1-1-1人工挖普通土10m3101.84101.84

1-1-2人工挖坚土10m3238.64238.64

1-1-3推土机推普通土20m内10m323.94 4.5619.38 1-1-4推土机推坚土20m内10m327.58 4.5623.02 1-1-5推土机推土100m内增运20m10m313.3313.33 1-1-6装载机装运土方20m内10m321.14 4.5616.58 1-1-7装载机装运200m内增运20m10m3 5.28 5.28 1-1-8铲运机铲运普通土200m内10m339.77 4.560.2234.99 1-1-9铲运机铲运坚土200m内10m350.95 4.560.2246.17 1-1-10铲运机500m内增运100m10m311.1711.17 1-1-11拉铲挖自卸汽车运普通土1km内10m3109.34 6.840.53101.97 1-1-12拉铲挖自卸汽车运坚土1km内10m3130.03 6.840.53122.66 1-1-13反铲挖自卸汽车运普通土1km内10m3106.03 6.840.5398.66 1-1-14反铲挖自卸汽车运坚土1km内10m3123.83 6.840.53116.46 1-1-15自卸汽车增运1km10m316.5716.57 1-1-16机械打孔爆破松石10m3136.0364.6034.8436.59 1-1-17机械打孔爆破坚石10m3250.92104.1255.4391.37 1-1-18挖掘机挖渣自卸汽车运渣1km内10m3216.968.360.53208.07 1-1-19自卸汽车运渣增运1km10m325.2425.24 1-1-20机械夯填土10m359.9744.8415.13 1-1-21光轮压路机回填碾压10m398.7233.440.6864.60 1-1-22振动压路机回填碾压10m395.9733.440.6861.85 1-2-1人工挖普通土深2m内10m3173.28173.28

1-2-2人工挖普通土深>2m10m3265.24265.24

1-2-3人工挖坚土深2m内10m3330.60330.60

1-2-4人工挖坚土深4m内10m3422.56422.56

1-2-5人工挖坚土深6m内10m3487.16487.16

1-2-6人工挖坚土深>6m10m3530.48530.48

1-2-7人工挖淤泥.流砂10m3836.00836.00

1-2-8人工挖冻土厚0.5m内10m31021.441021.44

1-2-9爆破后人工挖冻土厚0.5m内10m3344.20300.2044.00

1-2-10人工挖沟槽普通土深2m内10m3245.21244.720.49 1-2-11人工挖沟槽普通土深>2m10m3333.86333.640.22 1-2-12人工挖沟槽坚土深2m内10m3483.09482.600.49 1-2-13人工挖沟槽坚土深4m内10m3543.62543.400.22 1-2-14人工挖沟槽坚土深6m内10m3614.98614.840.14 1-2-15人工挖沟槽坚土深>6m10m3668.88668.800.08 1-2-16人工挖地坑普通土深2m内10m3272.74271.32 1.42 1-2-17人工挖地坑普通土深>2m10m3363.96363.280.68 1-2-18人工挖地坑坚土深2m内10m3544.06542.64 1.42 1-2-19人工挖地坑坚土深4m内10m3612.48611.800.68 1-2-20人工挖地坑坚土深6m内10m3683.68683.240.44 1-2-21人工挖地坑坚土深>6m10m3737.53737.200.33 1-2-22人工挖桩孔普通土孔深8m内10m3815.45728.0887.37

1-2-23人工挖桩孔坚土孔深8m内10m31326.171184.08142.09

1-2-24人工挖桩孔普通土孔深12m内10m31104.86986.48118.38

1-2-25人工挖桩孔坚土孔深12m内10m31747.511560.28187.23

1-2-26人工挖桩孔普通土孔深16m内10m31435.971282.12153.85

1-2-27人工挖桩孔坚土孔深16m内10m32271.852028.44243.41

1-2-28人工挖桩孔普通土孔深>16m10m31657.291479.72177.57

1-2-29人工挖桩孔坚土孔深>16m10m32621.702340.80280.90

1-2-30人工凿松石方10m3544.92544.92

1-2-31人工凿坚石方10m31225.121225.12

1-2-32人工凿沟槽松石10m3645.24645.24

1-2-33人工凿沟槽坚石10m31736.601736.60

1-2-34人工凿地坑松石10m3895.28895.28

1-2-35人工凿地坑坚石10m32614.402614.40

1-2-36人工凿桩孔松石10m32998.782677.48321.30

1-2-37人工修整爆破后基底松石10m2168.72168.72

1-2-38人工修整爆破后基底坚石10m2434.72434.72

1-2-39人工修整爆破后基底槽坑松石10m2204.44204.44

1-2-40人工修整爆破后基底槽坑坚石10m2484.12484.12

1-2-41人工修整爆破后边坡松石10m2107.92107.92

1-2-42人工修整爆破后边坡坚石10m2297.92297.92

1-2-43人工运土方20m内10m3148.96148.96

1-2-44人工运土方200m内增运20m10m333.4433.44

1-2-45人工运淤泥流砂20m内10m3334.40334.40

1-2-46人工运淤泥流砂200m内增运20m10m350.1650.16

1-2-47人力车运土方50m内10m3120.08120.08

1-2-48人力车运土方500m内增运50m10m319.0019.00

1-2-49人力车运淤泥流砂50m内10m3269.80269.80

1-2-50人力车运淤泥流砂500m内增运50m10m328.8828.88

1-2-51人工清运石渣20m内10m3353.40353.40

1-2-52人工清运石渣200m内增运20m10m364.6064.60

1-2-53人力车清运石渣50m内10m3319.96319.96

1-2-54人力车清运石渣500m内增运50m10m341.8041.80

1-2-55人工清运石渣桩孔人工出渣10m3577.11515.2861.83

1-2-56人工装车土方10m3118.56118.56

1-2-57人工装车石渣10m3158.84158.84

1-3-1推土机推普通土20m内10m321.92 4.5617.36 1-3-2推土机推坚土20m内10m327.02 4.5622.46 1-3-3推土机推土100m内增运20m10m312.2512.25 1-3-4装载机装运土方20m内10m322.65 4.5618.09 1-3-5装载机装运200m内增运20m10m3 5.28 5.28 1-3-6铲运机铲运普通土200m内10m343.21 4.560.2238.43 1-3-7铲运机铲运坚土200m内10m355.53 4.560.2250.75 1-3-8铲运机运土500m内增运100m10m311.1711.17 1-3-9挖掘机挖普通土10m327.93 4.5623.37 1-3-10挖掘机挖坚土10m333.94 4.5629.38 1-3-11挖掘机挖淤泥.流砂10m387.5124.3263.19 1-3-12挖掘机挖槽坑普通土10m332.009.1222.88 1-3-13挖掘机挖槽坑坚土10m334.279.1225.15 1-3-14挖掘机挖普通土自卸汽车运1km内10m3126.16 6.840.53118.79 1-3-15挖掘机挖坚土自卸汽车运1km内10m3152.15 6.840.53144.78

1-3-16挖掘机挖普通土槽坑汽车运1km内10m3122.559.120.53112.90 1-3-17挖掘机挖坚土槽坑汽车运1km内10m3147.679.120.53138.02 1-3-18人工打孔爆破松石10m3241.74206.7235.02

1-3-19人工打孔爆破坚石10m3506.62455.2451.38

1-3-20人工打孔爆破槽坑松石10m3643.46557.8485.62

1-3-21人工打孔爆破槽坑坚石10m31306.661177.24129.42

1-3-22机械打孔爆破松石10m3160.8075.2438.5347.03 1-3-23机械打孔爆破坚石10m3299.29120.8461.17117.28 1-3-24机械打孔爆破槽坑松石10m3387.75183.9293.77110.06 1-3-25机械打孔爆破槽坑坚石10m3751.38317.68148.98284.72 1-3-26机械打孔爆破桩孔松石10m3907.28593.56194.76118.96 1-3-27机械打孔爆破桩孔坚石10m32100.811274.52403.13423.16 1-3-28控制爆破松石10m3475.18171.76249.8353.59 1-3-29控制爆破坚石10m3802.89247.76399.05156.08 1-3-30控制爆破槽坑松石10m3772.35245.48406.50120.37 1-3-31控制爆破槽坑坚石10m31465.32431.68659.76373.88 1-3-32静力爆破坚石10m35141.761305.682269.091566.99 1-3-33静力爆破槽坑坚石10m35712.691450.082521.211741.40 1-3-34风镐破碎桩孔松石10m34533.892566.52307.981659.39 1-3-35风镐破碎桩孔坚石10m36476.833666.24439.952370.64 1-3-36风镐破碎鼓石10m31934.681155.20779.48 1-3-37液压锤破碎松石10m3325.7847.12278.66 1-3-38液压锤破碎坚石10m3399.8747.88351.99 1-3-39液压锤破碎槽坑松石10m3385.9648.64337.32 1-3-40液压锤破碎槽坑坚石10m3474.7249.40425.32 1-3-41推土机推石渣20m内10m361.21 6.0855.13 1-3-42推土机推石渣100m内增运20m10m337.7837.78 1-3-43挖掘机挖集石渣10m380.34 6.0874.26 1-3-44挖掘机挖石渣自卸汽车运1km内10m3245.598.360.53236.70 1-3-45装载机装土方10m322.11 4.5617.55 1-3-46装载机装石方10m341.17 6.0835.09 1-3-47挖掘机装土方10m321.39 4.5616.83 1-3-48挖掘机装石方10m342.77 6.0836.69 1-3-49机动翻斗车运土方100m内10m397.3897.38 1-3-50机动翻斗车运土方500m内增运100m10m313.3813.38 1-3-51机动翻斗车运石方100m内10m3296.16296.16 1-3-52机动翻斗车运石方500m内增运100m10m335.4735.47 1-3-53拖拉机运土方1km内10m3188.16188.16 1-3-54拖拉机运土方增运1km10m322.4122.41 1-3-55拖拉机运石方1km内10m3387.05387.05 1-3-56拖拉机运石方增运1km10m345.2945.29 1-3-57自卸汽车运土方1km内10m371.78 2.280.5368.97 1-3-58自卸汽车运土方增运1km10m312.4212.42 1-3-59自卸汽车运石方1km内10m3125.37 2.280.53122.56 1-3-60自卸汽车运石方增运1km10m322.8822.88 1-3-61垂直运输机械运土方10m353.0425.0827.96 1-3-62垂直运输机械运石方10m389.7142.5647.15

1-3-63运输钻孔桩泥浆5km内(桩体积)10m31577.93488.681089.25 1-3-64运输钻孔桩泥浆增运1km(桩体积)10m382.5582.55 1-4-1人工场地平整10m247.8847.88

1-4-2机械场地平整10m2 5.910.76 5.15 1-4-3竣工清理10m312.1612.16

1-4-4基底钎探十眼86.6486.64

1-4-5人工原土夯实10m212.1612.16

1-4-6机械原土夯实10m28.37 6.84 1.53 1-4-7原土机械碾压10m2 1.440.760.68 1-4-8填土机械碾压10m3116.2237.240.6878.30 1-4-9人工松填土10m360.0460.04

1-4-10人工夯填土(地坪)10m3122.28121.600.68

1-4-11机械夯填土(地坪)10m357.0840.2816.80 1-4-12槽、坑人工夯填土10m3152.68152.000.68

1-4-13槽、坑机械夯填土10m375.0353.2021.83 1-4-14槽、坑夯填砂10m31182.23198.36981.72 2.15 1-4-15槽、坑夯填石屑10m3732.56198.36532.05 2.15 1-4-16槽、坑夯填石渣10m3721.02258.40459.80 2.82 1-4-17钎探灌砂10眼 2.69 1.67 1.02

2-1-13:7灰土垫层10m31460.91636.12812.7512.04 2-1-2砂垫层10m31337.69354.16981.38 2.15 2-1-3人工级配砂石垫层10m31586.57610.28969.72 6.57 2-1-4天然级配砂石垫层10m31261.17509.20745.40 6.57 2-1-5干铺碎石垫层10m31428.87510.72911.047.11 2-1-61:3砂浆灌碎石垫层10m32021.24619.401335.8965.95 2-1-7干铺碎砖垫层10m31686.83593.561086.167.11 2-1-81:3砂浆灌碎砖垫层10m32291.23836.001404.3050.93 2-1-9干铺地瓜石垫层10m31433.16603.44822.177.55 2-1-101:3砂浆灌地瓜石垫层10m32194.05821.561304.8567.64 2-1-11干铺毛石垫层10m31542.35649.80884.627.93 2-1-121:3砂浆灌毛石垫层10m32343.93983.441286.9973.50 2-1-13C154现浇无筋砼垫层10m32640.08775.961853.5310.59 2-1-14C154现浇毛石砼垫层10m32478.48735.681732.2110.59 2-2-1夯填灰土10m31450.80617.12821.6412.04 2-2-2人工填砂石机械振动10m31031.82282.72747.60 1.50 2-2-3人工填砂石机械碾压10m31143.97335.92784.8423.21 2-2-4推土机填砂碾压10m3824.60 5.32784.8434.44 2-2-5推土机挤淤碾压10m3852.999.12782.4261.45 2-2-6填铺石屑10m3872.17335.92531.87 4.38 2-2-7填铺碎石10m31420.51502.36911.047.11 2-2-8抛石挤淤10m31112.77456.76653.62 2.39 2-2-9填筑C154现浇毛石砼10m32432.88690.081732.2110.59 2-3-1打砼方桩12m内10m32304.00603.4457.561643.00 2-3-2打砼方桩18m内10m32134.31405.8457.561670.91 2-3-3打砼方桩30m内10m31356.69242.4457.561056.69 2-3-4打砼方桩>30m10m31169.93207.4857.56904.89 2-3-5压砼方桩12m内10m32672.02545.68180.321946.02

2-3-6压砼方桩18m内10m32785.32575.32180.322029.68 2-3-7压砼方桩30m内10m33211.25476.52180.322554.41 2-3-8压砼方桩>30m10m32725.88402.04180.322143.52 2-3-9打砼管桩16m内10m39312.87771.406157.822383.65 2-3-10打砼管桩24m内10m38852.70658.166157.822036.72 2-3-11打砼管桩32m内10m38687.26620.166157.821909.28 2-3-12打砼管桩>32m10m38660.78612.566157.821890.40 2-3-13打砼板桩1m3内10m33797.68921.1244.962831.60 2-3-14打砼板桩1.5m3内10m33156.33763.0444.962348.33 2-3-15打砼板桩2.5m3内10m32656.67585.9644.962025.75 2-3-16打砼板桩>2.5m310m32338.64514.5244.961779.16 2-3-17C203现浇砼打孔灌砼桩10m内10m37359.172460.122604.162294.89 2-3-18C203现浇砼打孔灌砼桩15m内10m35561.091488.082604.161468.85 2-3-19C203现浇砼打孔灌砼桩>15m10m35147.561262.362604.161281.04 2-3-20C203现浇砼夯扩成孔灌注砼桩身10m38355.362911.562602.712841.09 2-3-21C203现浇砼夯扩成孔灌注桩夯扩砼10m38888.643231.522502.953154.17 2-3-22螺旋钻机钻孔12m内10m32342.69758.48123.801460.41 2-3-23C203现浇砼螺旋钻孔灌注砼桩12m内10m33156.90338.962498.85319.09 2-3-24螺旋钻机钻孔>12m10m32058.82648.28123.801286.74 2-3-25C203现浇砼螺旋钻孔灌注砼桩>12m10m33008.75228.762498.85281.14 2-3-26回旋钻机钻孔φ600内10m35484.291613.48286.303584.51 2-3-27回旋钻机钻孔φ800内10m34788.701437.16281.993069.55 2-3-28回旋钻机钻孔φ1000内10m34266.681307.20274.222685.26 2-3-29回旋钻机钻孔φ1200内10m33629.96975.08256.302398.58 2-3-30回旋钻机钻孔φ>120cm10m33229.50881.60240.592107.31 2-3-31回旋钻机钻孔入岩φ600内10m323058.256992.00266.5515799.70 2-3-32回旋钻机钻孔入岩φ800内10m316076.784816.88266.5510993.35 2-3-33回旋钻机钻孔入岩φ1000内10m313726.294115.40266.559344.34 2-3-34回旋钻机钻孔入岩φ1200内10m310716.853195.04266.557255.26 2-3-35回旋钻机钻孔入岩φ>120cm10m37879.432387.16266.555225.72 2-3-36C203水下砼回旋钻孔灌注砼桩10m33220.43277.402943.03

2-3-37C252现浇灌注砼桩壁人工挖孔10m33714.591245.642310.03158.92 2-3-38M10 砂浆砌黏土砖桩壁120人工挖孔10m34018.351771.562213.2633.53 2-3-39M10 砂浆砌黏土砖桩壁240人工挖孔10m34008.801771.562198.0639.18 2-3-40C204现浇灌注砼桩芯人工挖孔10m33350.57947.722061.73341.12 2-3-41C204现浇灌注毛石砼桩芯人工挖孔10m32905.22661.961902.14341.12 2-3-42打灰土挤密桩6m内10m33309.961058.681030.391220.89 2-3-43打灰土挤密桩>6m10m32612.51672.601030.39909.52 2-3-44打砂桩10m内10m33326.221314.80920.001091.42 2-3-45打砂桩15m内10m32780.84921.12920.00939.72 2-3-46打砂桩>15m10m32548.98738.72920.00890.26 2-3-47打碎石桩10m内10m33407.541396.12920.001091.42 2-3-48打碎石桩15m内10m32839.36979.64920.00939.72 2-3-49打碎石桩>15m10m32595.34785.08920.00890.26 2-3-50振冲碎石桩10m32322.19547.20974.96800.03 2-3-51钻孔压浆碎石桩10m34899.131256.282578.891063.96 2-3-52打砂石桩10m内10m33860.181396.121372.641091.42

2-3-53打砂石桩15m内10m33292.00979.641372.64939.72 2-3-54打砂石桩>15m10m33047.98785.081372.64890.26 2-3-55深层搅拌粉喷水泥桩(水泥10%)10m31560.91383.04671.14506.73 2-3-56深层搅拌浆喷水泥桩(水泥10%)10m31603.84430.92685.22487.70 2-3-57水泥桩水泥掺量每增1%10m360.9060.90

2-3-58高压旋喷水泥桩成孔10m466.21121.608.68335.93 2-3-59双重管旋喷机高压旋喷水泥桩10m32749.79788.12769.901191.77 2-3-60三重管旋喷机高压旋喷水泥桩10m33669.09875.521102.901690.67 2-3-61预制钢筋砼桩接桩包角钢十根5861.621394.60424.434042.59 2-3-62预制钢筋砼桩接桩包钢板十根8824.731456.163359.934008.64 2-3-63预制钢筋砼桩接桩注硫磺胶泥10m228007.367326.404160.6116520.35 2-3-64预制钢筋砼桩截方桩十根1425.53355.68950.20119.65 2-3-65预制钢筋砼桩截管桩十根563.12288.80274.32 2-3-66预制钢筋砼方桩凿桩头10m33561.322701.04860.28 2-3-67灌注砼桩凿桩头10m31418.621075.40343.22 2-3-68桩头钢筋整理十根65.3665.36

2-3-69回旋钻机挤扩支盘钻孔D800内10m32141.58291.0823.461827.04 2-3-70回旋钻机挤扩支盘钻孔D>80010m31750.81238.6415.761496.41 2-4-1强夯<100t-m 25夯点 4击hm21388.04411.92976.12 2-4-2强夯<100t-m 25夯点增减1击hm2261.5383.60177.93 2-4-3强夯<100t-m 23夯点 4击hm21277.58379.24898.34 2-4-4强夯<100t-m 23夯点增减1击hm2232.9769.16163.81 2-4-5强夯<100t-m 17夯点 4击hm2945.34281.20664.14 2-4-6强夯<100t-m 17夯点增减1击hm2171.7150.92120.79 2-4-7强夯<100t-m 13夯点 4击hm2722.04214.32507.72 2-4-8强夯<100t-m 13夯点增减1击hm2130.6638.7691.90 2-4-9强夯<100t-m 10夯点 4击hm2555.54164.92390.62 2-4-10强夯<100t-m 10夯点增减1击hm2100.0329.6470.39 2-4-11强夯<100t-m 低锤满拍hm21302.56370.12932.44 2-4-12强夯<200t-m 25夯点 4击hm22058.30550.241508.06 2-4-13强夯<200t-m 25夯点增减1击hm2375.68100.32275.36 2-4-14强夯<200t-m 23夯点 4击hm21893.27506.161387.11 2-4-15强夯<200t-m 23夯点增减1击hm2346.6492.72253.92 2-4-16强夯<200t-m 17夯点 4击hm21399.02373.921025.10 2-4-17强夯<200t-m 17夯点增减1击hm2256.2668.40187.86 2-4-18强夯<200t-m 13夯点 4击hm21069.81285.76784.05 2-4-19强夯<200t-m 13夯点增减1击hm2196.4653.20143.26 2-4-20强夯<200t-m 10夯点 4击hm2822.69219.64603.05 2-4-21强夯<200t-m 10夯点增减1击hm2150.9440.28110.66 2-4-22强夯<200t-m 低锤满拍hm21820.59464.361356.23 2-4-23强夯<300t-m 25夯点 4击hm22591.12650.561940.56 2-4-24强夯<300t-m 25夯点增减1击hm2502.32124.64377.68 2-4-25强夯<300t-m 23夯点 4击hm22383.74598.121785.62 2-4-26强夯<300t-m 23夯点增减1击hm2456.52114.76341.76 2-4-27强夯<300t-m 17夯点 4击hm21761.87442.321319.55 2-4-28强夯<300t-m 17夯点增减1击hm2336.5384.36252.17 2-4-29强夯<300t-m 13夯点 4击hm21346.98337.441009.54

2-4-30强夯<300t-m 13夯点增减1击hm2257.9464.60193.34 2-4-31强夯<300t-m 10夯点 4击hm21036.00259.92776.08 2-4-32强夯<300t-m 10夯点增减1击hm2199.5750.16149.41 2-4-33强夯<300t-m 低锤满拍hm22857.75444.602413.15 2-4-34强夯<400t-m 25夯点 4击hm25621.371239.564381.81 2-4-35强夯<400t-m 25夯点增减1击hm21203.13265.24937.89 2-4-36强夯<400t-m 23夯点 4击hm25171.021140.004031.02 2-4-37强夯<400t-m 23夯点增减1击hm21106.65243.96862.69 2-4-38强夯<400t-m 17夯点 4击hm23618.09798.002820.09 2-4-39强夯<400t-m 17夯点增减1击hm2817.20180.12637.08 2-4-40强夯<400t-m 13夯点 4击hm22922.77644.482278.29 2-4-41强夯<400t-m 13夯点增减1击hm2625.86138.32487.54 2-4-42强夯<400t-m 10夯点 4击hm22249.01496.281752.73 2-4-43强夯<400t-m 10夯点增减1击hm2482.41106.40376.01 2-4-44强夯<400t-m 低锤满拍hm23616.93759.242857.69 2-4-45强夯<500t-m 25夯点 4击hm27021.081400.685620.40 2-4-46强夯<500t-m 25夯点增减1击hm21502.58299.441203.14 2-4-47强夯<500t-m 23夯点 4击hm26457.231288.205169.03 2-4-48强夯<500t-m 23夯点增减1击hm21382.40275.881106.52 2-4-49强夯<500t-m 17夯点 4击hm24514.59902.123612.47 2-4-50强夯<500t-m 17夯点增减1击hm21021.20203.68817.52 2-4-51强夯<500t-m 13夯点 4击hm23649.90728.082921.82 2-4-52强夯<500t-m 13夯点增减1击hm2781.70156.56625.14 2-4-53强夯<500t-m 10夯点 4击hm22808.09560.882247.21 2-4-54强夯<500t-m 10夯点增减1击hm2602.32120.08482.24 2-4-55强夯<500t-m 低锤满拍hm24023.85911.243112.61 2-4-56强夯<600t-m 25夯点 4击hm27764.461583.086181.38 2-4-57强夯<600t-m 25夯点增减1击hm21623.57299.441324.13 2-4-58强夯<600t-m 23夯点 4击hm26974.361288.205686.16 2-4-59强夯<600t-m 23夯点增减1击hm21382.40275.881106.52 2-4-60强夯<600t-m 17夯点 4击hm24518.88902.123616.76 2-4-61强夯<600t-m 17夯点增减1击hm21021.20203.68817.52 2-4-62强夯<600t-m 13夯点 4击hm23649.90728.082921.82 2-4-63强夯<600t-m 13夯点增减1击hm2781.70156.56625.14 2-4-64强夯<600t-m 10夯点 4击hm22808.09560.882247.21 2-4-65强夯<600t-m 10夯点增减1击hm2602.32120.08482.24 2-4-66强夯<600t-m 低锤满拍hm24392.41994.843397.57 2-4-67强夯<100t-m 7夯点 4击hm2553.99159.60394.39 2-4-68强夯<100t-m 7夯点增减1击hm269.7218.2451.48 2-4-69强夯<100t-m 4夯点 4击hm2433.00124.64308.36 2-4-70强夯<100t-m 4夯点增减1击hm246.7012.1634.54 2-4-71强夯<100t-m 低锤满拍hm21439.36370.121069.24 2-4-72强夯<200t-m 7夯点 4击hm2809.69212.80596.89 2-4-73强夯<200t-m 7夯点增减1击hm2101.6724.3277.35 2-4-74强夯<200t-m 4夯点 4击hm2659.92173.28486.64 2-4-75强夯<200t-m 4夯点增减1击hm270.8116.7254.09 2-4-76强夯<200t-m 低锤满拍hm21993.43464.361529.07

2-4-77强夯<300t-m 7夯点 4击hm2964.25240.16724.09 2-4-78强夯<300t-m 7夯点增减1击hm2132.1429.64102.50 2-4-79强夯<300t-m 4夯点 4击hm2757.23188.48568.75 2-4-80强夯<300t-m 4夯点增减1击hm290.7220.5270.20 2-4-81强夯<300t-m 低锤满拍hm23141.23444.602696.63 2-4-82强夯<400t-m 7夯点 4击hm21758.27390.641367.63 2-4-83强夯<400t-m 7夯点增减1击hm2314.5763.08251.49 2-4-84强夯<400t-m 4夯点 4击hm21251.66278.16973.50 2-4-85强夯<400t-m 4夯点增减1击hm2209.4841.80167.68 2-4-86强夯<400t-m 低锤满拍hm23900.41759.243141.17 2-4-87强夯<500t-m 7夯点 4击hm22154.69430.161724.53 2-4-88强夯<500t-m 7夯点增减1击hm2388.5271.44317.08 2-4-89强夯<500t-m 4夯点 4击hm21548.09308.561239.53 2-4-90强夯<500t-m 4夯点增减1击hm2259.5947.27212.32 2-4-91强夯<500t-m 低锤满拍hm24288.68911.243377.44 2-4-92强夯<600t-m 7夯点 4击hm22369.58472.721896.86 2-4-93强夯<600t-m 7夯点增减1击hm2429.2280.56348.66 2-4-94强夯<600t-m 4夯点 4击hm21718.63342.761375.87 2-4-95强夯<600t-m 4夯点增减1击hm2287.1153.20233.91 2-4-96强夯<600t-m 低锤满拍hm24680.88994.843686.04 2-5-1木撑木挡土疏板防护10m2202.54126.1676.38

2-5-2钢撑木挡土疏板防护10m2162.5196.5265.99

2-5-3木撑木挡土密板防护10m2256.90162.6494.26

2-5-4钢撑木挡土密板防护10m2205.53123.8881.65

2-5-5木撑钢挡土疏板防护10m2201.77127.6874.09

2-5-6钢撑钢挡土疏板防护10m2158.3597.2861.07

2-5-7木撑钢挡土密板防护10m2245.39162.6482.75

2-5-8钢撑钢挡土密板防护10m2195.00125.4069.60

2-5-9袋土围堰10m32127.731319.36749.6058.77 2-5-10打钢工具桩6m内t968.68251.5637.62679.50 2-5-11打钢工具桩10m内t673.63173.2837.62462.73 2-5-12打钢工具桩15m内t493.48122.3637.62333.50 2-5-13打钢工具桩>15mt393.3697.2837.62258.46 2-5-14拔钢工具桩6m内t445.06185.44 3.71255.91 2-5-15拔钢工具桩10m内t309.88127.68 3.71178.49 2-5-16拔钢工具桩15m内t252.67104.88 3.71144.08 2-5-17拔钢工具桩>15mt245.33101.84 3.71139.78 2-5-18安拆导向夹具10m113.0531.9226.5054.63 2-5-19土层砂浆土钉(钻孔灌浆)10m275.28171.0041.9662.32 2-5-20岩石砂浆土钉(钻孔灌浆)10m390.32181.6418.26190.42 2-5-21锚杆机钻孔灌浆10m1764.86456.00654.94653.92 2-5-22锚杆机入岩增加10m3149.151824.00498.75826.40 2-5-23C251现浇砼土层喷射砼护坡 初喷5010m2287.18112.48131.3643.34 2-5-24C251现浇砼岩层喷射砼护坡 初喷5010m2380.42192.28141.2746.87 2-5-25C251现浇砼喷射砼护坡每增减10mm10m255.1920.5226.278.40 2-6-1抽水机基底排水 降水深1m内10m2774.1015.2030.92727.98 2-6-2抽水机基底排水 降水深2m内10m21340.5622.8075.911241.85

2-6-3抽水机基底排水 降水深3m内10m21689.2838.00123.061528.22 2-6-4砖砌集水井排水h2-4m内座2419.471717.60617.9183.96 2-6-5钢筋笼集水井排水h2-4m内座2205.121343.68804.9156.53 2-6-6砼无砂管φ55cm集水深井10m4582.761447.041212.691923.03 2-6-7钢筋笼集水深井10m3698.321567.12386.281744.92 2-6-8钢管集水深井10m3127.711227.40146.381753.93 2-6-9潜水泵抽水机集水井排水台日474.98 3.04471.94 2-6-10单机清水泵抽水机集水井排水台日673.79 3.04670.75 2-6-11泥浆泵抽水机集水井排水台日1158.41 3.041155.37 2-6-12轻型井点7m降水井管安拆十根2684.231190.16372.411121.66 2-6-13轻型井点7m降水设备使用套天1461.38228.0085.881147.50 2-6-14喷射井点10m降水井管安拆十根8369.253496.001287.323585.93 2-6-15喷射井点10m降水设备使用套天2856.44456.0062.182338.26 2-6-16喷射井点15m降水井管安拆十根13551.175740.281850.925959.97 2-6-17喷射井点15m降水设备使用套天2934.70456.00140.442338.26 2-6-18喷射井点20m降水井管安拆十根17627.427407.722411.597808.11 2-6-19喷射井点20m降水设备使用套天2987.82456.00193.562338.26 2-6-20喷射井点30m降水井管安拆十根23078.799613.243522.409943.15 2-6-21喷射井点30m降水设备使用套天3200.47456.00406.212338.26 2-6-22大口径φ600井点15m降水井管安拆十根48388.7716313.406185.2825890.09 2-6-23大口径φ600井点15m降水设备使用套天2849.45456.0055.192338.26 2-6-24水平井点25m降水井管安拆十根87463.8432858.605826.1248779.12 2-6-25水平井点25m降水设备使用套天2083.42456.0042.911584.51 2-6-26电渗井点阳极降水制安及拆除十根12297.221802.729097.761396.74 2-6-27电渗井点阳极降水设备使用套天1565.50456.00581.26528.24 2-6-28射流泵井点降水制安及拆除眼组138.7584.3629.8924.50 2-6-29射流泵井点降水井点抽水组天873.15307.80565.35 3-1-1M5.0砂浆砖基础10m32894.84925.681932.2336.93 3-1-2M5.0混浆矩形砖柱周长1.2m内10m34080.182018.562030.9530.67 3-1-3M5.0混浆矩形砖柱周长1.8m内10m33937.131884.042018.9134.18 3-1-4M5.0混浆矩形砖柱周长>1.8m10m33575.291525.322014.2935.68 3-1-5M5.0混浆异形砖柱10m34542.361905.322595.6041.44 3-1-6M2.5混浆单面清水砖墙 11510m33615.701580.802004.3530.55 3-1-7M2.5混浆单面清水砖墙 18010m33588.521561.041994.0533.43 3-1-8M2.5混浆单面清水砖墙 24010m33360.131371.801953.1535.18 3-1-9M2.5混浆单面清水砖墙 36510m33320.721295.801987.6137.31 3-1-10M2.5混浆单面清水砖墙 ≥49010m33267.391245.641983.4438.31 3-1-11M2.5混浆混水砖墙 5310m34075.722018.562038.7618.40 3-1-12M2.5混浆混水砖墙 11510m33551.861516.962004.3530.55 3-1-13M2.5混浆混水砖墙 18010m33454.571428.041993.2333.30 3-1-14M2.5混浆混水砖墙 24010m33157.211168.881953.1535.18 3-1-15M2.5混浆混水砖墙 36510m33161.371136.201987.6137.56 3-1-16M2.5混浆混水砖墙 49010m33145.491124.041983.1438.31 3-1-17弧形砖墙另加工料10m3144.81114.0030.81

3-1-18M5.0混浆贴砌砖墙 5310m2250.24122.36125.25 2.63 3-1-19M5.0混浆贴砌砖墙 11510m2436.11182.40248.58 5.13 3-1-20M5.0混浆贴砌砖墙 24010m2810.96304.00496.8210.14

3-1-21M5.0混浆空花砖墙 11510m2320.23156.56161.54 2.13 3-1-22M5.0混浆空花砖墙 24010m2669.19327.56337.12 4.51 3-1-23M5.0混浆砖平璇10m34554.082059.602458.6835.80 3-1-24M5.0混浆砖拱璇10m35576.262933.602603.4839.18 3-1-25M5.0混浆砖过梁10m33965.181597.522324.4743.19 3-1-26M5.0混浆半砖栏板10m2431.91194.56233.84 3.51 3-1-27M5.0砂浆砖台阶10m33082.231045.002000.3036.93 3-1-28M5.0混浆砖地沟10m33094.641060.961998.0035.68 3-1-29M5.0混浆零星砖砌体10m33674.461748.001893.4133.05 3-2-1M5.0砂浆乱毛石基础10m32178.29897.561219.2661.47 3-2-2M5.0混浆乱毛石墙10m32755.121445.521248.1361.47 3-2-3M5.0混浆乱毛石挡土墙10m32308.24998.641248.1361.47 3-2-4M5.0混浆乱毛石护坡10m32481.421076.161337.7867.48 3-2-5干砌乱毛石护坡10m31638.06699.20938.86

3-2-6M5.0混浆整毛石墙毛石背里45010m21352.08737.96586.4527.67 3-2-7M5.0混浆整毛石墙毛石背里±1010m227.5014.4412.430.63 3-2-8M5.0混浆整毛石墙砖背里45010m21493.87680.96792.1320.78 3-2-9M5.0混浆整毛石墙砖背里±1010m232.2112.1619.670.38 3-2-10整砌毛石表面处理10m2437.78376.9660.82

3-2-11石表面倒扁光(斜面10cm内)10m134.52134.52

3-2-12M5.0混浆方整石柱10m36736.502294.444420.6521.41 3-2-13M5.0混浆方整石墙10m35652.401211.444418.9322.03 3-2-14M5.0混浆方整石墙毛石背里45010m22023.24658.921345.2919.03 3-2-15M5.0混浆方整石墙毛石背里±1010m227.5514.4412.480.63 3-2-16M5.0混浆方整石墙砖背里45010m22156.13600.401538.2017.53 3-2-17M5.0混浆方整石墙砖背里±1010m232.2112.1619.670.38 3-2-18M10 混浆方整石平璇10m37313.672204.765086.3822.53 3-2-19M10 混浆方整石拱璇10m37735.282665.325046.8023.16 3-2-20M5.0混浆零星方整石砌体10m37820.373156.284636.4227.67 3-2-21M5.0混浆整砌毛石墙10m33139.071589.921487.6861.47 3-2-22M5.0混浆整砌毛石挡土墙10m32531.681098.201372.0161.47 3-3-1M5.0混浆烧结粉煤灰轻质砖墙11510m33481.271530.641920.0830.55 3-3-2M5.0混浆烧结粉煤灰轻质砖墙18010m33438.411492.641912.4733.30 3-3-3M5.0混浆烧结粉煤灰轻质砖墙24010m33133.861222.081876.6035.18 3-3-4M5.0混浆烧结粉煤灰轻质砖墙36510m33136.911187.881911.4737.56 3-3-5M5.0混浆黏土多孔砖墙11510m33122.931071.602027.7923.54 3-3-6M5.0混浆黏土多孔砖墙18010m33061.29965.962065.6629.67 3-3-7M5.0混浆黏土多孔砖墙24010m32964.72902.122033.0629.54 3-3-8M5.0混浆黏土多孔砖墙36510m32974.33813.202129.5831.55 3-3-9M5.0混浆煤矸石多孔砖墙9010m34080.291124.802930.5824.91 3-3-10M5.0混浆煤矸石多孔砖墙19010m32610.83950.001635.9224.91 3-3-11M5.0混浆煤矸石多孔砖墙24010m33303.57933.282339.2431.05 3-3-12M5.0混浆煤矸石多孔砖墙29010m32923.01849.682043.2830.05 3-3-13M5.0混浆承重型黏土空心砖墙11510m33497.551124.802351.9720.78 3-3-14M5.0混浆承重型黏土空心砖墙18010m32650.791014.601615.2820.91 3-3-15M5.0混浆承重型黏土空心砖墙24010m33304.06946.962329.5627.54 3-3-16M5.0混浆承重型黏土空心砖墙36510m33206.47855.002322.0529.42

3-3-17M5.0混浆非承重黏土空心砖墙11510m33122.151169.641930.2322.28 3-3-18M5.0混浆非承重黏土空心砖墙24010m32773.96973.561777.3723.03 3-3-19M5.0混浆零星空心砖砌体10m33592.961491.122069.0432.80 3-3-20M5.0混浆煤矸石空心砖墙11510m32860.861181.041656.0323.79 3-3-21M5.0混浆煤矸石空心砖墙18010m32822.361082.241714.8325.29 3-3-22M5.0混浆煤矸石空心砖墙24010m32677.73982.681665.8829.17 3-3-23M5.0混浆煤矸石空心砖墙36510m32598.49899.081668.2431.17 3-3-24M5.0混浆加气砼砌块墙12010m32490.29853.481626.5410.27 3-3-25M5.0混浆加气砼砌块墙18010m32436.25785.841640.1410.27 3-3-26M5.0混浆加气砼砌块墙24010m32396.09686.281699.5410.27 3-3-27M5.0混浆泡沫砼砌块墙9010m32202.27846.641332.4723.16 3-3-28M5.0混浆泡沫砼砌块墙19010m32090.08770.641307.6711.77 3-3-29M5.0混浆泡沫砼砌块墙29010m31969.45684.761269.1715.52 3-3-30M5.0混浆泡沫砼砌块墙39010m31949.04617.121316.4015.52 3-3-31M7.5混浆硅酸钙砌块墙12010m32711.041027.521671.1312.39 3-3-32M7.5混浆硅酸钙砌块墙18010m32773.59963.681797.5212.39 3-3-33M7.5混浆硅酸钙砌块墙24010m32356.10867.161476.5512.39 3-3-34M7.5混浆硅酸钙砌块墙36510m32279.65784.321480.9314.40 3-3-35石膏砌空心块墙11010m37397.05672.606724.45

3-3-36石膏砌空心块墙18010m37354.98604.206750.78

3-3-37石膏砌夹心块墙8010m37460.16744.806715.36

3-3-38石膏砌夹心块墙10010m37445.90724.286721.62

3-3-39M7.5混浆粉煤灰加气砼砌块墙20010m31548.67677.16856.7414.77 3-3-40M7.5混浆煤矸石砌块墙28010m32026.36696.161314.1816.02 3-3-41M7.5混浆硅酸盐砌块墙24010m33232.19795.722423.8312.64 3-3-42M7.5混浆膨胀珍珠岩砌块墙11010m313585.13755.4412820.689.01 3-3-43M7.5混浆砼空心砌块墙9010m33860.09891.482952.5916.02 3-3-44M7.5混浆砼空心砌块墙19010m32450.21782.801654.1413.27 3-3-45M7.5混浆砼空心砌块墙29010m32421.52688.561715.4317.53 3-3-46M7.5混浆砼空心砌块墙39010m32305.07633.841654.5816.65 3-3-47M7.5混浆轻骨料砼空心砌块墙9010m32327.46848.921462.5216.02 3-3-48M7.5混浆轻骨料砼空心砌块墙19010m32127.84745.561369.0113.27 3-3-49M7.5混浆轻骨料砼空心砌块墙29010m32341.64655.881668.2317.53 3-3-50M7.5混浆轻骨料砼空心砌块墙39010m31997.30604.201376.4516.65 3-3-51M5.0混浆砌空心砌块烟风道24010m36339.322591.603740.717.01 3-3-52M5.0混浆砌变压式排烟道半周80010m1098.03560.88536.950.20 3-3-53M5.0混浆砌变压式排烟道半周120010m1884.85733.401151.170.28 3-3-54M5.0混浆砌变压式排烟道半周150010m2559.17874.001684.830.34 3-3-55M10 砂浆钢筋砼漏空花格70内10m2639.00104.12534.570.31 3-3-56M10 砂浆钢筋砼漏空花格100内10m2796.61149.72646.440.45 3-3-57M10 砂浆钢筋砼漏空花格200内10m21085.14299.44784.790.91 3-3-58预制水磨石隔断板.窗台板10m2954.82120.08834.74

3-3-59砖砌屋面烟囱三孔内10m1401.12327.331070.91 2.88 3-3-60砖砌屋面烟囱三孔以上10m2964.99670.552290.43 4.01 3-3-61M5.0混浆加气砼砌块墙20010m32375.25766.081598.9010.27 3-3-62M5.0混浆加气砼砌块墙25010m32267.53671.761585.5010.27 3-3-63M5.0混浆加气砼砌块墙30010m32219.92628.671580.9810.27

3-3-64M5.0混浆泡沫砼砌块墙20010m31997.22748.221238.7310.27 3-3-65M5.0混浆泡沫砼砌块墙25010m31970.45718.961241.2210.27 3-3-66M5.0混浆泡沫砼砌块墙30010m31908.49673.281224.9410.27 3-3-67M5.0混浆硅酸钙砌块墙20010m32542.92931.301601.3510.27 3-3-68M5.0混浆硅酸钙砌块墙25010m32474.60859.481604.8510.27 3-3-69M5.0混浆硅酸钙砌块墙30010m32415.58821.941583.3710.27 3-3-70M5.0混浆煤矸石多孔砖墙11510m32545.63830.451691.7723.41 3-3-71M5.0混浆煤矸石多孔砖墙14010m32928.18818.062085.2124.91 3-3-72M5.0混浆煤矸石多孔砖墙24010m33093.61723.292339.2731.05 3-3-73M5.0混浆煤矸石多孔砖墙34010m32619.70801.191789.2229.29 3-3-74M5.0混浆煤矸石多孔砖墙36510m32491.07751.791667.9271.36 3-3-75M5.0混浆煤矸石多孔砖墙24010m32528.82802.641695.5130.67 3-4-1GRC多孔板墙6010m22113.46104.882003.70 4.88 3-4-2GRC多孔板墙8010m22185.84116.282064.57 4.99 3-4-3GRC多孔板墙9010m22235.03124.642105.40 4.99 3-4-4GRC多孔板墙10010m22283.75129.202149.46 5.09 3-4-5GRC多孔板墙12010m22339.05141.362192.49 5.20 3-4-6轻集料砼多孔条板墙7510m21609.77103.361502.25 4.16 3-4-7轻集料砼多孔条板墙10010m21720.26112.481603.62 4.16 3-4-8轻集料砼多孔条板墙12010m22048.51123.881920.47 4.16 3-4-9轻陶粒砼实心条板墙6010m2983.79116.28861.25 6.26 3-4-10轻陶粒砼实心条板墙8010m21106.65127.68972.60 6.37 3-4-11石膏空心条板墙6010m2848.3294.24749.31 4.77 3-4-12石膏空心条板墙8010m21023.67101.08917.71 4.88 3-4-13双层石膏空心条板墙10m21639.28220.401415.00 3.88 3-4-14双层石膏空心条板墙填充5010m21822.76239.401579.37 3.99 3-4-15双层石膏空心条板墙填充厚±1010m231.550.7630.79

3-4-16硅镁多孔板墙9010m21279.56112.481162.09 4.99 3-4-17硅镁多孔板墙10010m21400.58116.281279.31 4.99 3-4-18木纤维增强水泥多孔板墙8010m21543.59105.641432.12 5.83 3-4-19网架水泥板聚苯乙烯泡塑心76(50)10m2956.5899.56854.31 2.71 3-4-20网架水泥板岩棉夹心65(40)10m2901.5887.40811.47 2.71 3-4-21网架水泥板岩棉夹心75(50)10m2943.1798.80841.66 2.71 3-4-22网架水泥板岩棉夹心85(60)10m21067.25109.44955.10 2.71 3-4-23GRC复合外墙板12010m21390.95139.841240.9110.20 3-4-24GRC复合外墙板37010m21867.40186.201671.1010.10 3-4-25彩钢压型板墙10m21160.9570.681029.1061.17 3-4-26双层彩钢压板墙聚氨酯板填6010m22308.25118.562090.5999.10 3-4-27双层彩钢压板墙聚氨酯板填10010m22539.79120.842319.8599.10 3-4-28双层彩钢压板墙聚氨酯板填±2010m2115.160.76114.40

3-4-29双层彩钢压板墙岩棉板填8010m22209.73120.081990.5599.10 3-4-30双层彩钢压板墙岩棉板填12010m22333.17121.602112.4799.10 3-4-31双层彩钢压板墙聚苯乙烯板填7510m22301.20119.322082.7899.10 3-4-32双层彩钢压板墙聚苯乙烯板填15010m22641.07123.122418.8599.10 3-4-33双层彩钢压板墙聚苯乙烯板±2510m2113.32 1.52111.80

3-5-1铸铁围墙10m1396.0291.961300.96 3.10 3-5-23:7灰土垫层方整石台阶10m23131.721103.521958.2569.95

山东省安装工程03定额计算规则

山东省安装工程 消耗量定额解释 第二册电气设备安装工程 1、五芯以上电缆头如何执行定额? 答:五芯电缆头制安执行定额时,按相应截面电缆头制安定额乘以系数1.3,六芯电缆头制安乘以系数1.6,每再增加一芯定额增加30%,以此类推。 2、竖直通道电缆敷设适用范围如何?电缆在竖井内桥架 中竖直敷设时能否适用? 答:竖直通道电缆敷设是按电缆在竖直通道内垂直敷设的安装条件考虑的,采用支架支持固定电缆,支架间距符合设计或规范要求。 电缆在竖井内桥架中敷设时,不符合通道敷设条件,应套用电缆其他敷设方式并乘以1.2系数。 3、电缆桥架、低压封闭式插接母线槽的支吊架制作安装是 否可按铁构件制作安装定额另行计算? 答:电缆桥架定额和低压封闭式插接母线槽定额均未含支吊架制作安装。现场制作的支吊架可按铁构件制作安装定额执行。桥架成品支吊架安装执行2-629。 4、防雷接地装置中,若利用柱内两根以上钢筋做引下线应 如何计算工程量?以焊接为一体的独立基础钢筋作为接地装置时如何执行定额?

答:利用建筑物内柱筋做引下线定额是按每一根柱内焊接两根主筋考虑的,如果焊接柱筋数目超过两根时,定额规定按比例调整。即:调整系数为实际利用柱内钢筋根数除以2而得。 以焊接为一体的独立基础钢筋作为接地装置时,由于基础钢筋是土建专业施工的,安装只发生焊接,所以可参照柱主筋与圈梁钢筋焊接定额以“10处”为计量单位计算。 5、等电位箱、电缆T接箱如何执行定额? 答:等电位箱、电缆T接箱箱体安装可执行接线箱安装相应定额,焊、压接线端子另计。 6、卫生间内的等电位接地如何执行定额? 答:卫生间内等电位接地采用圆、扁钢时,可参照防雷及接地装置中“接地母线沿砖、混凝土明设”项目执行。 7、电气刚性阻燃管暗配没有发生切割墙体的情况,如何执 行? 答:电气刚性阻燃管暗配定额综合考虑了在墙体敷设时切割墙体工作。如果工程中没有切割墙体的情况,可对定额进行调整,人工乘以系数0.9,材料扣除水泥砂浆用量。 8、在部分电气工程中使用方形管及其接线盒、紧锁式钢导 管(JDG管)电线保护管时应套用何定额?

山东省建筑工程管理局、山东省建筑业协会

山东省建筑工程管理局、山东省建筑业协会关于公布2011年全省建筑业群众性质量管理 活动评选结果的通知 鲁建管质安字〔2011〕29号 各市建管局(处),有关市住房城乡建委(建设局),各市建筑业协会(联合会),省直有关部门,中央驻鲁有关施工企业:2011年5月,省建管局、省建筑业协会在潍坊市召开了全省建筑业群众性质量管理活动经验交流会。经评审委员会现场评审,评出优秀QC成果一等奖36项、二等奖41项、三等奖54项;省建筑业优秀质量管理小组131个(见附件1);省建筑业质量信得过班组31个(见附件2);省建筑业优秀质量管理工作者82名(见附件3)。经研究,同意评审结果,现予以公布。 省建管局、省建筑业协会同意推荐山东万鑫建设有限公司贾华远QC小组等42个QC小组为全国工程建设优秀质量管理小组,潍坊昌大建设集团有限公司、威海建设集团有限公司为中国建筑业协会全国工程建设QC小组活动优秀企业,张连悦、王奋、邢庆毅为中国建筑业协会全国工程建设QC小组活动优秀推进者,青建集团股份公司为国家工程建设质量奖审定委员

会全国工程建设质量管理小组活动优秀企业,孙国春为国家工程建设质量奖审定委员会全国工程建设质量管理小组活动卓越领导者,高保林为国家工程建设质量奖审定委员会全国工程建设质量管理小组活动优秀推进者(见附件4);同意推荐山东德信建设集团股份有限公司安文平QC小组等20个QC小组为山东省优秀质量管理小组,赵其文等10名同志为山东省优秀质量管理工作者,潍坊市三建集团有限公司技术部QC小组为山东省质量信得过班组,山东德建集团有限公司为山东省质量管理小组活动优秀企业,胡兆文为山东省质量管理小组活动卓越领导者(见附件5)。 附件:1、2011年全省建筑业优秀质量管理小组和优秀成果名单 2、2011年全省建筑业质量信得过班组名单 3、2011年全省建筑业优秀质量管理工作者名单 4、推荐参加2011年全国工程建设优秀QC小组成果交流会的单位、个人名单 5、推荐参加2011年全省群众性质量管理活动经验交流会的单位、个人名单 二〇一一年五月二十日

最新山东省建筑工程资料(完整版)资料

山东省建筑工程资料 第一章工程管理资料 工程概况表 工程开工报告 工程竣工报告 工程停工报告 工程复工报告 施工进度计划分析 项目大事记 施工日志 不合格项处置记录 建设工程质量事故报告书 第二章工程技术资料 工程技术文件报审表 技术交底记录 图纸会审记录 设计交底记录 设计变更\洽商记录 第三章工程测量记录 工程定位测量记录 地基验槽记录 楼层放线记录 沉降观测记录 单位工程垂直度观测记录 第四章工程施工记录 隐蔽工程记录表 预检工程记录表 施工通用记录表 中间检查交接记录表 地基处理记录 地基钎探记录 桩基施工记录 混凝土施工记录 混凝土养护测温记录 砂浆配合比申请单 混凝土配合比申请单 混凝土开盘鉴定 预应力张拉记录 预应力筋张拉记录 有粘接应力结构灌浆记录 建筑烟(风)道检查记录

自动扶梯\自动人行道安装调试记录 第五章工程试验记录 施工试验记录(通用) 混凝土试块强度统计\评定记录 砂浆试块强度统计\评定记录 防水工程试验检查记录 设备单机试运转记录 调试报告 电气接地电阻测试记录 电气器具通电安全检查记录 电气照明、动力试运行记录 综合布线测试记录 电气绝缘电阻测试记录 光纤损耗测试记录 视频系统末端测试记录 管道灌水试验记录 管道强度严密性试验记录 管道通水记录 管道吹(冲0洗()脱脂试验记录 室内排水管道通球试验记录 伸缩器安装记录表 现场组装除尘器、空调机漏风检测记录 风管漏风检测记录 各房间室内风量测量记录 管网风量平衡记录 电梯主要功能检查记录表 第六章施工验收记录 分项工程质量验收记录 分部(子分部)工程质量验收记录 单位(子单位)工程质量控制资料核查记录 单位(子单位)工程安全和功能检验资料核查及主要功能抽查记录 单位(子单位)工程观感质量检查记录 施工现场质量管理检查记录 工程检验质量检查记录表(通用) 分部分项工程 共划分为:一、地基与基础工程;二、主体结构;三、建筑装饰装修;四、建筑屋面; 五、建筑给水、排水及采暖;六、建筑电气;七、智能建筑;八、通风与空调;九、电梯

山东省安装定额 、九.

册说明 册说明 一、山东省安装工程消耗量第九册《通风空调工程》(以下简称本定额)适用于工业与民用建筑的新建、扩建和整体更新改造项目中的通风、空调工程。二、本定额项目包括通风空调安装工程中的薄钢板风管、净化风管、铝板风管、不锈钢板风管、塑料风管、复合型风管的制作安装及玻璃钢风管安装,还包括与各种风管相配套的风阀、风口、风帽、风罩、消声器等部件制作安装和通风空调设备安装。全册共十三章633个子目。 三、本定额主要依据的标准、规范有: 四、通风、空调工程所用的型钢及普通钢板除锈、刷漆,除各章节另有说明外,定额中均已包括在内(型钢及部件用普通钢板按红丹防锈漆及调和漆各二遍、普通钢板风管按内外红丹防锈漆二遍考虑),如设计要求刷其他漆种时可进行换算。 五、本定额中未包括的刷油和绝热、防腐蚀项目,使用第十一册相应定额。 六、各风管、部件及通风空调设备定额项目中没有包括的型钢支架,除各章另有说明外,应使用第一章中支架制作安装项目另行计算。七、本定额未考虑预留铁件的制作的埋设,除各章另有说明者外,均按膨胀螺栓固定支、吊架计算,不得因安装方式不同进行调整。本定额项目内未考虑安装在支架上的木垫或非金属垫料,发生时按设计计入成品材料(含加工和防腐),其余不变。 八、本定额项目中的法兰垫料如设计要求使用材料品种不同者可以换算,但人工不变。使用泡沫塑料者每1kg闭孔乳胶海绵换算为泡沫塑料0.25kg;使用橡胶者 1kg闭孔乳胶海绵换算为橡胶板式2kg。九、本册定额中均未包括设备的基础灌浆和地脚螺栓的灌浆,发生时,按第一册《机械设备安装工程》中相应定额另行计算。十、风道及部件在加工厂预制的,其场外运输另行计算。十一、遇有下列情况,应按相应定额项目调整消耗量: 3.超高增加消耗量:定额中操作物高度以距楼地面6m为限,如超过6m时,定额人工(含6m以下)乘以下列系数: 2.在洞库、暗室内施工时,定额人工、机械消耗量增加15%; 十二、关于下列工程内容,是按定额消耗量为基础计价后进行测算综合取定,其计算方法规定如下: 1.高层建筑(指高度在6层或20m以上的工业与民用建筑)增加费,可按下表计算(其中70%为

2006版《山东省建筑工程费用项目组成及计算规则》

山东省建筑工程 费用项目组成及计算规则 山东省建设厅 2006年2月

山东省建设厅 鲁建标字【2006】2号 关于印发《山东省建筑安装市政工程 费用项目组成及计算规则》的通知 各市建委(建设局)、省直有关部门: 为加强对工程造价的动态管理,适应建设工程计价的需要,根据国家有关规定,结合我省情况,我们制定了《山东省建筑安装市政工程费用项目组成及计算规则》(以下简称“费用计算规则”)。现予以印发,并就有关问题通知如下: 一、本费用计算规则自2006年4月1日起施行。2006年4月1目前已签定合同的工程,可仍按原合同及有关规定执行。 二、原省建设厅鲁建标字(2004)15号文件发布的《山东省建筑安装工程费用及计算规则》和原省工程建设标准定额站鲁标定字(2002)11号文件发布的《山东省市政工程费用定额》同时停止使用。 三、本费用计算规则由山东省工程建设标准定额站负责管理、解释。在执行过程中,有何问题和意见,请及时反馈给山东省工程建设标准定额站。 2006年2月20日

目录 一、总说明 (1) 二、山东省建筑工程费用项目组成 (3) 三、建筑工程费用计算程序 (10) 四、装饰工程费用计算程序 (14) 五、建筑、装饰工程费率表 (16) 六、工程类别划分 (18) 附件:山东省建设厅鲁建发(2005)29号关于印发《山东省(建筑工程安全防护、文明施工措施费用及使用管理规定)实施细则》的通知 (22)

一、总说明 (一)根据建设部、财政部《关于印发建筑安装工程费用项目组成的通知(建标【2003】206号)》和省建设厅、省财政厅《关于印发山东省建筑安装工程费用项目组成的通知(鲁建标字【2004】3号)》,为统一我省建筑工程费用计算程序并发布我省建筑、装饰装修工程费率,制定本规则。 (二)本规则适用于山东省行政区域内一般工业与民用建筑、装饰装修工程的新建、扩建和改建工程的计价活动,与《山东省建筑工程消耗量定额》及2006年版《山东省建筑工程价目表》配套使用。 (三)建筑工程计价活动包括编制施工图预算、招标标底,投标报价和签订施工合同价以及确定工程竣工结算等内容。 (四)规费中的社会保障费,按省政府鲁政发【1995】101号和省政府办公厅鲁政办发【1995】77号文件规定,在工程开工前由建设单位向建筑企业劳保机构交纳。企业在投标报价时,不包括该项费用。在编制工程预(结)算时,仅将其作为计税基础。 (五)规费中的安全施工费,在工程发包时,按规定计算出费额,在工程造价中列为暂定金额;工程施工时,由工程发包单位、市建筑安全监督机构、工程造价管理机构对施工现场设置的安全设施内容进行确认,并由市工程造价管理机构核定其费用,作为工程结算的依据。 (六)企业管理费费率、利润率和部分措施费费率按不同的工程类别确定。 (七)工程量清单计价可参照本规则公布的相应费率。 (八)本规则中工程费用计算程序是建筑、装饰装修工程计价活动的依据,其中,实行定额计价方式,执行计算程序(一);实行工程量清单计价方式,执行计算程序(二)。各种费率(规费、税金除外)是计价活动的参考。

山东省房屋修缮工程计价定额价目表(2015年5月)

01-1-1平房拆除 预制板顶1.5砖墙内m276.3876.38 01-1-2平房拆除 预制板顶2砖墙m280.0380.03 01-1-3平房拆除 现浇板顶1.5砖墙内m291.2091.20 01-1-4平房拆除 现浇板顶2砖墙m293.6393.63 01-1-5平房拆除 加气砼板顶1.5砖墙内m275.2475.24 01-1-6平房拆除 加气砼板顶2砖墙m276.9976.99 01-1-7平房拆除 瓦顶1.5砖墙内m252.5952.59 01-1-8平房拆除 瓦顶2砖墙m257.0057.00 01-1-9平房拆除 瓦顶空斗墙m234.2834.28 01-1-10平房拆除 轻型屋面m243.4043.40 01-1-11平房拆除 简易棚m217.8617.86 01-1-12拆除带泥背瓦屋面m2 6.16 6.16 01-1-13拆除石棉瓦.玻璃钢瓦屋面m2 3.27 3.27 01-1-14拆除镀锌瓦垄铁屋面m2 2.28 2.28 01-1-15拆除瓦条挂瓦屋面m2 4.26 4.26 01-1-16拆除人字屋架跨度6m内榀42.7942.79 01-1-17拆除人字屋架跨度8m内榀92.2692.26 01-1-18拆除人字屋架跨度12m内榀147.06147.06 01-1-19拆除木屋面板m2 3.19 3.19 01-1-20拆除挂瓦条m20.910.91 01-1-21拆除椽子根0.610.61 01-1-22拆除檩条根 4.56 4.56 01-1-23拆除屋面板油毡瓦条m2 3.65 3.65 01-1-24铲除屋面卷材防水层m2 5.09 5.09 01-1-25铲除屋面天沟.檐沟卷材防水层m2 6.61 6.61 01-1-26铲除屋面涂膜防水层m27.607.60 01-1-27铲除屋面天沟.檐沟涂膜防水层m29.889.88 01-1-28拆除屋面保温层m2 3.42 3.42 01-1-29拆除屋面砼隔热板m27.307.30 01-1-30拆除砖基础m376.6176.61 01-1-31拆除毛石基础m3119.62119.62 01-1-32拆除整砖墙m356.6256.62 01-1-33拆除方整石墙m363.7663.76 01-1-34拆除碎砖.乱石墙m336.1036.10 01-1-35拆除砌块墙m340.3640.36 01-1-36拆除空心斗墙.空花墙m324.9324.93 01-1-37拆除暖气沟.地垄墙m343.0943.09 01-1-38拆除零星砌体m372.3572.35 01-1-39拆除水泥砂浆楼地面m27.077.07 01-1-40拆除粘土砖.水泥花砖楼地面m2 6.54 6.54 01-1-41拆除缸砖.瓷砖.马赛克地面m227.3627.36 01-1-42拆除水磨石.大理石.花岗岩板地面m230.1030.10 01-1-43拆除塑料楼地面m2 2.36 2.36 01-1-44拆除玻璃制品楼地面(带龙骨)m2 6.54 6.54 01-1-45拆除木地板(带龙骨)m2 4.33 4.33 01-1-46拆除木地板m2 3.27 3.27 01-1-47拆除普通木门窗(1m2内)樘14.5214.52

山东省安装工程消耗量定额解释

省安装工程消耗量定额解释 共性问题 1、本定额的使用围“新建、扩建及改造工程”应如何理解?是否与修缮定额的围重复? 答:本定额所说的改造工程指工业技术改造工程或整体更新改造工程。所谓整体更新改造,指在已有建筑物或生产装置区,增加或重新更换完整、独立的功能系统安装工程。如:消防、给排水、通风空调、照明、热力设备等系统,而不是局部或系统中的一部分。对于局部和系统中部分安装工程的拆除、安装除另有说明外,应执行修缮定额,两者不重复。执行修缮定额时,对于修缮定额缺项的安装项目可以使用安装定额。 2、在执行消耗量定额时,如遇有缺项可否使用96综合定额和94安装估价表? 答:在执行消耗量定额时,如遇缺项,可以参照96综合定额和94安装估价表相关定额的消耗量进行计价。 3、材料、设备的水平及垂直运输是怎样考虑的? 答:水平运输是指安装物自施工现场施工单位仓库或现场指定堆放地点运至安装地点的水平运输。各册定额中除另有说明者外:设备水平运输按100m取定;材料、成品、半成品按300m 取定。执行定额时,不论施工现场的水平距离多少,均不作调整。 垂直运输是指安装物自设备安装现场基准面运至安装位置的垂直运输。垂直运输基准面,室以室地平为基准面,室外以安装现场地平面为基准面。除定额另有说明外,材料、成品、半成品构件等垂直运输按六层(或20m)计,超过部分的垂直运输,在高层建筑增加费中计取;设备垂直运输按10m取定,设备垂直运输如超过10m时,除定额已有明确规定外,可按第一册说明第六条第一款规定计。 4、消耗量定额中没有列出脚手架系数的安装工程,如何计取脚手架搭拆? 答:消耗量定额各册或章已规定了计取系数。个别没有列出且须搭设的脚手架工程费用,可按施工组织设计计算。 5、什么情况下计取洞库、暗室增加费? 答:洞库、暗室增加费指在没有自然采光、没有正常通风、没有正常运输行走通道的情况下施工,而进行补偿的施工降效费。地下室应计该系数,但地下室设有地上窗、洞口除外。 6、计取高层建筑增加费时,如遇层数和高度不一致时,应以层数还是高度为准? 答:计取高层建筑增加费时,高度和层数(含折算后的层数)满足一个指标即可。 7、计算建筑物的层数或高度时,应注意哪些情况? 答:计算建筑物的层数或高度时,应注意以下问题: (1) 地下室部分不能计算层数和高度; (2) 层高不超过2.2m时,不计层数;

最新山东省建筑工程消耗量定额补充规定(一)

山东省建筑工程消耗量定额补充规定(一)

建筑工程消耗量定额补充规定(一) 1、关于重申停止执行《山东省建筑工程综合定额》的问题鲁建标字[2003]3号文规定,96版《山东省建筑工程综合定额》已于2003年4月1日停止使用。但是,有个别工程仍继续执行。为维护建设市场经济秩序,保护建设主体各方合法权益,现重申停止执行《山东省建筑工程综合定额》,其原有的配套政策废止,新的计价政策不能与之配套使用。自2009年1月1日起执行《山东省建筑工程综合定额》的工程将不预办理工程竣工结算登记备案。 2、关于定额人工单价的问题 鲁建标字[2008]10号文规定的“消耗量定额价目表中综合工日单价”(44元/工日)指山东省价目表中的省定额“人工费”单价及“基价”组成,是全省统一的计价价格,应作为计取企业管理费、利润等有关费用的基础。该综合工日单价不得因合同约定等原因而调整。合同约定的人工单价仅作为工程所在地市价。 3、竹胶(胶合)板模板问题 承发包双方办理现场签证的,按签证结算模板制作费用;未办理签证的,按照设计图纸和相应计算规则计算模板接触面积,乘以下列摊消系数确定制作数量,执行10-4-310~315

模板制作费用。同时扣减《山东省建筑工程消耗量定额》现浇混凝土模板子目中成品胶合板模板材料消耗量,计算模板安装、拆除费用。其他相关规定执行《山东省建筑工程消耗量定额补充册(二)》。 竹胶(胶合)板模板制作摊消系数 4、框架梁计取脚手架及混凝土工程量计算问题 根据省定额站解释,现浇混凝土单梁、连续梁的脚手架按其相应规定计算,有梁板的板下梁不计算脚手架。 我省工程量清单计价办法及消耗量定额中的有梁板是指现浇密肋板、井字梁板(即由同一平面内相互正交或斜交的梁与板所组成的结构构件),板下梁是指搭在框架梁上的梁。 钢筋混凝土框架结构中,框架梁应按单梁、连续梁规定计算脚手架。建筑物外墙上的框架梁,其脚手架已包含在外脚手架内,不再重复计算。 在计算混凝土工程量时,框架梁与板整浇的,执行单梁、连续梁及平板定额;框架梁、搭在框架梁上的梁(含密勒梁、井字梁)与板整浇的,板下梁与板合并执行有梁板定额,框架梁仍执行单梁、连续梁定额。 5、轻型框剪墙项目的使用

山东省安装定额 、七.

册说明 一、山东省安装工程消耗量定额第七册《消防及安全防范设备安装工程》(以下简称本定额)适用于工业与民用建筑中的新建、扩建和整体更新改造工程。 二、本定额主要依据的标准、规范有: 三、下列内容执行其他册相应定额: 1.电力、控制电缆敷设,桥架安装,配管、配线、接线盒,动力、应急照明控制设备及器具,电动机检查接线,防雷接地装置等安装,均执行第二册《电气设备安装工程》相应定额项目。 2.阀门、法兰安装,各种套管的制作安装,焊接或法兰连接的不锈钢管、铜管及泵间管道安装,执行第六册《工业管道工程》相应定额项目。 3.消火栓管道、室外给水管道安装及水箱制作安装执行第八册《给排水、采暖、燃气工程》相应项目。 4.各种消防泵、稳压泵等机械设备安装及二次灌浆执行第一册《机械设备安装工程》相应项目。 5.各种仪表的安装、水流指示器、压力开关、驱动装置及泄漏报警开关的接线、校线、光缆敷设及配件制安、生产专用通讯设备安装等执行第十册《自动化控制仪表安装工程》相应项目。 6.泡沫液储罐、设备支架制作及安装等执行第五册《静置设备与工艺金属结构制作安装工程》相应项目。 7.本册定额中未包括的设备及设备支架除锈、刷油及绝热工程执行第十一册《刷油、防腐蚀、绝热工程》相应项目。 四、遇有下列情况,应按相应定额项目调整消耗量:

1.超高增加消耗量:定额中操作物高度以距楼地面5m为限,如超过5m时,定额人工(含5m以下)乘以下列系数: 2.设置于管道间、管廊、已封闭的吊顶、地沟内的管道安装,其定额人工乘以系数1.30; 3.在洞库、暗室内施工时,定额人工、机械消耗量增加15%。 五、关于下列工程内容,是按定额消耗量为基础计价后进行测算综合取定,其计算方法规定如下: 1、脚手架搭拆费,可按定额人工费的5%计算,其中人工工资占25%; 2、高层建筑(指高度在6层或20m以上的工业与民用建筑)增加费,可按下表计算(其中人工工资占70%,其余为机械费):

山东省建筑工程消耗量定额价目表(2015年5月)

1-1-1人工挖普通土10m3101.84101.84 1-1-2人工挖坚土10m3238.64238.64 1-1-3推土机推普通土20m内10m323.94 4.5619.38 1-1-4推土机推坚土20m内10m327.58 4.5623.02 1-1-5推土机推土100m内增运20m10m313.3313.33 1-1-6装载机装运土方20m内10m321.14 4.5616.58 1-1-7装载机装运200m内增运20m10m3 5.28 5.28 1-1-8铲运机铲运普通土200m内10m339.77 4.560.2234.99 1-1-9铲运机铲运坚土200m内10m350.95 4.560.2246.17 1-1-10铲运机500m内增运100m10m311.1711.17 1-1-11拉铲挖自卸汽车运普通土1km内10m3109.34 6.840.53101.97 1-1-12拉铲挖自卸汽车运坚土1km内10m3130.03 6.840.53122.66 1-1-13反铲挖自卸汽车运普通土1km内10m3106.03 6.840.5398.66 1-1-14反铲挖自卸汽车运坚土1km内10m3123.83 6.840.53116.46 1-1-15自卸汽车增运1km10m316.5716.57 1-1-16机械打孔爆破松石10m3136.0364.6034.8436.59 1-1-17机械打孔爆破坚石10m3250.92104.1255.4391.37 1-1-18挖掘机挖渣自卸汽车运渣1km内10m3216.968.360.53208.07 1-1-19自卸汽车运渣增运1km10m325.2425.24 1-1-20机械夯填土10m359.9744.8415.13 1-1-21光轮压路机回填碾压10m398.7233.440.6864.60 1-1-22振动压路机回填碾压10m395.9733.440.6861.85 1-2-1人工挖普通土深2m内10m3173.28173.28 1-2-2人工挖普通土深>2m10m3265.24265.24 1-2-3人工挖坚土深2m内10m3330.60330.60 1-2-4人工挖坚土深4m内10m3422.56422.56 1-2-5人工挖坚土深6m内10m3487.16487.16 1-2-6人工挖坚土深>6m10m3530.48530.48 1-2-7人工挖淤泥.流砂10m3836.00836.00 1-2-8人工挖冻土厚0.5m内10m31021.441021.44 1-2-9爆破后人工挖冻土厚0.5m内10m3344.20300.2044.00 1-2-10人工挖沟槽普通土深2m内10m3245.21244.720.49 1-2-11人工挖沟槽普通土深>2m10m3333.86333.640.22 1-2-12人工挖沟槽坚土深2m内10m3483.09482.600.49 1-2-13人工挖沟槽坚土深4m内10m3543.62543.400.22 1-2-14人工挖沟槽坚土深6m内10m3614.98614.840.14 1-2-15人工挖沟槽坚土深>6m10m3668.88668.800.08 1-2-16人工挖地坑普通土深2m内10m3272.74271.32 1.42 1-2-17人工挖地坑普通土深>2m10m3363.96363.280.68 1-2-18人工挖地坑坚土深2m内10m3544.06542.64 1.42 1-2-19人工挖地坑坚土深4m内10m3612.48611.800.68 1-2-20人工挖地坑坚土深6m内10m3683.68683.240.44 1-2-21人工挖地坑坚土深>6m10m3737.53737.200.33 1-2-22人工挖桩孔普通土孔深8m内10m3815.45728.0887.37 1-2-23人工挖桩孔坚土孔深8m内10m31326.171184.08142.09 1-2-24人工挖桩孔普通土孔深12m内10m31104.86986.48118.38 1-2-25人工挖桩孔坚土孔深12m内10m31747.511560.28187.23

《山东省安装工程消耗量定额》解释

《山东省安装工程消耗量定额》解释 第五册《静置设备与工艺金属结构制作安装工程》 1、定额中工艺金属结构的安装高度按多少考虑的?不同的安装高度是否可以调整? 答:工艺金属结构的安装高度,定额中是按其安装基准面离地面(设计正负零)10m以内综合取定。安装高度在10m以内,定额不作调整;安装高度超过10m时,其制作安装基价应按 2、型钢圈制作定额项目适用于哪些范围?在计算相应的平台或梯子的重量时是否还另计算煨圈重量及其安装费用? 答:型钢圈煨制项目适用于容器、塔器、罐体、烟囱、圆形烟道、漏斗、料仓等的加固圈、支撑圈的煨制加工。计算时除按其设计图示重量套用相应的型钢圈煨制定额外,还应将其重量计入所属设备或构件的整体制作安装重量,套用相应定额。但该型钢材料只能按其净重加煨制损耗(定额取定为7%)计算一次主材费。本章中各种平台、梯子、栏杆制作安装项目,定额工作内容已包括型钢煨制,加工方法为氧乙炔加热,不应再套用型钢圈煨制定额。 3、桁架、管廊、设备框架、单梁结构如何定义和划分? 答:从广义上说,凡是由杆件和节点组成,通过焊接、铆接或螺栓连接而成的结构,都可称为桁架。桁架的杆件可以是单根型钢或钢管,也可以由两根相同规格或两根以上不同种类不同规格的型钢组焊而成。其节点型式有钢板连接板(俗称拉筋板)和球节点等型式。桁架结构的应用极其广泛,如常见的桁架式桥梁、高压输电线路铁塔及广播电视、通讯铁塔等。工艺金属结构中的桁架结构,主要是指与安装专业相关的、为了支承和传递工艺设备或工艺管道的本身重量以及其他附加应力所引起的荷载,以满足生产工艺要求的桁架类钢结构。如皮带输送机或其他输送机栈桥(也称为通廊)、架空管道跨路支托桁架等,一般是由平行的上、下弦杆和腹杆拉撑等构件组成的格架式结构,其结构断面以方、矩形最为常见。 管廊钢结构(俗称管廊柱子),是由连续的管廊架(梁)和成排的落地立柱以及各种拉撑组成的大型构架,其基本结构断面呈“∏”型。管廊结构可以是单层,也可以是双层,用以支托成排的各种管线,在化工和石油化工生产装置中应用较多。管廊钢结构通常采用各种规格

DB37-5063-2016山东省建筑施工现场安全管理资料规程

DB 山东省工程建设标准 DB37/5063-2016 J13512-2016 建筑施工现场安全管理资料规程 Management specification of construction site Safety Management Documents 2016-07-21 发布 2016-09-01 实施 联合发布 山东省住房和城乡建设厅 山东省质量技 术监督局

山东省工程建设标准 建筑施工现场安全管理资料规程Management specification of construction site Safety Management Documents DB37/5063-2016 住房和城乡建设部备案号:J13512-2016 主编单位:山东省建筑施工安全监督站 山东省建筑安全与设备管理协会批准部门:山东省住房和城乡建设厅 山东省质量技术监督局 发布日期:2016年07月21日 施行日期:2016年09月01日

前言 为规范施工现场安全管理资料的编制和管理工作,加强施工过程中各个环节、部位的安全管理,根据山东省住房和城乡建设厅2015年工程建设标准编制计划的安排,山东省建筑施工安全监督站、山东省建筑安全与设备管理协会在广泛调研的基础上,参考国家相关标准,结合我省建筑施工安全管理实践经验,编制了本规程。 本规程的主要技术内容是:1.总则;2.术语;3.安全管理资料的管理;4.安全管理资料的分类与整理;5.建设单位施工现场安全管理资料;6.监理单位施工现场安全管理资料;7.施工单位施工现场安全管理资料;附录A、B、C均为本规程的资料性附录,附录D为参考性附录。 本规程由山东省住房和城乡建设厅负责管理,山东省建筑施工安全监督站负责具体技术内容的解释。 本规程在编制过程中难免存在疏漏之处,各单位在使用过程中如有意见或建议请反馈给山东省建筑施工安全监督站(地址:济南市正觉寺小区一区1号,邮编:250011,电子信箱:sdjzaq@https://www.360docs.net/doc/248810314.html,),以便修订时参考。 本规程主编单位:山东省建筑施工安全监督站 山东省建筑安全与设备管理协会 本规程参编单位:山东三箭集团有限公司 中建八局第一建设有限公司 济南一建集团总公司 济南四建(集团)有限责任公司 山东建设建工(集团)有限责任公司 山东建设监理咨询有限公司 山东聊建集团有限公司 山东圣大建设集团有限公司 本规程主要起草人:栾启亭张英明祁忠华刘锦杜海滨 石剑杨一伟房健张剑王琳 陈科芳郭世华明宪永彭强孟宪达 宋月兰张红刘其贤杜润峰宋超 葛文峰崔宏海范国耀王泉波李振 王海洋任加良赵书君姜云海胡启勇

山东省房屋修缮工程计价定额价目表(2013年4月最新发布版)

01-1-1平房拆除 预制板顶1.5砖墙内m266.3366.33 01-1-2平房拆除 预制板顶2砖墙m269.5069.50 01-1-3平房拆除 现浇板顶1.5砖墙内m279.2079.20 01-1-4平房拆除 现浇板顶2砖墙m281.3181.31 01-1-5平房拆除 加气砼板顶1.5砖墙内m265.3465.34 01-1-6平房拆除 加气砼板顶2砖墙m266.8666.86 01-1-7平房拆除 瓦顶1.5砖墙内m245.6745.67 01-1-8平房拆除 瓦顶2砖墙m249.5049.50 01-1-9平房拆除 瓦顶空斗墙m229.7729.77 01-1-10平房拆除 轻型屋面m237.6937.69 01-1-11平房拆除 简易棚m215.5115.51 01-1-12拆除带泥背瓦屋面m2 5.35 5.35 01-1-13拆除石棉瓦.玻璃钢瓦屋面m2 2.84 2.84 01-1-14拆除镀锌瓦垄铁屋面m2 1.98 1.98 01-1-15拆除瓦条挂瓦屋面m2 3.70 3.70 01-1-16拆除人字屋架跨度6m内榀37.1637.16 01-1-17拆除人字屋架跨度8m内榀80.1280.12 01-1-18拆除人字屋架跨度12m内榀127.71127.71 01-1-19拆除木屋面板m2 2.77 2.77 01-1-20拆除挂瓦条m20.790.79 01-1-21拆除椽子根0.530.53 01-1-22拆除檩条根 3.96 3.96 01-1-23拆除屋面板油毡瓦条m2 3.17 3.17 01-1-24铲除屋面卷材防水层m2 4.42 4.42 01-1-25铲除屋面天沟.檐沟卷材防水层m2 5.74 5.74 01-1-26铲除屋面涂膜防水层m2 6.60 6.60 01-1-27铲除屋面天沟.檐沟涂膜防水层m28.588.58 01-1-28拆除屋面保温层m2 2.97 2.97 01-1-29拆除屋面砼隔热板m2 6.34 6.34 01-1-30拆除砖基础m366.5366.53 01-1-31拆除毛石基础m3103.88103.88 01-1-32拆除整砖墙m349.1749.17 01-1-33拆除方整石墙m355.3755.37 01-1-34拆除碎砖.乱石墙m331.3531.35 01-1-35拆除砌块墙m335.0535.05 01-1-36拆除空心斗墙.空花墙m321.6521.65 01-1-37拆除暖气沟.地垄墙m337.4237.42 01-1-38拆除零星砌体m362.8362.83 01-1-39拆除水泥砂浆楼地面m2 6.14 6.14 01-1-40拆除粘土砖.水泥花砖楼地面m2 5.68 5.68 01-1-41拆除缸砖.瓷砖.马赛克地面m223.7623.76 01-1-42拆除水磨石.大理石.花岗岩板地面m226.1426.14 01-1-43拆除塑料楼地面m2 2.05 2.05 01-1-44拆除玻璃制品楼地面(带龙骨)m2 5.68 5.68 01-1-45拆除木地板(带龙骨)m2 3.76 3.76 01-1-46拆除木地板m2 2.84 2.84 01-1-47拆除普通木门窗(1m2内)樘12.6112.61

山东省建筑工程施工技术管理规程

山东省建筑工程施工技 术管理规程 文档编制序号:[KK8UY-LL9IO69-TTO6M3-MTOL89-FTT688]

建筑工程施工技术:是施工企业根据有关管理规定,在施工过程中形成的应当归档保存的各种图纸、表格、文字、音像材料等技术文件的总称。 它是工程建设及竣工交付使用的必备条件,也是工程进行检查验收、管理、使用、维护、改建和扩建的依据。 《山东省建筑工程施工技术资料管理规程》主要划分为施工技术管理资料和施工质量验收两大部分。 《山东省建筑工程施工技术管理规程》是全省施工文件管理的最低标准,为全省工程技术整理提供一个范例,各地在执行时,不得低于此标准。 第一部分总则、术语、管理职责 一、编制目的及原则: 为了加强山东省建筑工程施工技术的化管理,提高工程建设水平,确保地基础、主体与功能适用要求,保证工程质量,体现工程资料是工程质量形成、验收评价的重要组成部分,结合我省的实际情况,制定本规程。 二、依据: 《中华人民共和国建筑法》、《建设工程质量管理条例》等国家现行的有关工程建设的法律、法规、、标准和山东省有关规定编制。 三、适用范围:

适用于山东省行政区域内新建、改建、扩建的建筑工程(含装饰装修)的施工技术管理。 凡在山东省行政区域内参与工程建设的建设、勘察、设计、、施工、检测、均应执行本规程。 四、管理的基本要求: 1、应与工程建设同步进行并完成,要求书写认真、字迹清晰、内容完整、责任方签字齐全 施工技术不符合要求的,不得进行工程竣工验收。 2、施工技术的形成、收集和整理应由各方责任主体共同形成,并保证其真实、准确、及时、完整。 3、施工技术资料的形成、归档过程,宜采用计算机管理,逐步实现以缩微品和光盘载体代替纸质载体。属国家、省重点工程的施工技术宜采用缩微品。 4、施工技术的管理除应执行本规程外,尚应符合国家现行有关规范、标准和政府部门的有关规定。(质量验收、验收统一标准等) 5、单位(子单位)工程、分包项目的竣工验收签章应使用企业法定公章,其他应使用项目部(分包单位)符合相应授权的公章。有关签字人员也应有相应的授权证明。 6、建设单位监督专业分包单位及时将施工技术完整、全面、准确地移交给总承包单位。 7、由建设单位采购建筑材料、构配件和设备,建设单位应保证建筑材料、构配件和设备符合设计文、标准和要求,并保证相关材料质量证

山东省安装工程-定额解释

山东省安装工程-定额解释 第一册机械设备安装工程中设备单机试运转包括的内容是哪些? 答:设备单机试运转属于整体设备安装内容范畴。其工作内容应按相应"规范"中规定的为准;不包括机械设备部分以外各系统(如电气、仪表、通风等系统)的试验、调整、试运转。单机试运转所用的除水、电、气、油、燃料需另计以外的其他材料、人工及机械均已包括在设备安装定额内。 第一册机械设备安装工程中是否包括设备单机试运转时的配合电工? 答:机械设备安装定额内,已包括试运转中所必须配合的电工。机械设备的电气部分的安装、调整、试验、试运转所需的电工,则包括在相应电气安装定额内。 设备本体范围内的管道及附件没有随设备配套供应,需现场进行配制后安装,应怎样计算该部分的制作安装费? 答:设备本体范围(以设备图纸为准)内的管道及附件的安装已包括在设备安装工作内容内。应属设备配套供应而未供应或供应的部件与设备本体图纸不一致需现场进行加工制作时,其制作应另行套用相应定额进行计算。 什么情况下计算泵、风机、压缩机的拆装检查项目? 答:风机、泵、压缩机设备凡是按施工及验收规范规定必须进行拆装检查工作的,或因设备久置或受潮湿等原因建设单位或设计部门提出进行拆装检查的,且实际上做了该项工作,并有双方签字的拆装检查施工记录时,均可计取拆装检查费用。 设备安装超高计算表中,其设备底座的安装标高起算点从何算起?"安装标高超过100m, 每增加20m,调整系数增加10个百分点"怎样理解? 答:设备底座的安装标高起算基准点按地平面正负零处,而不是按楼地面计。安装标高超过100m时,系数的调增是按"每20m"为一调整单位,调增10个百分点,不足20m则按20m计。如:某设备底座安装标高为105m,超过5m达不到20m,其系数也应按调增10个百分点计,即超高系数应为1.9+0.10=2.00。 除第四、五章定额包含了脚手架搭拆外,其他章节的脚手架如何计算? 答:如发生可按施工组织设计或参照建筑工程消耗量定额另计。 各种消防泵、稳压泵、变频调速恒压供水设备机组,应执行什么定额? 答:可按设备类型套用本册第九章及其他相应的定额项目。 定额中未包括大型设备吊装所用的施工机械费用,请问什么样的设备为大型设备?其所

鲁建发29号山东省〈建筑工程安全防护、文明施工措施费用及使用管理规定〉

鲁建发〔2005〕29号2005年11月21日 各市建委(建设局)、省直有关部门: 为加强建筑工程安全生产、文明施工管理,保障施工从业人员的作业条件和生活环境,防止施工安全事故的发生,根据建设部建办[2005]89号《关于印发〈建筑工程安全防护、文明施工措施费用及使用管理规定〉的通知》精神,结合我省实际,我们制定了《山东省〈建筑工程安全防护、文明施工措施费用及使用管理规定〉实施细则》,现印发给你们,请认真贯彻执行。 山东省〈建筑工程安全防护、文明施工措施费用及使用管理规定〉实施细则 第一条为加强建筑工程安全生产、文明施工管理,保障施工从业人员的作业条件和生活环境,防止施工安全事故发生,根据建设部建办[2005]89号“关于印发《建筑工程安全防护、文明施工措施费用及使用管理规定》的通知”精神,结合我省实际情况,制定本实施细则。 第二条本实施细则适用于全省各类新建、扩建、改建的房屋建筑工程(包括与其配套的线路管道和设备安装工程、装饰工程)市政基础设施工程和拆除工程。 第三条本实施细则所称安全防护、文明施工措施费用,是指按照国家现行的建筑施工安全、施工现场环境与卫生标准和有关规定,购置和更新施工安全防护用具及设施、改善安全生产条件和作业环境所需要的费用。建设单位对建筑工程安全防护、文明施工措施有其他要求的,所发生费用一并计入安全防护、文明施工措施费。 第四条建筑工程安全防护、文明施工措施费用是由《山东省建筑安装工程费用项目组成》(鲁建标字[2004]3号)中措施费所含的环境保护费、文明施工费、临时设施费及规费中的安全施工费组成。 第五条环境保护费、文明施工费、临时设施费按我省发布的各专业工程相应费率确定;安全施工费由各市工程造价管理机构制定计取办法。 第六条编制工程概(预)算,应依据省、市工程造价管理机构的规定,计列工程安全防护、文明施工措施费。 第七条实行招投标的建设项目,招标方或具有资质的中介机构编制招标文件时,在措施费项中单独列出环境保护费、文明施工费、临时设施费,在规费中列出安全施工费。投标方应根据工程情况,在施工组织设计中制定相应的安全防护、文明施工措施,并结合自身条件单独报价。对环境保护费、文明施工费、临时设施费的报价,不得低于按省发布费率计算所需费用总额90%,安全施工费按各市的规定全额计取。 第八条建设单位与施工单位应在施工合同中明确安全防护、文明施工措施项目总费用,以及费用预付计划、支付计划、使用要求、调整方式等条款。建设单位与施工单位在施工合同中对安全防护、文明施工措施费用预付、支付计划未作约定或约定不明的,合同工期在一年以内的,建设单位预付安全防护、文明施工措施项目费用不得低于该费用总额的50%;合同工期在一年(含一年)以上的,预付安全防护、文明施工措施费用不得低于该费用总额的30%,其余费用应当按照施工进度支付。实行工程总承包的,总承包单位依法将工程分包给其他单位的,总承包单位与分包单位应当在分包合同中明确安全防护、文明施工措施费用由总承包单位统一管理。安全防护、文明施工措施由分包单位实施的,由分包单位提出专项安全防护措施及施工方案,经总承包单位批准后及时支付所需费用。

山东省建筑工程资料

山东省建筑工程资料 第一章工程管理资料工程概况表 工程开工报告 工程竣工报告 工程停工报告 工程复工报告 施工进度计划分析 项目大事记 施工日志 不合格项处置记录 建设工程质量事故报告书 第二章工程技术资料工程技术文件报审表 技术交底记录 图纸会审记录 设计交底记录 设计变更\洽商记录 第三章工程测量记录工程定位测量记录 地基验槽记录 楼层放线记录 沉降观测记录

单位工程垂直度观测记录 第四章工程施工记录隐蔽工程记录表 预检工程记录表 施工通用记录表 中间检查交接记录表 地基处理记录 地基钎探记录 桩基施工记录 混凝土施工记录 混凝土养护测温记录 砂浆配合比申请单 混凝土配合比申请单 混凝土开盘鉴定 预应力张拉记录 预应力筋张拉记录 有粘接应力结构灌浆记录 建筑烟(风)道检查记录 自动扶梯\自动人行道安装调试记录 第五章工程试验记录施工试验记录(通用) 混凝土试块强度统计\评定记录

砂浆试块强度统计\评定记录 防水工程试验检查记录 设备单机试运转记录 调试报告 电气接地电阻测试记录 电气器具通电安全检查记录 电气照明、动力试运行记录 综合布线测试记录 电气绝缘电阻测试记录 光纤损耗测试记录 视频系统末端测试记录 管道灌水试验记录 管道强度严密性试验记录 管道通水记录 管道吹(冲0洗()脱脂试验记录 室内排水管道通球试验记录 伸缩器安装记录表 现场组装除尘器、空调机漏风检测记录 风管漏风检测记录 各房间室内风量测量记录 管网风量平衡记录 电梯主要功能检查记录表 第六章施工验收记录

分项工程质量验收记录 分部(子分部)工程质量验收记录 单位(子单位)工程质量控制资料核查记录 单位(子单位)工程安全和功能检验资料核查及主要功能抽查记录 单位(子单位)工程观感质量检查记录 施工现场质量管理检查记录 工程检验质量检查记录表(通用) 分部分项工程 共划分为:一、地基与基础工程;二、主体结构;三、建筑装饰装修;四、建筑屋面; 五、建筑给水、排水及采暖;六、建筑电气;七、智能建筑;八、通风与空调;九、电梯