An Information-based Integration Framework to Support Building Construction Industry

Prince Joseph Sackey

Department of Information Technology, Academic City College, Accra, Ghana

Email: prince.sackey@https://www.360docs.net/doc/c68312686.html,

Received: 02 June 2017; Accepted: 07 August 2017; Published: 08 January 2018

Abstract—Information integration provides the basis for effective team work. The research work is aimed at for-mulating a framework of information integration to sup-port the building construction industry. A conceptual model was created based on the requirements obtained from the industry. Qualitative research and quantitative research were adopted for the study which involves ex-pert opinion, data requirements and data collection meth-od, data analysis and sensitizing concepts. Questionnaire was developed and administered based on the information obtained from the interview. Drawing on the interviews and the questionnaires administered, a framework was developed to harness the information needed for con-struction projects. This paper provides members such as land surveyor, contractor, quantity surveyor, engineers, architect and project manager in a team the platform to execute their work from anywhere and anytime without delay. The major advantages of this framework are: to provide members of a building construction team to work from anywhere and at any time and to articulate their activities in a way that can help develop positive work culture. Finally, the framework will enable information system developer develop a system to support building construction work activities.

Index Terms—Component, Tacit and explicit infor-mation, sensitizing concept, information integration.

I.I NTRODUCTION

Information integration is defined as combining of all the organizations dispersed information resources in or-der to apply them in production, and as a means of creat-ing new information out of different and novel combina-tions of existing information [1]. Information has become a globally acceptable medium for industrial development. For this reason, Information needs to be well harnessed for better usage. The presence of available information that can support a project in the building construction industry will facilitate and speed up work processes; hence is difficulty to harness this information. However, it will put impediments in the project team to complete their work as scheduled without unnecessary delays. In-formation, when in discrete parts, is difficult to use. It is important for companies which want to have competitive advantage to capitalize on the information gained in other projects in future projects. This ensures that mistakes are not repeated, thus giving them advantage over their com-petitors. Companies with the vision of remaining on top of the industry in which they operate must devote about one percent of their total revenue towards Information Management [2]. Putting together different aspects of information for the purpose of reuse to achieve a common goal is referred to as information integration.

The individual team members will be given access to all the needed information to complete a project at hand. This is because if a team leader needs information that will enable him or her execute his or her duty and the necessary information is not at hand, it will cause delay in the work processes. The problem becomes severe in sit-uations where other members who have to deliver such information are not found on time or not available. However, if there is a common place where all infor-mation in the organization is harness and kept at an ap-propriate time, this delay will be prevented because each member can log into the resource and have the necessary information needed. Many a time building construction industries may have similar projects of which they may not necessarily need to start from scratch because this project has been executed before; however, if information acquired from previous projects was not kept for reuse, the whole project will have to be started all over again leading to delays and increasing cost.

Project documentation comes with hardcopy which makes the handling of such documents difficult. This may lead to loss of documents, and destruction resulting from poor handling by team members. The research work has identified all the major activities performed at building sites and has organized them in such a way that provides access to individual members in the team who require such information to perform their tasks during and after the execution of the project.

In order to complete this research work successfully, the following objectives will be addressed:

To evaluate the building construction process activities requirements that can enable the formulation of a frame-work for integration of knowledge in the building con-struction industry.

To create a conceptual model based on the construction process activities requirement on building site.

The following are research questions the study will seek to address:

What information is required from team members of a building construction to execute a building construction project?

How will these team members fit into a model to inte-grate the information from each member?

II.R ELATED W ORK

https://www.360docs.net/doc/c68312686.html,rmation Integration

Fig. 1 is a transmission of information framework for the construction industry in Malaysia. The information transmission in this framework lay emphasis on transmis-sion of information from the outside agencies to team member in a construction firm [3]. Its concentration was not on the information that is supposed to be shared among team members to complete a project but maintain-ing the Integrity of the Specifications. To make the first model in Fig. 1 properly integrate information, [3] intro-duced an elementary tactic of mapping transmission of information as shown in Fig. 2.

In view of these frameworks discussed, none these frameworks considered the integration of information based on disciplines and among team members within a project in the building construction industry. This paper sought to harness the knowledge based on major disci-plines for building projects in the building construction industry from the design stages of the project to the com-pletion.

B.Tacit and Explicit Information

Information which is tacit is difficult to validate and extremely personal. Understanding of individuals, guess-es and perceptions is categorized under this type of in-formation. Such information is soft and keeps in the head [4]. Tacit information is tougher to handover [1], [4] be-sides it forms from communal understanding [5]. An in-stance of tacit information is the difficulty in illustrating how to travel with an air craft prior to its use.

Fig.1. Transmission of Information (FK) Framework

Information which is explicit may be communicated in numbers or words. This will provide the information in codified processes and hard data form.

Fig.2. Information map strategy

Explicit information is independent and impersonal of the context and is also described as object and rule base [6]. Hence, explicit information can be developed by formal learning, attained without influence from the in-formation owner, and can be deposited in one location [5].

https://www.360docs.net/doc/c68312686.html,rmation used in Building Construction Project The construction process information needs should be extracted from all stakeholders in the building industry and should be duly integrated effectively [7]. Commend-able construction information integration with various phases of project development might overcome these challenges which could impede success in project execu-tion [8].

Reference [9] inferred that there can be an important contribution from contractors when they are called to take part or share their information during the initial phase of the building construction design activities. However, as [11] suggested, lack information from contractor in terms of misinterpretation or lack of appreciation that come from construction requirements has been as a result of their absence from the initial design. Reference [12] also acknowledged that the inability of Malaysian contractors to possess enough information, which has been an obsta-cle for the success of construction project, is as a result from the absence of contractor involvement at the design stage of the construction processes.

In the process of building construction, it has been not-ed that information is a very important asset which brings the process to success [13]. It has been identified that there must be major enhancement in knowledge and in-formation transmission within the building construction firm [14]. Nevertheless, there has been inadequate con-cern about transfer of information in construction pro-cesses of many countries especially Africa [15]. In view of these, this study sought to provide an efficient and effective way to disseminate information in building con-struction site.

https://www.360docs.net/doc/c68312686.html,rmation Based Systems (IBS)

Information Application System is a process that sup-ports some individuals to utilize Information from other individuals in the sense of not really learning, or acquir-ing, that Information. The following are Information ap-plication technologies that back the cause and procedure: help desk systems, troubleshooting systems, decision support systems, expert systems and advisor systems [22]. It also refers as a search program which is Inference En-gine (IE) and Information Base. The present Information in the Information base is deduced by the IE, which is a software program. A repository of Information in many ways can be accessed in the Information base. It was con-cluded that although there are many advantages of Infor-mation base system development and usage however, there is a difficulty when many individual possess the Information.

The amalgamation of Information estimation by credal sets (CSs) and Information depiction through focused acyclic graphs which brought about progress of credal networks (CNs) that is viewed generally to CSs of Bayes-ian networks (BNs). In view of this a formalism of CNs was used to build IBSs which in practice has shown to be effective. Based on hand-on experience, the proposed approach had satisfied many conditions which have prov-en to be important in effective and efficient illustration of an expert Information in a IBS. Examples are airspace surveillance and environmental monitoring. In Japan Toshiba was judged very progressive in the use of Infor-mation-based systems. They have many application types; however, the problem solving situation covers a wider range. The percentage of applications receiving opera-tional eminence is high. The integration of technologies and techniques range by Toshiba includes fuzzy expert systems, conventional order processing systems, case-based reasoning with neural nets, simulators, etc. Toshiba is no more limited to the initial stage of their application of stand-alone systems [23].

Information-based system applications in engineering design at MIT is a computer-aided process engineering software environment that permits designers to go about steadily among various engineering tasks. The Infor-mation-based methodology for query expansion in con-text-aware Information outline and selection. A prototype was built to realize this model. Their experimental results confirmed that the proposed approach can improve origi-nal precision of queries. AceProject developed by Web-systems International, a Canadian based company, was developed as a standalone platform to manage the organi-zat ion’s activities. Now it has been developed as a web-based project management suite of applications that sup-port the framework for improved planning, irrespective of the operation's size. AceProject is designed for any per-son or business trying to manage projects, tasks, or just business activities in general. It provides a free entry-level choice for organizations of small size which now can account for what happen daily, weekly, monthly or annually as recurring items and team task that the appli-cation user can request. It also provides for online project management and collaboration application [24].

III.M ETHODOLOGY

The research methodology adopted for this paper is the qualitative and quantitative research. The main goal of qualitative research is to invest igate people’s behavior to understand context and the particular situations they per-form their actions [16]. This section uses the following subheadings to explain the chosen methodology for the research study: Expert opinion, Data Collection Method, Data Analysis and Sensitizing Concepts. The quantitative was to get the views from construction team members on how best the building construction team will fit into the model so as to integrate the information from each mem-ber.

A.Expert Opinion

Information was gathered from twelve experts. Two each of the following: project manager, quantity surveyor, structure engineer, architect, building contractor and land surveyor in three building construction companies.

B.Data Collection Method

Interviews, observations and documents were used as the data collection method. These provided an opportuni-ty to ask questions that pertained to the research study from the experts. The field of study was observed and was related to some relevant documentation that was ex-tracted from other researchers.

C.Data Analysis

Coding and Conceptualization: The main objective of coding is to move away from the experimental material in a way that will prevent it from simple duplication [17]. In the first stage of coding a large amount of data were col-lected and, to reduce it, key words were used to select the important ones. In the second coding, focus coding of key words were used to gather and compare data from re-spondents or interviewees to ascertain conclusions from the interview. Finally, theoretical coding enables the re-search to formulate the framework to indicate how knowledge can be integrated to support construction in-dustry. The below table 1 shows how the detail of the description above was presented.

D.Sensitizing Concepts

There will be a deeper understanding of one’s own empirical work when there is a discussion of existing literature throughout the process of the research work [18]. All the major team members were not involved at all stages of the construction project. These result in poor construction of project due to lack of initial knowledge contributions from contractors concerning requirement of the project and contributions from all members through-out the construction work.

Table 1. Coding Process

Fig. 3 is a sequence diagram that indicates the work process of a construction industry. The client will request to put up a building, upon which he will discuss the de-sign with the architect. The architect will design the building with the help of the engineers (structural and services) and submit to the quantity surveyor to estimate the total cost of the building. The architect will submit the cost to the client, upon acceptance; he will award the con-tract to the contractor. As the building is under construc-tion the architect, engineers and the quantity surveyor will provide support services to the contractor until the completion of the building.

Fig 4 is the proposed sequence diagram. The land sur-veyor will submit the site plan to the framework, which the architect will access and discuss with the project manager as to how the client wants the building to be. Based on the discussions, the architect will draw the ini-

tial design and submit the initial design into the frame-work.

The framework will compare the initial design with the land size to see whether the proposed structure is feasible. The quantity surveyor will use the initial design to pro-vide advice on land economic matters.

Fig.3. Sequence Diagram for Current Work Process in Construction

Industry

The engineers will also provide their designs based on the initial design. The contractor will also contribute by giving advice as to the building requirements needed in the initial stage of the design development of the building. This will enable the contractor to have full knowledge of the building.

The architect will access all these contributions to as-sist him/her to provide the final building design. The quantity surveyor will access the final building design to estimate the total cost of the building and submit to the framework. The contractor will be awarded the contract through the framework and the contractor will acknowledge acceptance through the framework. During the construction of the building, the architect, engineers and the quantity surveyor will provide support service to the contractor until the completion of the building. Modi-fication or upgrade can be done simply through the framework and each team member can easily access it immediately. Documents and advice kept in the frame-work can be reuse when the need arises.

Fig.4. Sequence Diagram of Information integration for Construction Industry

IV.R ESULTS

Fig. 5 is an Information-Based Framework to support building construction industry. The framework was for-mulated based on the major disciplines for building con-struction projects. The major disciplines that were taken into consideration are land surveyor, architect, engineers, quantity surveyor, contractor and the project manager. The framework addresses the gap identified from the literature document and interviews with expert. The workflow in the construction project, as shown by litera-ture and the interviews, starts from the client having the idea to build and discussing with architect. Then the ar-chitect collaborates with the engineers to produce the drawings. The drawings are handed over to the quantity surveyor for bill of quantity and estimation of project cost. The next stage is to award the project to the contractor. In this sense, the contractor does not contribute during the initial design stage of the building project which results in poor construction work. Reference [19] confirms the fact that there can be an important contribution from contrac-tors to share their information during the initial phase of the building construction design activities. If not, it will result in misinterpretation or deficiency in the require-ments from contractors. The inadequacy of contractors’ information regarding a project is the outcome of their absence during initial design stage of the project [20]. The emphasis made by [21] concerning information inte-gration of construction project at each phase of the pro-ject development may curb the challenges with respect to quality, cost and time during project implementation.

In order to present good and economic building design, all the team members, land surveyor, architect, engineers, quantity surveyor and contractor should be present at the site for their initial contribution of information. The ar-chitect with the help of the engineers will put all these experts’ initial information contribution a bout the project into consideration to design the building. The designed work will be given to the quantity surveyor to estimate quantity of material and total cost of the building, which will lead to the bill of quantity. He will properly execute this through the contributions from all the team members at this stage. This outcome will be communicated to the project manager who is the representative of the client to inform the client about the total cost of the construction project to be discussed with the team. Acceptance or re-jection may be considered from the client base on the funds available for the project.

From the workflow discussed at each stage of the pro-cess, information will be available to all the team mem-bers. If the total cost of the construction is accepted by the client, then the contract will be awarded the contrac-tor to begin construction. Because, the contractor was involved during the initial stage of the design work, it will be easy to understand the design. Again, there will be contributions from all the team members from the initial stage of construction to completion through the frame-work. This will be easily facilitated through the imple-mentation of the framework.

Fig.5. A Knowledge-Based Framework to Support Building Construction Industry

Fig. 6 Building Construction information is Explicit

Fig. 6 indicates that 35 respondents representing 70% agreed that information used for building construction projects are explicit. This provide the basis that infor-mation for building construction is sharable. 12 (24%) respondents also disagreed and 3 (6%) were not sure on the issue.

Fig. 7 provides responses from respondents, 5 (10%) accept that the major information used for building construction projects are in the form of text based documents, 6 (12%) accepted drawings to be the major document, however, 39 respondents which represents 78% are of the view that both text and drawing are the major forms of information for building construction projects.

It is recorded in Fig. 8 that 35 respondents representing 70% accepted that building construction team members need to work at different times. For this reason, it has been necessary for the use of the model to serve as a platform for the various contribution from the individual team members. In addition, 10 (20%) are of view that their work should be at the same time and 5 (10%) also accepted both, that is different times and same time should be used.

From the Table 2 the probability value is greater than the significance level, so the hypothesis that harnessing all information needed for a building construction on one platform will help is accepted. This will enable all docu-ments needed for building construction project to be put on a system that will enable all the members in the con-struction team to access and make necessary changes and contributions to the whole team members.

Fig.7. Forms of Information

Fig.8. Team member Times of Work

Table 2. Harnessing all information needed for a building construction

on one platform will help

V.C ONCLUSION

This paper specifically provided building industries with an information-based integration framework to facil-itate construction projects. All team members can con-tribute to this information-based framework from the initial stage of construction to its completion. It will fur-ther harness the individual information that can be ac-cessed by each member if the need arises. It will again keep all contributed information in the framework for future use. Projects need not be always started from the scratch since related information needed is kept.

The study will further look at integration of software to provide a platform that members of the building construc-tion industry will used within the same environment to execute their task. Based on the information-based inte-gration framework a system will be built to integrate knowledge to support construction industry.

A CKNOWLEDGMENT

Is our desire to express our sincere appreciation to Mr. Ansong Danso for his contribution that brought the work to successfully completion.

R EFERENCES

[1]Grant, R. M, "Toward a Knowledge-Based Theory of the

Firm." Strategic Management Journal 17(Winter Special Issue):, 1996, pp.109-122.

[2]Bullen, D, Corporate Training & Development: How Top

Companies Make The ROI Case For Employee Training.

NY: Apollo light speed, 2014. Accessed from https://https://www.360docs.net/doc/c68312686.html,/sites/ default/ (9780262015080)

sch_0001.pdf on 4/11/2015

[3]Moh’d A. Z and Hilary, D, Knowledge transfer: A model

framework for construction knowledge integration. Con-

ference Papers. Paper 20. Geelong: Bond University ePublications@bond, 2011, Access from https://www.360docs.net/doc/c68312686.html,.au/cgi/viewcontent.

cgi?article=1019&context=aubea_2011 on 23/10/2016 [4]Ruppel, C., Harrington, S, Sharing Knowledge Through

Intranets: A Study of Organisational Culture and Intranet Implementation. IEEE Transactions on Professional Communication, 2001, vol. 44, issue 1, pp.37-52.

[5]Lam, A, Tacit Knowledge, Organisational Learning and

Societal Institutions: An Integrated framework. Organisa-

tion Studies (Walter de Gruyter GmbH & Co. KG.) 2000, vol. 21, issue 3, pp.487-513.

[6]Jonsson, A, Kuskaps?verf?ring och knowledge manage-

ment. Malm?: uppl. red. Liber AB, 2012.

[7]Eliufoo, H. K. (2005). Knowledge creation and transfer in

construction organisations, PhD Thesis, Tanzania: Royal Institute of Technology.

[8]Anderson, S.D. Fisher, D.J. and Rahman, S.P, Integrating

constructability into project development: a process ap-

proach, Journal of Construction Engineering and Man-

agement, 2000, 126 (2), pp 81-88.

[9]M. Young, The Technical Writer's Handbook. Mill Valley,

CA: University Science, 1989.

[10]Alshawi, M. and Underwood, J, Improving the construc-

tability of design solutions through an integrated system, Journal of Engineering, Construction and Architectural Management, 1996, 3(1/2), pp. 47-67.

[11]Arditi, D., Elhassan, A. and Toklu, Y.C, Constructability

analysis in the design firm, Journal of Construction, Engi-

neering and Management, 2002, 128(2), pp 117-126. [12]Saghatforoush, E., Hashim, S., Jaafar, M. D. and Abdul-

Kadir, M.R, Constructability implementation among Ma-

laysian Building Contractors, Scientific Research, 2009, 29(4), pp 518-532. Science, Department of Energy. Ac-

cessed from https://www.360docs.net/doc/c68312686.html,/au/awc/awcgate/doe /benchmark/ch05. pdf on 09/12/2015.

[13]Chen, L., and Mohamed, S. (2008), Impact of the internal

business environment of knowledge management within construction organisations. Construction Innovation, vol.8(1), pp 61-81.

[14]Zaidi, M.A. and Davies, H, A question of continuing con-

trol - balancing building quality of housing and building codes, In Proceedings, Building Australia's Future Inter-

national Conference, September pp. 20-23, 2009, Gold Coast, Australia.

[15]de Silva, N., Dulaimi, M., Ling, F. and Ofori, G, Improv-

ing the maintainability of buildings in Singapore, Building and Environment, 2004, vol. 39(10), pp 1243-1251. [16]Mishler, E. G, Validation in inquiry-guided research: The

role of exemplars in narrative studies. Harvard Education-

al Review, 1990, 60, 415–441.

[17]Kuckartz, U, Einführung in die computer gestützte Ana-

lyse qualitativer Daten. 3rd edition. Wiesbaden: VS Ver-

lag für Sozialwissenschaften, 2010.

[18]Corbin, J., & Strauss, A, The basics of qualitative research

(3rd ed.) Los Angeles, CA: Sage, 2008.

[19]Alshawi, M. and Underwood, J, Improving the construc-

tability of design solutions through an integrated system, Journal of Engineering, Construction and Architectural Management, 1996, 3(1/2), pp 47-67.

[20]Arditi, D., Elhassan, A. and Toklu, Y.C, Constructability

analysis in the design firm, Journal of Construction, Engi-

neering and Management, 2002, 128(2), pp 117-126. [21]Anderson, S.D. Fisher, D.J. and Rahman, S.P, Integrating

constructability into project development: a process ap-

proach, Journal of Construction Engineering and Man-

agement, 2000, 126 (2), pp 81-88.

[22]Becerra-Fernandez, I. and Sabherwal, R. (2010).

Knowledge Management: Systems and Processes. Ar-monk (N.Y.); London: M.E. Sharpe.

[23]Edward, F., Peter E. F., Bruce B. J., Penny N. H, Herbert

S., Howard S., Robert S. E (1993) Knowledge-Based Sys-tems In Japan. Japanese Technology Evaluation Center Japan: WTEC Hyper-Librarian

[24]Heather, C. (2012). Cloud-based project app now supports

repetitive tasks. ZDNet. Accessed from https://www.360docs.net/doc/c68312686.html,/article/cloud-based-project-app-

now-supports-repetitive-tasks/ on 11/10/2016

Authors’ Profiles

Prince J. Sackey comes from Accra,

James-Town, Ghana. He holds B.Ed Voca-

tional and Technical, M.Ed Information

Technology and M.Sc Information Tech-

nology from University of Education Win-

neba, Kumasi-Ghana, University of Cape

Coast, Cape Coast-Ghana, and Kwame

Nkrumah University of Science and Tech-nology, Kumasi-Ghana respectfully. He obtained B.Ed in 2003, M.Ed in 2012 and MSc in 2017.

He taught at several secondary schools from 1997 to 2014 and became a LECTURER in the department of Information Technology at Academic City College-Accra Ghana from 2014 to date. He has published six papers. These include Enforcing Dilution of Precision in Global Positioning System (GPS) (Imo: AJC & ICT, 2015), The Use of Agent Technology in Database Technology and Data Warehousing (Accra: IJICTM, 2015). Mr. Prince J. Sackey is a member of the IEEE.

How to cite this paper: Prince Joseph Sackey," An Information-based Integration Framework to Support Building Construction Industry", International Journal of Information Engineering and Electronic Business(IJIEEB), Vol.10, No.1, pp.31-38, 2018. DOI: 10.5815/ijieeb.2018.01.05

《2016-2020年建筑业信息化发展纲要》

附件: 2016-2020年建筑业信息化发展纲要 建筑业信息化是建筑业发展战略的重要组成部分,也是建筑业转变发展方式、提质增效、节能减排的必然要求,对建筑业绿色发展、提高人民生活品质具有重要意义。 一、指导思想 贯彻党的十八大以来、国务院推进信息化发展相关精神,落实创新、协调、绿色、开放、共享的发展理念及国家大数据战略、 “互联网+”行动等相关要求,实施《国家信息化发展战略纲要》,

增强建筑业信息化发展能力,优化建筑业信息化发展环境,加快推动信息技术与建筑业发展深度融合,充分发挥信息化的引领和支撑作用,塑造建筑业新业态。 二、发展目标 “十三五”时期,全面提高建筑业信息化水平,着力增强BIM、大数据、智能化、移动通讯、云计算、物联网等信息技术集成应用能力,建筑业数字化、网络化、智能化取得突破性进展,初步建成一体化行业监管和服务平台,数据资源利用水平和信息服务能力明显提升,形成一批具有较强信息技术创新能力和信息化应用达到国际先进水平的建筑企业及具有关键自主知识产权的建筑业信息技术企业。 三、主要任务 (一)企业信息化。 建筑企业应积极探索“互联网+”形势下管理、生产的新模式,深入研究BIM、物联网等技术的创新应用,创新商业模式,增强核心竞争力,实现跨越式发展。 1.勘察设计类企业。 (1)推进信息技术与企业管理深度融合。 进一步完善并集成企业运营管理信息系统、生产经营管理信息系统,实现企业管理信息系统的升级换代。深度融合BIM、大数据、智能化、移动通讯、云计算等信息技术,实现BIM与企业

管理信息系统的一体化应用,促进企业设计水平和管理水平的提高。 (2)加快BIM普及应用,实现勘察设计技术升级。 在工程项目勘察中,推进基于BIM进行数值模拟、空间分析和可视化表达,研究构建支持异构数据和多种采集方式的工程勘察信息数据库,实现工程勘察信息的有效传递和共享。在工程项目策划、规划及监测中,集成应用BIM、GIS、物联网等技术,对相关方案及结果进行模拟分析及可视化展示。在工程项目设计中,普及应用BIM进行设计方案的性能和功能模拟分析、优化、绘图、审查,以及成果交付和可视化沟通,提高设计质量。 推广基于BIM的协同设计,开展多专业间的数据共享和协同,优化设计流程,提高设计质量和效率。研究开发基于BIM的集成设计系统及协同工作系统,实现建筑、结构、水暖电等专业的信息集成与共享。 (3)强化企业知识管理,支撑智慧企业建设。 研究改进勘察设计信息资源的获取和表达方式,探索知识管理和发展模式,建立勘察设计知识管理信息系统。不断开发勘察设计信息资源,完善知识库,实现知识的共享,充分挖掘和利用知识的价值,支撑智慧企业建设。 2.施工类企业。 (1)加强信息化基础设施建设。

建筑业10项新技术(2017版)

建筑业10项新技术(2017版) 1 地基基础和地下空间工程技术 2 钢筋与混凝土技术 3 模板脚手架技术 4 装配式混凝土结构技术 5 钢结构技术 6 机电安装工程技术 7 绿色施工技术 8 防水技术与围护结构节能 9 抗震、加固与监测技术 10 信息化技术 1 地基基础和地下空间工程技术................. 错误!未定义书签。 1.1 灌注桩后注浆技术..................... 错误!未定义书签。 1.2 长螺旋钻孔压灌桩技术................. 错误!未定义书签。 1.3 水泥土复合桩技术..................... 错误!未定义书签。 1.4 混凝土桩复合地基技术................. 错误!未定义书签。 1.5 真空预压法组合加固软基技术........... 错误!未定义书签。 1.6 装配式支护结构施工技术............... 错误!未定义书签。 1.7 型钢水泥土复合搅拌桩支护结构技术..... 错误!未定义书签。

1.8 地下连续墙施工技术................... 错误!未定义书签。 1.9 逆作法施工技术....................... 错误!未定义书签。 1.10 超浅埋暗挖施工技术.................. 错误!未定义书签。 1.11 复杂盾构法施工技术.................. 错误!未定义书签。 1.12 非开挖埋管施工技术.................. 错误!未定义书签。 1.13 综合管廊施工技术.................... 错误!未定义书签。 2 钢筋与混凝土技术........................... 错误!未定义书签。 2.1 高耐久性混凝土技术................... 错误!未定义书签。 2.2 高强高性能混凝土技术................. 错误!未定义书签。 2.3 自密实混凝土技术..................... 错误!未定义书签。 2.4 再生骨料混凝土技术................... 错误!未定义书签。 2.5 混凝土裂缝控制技术................... 错误!未定义书签。 2.6 超高泵送混凝土技术................... 错误!未定义书签。 2.7 高强钢筋应用技术..................... 错误!未定义书签。 2.8 高强钢筋直螺纹连接技术............... 错误!未定义书签。 2.9 钢筋焊接网应用技术................... 错误!未定义书签。 2.10 预应力技术.......................... 错误!未定义书签。 2.11 建筑用成型钢筋制品加工与配送技术.... 错误!未定义书签。

中国建筑业信息化发展报告

中国建筑业信息化发展报告 改革开放30多年来,我国建筑业得到了持续快速的发展,建筑业在国民经济中的支柱产业地位不断加强,对国民经济的拉动作用更加显著。数据显示:近10年来,我国建筑业市场一直保持着年均22%的高速增长,2009年建筑业总产值已经达到7.58万亿,其增加值占当年GDP总值的6.66%。 然而与发达国家相比,我国建筑业的劳动生产率仅相当于欧美国家的4%,企业的平均利润率仅为1%~2%。导致目前现状是多钟原因的结果,建筑业信息化建设相对落后,也是制约建筑业有好有快发展的重要原因之一。2007年,我国已实施信息化建设的建筑业企业对信息化的投入平均只占企业产值的0.027%,而发达国家建筑业企业这一数字在0.3%以上,相差了11倍之多。值得庆幸的是,在国家信息化与工业化融合的整体战略下,2003年原建设部出台《2003-2008年全国建筑业信息化发展规划纲要》。2007年原建设部《施工总承包企业特级资质标准》(建市〔2007〕72号)第三大条第五项中规定只有符合“企业已建立内部局域网或管理信息平台,实现了内部办公、信息发布、数据交换的网络化;已建立并开通了企业外部网站;使用了综合项目管理信息系统和人事管理系统、工程设

计相关软件,实现了档案管理和设计文档管理”等条件的建筑业企业,才具备申报特级资质企业的资格。在政府的大力推动下和企业自身提升核心竞争力的原动力需求下,越来越多的建筑业企业开始了全面信息化建设,信息化作为巨大生产力,对企业提高效率、提升管理以及降低成本都发挥着越来越重要的作用。 回顾和展望我国建筑业信息化发展历程,与计算机软硬件、通信技术为代表的信息技术的高速发展和广泛应用是分不开的,结合信息技术发展历程和信息化涉及企业运营管理范围,从20世纪80年代建筑业信息化建设起步,建筑业信息化发展可以归纳划分为个人级、部门(项目)级、企业级以及联盟体级四个阶段(见图1),大部分企业已经历了第一、第二阶段,第三阶段为大都企业正在进行的阶段,第四阶段为未来发展的趋势。 图1:建筑业信息化发展阶段划分

实验室信息化管理现状和信息管理平台的必要性 (2)

实验室信息化管理现状和信息管理平台的必要性 很多实验室,处于深化市场机制的过程中,还未采用各种现代化管理手段,作为实验室主管,无法快速、全面、准确地掌控合同状况、试验进度、人员管理等实验室信息;人员和任务分配过程较复杂;检验任务书、试验报告、原始记录等信息需要重复录入,而且查询、生成不方便;实验仪器设备的查询、维修、校准、各种标准文本的发放、查询等管理手续繁琐;从检验任务书的传递、检验,以及检验报告等都由人工处理;虽然各部门都配备了电脑,但是大多数部门的计算机都是独立使用,没有很好地实现资源共享。这种不适应当前检验工作需要的现状,说明了引入实验室信息管理平台的必要性。 LIMS可用于管理完整的实验程序,从样品登记到检验、校核、审核到最终批准报告,建立在过程质量控制的基础上,对检测流程进行有效全面的管理,对影响质量的人、机、料、法、环因素加以控制,同时为质量改进提供数据依据。进行LIMS功能模块设计,可有以下几个模块:委托管理:样品登记、样品接收、留样管理、客户管理;实验管理:任务分配、检验结果输入、报告校核、报告审核、报告批准、规程管理、仪器管理、系统管理等 青之软件专业从事实验室软件开发已经有十多年了,系统符合17025的管理体系,功能涵盖业务受理、出具报告、收费、人机料法环等所有常见的管理职能、帮助实验室改善管理、提升竞争力,在不同的模块下可以对相应的部门进行一个系统的归纳和管理。不仅方便了部门员工平时对于工作进度和结果的查看,也方便了管理者整体把握实验室的各项信息。 支持标准:ISO/IEC 17025、E1578 实验室类型:第一、二方实验室,第三方实验室 细分行业:综合质检、食品药品、检验检疫、计量校准、纤检、环检、石油化工、机械制造、电子电器等全行业支持。

信息化应用需求及分类

信息化应用需求及分类 建筑行业信息化可分为企业管理层面和工程项目管理层面。当前,我国建筑施工企业管理又可细分为集团公司(工程局)和子公司(工程处)两个层次的管理。集团公司(工程局)的主要管理业务为:集团公司的经营、计划、人事、财务、技术管理;对所属分公司的管理以及对所属重点项目的综合信息处理。子公司(工程处)的主要管理业务为:子公司的经营、计划、人事、财务、技术管理;对所属项目的综合信息处理。工程项目管理的主要管理业务为:与具体工程项目相关的信息处理。如,招投标、预决算、施工组织与计划、合同管理及施工现场管理等。目前,大部分企业尚未形成企业指导项目、项目依托企业,协调发展的信息化管理体系。因此,根据行业特点,我们通常将应用软件分为以下三类:①工具类 钢筋优化下料及统计技术、模板及脚手架CAD设计技术、混凝土搅拌站的自动计量、混凝土成熟测量、具有三维计算深基坑支护与支撑结构设计以及实验室数据的自动采集软件等。能与设计数据相衔接的三维图形算量技术、依据工程量清单进行计价技术、工程量自动计算技术、施工组织设计编制、竣工图纸绘制、设计图纸现场CAD放样以及大型工程机械使用卫星定位技术、装饰工程三维CAD设计技术、IP视频监控技术。②管理类 (1)项目级 工程报价、项目成本管理、进度计划控制、项目物资管理、项目设备管理、项目质量管理、项目安全管理、协同项目管理、三维CAD技术在施工过程中的应用技术,多项目综合管理;工程设计方面的模型设计技术、可视化智能设计技术、智能化二维工程设计和三维协同设计集成技术、协同设计技术等。 (2)企业级 财务管理、资金管理、合同管理、人力资源管理、物资材料采购管理、办公(OA)管理、图纸档案管理、基础数据库建设、设计数据转入施工阶段使用技术;知识管理、客户资源管理;企业资源计划管理(ERP)。 ③标准类 基础信息编码标准、信息交换标准、WBS分类编码标准、工作流程标准、其它与信息化相关的标准。 ④信息化对需求的支持 信息技术是增强企业综合实力和市场竞争能力的有效手段,它可以有效地提高决策水平,提高工作效率,提高产品及服务质量,提高企业的市场反应能力,提高创新能力,提高企业的生产自动化水平,降低产品及管理成本,促进市场销售,改善企业内部管理,优化企业供应链和产业链,进而大幅度提高经济效益。为达到以上目标,在基础平台建设方面,采用当今国内外先进的技术手段,建成以光纤通讯为主,综合利用卫星通讯、数字微波、无线通讯、互联网等方式,建立起以总部为中心,向外呈星状辐射的覆盖全国及世界各地的主要

建筑企业信息化建设

建筑企业信息化建设 编制:闫军伟 单位:河南振华建筑有限公司

建筑企业信息化建设 随着市场经济的发展,建筑行业的竞争日趋激烈,传统的管理理念和手段已无法适应建筑业快速发展的要求。在激烈的市场竞争中,建筑企业能否为社会提供质量高、工期短、造价低的建筑产品,成为制约建筑企业成败的关键因素。充分运用信息技术所带来的巨大生产力,提高自身的信息化应用水平和管理水平,无疑将成为保证企业成功的重要砝码。 一、建筑企业信息化的内容和作用 建筑企业信息化包括两个层面:一是企业管理信息化。企业管理已经历了数据管理一信息管理一知识管理的发展历程,其中,数据是企业最原始的资源,信息是有用资源,而知识是有价值的资源。在强调知识管理的今天,信息化是企业知识管理的根本途径。二是工程项目管理信息化。建筑企业的发展是以工程项目为载体的,在项目建设过程中,从项目前期决策到规划设计,再到项目实施及竣工试运行分为四个阶段。特别是项目的进度、成本、质量、安全、环保、合同等方面的信息浩如烟海,难免处于失控状态。运用信息技术和网络化进行企业扁平化、现代化管理,建立远程动态监控体系,增强了企业和项目管理的可控性,以实现企业法人零距离管理项目的目标。 建筑企业信息化从企业的管理能力角度来看可提升企业业务流程的速度,加快信息交流,从而提高企业的管理水平和效率,加快企业信息化建设,用现代手段实现人力、资金、物料、信息资源的统一规划、管理、配、置和协调,使信息技术与管理业务流程相互整合,

使信息网络成为项目信息交流的载体,从而加快项目管理系统中的信息反馈速度和系统的反应速度,提高企业管理效率,突破地域限制,实现跨地域管理。 建筑企业信息化从企业工程项目角度看,通过信息系统不仅可以建立全面预算机制,缩短预算周期,同时通过严格的项目成本管理,可以做到质量有依据、消耗有定额、管理有规范。构建合理有效的预算计划体系对成本进行全面控制,不仅可以有效的预防账目不清,还将企业施工生产各环节用计算机进行及时信息处理,并在企业内部形成网络,做到企业人员流、资金流、物资流和信息流的集成科学管理,方便了企业管理者对每个项目进行实时监控了解运作情况,使企业组织整体高效运行。 建筑企业信息化从企业总体整合能力方面看,信息技术能够形成企业的超强核心竞争力,带动企业的发展。通过使用信息化技术能够将建筑企业的施工、财务、材料采购、劳资等内容整合、提炼升华,能够将企业总部、专业子分公司、外地项目部的三级管理层连成一个有机整体,提高企业整体竞争力。 在当今以信息化带动工业化、城市化发展进程已经是一个全面而广泛的共识。但信息化在建筑业相较于其他行业,还呈现出发展水平不高、发展速度不快,尤其作为最为核心的产业环节一一工程项目管理信息化仍发展缓慢、踯躅不前,信息化仍未成为企业主要/核心竞争能力。其实决定企业信息化成功与否的因素很多,实施信息化失败的表面现象也不尽相同:软件功能不能满足业务需求;数据不能及时

建筑业10项新技术(2017年最新版)

建筑业10项新技术(2010年版) 1地基基础和地下空间工程技术 1.1灌注桩后注浆技术 1.2长螺旋钻孔压灌桩技术 1.3水泥粉煤灰碎石桩(CFG桩)复合地基技术 1.4真空预压法加固软土地基技术 1.5土工合成材料应用技术 1.6复合土钉墙支护技术 1.7型钢水泥土复合搅拌桩支护结构技术 1.8工具式组合内支撑技术 1.9逆作法施工技术 1.10爆破挤淤法技术 1.11高边坡防护技术 1.12非开挖埋管技术 1.13大断面矩形地下通道掘进施工技术 1.14复杂盾构法施工技术 1.15智能化气压沉箱施工技术 1.16双聚能预裂与光面爆破综合技术 2混凝土技术 2.1高耐久性混凝土 2.2高强高性能混凝土 2.3自密实混凝土技术 2.4轻骨料混凝土 2.5纤维混凝土 2.6混凝土裂缝控制技术 2.7超高泵送混凝土技术 2.8预制混凝土装配整体式接受施工技术 3钢筋及预应力技术 3.1高强钢筋应用技术 3.2钢筋焊接网应用技术 3.3大直径钢筋直螺纹连接技术 3.4无粘结预应力技术 3.5有粘结预应力技术 3.6索结构预应力施工技术 3.7建筑用成型钢筋制品加工与配送技术 3.8钢筋机械锚固技术 4模板及脚手架技术 4.1清水混凝土模板技术 4.2钢(铝)框胶合板模板技术 4.3塑料模板技术 4.4组拼式大模板技术 4.5早拆模板施工技术 4.6液压爬升模板技术

4.7大吨位长行程油缸整体顶升模板技术 4.8贮仓筒壁滑模托带仓顶空间钢结构整安装施工技术 4.9插接式钢管脚手架及支撑架技术 4.10盘销式钢管脚手架及支撑架技术 4.11附着升降脚手架技术 4.12电动桥式脚手架技术 4.13预制箱梁模板技术 4.14挂篮悬臂施工技术 4.15隧道模板台车技术 4.16移动模架造桥技术 5钢结构技术 5.1深化设计技术 5.2厚钢板焊接技术 5.3大型钢结构滑移安装施工技术 5.4钢结构与大型设备计算机控制整体顶升与提升安装施工技术5.5钢与混凝土组合结构技术 5.6住宅钢结构技术 5.7高强度钢材应用技术 5.8大型复杂膜结构施工技术 5.11模块式钢结构框架组装、吊装技术 6机电安装工程技术 6.1管线综合布置技术 6.2金属矩形风管薄钢板法兰连接技术 6.3变风量空调系统技术 6.4非金属复合板风管施工技术 6.5大管道闭式循环冲洗技术 6.6薄壁不锈钢管道新型连接技术 6.7管道工厂化预制技术 6.8超高层高压垂吊式电缆敷设技术 6.9预分支电缆施工技术 6.10电缆穿刺线夹施工技术 6.11大型储罐施工技术 7绿色施工技术 7.1基坑施工封闭降水技术 7.2基坑施工降水回收利用技术 7.3预拌砂浆技术 7.4外墙自保温体系施工技术 7.5粘贴式外墙外保温隔热系统施工技术 7.6现浇混凝土外墙外保温施工技术 7.7硬泡聚氨酯外墙喷涂保温施工技术 7.8工业废渣及(空心)砌块应用技术 7.9铝合金窗断桥技术 7.10太阳能与建筑一体化应用技术 7.11供热计量技术

试验室信息化试题1

试验室信息化系统试题 姓名:职务:得分: 1、登记信息化软件后,第一次录入试验项目,应该,将右侧模板窗口的模板拖拽到相应的工地试验室节点下,松开,弹出后,试验模板添加成功。 2、新录入的试验报告,可以右键点击,选择,全部内容重新填写;也可以选中最近的一份已经录入完成的试验报告,右键点击,,粘贴后的资料保留部分固定不变的内容,仅需要填写或更改其他变化的部分,如、、、试验数据等。 3、试验数据录入过程中,系统设置了公式和,录入试验数据,系统,另外相同内容单元格只需填写一次,其他单元表中的此单元格,完成后点击保存。 4、原材料模板内包含。试验数据录入完成后,应完善表内内容,并及时进行报验。 5、、为试验后数据自动采集,其他试验均为试验后。数据自动采集试验,应先填写好,之后登陆试验采集系统,采集,试验完成后试验数据自动采集上传至信息化软件对应的试验记录报告模板中。 6、为保证试验资料的,防止用户,系统

设置了指定用户自己上传的资料,如果确实需要修改,需要通过系统向权限部门(如、业主用户)提交申请,通过审批后,改用户才能修改资料。 7、试验数据修改申请应先从台账模板上找到要修改的资料,双击打开该条资料的编辑界面,点击左上角的打开申请界面,输入申请修改的和,必须如实填写,点击确定等待即可。监理查看施工单位的申请原因和内容,填写相应的,点击后,申请的用户打开自己试验资料可以进行修改,若点击,则用户申请的资料不能修改。(对于采集上传的试验数据,如需修改应在申请监理审批过后联系做相应处理。此类常见的修改原因如:试验过程中、等。)8、用户在台账上可以通过来查询需要的资料。例如要查询某个已知试验编号的试验报告,首先进入该报告的台账模板,在报告编号标题栏上点击右键,在左侧筛选栏里输入要查询的试验报告编号,点击左下角即查询到所要查询的资料。 9、登记试验软件界面后,在软件正下方存有待做事项列表一栏。点击该栏,会弹出四个标题栏:、、、。 10、用户可以通过工具栏查询以往的不合格报告。具体路径为:工具栏- -查询不合格报告。

浅谈建筑施工企业信息化的应用与发展

龙源期刊网 https://www.360docs.net/doc/c68312686.html, 浅谈建筑施工企业信息化的应用与发展 作者:张弦 来源:《数字化用户》2013年第18期 【摘要】当前世界正在经历一场革命性的变化,即信息技术革命,信息技术的发展将显 著推动人类文明的进步,信息化是时代发展的大趋势。对于建筑施工这一传统行业而言,信息技术早已被人们发现并使用,然而经历数十年的探索研究成功者甚少。随着我国经济的快速发展,工程项目规模不断扩大,施工的难度增加,质量的标准提高,建筑施工企业的市场竞争也日趋激烈,施工企业想要在现代化的市场中立于不败之地,在强化“硬实力”的同时,还要不断提升“软实力”,在这一时代背景下建筑施工企业对信息化的需求也日趋强烈。 【关键词】建筑施工信息化网络 当前世界正在经历一场革命性的变化,即信息技术革命,美国著名的未来学家阿尔文·托 夫勒认为,信息化是时代发展的潮流,是先进生产力,“信息化将促进人类社会发展”的概念得到了普遍的认同。实际早在上世纪中叶,就有先驱者依照工业化发展的问题,提出了信息化管理概念。至90年代,世界各国便相继开始了信息基础建设。然而目前还没有一个国家真正地进入信息时代,世界正处于新旧交替之中,拥有信息和知识的国家将走在世界的前端。在中国,信息化早已定义为现代化的必经之路。2011年5月住建部发布《2011—2015年建筑业信息化发展纲要》,《纲要》提出全国的施工企业应在“十二五”期间基本实现建筑企业信息系统的应用普及。2012年5月又发布了《建筑施工企业信息化评价标准》作为行业标准。说明国 家层面已经开始重视并引导这一发展趋势并之做好了准备。建设施工企业作为推动社会经济发展的重要组成部分,在产业变得越来越知识密集型,竞争越来越激烈时,如何进行信息化管理,提高竞争力,在市场中占取成本、技术优势已经是必不可少的重要研究课题。下文就如何推动信息化应用和发展进行简要探讨。 一、建筑施工企业信息化的概念 信息化是信息技术的采用过程,建筑施工企业信息化是利用网络、计算机、通信技术为核心,企业内部外部相结合,充分开发和利用信息资源,加速信息流通,及时把握机会事项信息共享,提高信息的利用率,以便做出科学合理的决策,对外界需求做出迅速反应,从而到达提高企业生存能力、适应能力、核心竞争力和盈利能力的目的。 二、建筑施工企业信息化的优势 (一)快速信息传递,提高工作效率 企业的决策可通过信息化交流的平台,高效的发送至各部门的基层单位,使决策者通过网络实时有效的掌握一线的工程进度和质量等信息。在管理过程中灵活的组织管理技术文档,对

建筑业10项新技术应用及推广

建筑业10项新技术推广及落实计划 一、概述 新修订的《建筑业10项新技术》充分吸纳了近几年来工程实践积累产生的先进技术、促进节能降耗的适用新技术,基本反映出现阶段工程技术领域最新先进技术成果。通过新技术的学习,有助于企业了解和把握目前行业技术发展方向,更好地在项目上运用新技术推动行业发展。 二、主要内容 十项新技术是以下十项: 1地基基础和地下空间工程技术 2 混凝土技术 3 钢筋及预应力技术 4 模板及脚手架技术 5 钢结构技术 6 机电安装工程技术 7 绿色施工技术 8 防水技术 9 抗震加固与监测技术 10 信息化应用技术 三、现场应用及推广 通过学习新修订的《建筑业10项新技术》并结合本项目实际情况,对10项新技术的应用及推行做一下阐述: (一)、混凝土技术 1、自密实混凝土技术 自密实混凝土,混凝土拌合物不需要振捣仅依靠自重即能充满模板、包裹钢筋并能够保持不离析和均匀性,达到充分密实和获得最佳的性能的混凝土,属于高性能混凝土的一种。自密实混凝土技术主要包括自密实混凝土流动性、填充性、保塑性控制技术;自密实混凝土配合比设计;自密实混凝土早期收缩控制技术。 本项目工程地下室顶板为400厚空心板,采用的是φ250的空心管间距@60作为空心骨架;考虑到顶板配筋密及空心管间距小,采用普通混凝土浇筑密实性不能得到有效保证,拟采用此自密实性混凝土进行浇筑,这样一来就可以很好地避免因振捣不

到位而造成蜂窝麻面等质量问题。 (二)、钢筋技术 大直径钢筋直螺纹连接技术 钢筋直螺纹连接技术是指在热轧带肋钢筋的端部制做出直螺纹,利用带内螺纹的连接套筒对接钢筋,达到传递钢筋拉力和压力的一种钢筋机械连接技术。目前主要采用滚轧直螺纹连接和镦粗直螺纹连接方式。技术的主要内容是钢筋端部的螺纹制作技术、钢筋连接套筒生产控制技术、钢筋接头现场安装技术。 本项目工程主体地下室及地下室车库梁、柱配筋多为大直径三级筋,根据设计及规范要求,≥Φ22的钢筋全部采用直螺纹套筒连接的形式进行连接,为更好指导现场施工,保证施工要求,并编制了具体的钢筋施工方案,现在现场已经应用。(三)、模板及脚手架技术 1)、清水混凝土模板技术 清水混凝土模板是按照清水混凝土技术要求进行设计加工,满足清水混凝土质量要求和表面装饰效果的模板。 本项目工程计划在地下室部分拟进行推广使用次项技术,一、可以有效减少后期的粉刷及修补;二、可以节约人力和物力;三、可以大大提高工程质量。具体施工要求及施工部署,我们将编著次项技术的专项施工方案。 2)、组拼式大模板技术 组拼式大模板是一种单块面积较大、模数化、通用化的大型模板,具有完整的使用功能,采用塔吊进行垂直水平运输、吊装和拆除,工业化、机械化程度高。组拼式大模板作为一种施工工艺,施工操作简单、方便、可靠,施工速度快,工程质量好,混凝土表面平整光洁,不需抹灰或简单抹灰即可进行内外墙面装修。 本项目各栋号单元与单元之间设计有竖向变形缝,采用组拼式大模板可以提高施工速度,解决支模难、拆模难的问题,并可以提高变形缝处的施工质量。目前项目正在使用次技术。 (四)、外墙保温技术 1)、外墙体自保温体系施工技术 墙体自保温体系是指以蒸压加气混凝土、陶粒增强加气砌块和硅藻土保温砌块(砖)等制成的蒸压粉煤灰砖、蒸压加气混凝土砌块和陶粒砌块等为墙体材料,辅以节点保温构造措施的自保温体系。即可满足夏热冬冷地区和夏热冬暖地区节能50%的设计标准。

建筑施工企业如何推进信息化建设

建筑施工企业如何推进信息化建设 来源:首都建设报2016年12月16日版次:06作者: ■北京城建亚泰建设集团有限公司李洪涛 “十三五”,国家进入信息技术革命时代,随着信息技术和信息产业在经济与社会发展中的作用日益显着,越来越多的企业正通过信息化建设来进行创新和转型,建筑业也同样面临信息化建设的挑战。这对于广大建筑施工企业来说,既是一个前所未有的挑战,同时也是加快推进信息化建设的一个强大动力。 北京城建亚泰集团自2014年初全面推行信息化建设以来,截止目前,OA办公平台、综合项目管理、人力资源、档案管理、财务NC等系统全部上线运行。笔者作为企业信息化建设的负责人,亲身经历了传统企业管理模式的桎梏和现代信息技术交互融合的艰辛历程,并对当前建筑企业的信息化建设进行了广泛调研。 建筑施工企业信息化建设现状及原因 据了解,目前国内建筑施工企业的信息化的进程参差不齐,而且高资质企业信息化建设水平明显高于低资质企业。一些大型企业已设立了自己的网站或网页,能利用计算机技术进行各项计算作业和辅助管理工作,如办

公自动化系统、招投标系统、财务管理系统等,基本实现了企业的信息化管理。但是,多数施工企业的信息化程度还比较低,没能实现信息资源的共享和网络自动传递。 造成建筑企业信息化建设参差不齐现状的原因有很多,例如:建筑业属于传统行业,受传统工作方式的影响较深,企业对信息技术和先进管理模式的重要性和作用还没有一个比较深刻的认识;建筑企业的领导对信息化建设的认识不够,缺乏顶层设计;企业管理观念没有转变,管理流程仍缺乏规范化、制度化等等。 建筑施工企业信息化建设的必要性和重要性 随着国家产业结构调整和宏观经济的下滑,建筑、市政行业市场竞争日趋激烈,政府监管更加严格,“微利”成为施工企业的主要特征,一些企业的生存与发展陷入了困境。但随着信息技术的不断发展,也给施工企业创造了一个实现集约化、精细化管理的平台。施工企业必须认识到基于信息技术的知识扩散和创新的意义,认识到知识管理、数据处理的重要性,并采取相应的管理措施,从而达到通过信息化建设来转型升级,提高企业的核心竞争力,保持企业竞争优势的目的。促进企业持续

建筑业10项新技术(2017版)

建筑业10xx技术(2017版)1地基基础和地下空间工程技术 2钢筋与混凝土技术 3模板脚手架技术 4装配式混凝土结构技术 5钢结构技术 6机电安装工程技术 7绿色施工技术 8防水技术与围护结构节能 9抗震、加固与监测技术 10信息化技术 1地基基础和地下空间工程技术................. 1.1灌注桩后注浆技术..................... 1.2长螺旋钻孔压灌桩技术................. 1.3水泥土复合桩技术..................... 1.4混凝土桩复合地基技术................. 1.5真空预压法组合加固软基技术........... 1.6装配式支护结构施工技术............... 1.7型钢水泥土复合搅拌桩支护结构技术..... 1.8地下连续墙施工技术................... 1.9逆作法施工技术.......................

1.10超浅埋暗挖施工技术.................. 1.11复杂盾构法施工技术.................. 1.12非开挖埋管施工技术.................. 1.13综合管廊施工技术.................... 2钢筋与混凝土技术........................... 2.1高耐久性混凝土技术...................错误!未定义书签。 错误!未定义书签。 错误!未定义书签。 错误!未定义书签。 错误!未定义书签。 错误!未定义书签。 错误!未定义书签。 错误!未定义书签。 错误!未定义书签。 错误!未定义书签。 错误!未定义书签。 错误!未定义书签。 错误!未定义书签。 错误!未定义书签。 错误!未定义书签。 错误!未定义书签。2.3自密实混凝土技术.....................错误!未定义书签。

实验室信息管理系统(LIMS)

1.实验室信息管理系统(LIMS)主要功能 1)样品的管理(Sample Management) 是指样品进入实验室到分配检测项目直至完成并认可检测结果出具证书的过程。样品被登录到LIMS 后,系统将严格按照预先定义好的有关规范对其实行管理。样品登录后,系统将自动分配一个按照一定规则命名的sample ID作为该样品在实验室中唯一的标识,并打印出条码。所有与样品有关的信息在样品登录时都将被记录下来,如送样单位付款单位接收报告单位的信息、需要出报告的日期、检测的项目及要求、样品的状态及描述、接收样品的日期部门及人员等。样品登陆后,根据检测项目的不同会自动给相关的技术小组下达工作任务,即自动分配样品。检测结果可以从仪器直接传输或者人工键盘输入,并且会有三级审核认可的过程,只有通过认可的结果才可以进行发布和产生分析证书。 2) 质量控制的管理(Quality Control Management) LIMS 应该提供相关的功能模块为实验室建立一套完善的质量管理体系,对影响实验室质量的诸要素进行有效的管理和控制,并严格规范实验室的标准操作流程(SOP)。为了保证分析数据的准确性、分析结果的可靠性和监测测试仪器的稳定性,过程质量控制中的数据进行统计分析。并通过对质控样品的数据分析,自动评价实验室总体或者个体的质量状况。通过对一定时间内样品关键质量数据的分析,预测其质量的趋势。 3) 仪器集成(Instrument Interface) 将测试仪器跟LIMS 集成,实现从测试仪器到LIMS 的自动数据传输代替测试和质量控制结果的键盘输入,从而大大提高工作的效率和减少错误率,缩短样品在实验室中的生命周期。 4)统计报表。 提供报表软件,生成准确反应实验室需求的报表,包括统计、计算等。通过开放式数据库连接,同时保持数据的一致性和安全性。 5) 厂家的管理。 包括厂家基本信息、厂家意见反馈、厂家送样历史记录、厂家样品监测信息、厂家与实验室业务往来统计、费用统计和厂家信誉额度等信息。

建筑业十项新技术及创新技术应用与管理方案

第十九节建筑业10项新技术及创新技术应用与管理方案 1.新技术应用推广组织机构建立 1.1组织机构的建立 为把本工程建成技术一流、管理科学、质量上创优质样板的工程,同时达到有计划、有步骤地开发和推广应用建筑业“十项”新技术(2010)的目的,我司将在工程开工之初,成立“十项”新技术推广应用领导小组。领导小组以项目经理为组长,各部门管理人员参加的项目科技进步工作小组,协调各项工作的实施、总结。 1.2工作小组职责范围 组长:项目经理 职责:组织工程科技推广工作的策划,指导科技推广工作实施,对工程科技推广工作进行监督、检查。 副组长:技术负责人 职责:参与工程整体科技推广策划,根据科技推广总体策划大纲,制定阶段性科技推广实施目标,并组织和指导责任部门,进行科技推广工作的实施,对阶段实施情况定期监督检查落实和总结。 组员:各部门管理人员 工程部主要负责对分包单位进行施工安排部署,保证按工程总进度计划实现工期目标;实施工程成品保护管理做到有保护措施,责任到人,落实到位;负责制定阶段性进度计划及检查落实,并负责收集、整理各种施工记录。 质量部主要负责对科技推广工作实施工程过程质量监控,参加不合格品的评审及质量改进措施的制订及实施;积极配合企业的质量执法小组检查工作,独立行使质量执法权利;代表总承包项目经理部对工序进行专检,专检合格后报监理检查;对工程的隐、预检进行验收,认真负责本部门质量记录的收集、整理,做到准确、及时、完整、交圈。 技术部主要负责确定在科技推广工作中各种施工方案及工艺作法,及时办理各种工程洽商和设计变更;负责工程施工的全过程控制,参加不合格品的评审,并及时制定质量改进措施;负责检验、测量和试验的控制,收集和整理有关施工的各种技术资料,做到准确、及时、完整、交圈。 商务部主要负责对科技推广的各种原材料、半成品、成品货比三家,让最优质的产品进入施工现场,确保优质工程的实现;负责工程合同的评审、记录并加以妥善保存;负责收集各种工程洽商及变更,签订补充合同,合同中有涉及到业主的有关事宜及时同其联系沟通,以保证合同履行结果满足业主要求;编制年、季、月度报价表及相应资金计划;负责将分解后的材料用量提供给监理为下一步的材料计划提供依据;负责进行科技推广项目的成本核算工作。 资料员应认真贯彻执行企业管理手册,遵照《文件和资料控制程序》和《竣工、交工资料收集、整理、传递、归档方法》,定期或不定期对项目部关于新技术的工程技术资料进行收集整理和检查,并督促按时归档。保管好已归档的新技术工程技术档案,建立科学的检索目录。 2.新技术应用推广目标及推广措施 2.1新技术应用推广目标 创中国建筑第二工程局有限公司科技推广示范工程,创重庆市科技推广示范工程。 2.2新技术应用推广措施 本项目策划阶段将科技推广及新技术应用作为本项目管理的重点,科技推广及应用效果与本项目工期、质量、安全、成本、环保及文明施工等目标实现有密切的关系。根据《建筑业10项新技术(2010)》列举与本工程相关的、可采用的新技术,结合工程实际情况,通过“方案优化、对比分析、过程监控、效果评价”,可以使新技术的推广与应用在工程项目管理中利益最大化,推动各项目标的顺利实现。 全过程策划 新技术的推广与应用在实施前进行全方面策划。根据合同约定、工程特点、管理目标、环保要求等,对本工程科技推广与应用情况进行综合分析,在方案优化、工艺标准、成本分析等方面进行对比,确定本工程推广应用新技术计划。 全员参与 项目总工组织、技术部牵头、全员参与,构成本项目科技推广与应用活动的组织模式。制定岗位职责,使各项工作质量均得到保证。科技推广与应用给项目带来良好的社会、经济效益的同时,员工的知识水平、业务能力也可以得到相应提高。 专业化公司的技术支持 本公司是拥有房屋建筑工程施工总承包特级资质的施工企业,拥有很多长期合作的专业协作公司。这些专业公司都具有精良的设备和优秀的专业技术人员,在推广应用建设部新的十项新技术方面有长期丰富的经验和独特的优势。他们能对项目推广及应用新技术给予强有力的支持和专业施工保障。在参与项目施工过程中,加强与专业协作公司的沟通与合作,对在项目中推广应用的新技术项目进行培训与交底,取得他们的理解与支持,可以为项目整体科技水平的提高提供保障。 物资配合 工程项目的物资主要是指物资材料、设备、机具的分供方和施工分包商。公司一方面针对重

建筑企业的信息化管理论文

建筑企业的信息化管理论文 改革开放二十多年来,我国建筑业得到了持续快速的发展,建筑业在国民经济中的支柱产业地位不断加强,对国民经济的拉动作用更加显着。加入世贸组织,在给中国建筑业带来难得的发展机遇的同时,也带来了不可避免的冲击和挑战。企业管理信息化是企业提高竞争力、整合现有信息资源的有效手段。我国建筑企业能否在激烈的市场竞争中立于不败之地,关键在于企业能否为社会提供质量高、工期短、造价低的建筑产品。充分运用信息技术所带来的巨大生产力,提高自身的信息化应用水平和管理水平,将是企业提升竞争力所优先考虑的途径,这也是国外优秀建筑企业发展过程中的实践总结。 建筑行业信息化的现状 建筑行业信息化的应用,必须适应建筑行业的特点和发展趋势,以先进的管理理念和方法为指导,依托现代计算机工具,建立一条可操作性强的、高速实时的、信息共享的操作体系,贯穿工程施工全过程,形成各管理层次、各部门、全员实时参与,信息共享、相互协作的,以项目管理为主线,以成本管理控制为核心,实现全集团财务和资金统筹管理的整体应用系统。建筑企业在企业信息的利用上还存在着一些问题,着重表现在: 1.建筑企业整体信息化水平较低,虽在工程项目管理、财务管理等方面应用了部分软件,但这些业务单元的信息化是孤立的、非集成的,系统之间的数据无法共享,系统扩展性较差,无法为企业管理决策提供全面、集成的信息支持。

2.建筑业管理者难于及时、动态地掌握集团所属企业的财务信息,无法实时监控整个集团的财务状况。集团管理缺乏详细、准确的数据,不能很好地进行数据分析和预测、决策。企业预算管理流于形式,重编制,轻执行,预算不能很好地指导企业的日程管理,缺乏有效的预算管理工具。 3.建筑企业由于项目众多,地域分散,银行开户较多,管理较为混乱,资金比较分散,资金使用效率低下,监控不利,应收账款居高不下。 4.建筑施工项目管理手段比较落后,无法及时掌握各个工程项目的成本费用发生及其盈亏状况,包括项目成本核算、收入核算和利润核算等数据模糊不清,无法实现工程管理中各个部门间数据的集成与共享,无法实现业务处理的流程化,无法实现多项目数据的集中管理。 5.企业在人力资源管理方面满足于人事档案的记录与保管,不能从发挥员工最大价值的角度进行人力资源的开发与使用;企业内部办公未能实现自动化、信息化,工作效率低下;企业在进行业绩分析与评价时缺乏有效、快捷的工具,无法及时对企业经营状况进行客观、准确、科学的分析与评价。 6.集团企业在财务管理方面:报表层层汇总和上报,造成信息滞后;集团对于分支机构的财务管理与控制的力度不够,非主营行业和人事权独立的分支机构;分支机构不能严格贯彻集团企业即定的会计制度和财务政策;多行业运作、跨地域经营,普遍存在管理分散,集团内资金运作分散,存贷款基层运作责权不对称,缺少统筹管理。 建筑企业信息化的应用价值

建筑工程十项新技术应用总结

XXXXXXXXXXXXXX工程 建筑业10项新技术应用汇报 目录 1、建筑业10项新技术——高强高性能混凝土 (1) 2、建筑业10项新技术——混凝土裂缝控制技术 (5) 3、建筑业10项新技术——高强钢筋应用技术 (7) 4、建筑业10项新技术——大直径钢筋直螺纹连接技术 (11) 5、建筑业10项新技术——索结构预应力施工技术 (15) 6、建筑业10项新技术——大型钢结构滑移安装施工技术 (19) 7、建筑业10项新技术——管线综合布置技术 (21) 8、建筑业10项新技术——预拌砂浆技术 (24) 9、建筑业10项新技术——聚氨酯防水涂料施工技术 (27) 10、建筑业10项新技术——深基坑施工监测技术 (30) 1、建筑业10项新技术——高强高性能混凝土

设计图号GS-08~GS-10、GS-19专业混凝土工程 设计做法说明: XXXXXXXXXXXXXX工程的高强高性能混凝土(简称 HS-HPC)是强度等级为 C60 的 HPC,其特点是具有更高的强度和耐久性,用于建筑塔楼内柱,与普通混凝土结构具有相同的配筋率,可以显著地缩小结构断面,增大使用面积和空间,并达到更高的耐久性。 1、主要技术内容 HS-HPC 的水胶比≤28%,用水量≥200kg/m ,胶凝材料用量 650~700kg/m ,其中水泥用量 450~500kg/m ,硅粉及矿物微细粉用量 150~200kg/m ,粗骨料用量 900~950kg/m ,细骨料用量 750~800kg/m ,采用聚羧酸高效减水剂或氨基磺酸高效减水剂。HS-HPC 用于钢筋混凝土结构还需要掺入体积含量 2.0~2.5%的纤维,如聚丙烯纤维、钢纤维等。 2、技术指标 (1)工作性:新拌 HS-HPC 混凝土的工作性直接影响该混凝土的施工性能。其最主要的 特点是粘度大,流动性慢,不利于超高泵送施工。混凝土拌合物的技术指标主要是坍落度、扩展度和倒坍落度筒混凝土流下时间(简称倒筒时间),坍落度≥240mm,扩展度≥600mm,倒筒时间≤10s,同时不得有离析泌水现象。 (2)HS-HPC 的配比设计强度应符合以下公式:f cu ,o = 1.15 f cu ,k (3)HS-HPC 应具有更高的耐久性,因其内部结构密实,孔结构更加合理。HS-HPC 的抗冻性、碳化等方面的耐久性可以免检,如按照《高性能混凝土应用技术规程》CECS207 标准检验,导电量应在 500 库仑以下;为满足抗硫酸盐腐蚀性应选择低 C3A 含量(<5%)的水泥;如存在潜在碱骨料反应的情况下,应选择非碱活性骨料。 (4)HS-HPC 自收缩及其控制 1)自收缩与对策 当 HS-HPC 浇筑成型并处于密闭条件下,到初凝之后,由于水泥继续水化,吸取毛细管中的水分,使毛细管失水,产生毛细管张力,如果此张力大于该时的混凝土抗拉强度,混凝土将发生开裂,称之自收缩开裂。水灰比越低,自收缩会越严重。一般可以控制粗细骨料的总量不要过低,胶凝材料的总量不要过高;通过掺加钢纤维可以补偿其韧性损失,但在侵蚀环境中,钢纤维不适用;需要掺入有机纤维,如聚丙烯纤维或其他纤维;采用外掺 5%饱水超细沸石粉的方法,以及充分地养护等技术措施可以有效的控制 HS-HPC 的自收缩和自收缩

相关文档
最新文档