CN Price Quote Template- excel表格
e-Business International Inc.
Portland Chicago San Francisco Shenzhen Shanghai Beijing
Formal Price Quote 正式报价表
Item 项目P/N (Drawing No.)件号(图号)Description 名称
Quantity 数量product material
产品材质
product weight 产品材料重量(g)product
meterial cost 产品材料费Unit price of the product 产品单价 (USD)Quantity of the moulds needed
所需模具数量
Mould
Material 模具材质
Mould Cavity & life 模具穴数及使用寿命Mould
Material cost
模具材料费
Unit Price
of the Mould 模具单价(USD)
Total Amount 总金额(USD)Mfg Tech 加
工工艺
Monthly Capacity 月生产量 (pcs)Product
weight(kg)
产品重量
Product
package
Size(M^3)产品
包装体积
1Cast Bracket --Cast Bracket Pair (2 pieces)
26,000
grade 24
020304050607080Total:
Other clauses: 其他条款1Technology notes
2c- casting (Resin, Green sand, Investment)3p-plating (Chrome,Nickel,)4m- machining 5mo-molded 6o-other 7
s-stamping
eBI comments (以下由eBI 填写)https://www.360docs.net/doc/ff12601606.html, - Your turn-key outsourcing solution to China!
within 60 days after goods arrives at destination (货物到达目的地后 60 天内支付)First Article Lead time 首样交货期 :Within after the contract signed. (合同签定后 天内提交首样)
Production Preparation Time 生产准备期 :Production set up within after the first article approved, including material lead time days. (首样确认后 天内可开始生产, 其中, 材料订购期 天)
Tooling Payment Terms 模具付款方式 :30% downpayment, 70 %payable after first article approved. (30%预付, 70%首样通过后支付.)Production Payment Terms 量产付款方式 :Company 客户名称RFQ No 项目号CN Manager 项目经理Tel # 联络方式(电话 / email )Mfg Engineer 工厂负责工程师Tel # 联络方式(电话 / email )Manufacturer 报价工厂Price Quote Terms 价格条件 :Packing 包装方式 :
According to eBI package requirement. (参照eBI 包装要求).
Receipt of drawing 收到图纸日期
FOB (FOB 港口价)
Mfg Manager 工厂负责经理201092娄海力
PM comments (项目经理审价意见):PE comments (项目工程师审价意见):
MFG Signature and Stamp 工厂签名并盖公章 :
Back