高速公路的施工阶段,需要全面提升工程施工技术,有效解决所存在的路基沉降问题,大大提升了公路工程的建设施工速度。 关键词:公路工程;路基沉降;病害 引言 随着社会的发展,大型民生项目建设的步伐也在加快。公路是关系国家竞争力和人们生活质量提高的关键项目,长时间以来始终受到政府部门和人们的广泛重视。而在公路施工中,唯有做好路基项目建设工作,方可为后期公路施工进度打好基础。所以,研究公路路基建设的质控对策是十分重要的,唯有科学合理的结论,方可更好提升公路建设质量。 1公路路基项目常见病害 1.1填料缺少适宜性 路基建设中,因为员工缺少必要的实践经验,在购置施工材料时极易忽视其性质,选取不合适的填料,下降了填料的适宜性,进而影响着路基建设质量,这样既会增多路基建设成本,甚至会延迟工期,影响着工程总体收益。 1.2中线移位现象 受到工作人员素质、工艺技术等因素的制约,路基施工阶段极易产生导线点破坏等现象。而且,目前工作人员忽视中线复查工作,也没有重视对控制桩的维护,进而造成中线偏移现象,与《路基施工标准》的内容相违背。 1.3存在安全生产问题 公路项目的建设环境比较复杂,尤其是地形环境,在施工阶段极易出现淤泥路段、软弱地基以及斜坡等,若未对这些地方采用科学的处理方法,将会导致路基出现严重的安全隐患,在后续投运过程容易产生滑坡、局域沉降等情况。 2公路产生路基沉降的原因 2.1地理因素导致的路基沉降 此处所指的地理因素主要就是地形与地势方面的因素。当前我国的公路建设数量持续的增大,公路网持续的扩张,很多复杂地形中也在大力开工建设高速公路项目,特别是很多的山岭与丘陵的地区中,地势变化非常明显,为了使整个高速公路项目运行更加的稳定,很多情况下都需要将路基建设得比较高。在这种情况之下,路基的高度逐渐提升,就容易发生沉降的问题,难以进行有效控制。 2.2水文因素导致的路基沉降 水文因素的影响是当前路基沉降中比较普遍的影响因素,目前我国的高速公路施工项目周边区域都存在地下水与江河水,路基表面也会直接受到这些水源的侵蚀或者冲击,路基底层也会因为地下水的移动而存在严重的冲击,进而导致路基出现沉降的问题,因此在进行高速建设施工的过程中,对于临近水源的工程施工项目需要多加注意,且进行准确的路基沉降监测和控制,从而可以保证公路工程的质量达到使用的需要。 2.3气候因素导致的路基沉降 这一方面的因素一般都是出现在我国的北方地区中,南方的昼夜温差比较大的地区也容易出现这一问题。具体分析,主要就是自然环境中的霜雪、严寒以及温差过大的情况下对于路基产生不良的影响,从而出现沉降问题。比如,气候比较寒冷的地区中进行路基的建设施工,很多情况下水源会冻结,只要温度上升,冰雪融化就会导致路基结构内部含水量的提升,承载性能自然会有所下降,路基沉降问题就会出现。这种路基沉降问题通常需要进行施工时间的调整来控制,但是因为高速公路施工周期一般比较长,要想全面消除这一问题难度比较高。 2.4土壤因素导致的路基沉降 土壤主要就是路基建设过程中所应用的工程材料土壤。从成本方面来考虑,也要考虑到工程的便捷性,路基施工的土壤需要从施工周边区域中进行选取,但是很多情况,施工周边的区域中土壤未必能够满足路基施工的需要,特别是要求比较高的高速公路施工项目。如果工程中应用大块的红砂岩,该种材料压实度会非常低,风化与渗透都比较强,所以整个土体结构的稳定性都非常差,未能够有效的调配就应用到工程中,就会导致路基出现沉降的问题。的控制,该方面容易受到工程机械、填筑施工的速度以及施工工艺方面的影响。 2.5设计因素导致的路基沉降 设计因素对于路基沉降的影响是非常直接的,主要是因为设计错误所导致的。高速公路设计方案确定的过程中,首先就是要进行交通量的预估,然后才能进行承载载荷的计算,从而确定路基的承载能力。但是如果交通量超出了规定的要求,公路路基需要长期承受汽车动载荷的影响,预期之外的路基沉降也会出现。这种沉降多数都是在公路施工结束之后所存在的,具备有明显的滞后性,所以控制难度较高。 1.6施工因素导致的路基沉降 从上文中可以发现,施工的过程中需要进行路基沉降的控制,该方面容易受到工程机械、填筑施工的速度以及施工工艺方面的影响。比如,目前我国很多的高速公路为了严格的控制含水量参数,为进行路基的沉降控制,很多情况下都是进行水平填筑施工,施工效果比较高。填筑施工的速度选择与控制要结合工程的沉降来控制。 3高速公路路基沉降及施工控制技术 3.1沉降监控技术 沉降监测是进行路基沉降与变形控制的方法,具体的施工流程如下所示:施工准备→观测布点→结构的统计和分析→结果综合分析→

公路沉降观测方案

318国道南浔至吴兴段改建及配套工程南浔段 路基沉降观测方案 项目负责:汪道静 编写: 邱良鹤 审核:王志刚 审定:郭云飞 提交单位:中交一航局二公司项目部 提交时间:二〇一五年九月

318国道南浔至吴兴段改建及配套工程南浔段路基 沉降观测方案 ?1工程概况 318国道南浔至吴兴段改建工程起点在、两省交界处,项目起点与老318国道(桩号约为K119+000)相交,向北通过南浔跨线桥与规划道路相接,向过南浔五桥互通跨长湖申Ⅲ级航道,终点接申苏浙皖至申嘉湖高速公路连接线,与湖盐公路相交,终点桩号为K33+164,主线全长33.164公里,旧馆连接线长约2.3公里,升山连接线约1.0公里。设计速度主线为80公里/小时,连接线为60公里/小时。 ? 2 技术标准及依据 ?1、《工程测量规》(GB50026-2007); ?2、《建筑变形测量规》(JGJ8-2007); ?3、《公路路基施工技术规》(JTGF10-2006)。 ? 3 水准基点的布设、施测 水准基点是整个观测工作的基准,其高程系统采用独立高程基准,各路段由其水准基点构成水准闭合环。本工程按三等水准测量精度要求,使用Trimble Dini0.3mm型电子水准仪,配合条码式铟瓦水准钢尺进行施测,业使用NASEW V3.0软件进行平差。 ? 3.1水准基点的布设 为保证观测值的可靠性,在施工区域外的位置进行埋设。水准基点标识设置如下所示:

? 3.2水准基点的施测 本工程采用单程双测的方法对各路段的水准基点进行闭合水准测量,将外业采集的数据下载至计算机,使用NASEW V3.0软件进行平差。 数据分析表明,本次水准观测精度完全满足三等水准测量精度要求,所有水准基点在观测期间均稳定可靠,未发生任何失稳现象,为观测数据的准确性提供了可靠依据。 ?4沉降观测 ? 4.1沉降板的布设 沉降观测采用布设沉降板进行观测,沉降板布置在左路肩、路中、右路肩三处。桥头路段布设1-2个观测断面;箱涵路段布设1个观测断面;一般路段布设间距为100-200m。沉降板布设示意图如下:

路基沉降观测方案

沉降观测方案 一、工程概况 1、软土分布及特性 本合同段软土分布于K9+000—K11+500,主要由低液限淤泥质粘土和松散砂土组成,砂土极松散,软土厚1~2米。据土工试验资料,淤泥质低液限粘土主要物理力学性质指标:含水量W=25.4%,天然密度ρ=1.95g/cm3,孔隙比e=0.915,IL=1.21,压缩系数a0.1-0.2=0.5MPa-1,压缩模量Es=3.49MPa,固结快剪内聚力Cg=12KPa,固结快剪内摩擦角Фg=2.8o,各级压力下垂直固结系数Cv50=0.93×10-3cm2/s,标准贯入击数N63.5=2击。 2、设计要求 2.1在软土地基上修筑公路路堤,最突出的问题是稳定和沉降。为掌握路堤在施工期间的变形动态,必须进行动态观测。在施工过程中进行沉降和稳定观测,一方面保证路堤在施工过程中的安全和稳定,另一方面能正确预测工后沉降,使工后沉降控制在设计允许范围之内。 2.2观测点最好设在同一个横断面上,这样有利于测点的看护,便于集中观测,统一观测频率,更重要的是便于各观测项目数据的综合分析。 2.3 每200米设置一个监测断面,桥头段每50米设置一个监测断面,且第一个监测断面设置在桥头搭板末端。按照路基横断面图测放出路肩沉降板、路中沉降板、位移边桩的具体位置。 2.4沉降观测板采用500 mm×500 mm×10mm的方形钢板为底盘,用内径40mm的镀锌铁管作测杆,将测杆焊于底盘中心,测杆与底盘连接处,用对角布置的4条Φ12钢筋(L行,边长100mm×100mm)帮焊。测杆第一节长1m,以后每节长度约1-1.2 m用水管接头(标准件)连接。位移边桩位采用1500mm ×100 mm×100 mm的砼预制桩。位移边桩埋设地下部分不小于1.2米,外露部分不小于0.1米。 2.5路堤沉降:在路基施工前,用DSZ3型水准仪以二级中等精度要求的几何水准测量测出沉降板的原始高程。在施工期及预压期按设计及规范要求定期观测沉降,并做好详细记录。 2.6地表土水平位移:在路基施工前,用全站仪采用坐标法测量位移边桩的坐标。在施工期及预压期按设计及规范要求定期观测位移边桩的位移情况,并做好详细记录。 2.7监测频率:试验段开始填筑后,填筑期间每日观测2次。 2.8监测工作时间进度根据施工进度安排,与施工紧密结合,确保整个工作协调进行。路堤中心线的沉降值应小于10mm/天,位移边桩的位移小于5mm/天,方可进行下一层的填筑。 2.9设计预压时间按6个月考虑,但实际预压时间应根据沉降观测及稳定要求确定,但至少保证预压一个雨季以上。本项目开工后应优先安排软土地基路段路基土石方的工程施工,确保预压效果。 3、处理路段及方案 本合同段的软土路基分布情况及处理方案,具体见下表:

路基沉降观测方案说明

新泾路东延工程(苏虞张~塘桥北环段)(K0+235~K4+443.59) 沉降观测 施 工 方 案

新泾路东延工程项目经理部 2012年8月 沉降观测实施方案 一、总则: 为掌握路堤在施工期中的变形动态,道路的变形监测工作是评价道路路基处理方式适宜性的重要手段之一,由于该工程项目所处的区域和地质情况,需要客观、科学地了解和掌握路基沉降的原因、搞清填筑材料、填筑高度与路基沉降的关系、路基的沉降规律,为减少或消除路基沉降引起的质量病害和指导路基、路面施工提供依据,保证道路的正常施工与运营。 二、编制依据: 1、新泾路东延工程施工图设计要求; 2、《工程测量规范》,GB50026-2007; 3、《国家一、二等水准测量规范》,GBT12894-2006; 4、《公路路基施工技术规范》,JTGF10-2006; 三、路基沉降位移观测技术要求: 1、观测断面设置桩号: K1+200、K1+250、K1+300、K1+745、K1+795、K1+900(河塘)、K3+460、K3+560、K3+640、EK0+060(河塘)、

FK0+280(河塘)、K2+054(箱涵) 、K2+407(箱涵) 、K2+924(箱涵) 、K4+020(箱涵) 、K0+594(箱涵),设置沉降板。 以上沉降断面的设定均根据本工程堆载预压段落设置。 本工程堆载预压段落为: ①、K1+180-K1+310、K1+735-K1+960、 K3+460-K3+570、K3+630-K3+700锡十一圩大桥及规划桥两侧高填方段落; ②、EK0+042-EK0+160、FK0+200-FK0+355互通区 匝道段; ③、K2+054、K2+407、K2+924、K4+020等4道箱涵, 堆载至河道两侧河岸线外侧各5m; ④、K0+594(8*4.5m)箱涵,堆载范围为箱涵加两侧开 挖回填宽度。 以上堆载部位堆载高度2.5m。 2、沉降位移观测点布设 本工程路基沉降观测布设根据不同地质情况、不同部位变化情况设置3种断面类型: (a)断面一:一般堆载预压段,沉降观测板在每个断面设置3处,分别位于路中和两侧路肩位置处; (b)断面二:堆载预压段且为河塘部位,仅在路基中心布置一个观测沉降板;

影响高速公路路基沉降的因素与防治措施

影响高速公路路基沉降的因素与防治措施 在路面的施工中最根本的是路基,在建筑高速路中,要把会对路基的稳定性以及强度产生作用的各个要素开展具体的解析,实施一定的手段,保证路基稳定性以及强度的建筑。文章主要讲述了路基发生下沉现象的原因,同时给出了治理办法。 标签:公路路基;沉降因素;防治 1 路基沉降的影响因素 1.1 路基土的应力对沉降的影响 通常软体能够区分为正常以及超常固结两种形式。压密土具有早期固结压力Pc。只有在外部施加的负荷高过压力Pc之后,土才能够被压密,剪应力形状变化的作用才越来越显著。针对还没有固结的土,因为早期凝固的应力比现在的自身重量轻,换句话讲,在自身重力应力影响下还没有全部的凝固,在地基上方没有施加的外力符合情况下,土里的有用应力在增长,当有用应力比自身重力的应力大时,才能够全部凝结。超常固结土,在早期其自身重力的应力就比凝结的应力小,如果外部施加的负荷产生的应力和自身重力产生的应力加起来比早期固结应力小,其变形情况就小。 1.2 填土高度对路基沉降的影响 填筑土越高,地基的下沉以及侧向移动也就越厉害。所以在策划路堤时,大多要规定出其高度,降低自身的重量,借此来降低路基的下沉。经过观察检测得到的数据解析,路基填筑土不多时,其下沉的情况和填筑土的高度不成正比。 1.3 路基填土压实度的影响 填筑土压实不够,就会出现土体早起凝固应力比自身重力的应力以及外加负荷产生的应力之和小,在自身重力应力的影响下会出现形状改变的现象,这些外加负荷主要有:车辆载重,特别是超载的现象;水分的变化会使土体的容量随之产生变化;地下水位的变化会使浮力产生变化;土体饱和情况的变化,会使孔缝水分压力产生变化。这些外加的负荷产生的应力会使土体应力产生变化,进而使土体的形状产生变化。土体压实不够还会使填筑路基侧向产生形状的改变。现在使用的地基下沉算计方式是假设其侧向不变,只有竖向产生改变,但是在实际的建筑中侧向也有形状改变的现象,其会导致土体下沉。 1.4 地下水位变化对路基沉降的影响 由于地下水位下降引起的地基荷载的增加,其稳定状态下的大小是土层由浮容重变成天然容重后引起的自重应力的增加。所以,地下水位下降到稳定状态下

高铁路基沉降观测方案

DK887+~DK889+段路基工程 观测、检测方案 一、观测方案 1、路基变形监测控制技术措施 高速铁路路基作为变形控制十分严格的土工构筑物,沉降变形监测应作为路基施工中的重要工序,贯穿整个路基施工始终。 路基沉降变形监测主要是测定每一层填料填筑过程中的地基沉降及整体水平位移和路基成型后的地基沉降及路堤本身的沉降值。在填筑施工期间,填土速率根据观测情况确定,如地基稳定情况良好可以酌情加快,反之减缓填土速率,当边桩横向位移大于5mm/d,地面沉降超过10mm/d时,停止填土。路堤填筑完成后,根据观测的数据绘制时间和沉降曲线,预测总沉降和剩余沉降。 该段路基沉降变形监测主要是路堤基底沉降监测和路基面沉降监测。 路基沉降变形监测施工工艺流程见图1。 2、监测测试项目 以路基中心沉降监测为重点,其他包括路基面位移监测、基底沉降位移监测、路堤本体沉降监测、深厚层第四系地层的深层沉降监测,另外还有软土或松软土地段的边桩位移监测等。 ⑴路堤基底沉降监测 每10~100m设一个监测断面,桥路过渡段必须设置。每个监测断面预埋1~3个沉降板(软弱地基时3个)。路堤填筑前,于路堤基

底地面预埋沉降板进行监测,每个监测断面预埋3个沉降板。沉降板 满足要求 图1 路基沉降变形监测施工工艺流程图

由沉降板、底座、测杆(ф=20mm钢管)及保护测杆的ф=49mmPVC 塑料管组成。随着填土的增高,测杆与套管亦应相应加高,每节长度不超过100cm,接高后的测杆顶面应高于套管上口,在填土施工中应采取措施保护测沉设施。 沉降板安装前应先将地面整平(可铺设0.1m厚中粗砂),注意保持底板的水平及垂直度。填土高度小于2.0m时,每两天观测一次,超过2.0m后,要求每天观测一次,在沉降速率较大的情况下,还应加密观测。地面沉降量用仪器测量,精度要求准确到±1mm。每天的观测数据都要及时整理并绘制“填土高~时间~沉降量”关系曲线图。 ⑵路基面沉降监测 路堤地段每50m设一个监测断面,桥路过渡段必须设置,且应加密。每断面3个监测点。分别于路基中心、两侧路肩各设一个监测桩(包桩),路基成形后设置。监测桩采用C15混凝土方桩或圆桩(边长或直径0.1m),其中埋设ф16mm钢筋一根,桩长0.6m,埋入基床表层以下0.55m。 ⑶测量的精度及频度 观测频率应与位移速率相适应,位移越小,观测频率也可减慢,反之位移越大,观测频率越要加快。当位移曲线骤然变大时,更要跟踪观测,分析原因,并考虑是否需要采取措施。 测量精度按二级水准测量标准;测量频度:在路堤填筑期间,每天监测一次,各种原因停工期间,前2天每天监测一次,以后每3天测试一次。填筑施工完成后,前15天内每3天监测一次,第15~30天每星期监测一次,第30~90天每15天监测一次,以后每个月监测