Factory Acceptance Test Report

Project:

Panel Name:

Panel NO. :

Serial No. of Panel:

Serial No. of Device:

Device Type:

DC Power Supply: V

AC Voltage (nominal value): V

Rated Frequency: Hz

Catalog

1. Target (1)

2. Purpose of Test (1)

3. Item of Test (1)

4. Test Equipments (1)

5. Test Carried Out By (1)

6. Content of Examination (2)

6.1 Sampling Test (2)

6.2 Binary Inputs Test (2)

6.3 Signal Contacts Test (4)

6.4 Output Contacts Test (4)

6.5 Logic Function Test (5)

6.5.1 Busbar Differential Protection (87B) (5)

6.5.2 Breaker Failure Protection of Busbar (50BF) (6)

1. Target

Target Name:Busbar Protection

Program Version:

2. Purpose of Test

Check the all function of relay. To ensure the function satisfy the requirement of Busbar Protection of this substation.

3. Item of Test

Check the correctness of hardware and cable. Check the accuracy of sampling, and check binary input and binary output, signal contact, tripping contact, mechanic and so on. Check the logic function of each relay element and setting value.

4. Test Equipments

5.Test Carried Out By

6. Content of Examination

6.1 Sampling Test

Current Test Slots: 04&05

Slots: 06&07

6.2 Binary Inputs Test

Slots: 09

BI Module: NR1502AS

Slots: 10

Slots: 11

6.3 Signal Contacts Test

Slots: B00

6.4 Output Contacts Test

Slots: 13

Slots: 14

Slots: 15

6.5 Logic Function Test

6.5.1 Busbar Differential Protection (87B)

(1)Settings

Pick up setting of differential current: 4 A,slope setting(fixed):0.5 ,(2)Pick up current of busbar differential protection test

Test result of pick up current:A,

(3)Slope test

Slope calculation:

Point 9 and point 5:K=( - )÷( - )=

Point 8 and point 4:K=( - )÷( - )=

Point 7 and point 3:K=( - )÷( - )=

Operation time:ms

(4)Function of CT circuit failure blocking BBP

Function of CT circuit failure blocking BBP:

Result:

6.5.2 Breaker Failure Protection of Busbar (50BF)

(1)settings

Phase current setting: 2 A,Zero sequence current setting:0.5 A,Negative sequence current setting:0.5 A,Setting of time delay 0.5 S。(2)Breaker failure protection test

Test result of current setting:A,

Test result of zero sequence current setting:A,

Test result of negative sequence current setting:A,

Test result of time delay S。

Result:

Signature

安全竣工验收汇报报告

重庆华昶制药项目二期工程质检中心、废水处理房项目工程安全竣工验收报告 大元建业集团股份有限公司 二〇一六年十二月 重庆华昶制药项目二期工程质检中心、废水处理房项目 工程安全竣工验收报告 重庆市两江新区建筑施工安全监督管理站及各位领导: 由大元建业集团承建的重庆华昶制药项目二期工程质检中心、废水处理房项目,在施工过程中始终坚持“安全第一、预防为主”的施工原则,严格按照安全生产及文明施工相关法律法规安全操作规程施工,严把安全关,在相关部门尤其是安管站的精心指导和我公司的全体管理人员的精心组织和文明施工下,该工程进展顺利。现该工程基础、主体、装修工程全部完工,下面谨代表施工方就工程竣工安全验收作如下汇报。: 一、工程概况简介

重庆华昶制药项目二期工程质检中心位于重庆市两江新区水土高新技术产业园方正大道。本工程建筑面积7184.59㎡,占地面积:1418.05㎡,建筑高度:21.45米,层高4.2米,共五层,为多层公共建筑,附属设施含道路、绿化、排水、电力等工程。建筑主体为钢筋砼框架结构;外墙装饰:黄金麻装饰铝板、黄金麻干挂石材、黄金麻涂料;方形建筑,工程等级:二级;抗震设防烈度:6度;耐火等级:二级;防火分区:五个区,每层为一个分区。 二、项目部组织机构情况 项目部根据施工要求,结合项目部实际情况,成立了以肖小小为组长的项目部安全生产领导小组、应急救援领导小组、治安消防保卫领导小组等安全组织机构。建立以项目经理为负责人的安全保证体系: 三、项目部施工过程安全管理实施情况 (一)建立健全项目部管理制度及各工种操作规程,编制安全专项资金使用计划和并实施。 (二)由公司与项目经理签订安全责任书,再由项目经理与项目部管理人员及班组长与班组工人签订安全责任书。

安装调试总结报告

海南078工程液氧液氮加排管路系统安装调试总结报告 编制:蒋剑涛 审核:陶艟 批准:唐志英 四川空分设备(集团)有限责任公司 2014年8月

一、工程概况 海南发射场078项目为低温液氧液氮管路系统安装调试项目。 本工程于2013年5月开工,2014年8月竣工并正式交付使用。 二、工程量及工程特点 工程量主要是安装液氧液氮加排管路系统,包括低温真空管、低温真空截止阀、调节阀、流量计、金属软管、发泡管段、蝶阀、测压管、波纹管。 工程特点主要是边施工、边修改且同时施工范围广、工程量大、施工配合和技术要求复杂、施工质量要求高等,具体体现在以下几点: 1、工程量大、施工范围广 由于本工程的安装工程量大、施工范围广,所以在施工时分成多个小组同时施工,但也常常发生与土建施工相冲突。针对此种状况,在做好详尽而周密的施工计划和组织安排的同时组织足够的人力与物力,并且认真做好内部统筹,积极加强外部协调,为确保工程顺利实施奠定了坚实的基础。 2、技术要求高、交叉作业多 本工程在施工过程中多次出现多人员同时赶工、交叉施工,在抢抓工期、确保安全的前提下,针对不同的施工作业面,面对交错复杂的管道、数目众多的设备,项目部施工管理人员深入现场实地查看,仔细研究科学统筹,做到了布局美观、走向合理,体现了较高的统筹管理水平和专业技术以及施工班组过硬的技术素质和丰富的施工经验。3、反复修改 本工程是边施工、边修改的工程。业主在施工过程中根据实际情况提出新要求,使得很多时候一边等图一边安装一边拆改。这样繁复的工作,造成了材料计划和施工统筹在不同时期和一定程度上的失调,增加了安装工程设计与施工的难度,还给施工配合带来很大的影响。为此,积极与甲方负责设计的工程技术人员进行交流、沟通,在收到甲

工程竣工验收报告样表

附件四:工程竣工验收报告样表 工程竣工验收报告 工程名称: 验收时间: 建设单位(盖章): 烟台市牟平区建设工程质量监督站监制

说明 一、工程符合下列要求方可进行竣工验收: (一)完成工程设计和合同约定的各项内容。 (二)施工单位在工程完工后对工程质量进行了检查,确认工程质量符合有关法律、法规和工程建设强制性标准,符合设计文件及合同要求,并提出工程竣工报告。工程竣工报告应经项目经理和施工单位有关负责人审核签字。 (三)对于委托监理的工程项目,监理单位对工程进行了质量评估,具有完整的监理资料,并提出工程质量评估报告。工程质量评估报告应经总监理工程师和监理单位有关负责人审核签字。 (四)勘察、设计单位对勘察、设计文件及施工过程中由设计单位签署的设计变更通知书进行了检查,并提出质量检查报告。质量检查报告应经该项目勘察、设计负责人和勘察、设计单位有关负责人审核签字。 (五)有完整的技术档案和施工管理资料。 (六)有工程使用的主要建筑材料、建筑构配件和设备的进场试验报告,以及工程质量检测和功能性试验资料。 (七)建设单位已按合同约定支付工程款。 (八)有施工单位签署的工程质量保修书。 (九)对于住宅工程,进行分户验收并验收合格,建设单位按户出具《住宅工程质量分户验收表》。 (十)建设主管部门及工程质量监督机构责令整改的问题全部整改完毕。 (十一)建筑节能验收合格;电梯验收合格;室内环境检测合格;新建住宅供热计量和温调装置安装验收合格;住宅分户验收合格。 (十二)法律、法规规定的其他条件。 二、工程竣工验收报告由建设单位负责填写。 三、报告内容必须真实可靠,语言简练,字迹清楚。 四、工程竣工验收报告一式四份,建设单位、施工单位、监督机构、备案机关各持一份。 五、附件 (一)施工许可证。 (二)施工图审查意见。 (三)施工单位工程竣工报告、勘察和设计单位质量检查报告、监理单位评估报告。 (四)施工单位签署的质量保修书。

安全验收评价报告模板

安全验收评价报告 模板

XX项目安全验收评价报告模版 1编制说明 1.1评价依据 1、中华人民共和国主席令第70号《中华人民共和国安全生 产法》 2、劳动部令第3号《建设项目(工程)劳动安全卫生监察规 定》 3、劳动部劳安字[1992]1号《建设项目(工程)职业安全卫 生设施与技术措施验收办法》 4、国家安管局安监管技装字[ ]37号《安全评价通则》 5、国家安管局安监管技装字[ ]79号《安全验收评价导则》 6、天津市安管局津安监管字[ ]84号《天津市安全评价管理办 法》 7、SJ30002-92《电子工业职业安全卫生设计规定》 8、国家、地方、行业有关劳动安全的法规、规定、规范和标 准(详见附件1) 9、建设单位提供的《中芯国际集成电路制造(天津)有限公 司项目》安全验收的相关资料。 10、中芯国际集成电路制造(天津)有限公司委托天津泰山安 全科技有限公司进行《中芯国际集成电路制造(天津)有

限公司项目》安全验收评价合同书。 1.2评价目的及评价范围 1、评价目的及评价内容 1)安全验收评价的目的是贯彻“安全第一,预防为主”的方针,为建设项目安全验收提供科学依据,对建设项目 未达到安全目标的系统或单元提出安全补偿及补救措 施,以利于提高建设项目本质安全程度,满足安全生产 要求。 2)安全验收评价内容 ①检查建设项目中安全设施是否已与主体工程同时设 计、同时施工、同时交付生产和使用;评价建设项 目及与之配套的安全设施是否符合国家有关安全生 产的法规、规定和技术标准。 ②从整体上评价建设项目的运行状态和安全管理是否 正常、安全、可靠。 2、评价范围 根据本项目安全验收评价技术服务合同书的规定内容,经 与建设单位商定:对中芯天津芯片生产厂房、化学品库、 污水处理站以及变配电站、锅炉房、油库、空压站、冷冻 站、水泵房的设备、设施进行劳动安全验收评价。 由于公司对工艺及产品生产技术保密且芯片生产线工艺

RCS-931纵联差动保护现场调试报告

RCS-931纵联差动保护现场调试报告 摘要:记录了柳林华光电厂4#机500KV出线RCS-931纵联差动保护的检验项目、检验数据及检验结论。 关键词:光纤纵联差动距离零序 1 外观及接线检查 1.1 检查保护装置的硬件配置,标注及接线等符合图纸要求。 1.2 保护装置各插件上的元器件的外观质量,焊接质量良好,所有芯片插紧。 1.3 检查保护装置的背板接线没有断线,短路,焊接不良等现象。 1.4 检查装置外部电缆接线与设计相符,满足运行要求。 检查结果:正确。 2 绝缘电阻试验 将保护装置的交流、出口及电源插件插入机箱,拔出其余插件;将打印机与微机保护装置断开;保护屏上各连片置“投入”位置;在保护屏端子排内侧分别短接交流电流和交流电压回路、保护直流回路、控制直流回路、信号回路的端子。2.1 整个二次回路绝缘测试 用1000V摇表分别测量各组回路之间及各回路对地的绝缘电阻。 项目要求值实测绝缘电阻值结论交流电压回路--地10ΜΩ大于10ΜΩ正确 交流电流回路--地10ΜΩ大于10ΜΩ正确 交流电流--交流电压10ΜΩ大于10ΜΩ正确直流回路--地10ΜΩ大于10ΜΩ正确 信号回路--地10ΜΩ大于10ΜΩ正确直流回路--交流回路10ΜΩ大于10ΜΩ正确 开入量输入回路10ΜΩ大于10ΜΩ正确整个二次回路(交流接地点断开) 1.0ΜΩ大于10ΜΩ正确 2.2逆变电源的检查 (1)外接直流电源缓慢上升时的自启动性能检验

插入全部插件,合上保护装置逆变电源插件上的电源开关,试验直流电源由零缓慢升至80%额定电压(即88V),此时保护面板上的电源指示灯亮。 (2)拉合直流电源时的自启动性能 直流电源调至80%、110%额定电压(即88V、121V),断开、合上逆变电源开关,保护装置运行灯亮,屏幕正常显示。 3 初步通电检验 3.1 保护装置的通电自检 保护装置通电后,自检正确,装置运行灯亮,屏幕正常显示,无异常报警。3.2 检验键盘 在保护装置正常运行状态下,按使用说明操作键盘,各键灵活,接触良好,检验功能正确。 3.3 打印机与保护装置的联机试验 将打印机与微机保护装置的通信电缆连接好,给上打印机电源,保护装置在运行状态下,按保护屏上的“打印”按钮,打印机能够自动打印保护装置的动作报告和定值报告,打印机与微机保护装置联机成功。 3.4 时钟的整定与校核 (1)时钟的整定 保护装置在“运行”状态下,按“↑”键进入主菜单后,移动光标至时钟整定,按“确认”键后进入时钟修改和整定状态,然后进行年、月、日、时、分、秒的时间整定。 检验结果:正确。 (2)时钟的失电保护功能检验 时钟整定好以后,通过断、合逆变电源开关的方法,检验在直流消失一段时间的情况下,走时仍准确。 检验结果:正确。 3.5 DSP、CPU及人机面板检查 检验项目检查结果 1.上电自复位及手动复位功能正确 2.接口与各保护插件通讯功能正确 3.运行状态检查正确

建设工程竣工验收报告表(空白表格)

建设工程竣工验收报告 工程名称: 建设单位名称: 竣工验收时间:20**年**月**日

建设工程竣工验收报告 单位工程名称 建筑面积 施工单位 勘察单位 设计单位 监理单位 开工时间 工程造价 竣工时间 工程概况: 竣工验收程序: 该工程在预验收的基础上整改到位,建设单位已收集勘察、设计、施工、监理单位的工程质量评估报告,同时组织成立了以建设单位为主的竣工验收小组。

竣工验收内容: 该工程能履行合同,在整个建设工程的各个环节按照法律、法规强制性标准执行,验收小组对工程实体进行了目测,得出总体评价,验收合格。 依据该项目工程的《建设工程施工合同》、设计文件、现行的有关验收规范,对该项目工程的资料,实体检查,验收小组对工程实体及资料总体评价为:合格。 竣工验收组织: 竣工验收标准: 对勘察单位评价: 按《建筑法》及《建筑工程质量管理条例》的内容,对勘察单位的意见为:勘察的实物质量与勘察报告相符,勘察的内容符合工程建设强制性标准,勘察单位的行为合法,我方予以认可。 对设计单位评价: 按《建筑法》及《建筑工程质量管理条例》的内容,对设计单位的意见为:设计单位各专业设计人员能严格按设计规范及执行强制性

标准进行设计,对审查机构在施工图审查报告中提出的整改意见落实到施工图中,设计对设计变更及技术核定等在现场进行复核后进行变更,对工程实体验收中能按设计施工图的要求进行全面把关。 对施工单位评价: 施工单位能按设计文件、现行的验收规范要求,认真施工,该项目工程在资料和实体未存在质量问题和违反强制性标准要求,同时能按合同和设计文件规定内容进行落实。 对监理单位评价: 能严格按照设计文件和合同内容约定结合现行验收规范及强制性标准,跟踪监督管理,在本工程中未出现质量事故,同时监理的行为规范,我方予以认可。 建设单位执行基本建设程序情况: 工程竣工验收意见: 质量等级: 工程竣工验收结论: 该项目工程同意交付使用,同时按《建筑工程质量管理条例》做好回访维修工作。

选煤厂现场调试报告

xxxx选煤厂现场调试报告 一、流程 流程比较典型,使用了无压三产品旋流器分选,粗精煤泥使用浓缩旋流器及振动弧形筛,煤泥离心机回收。由于粗中矸煤泥对水分要求较低,使用浓缩旋流器及高频筛回收。细煤泥使用浮选机处理。 从现场调试来看工艺方面无大问题。但经现场人员对产品的变更,对流程做了以下几点修改。 ①把原煤分级筛分级粒度由50mm降为25mm。 目的是为产生更多的块煤产品。筛上物不经分选,直接通过人工拣矸后出售,增加利润。但经现场观察,发现筛上煤层过厚使分级效率大大降低,大量小颗粒进入筛上物中,使人工拣矸工作量大增,拣矸效率降低,可能使块煤产品灰分过高。因此,现场只在分级筛末端加了一小段25mm筛蓖,既多产生一些块煤产品,又不至于使分级效率降低。 ②精煤脱介筛处分出的+13mm块煤,由原来的与末煤产品混合改为单独储存 出售。 改造方法为直接将+13mm溜槽伸出厂外。改造后使块煤产品增加,利润增加,但问题是溜槽口距离地面高差太小,储煤量太少,需要在煤堆积到溜槽口前及时运走或出售。块煤产量大时就显得比较麻烦,因此可以通过建一皮带走廊把块精煤产品运至储煤仓或储煤场。 ③关于TBS 由于旋流器对粗煤泥也有一定得分选作用,因此精煤磁尾经水力旋流器分级后底流灰分较低,经现场化验可以直接脱水后掺入精煤产品(精煤产品要求灰分为11.00%-11.50%)。故现阶段不使用TBS。若煤质变差或精煤灰分要求较高使得直接掺入精煤背灰严重时,则进入TBS分选。 二、管路 ①自流管道 从整体看自流管道角度偏小,比如高频筛筛下水管道,离心机离心液管道及精煤磁尾入桶管道。经现场观察,高频筛筛下水管道堵得比较严重。设计角度在十度左右。现在临时解决方案为使用一根循环水管插入管道口,使流量加大不至于煤泥沉淀。这样需要占用一根打扫卫生用的循环水管,并且显得比较乱,不利于人通行。我认为可以通过加高高频筛底座使得溜槽高度增加,从而使管道一端增高来增大角度。或者可以通过在溜槽里面铺贴瓷砖,同时减小溜槽角度,使溜槽与管道接口处上移增加管道角度。或者可以通过较小管道直径使流速增加防止沉淀。 ②精煤磁选机入料管道 精煤磁选机有三台,两台合在一起,另一台独立。但入料管道分配入料不均。来料有两条对称管道通到一根水平的分配管道。由于分配管道靠近单独磁选机的一端变径不明显,使入料量太大,回收效率低,另两台则入料少,使总体磁选效率不高。现在的解决方式为在变径旁增加了一个类似阀门装置,可以调节去单独磁选机的入料量。 ③上升管道

安全竣工验收自评报告(20200422124542)

安全竣工验收自评报告 根据《关于实施上海市建筑施工企业负责人及项目负责 人施工现场带班制度的通知》等有关法律和规定,结合本工 程建设特点,我项目部制定了《安全生产责任制》,并成立了安全生产组织机构。项目部根据“管生产必须管安全”,“安全生产,人人有责”的原则,明确各级领导、各职能部门和 各类人员在施工生产活动中所负的安全责任,层层签定责任 书并定期进行了考核、评比、奖惩。 工程安全自查报告4篇各类报告项目部根据工程特点编 制了安全生产操作规程、安全作业指导书等指导性文件,并 形成了安全生产制度汇编,包括:安全生产培训制度、例会 制度、劳保用品管理制度、内部事故调查处理制度、安全生 产检查制度、安全生产考核制度等,各种规章制度健全,执 行有效。 项目部根据本工程特点,通过对施工中人的不安全行为, 物的不安全状态,作业环境的不安全因素等进行了风险评价, 并识别出重大危险源,通过制定相应的应急预案或管理方案 达到预防事故发生的目的。本项目所识别出的重大危险源有:①.高处作业;②.坍塌;③.机械伤害;④.火灾;⑤. 食物中毒;⑥施工用电。项目部配备了有执业资格的专职安全员, 每日对施工区、生活区、基坑边坡及道路、部位进行巡查, 并严格遵守安全生产检查制度,每月至少进行一次大检查,

对巡查或检查过程中发现的安全隐患立即进行整改,整改合 格后方继续施工。 为保证冬季施工的稳步有序推进,确保施工质量和安全 生产,项目部制定了《冬季施工安全技术措施》并积极召开 了冬季施工专题会议,确保冬季施工各项工作的顺利开展。 项目部主要从以下几方面进行工作部署: 一是提高认识,加强对冬季安全生产工作的组织领导, 全面落实各级安全生产责任制,加强对安全责任落实情况的 监督检查。 二是开展安全生产大检查,落实安全保证措施。根据冬 季施工特点,认真分析易发事故类型、原因,查找各类事故。 根据重庆市防汛抗旱指挥部的会议精神以及璧汛3号文件要求,我镇由镇长周梁亲自挂帅,组成汛前安全检查小组,对大路镇辖区内的水利工程现状、河道设障、抢险物资管理、水库运行、涉河建设项目等情况开展了一次拉网式大检查, 并对查出的隐患和现象进行了登记造册,并提出了整治时间 和整治要求,现将自查情况报告如下: 由于近几年来的洪灾,给我镇造成了较大的经济损失。 因此,我们树立了以人为本,构建和谐社会,确保一方平安 的思想,扎实做好今年的防汛工作。 我镇根据文件要求,建立了防汛抗旱工作领导小组,由 镇长任组长,副镇长、联系农业的副书记为副组长,农办、

安全服务项目验收报告模板

验收报告 页8 共页1 第 目录 ............................................................................ 3验收项目名称1. ................................................................................... 3验收双方2. . 3............................................................................. 3验收主要内容................................................................................... 34.验收依据. 验收情况描述. 5............................................................................ 3 .6. ....................................................................................... 4嘉奖项 7.................................................................................... 4验收事项. . 8.................................................................................... 6 双方确认文档输出清单. 9 (7) 页8 共页2 第 1.验收项目名称 项目名称: 2.验收双方 甲方: 乙方: 验收主要内容3. 1 2 3 4.验收依据 此次项目实施工作验收主

PCS-915现场验收调试报告英文版

Factory Acceptance Test Report Project: Panel Name: Panel NO. : Serial No. of Panel: Serial No. of Device: Device Type: DC Power Supply: V AC Voltage (nominal value): V Rated Frequency: Hz

Catalog 1. Target (1) 2. Purpose of Test (1) 3. Item of Test (1) 4. Test Equipments (1) 5. Test Carried Out By (1) 6. Content of Examination (2) 6.1 Sampling Test (2) 6.2 Binary Inputs Test (2) 6.3 Signal Contacts Test (4) 6.4 Output Contacts Test (4) 6.5 Logic Function Test (5) 6.5.1 Busbar Differential Protection (87B) (5) 6.5.2 Breaker Failure Protection of Busbar (50BF) (6)

1. Target Target Name:Busbar Protection Program Version: 2. Purpose of Test Check the all function of relay. To ensure the function satisfy the requirement of Busbar Protection of this substation. 3. Item of Test Check the correctness of hardware and cable. Check the accuracy of sampling, and check binary input and binary output, signal contact, tripping contact, mechanic and so on. Check the logic function of each relay element and setting value. 4. Test Equipments 5.Test Carried Out By

现场质量检验报告单

第三章(2)现场质量检验报告单 质报单1、开挖基坑现场质量检验报告单 质报单2、基础工程现场质量检验报告单 质报单3、混凝土浇注申请报告单 质报单4、模板安装现场质量检验报告单 质报单5、拱架、支架现场质量检验报告单 质报单6、分层压实度现场质量检验报告单 质报单7、分层压实度现场质量检验报告单 质报单8、分层压实度现场质量检验报告单 质报单9、路基压实度现场质量检验报告单 质报单10、路面底基层压实度现场质量检验报告单 质报单11、路面基层压实度现场质量检验报告单 质报单12、路面面层压实度现场质量检验报告单 质报单13、无机结合料稳定抗压强度现场质量检验报告单质报单14、弯沉值检测现场质量检验报告单 质报单15、弯沉值检测现场质量检验报告单 质报单16、路面结构层厚度现场质量检验报告单 质报单17、路面结构层厚度现场质量检验报告单 质报单18、路面结构层厚度现场质量检验报告单 质报单19、水泥混凝土抗弯强度现场质量检验报告单 质报单20、水泥混凝土抗压强度现场质量检验报告单 质报单21、砂浆抗压强度现场质量检验报告单 质报单22、水泥混凝土抗压强度现场质量检验报告单 质报单23、砌筑砂浆施工现场质量检验报告单 质报单24、结构物回填现场质量检验报告单 质报单25、无机结合料稳定抗压强度现场质量检验报告单质报单26、隧道喷射混凝土抗压强度现场质量检验报告单质报单27、冲击压实路堤现场质量检验报告单 质报单28、强夯片(砾)石桩柱现场质量检验报告单

质报单29、土工织物铺设现场质量检验报告单 质报单30、坡体排水(仰斜排水孔)现场质量检验报告单质报单31、预应力锚索现场质量检验报告单 质报单32、锚碇板挡土墙现场质量检验报告单 质报单33、柱板式锚杆挡土墙现场质量检验报告单 质报单34、单元格锚杆框架防护现场质量检验报告单 质报单35、预应力锚杆框架现场质量检验报告单 质报单36、SNS柔性防护网现场质量检验报告单 另加:(通用)现场质量检验报告单 (编号说明:表ZBD-01即质报单1,其他相似。)

施工安全竣工总结报告

施工安全竣工总结 吴川第一城酒店工程位于吴川市梅录水口桥西岸西区,该酒店是一幢十六层,总高度为57.8米,总建筑面积为11440M2,框架结构,锤击管桩基础。本工程于2009年07月25日开工,2010年10月28日顺利竣工,在整个施工过程中,安全事故为零。以下是该工程项目安全施工的总结。 公司惯彻“安全第一、预防为主、综合治理”的方针,建立以人为本的安全管理体系,强化安全管理理念,严格按照《建筑施工安全检查标准》(JGJ59-99)进行安全管理,为进一步建立和完善安全生产责任制管理体系和组织保障体系。施工现场建立了以项目经理为首的安全生产管理机构,建立了项目安全管理目标,并将目标分解到项目各成员,明确项目各管理人员、班组各成员的安全管理职责,并用制度固定下来,把安全与生产从组织领导上统一起来,形成一个较为严密的管理体系,来开展安全生产工作。对工人进行三级安全教育及交底后才能上岗,定期进行考核。文明施工设现场围挡,封闭管理,设施齐全,消防措施到位,治安良好。 锤击管桩基础及地下室施工,严格执行图纸及相关要求进行施工,危险部位设有安全护栏和警戒线,并派专人监护。 主体结构施工,墙、柱、梁、楼面板的模板工程,采用大板模板,楼层高度5米以下的楼层用门式钢管脚手作支顶,钢管作水平拉杆。楼层高度5米以上的楼层,采用钢管搭设满堂支撑顶架,在安装过程

中,严格按照模板工程施工方案进行施工,待安装完毕,经各方责任主体单位现场验收合格后,才能进行下一道工序施工。模板拆除均经过公司及监理审批,认定符合拆模条件后,才进行拆模。 外排脚手架采用钢管搭设,间距步距剪刀撑设置都符合安全规范要求,脚手架搭设的施工层为1.8米,且施工层满铺脚手板,每层设刚性连墙杆与建筑物可靠连接,脚手架外立杆内侧满挂密目式安全网封闭。 物料提升机、塔式起重机进行备案,首先办理机械登记;其次办理安装告知手续,让有资质的安装公司进行机械安装,安装后经湛江市顺安建筑安全咨询有限公司检测合格后再办理机械登记,在完善相关手续后才进行使用。 钢筋机械、混凝土搅拌机、砂浆搅拌机、电焊机等施工机械、机具都有接零、接地装置,上述机具经各方责任主体单位检查验收,合格后才投入使用。 施工用电,执行《施工现场临时用电安全技术规范》(JGJ46-2005)施工,采用三相五线制,采用三级配电两线保护,实行一机一闸一漏一相,且电相都设有标牌和使用功能及主管责任人负责。每天专职电工作巡查记录,进行归档。 外墙装饰施工,先检查外排脚手架是否具有安全性和稳定性,脚手板的刚性及承载力,都符合安全要求后才上架施工。室内装饰先检查电线是否破损,机具运作是否正常,经检查没有存在安全隐患后,再进行施工。

启闭机调试报告(苍松参考)

北京市北运河北关分洪枢纽改建工程 分洪闸闸门及控制系统联合调试报告 一、工程概况 北关分洪枢纽改建工程位于北京市通州区,北运河的始端,温榆河的终点。由新建拦河闸和分洪闸等主要建筑物以及配套设施组成,是北运河的控制性工程,是北运河安全度汛的关键,关系到北京、河北、天津三省市的防洪安全。 工程新建分洪闸,位于原闸下游,闸室中心线距上游通惠河河口354m。分洪闸共9孔,总净宽90.00m。闸室垂直水流向总宽度105.20m,闸底高程16.86m。在左岸,布置有控制4孔闸门的液压站及检修门机库;在右岸,布置有控制5孔闸门的液压站房、配电房及管理房。闸墩上设检修桥,桥面宽6.00m,桥上布置有门机轨道。 分洪闸工作闸门采用露顶式弧形钢闸门,孔口尺寸10.0mX4.0m(宽X 高),设计水头3.64m,闸门动水启动。单扇弧形工作闸门重约22t。 工作闸门上游设露顶式平面叠梁门检修闸门,孔口尺寸为10.00X3.75m,全套3节叠梁门自重约为13.0t。检修门启闭设备为移动式门机,9孔共用。 根据各施工单位汇报,已完成设备施工安装和工程质量检验,可以进入联合调试。 二、联合调试的目的 分洪闸工程于2008年2月25日开工,5月30日分洪闸闸门全部制作完毕,并陆续运往工地进行安装,8月12日闸门安装完毕,2009年8月10

日施工单位完成了分洪闸闸闸门的调试运行。到目前分洪闸及船闸已具备了联合调试条件。 因此,通过全行程的门、机启闭联调,采集各项检测数据,检验闸门与液压启闭机以及控制系统是否满足设计标准与工程使用要求。 三、联合调试大纲 (一)联合调试的依据 北京市水利规划设计研究院提出的北关分洪枢纽联合调度调试程序及 技术要求为依据。 (二)联合调试的组织 联合调试前,召开了预备会议。预备会议确定,对人员进行了具体分工:由总监施梓具体进行现场协调; 液压站操作人员:李铮、徐红斌;记录人员:张兴锋 闸门运行观测人员:蒙强、王立刚;记录人员:侯磊 确定正式试运行日期:确定3月7日开始联合调试。 (三)联合调试过程安排及要求 根据目前工程完成情况,联合调试共分两个现场: 1、现地控制现场:按位置分分洪闸左岸液压站、右岸液压站; 2、闸室。 现场具体要求: 现地检测试验。按右岸液压站——左岸液压站顺序进行。 (1)右岸液压站四孔:按现地手动方式进行闸门运行并检测。 (2)左岸液压站五孔:按现地手动方式进行闸门运行并检测。

安全三同时验收报告

怎样对竣工项目进行安全三同时验收 申请县以上安监管理部门验收,由市级安监部门组织专家验收,一是材料(文字的可行性报告、安全制度、措施、人员、设备台账等等),二是现场验收。验收合格专家签字,出 具合格证明文件。不合格,哪一项不合格整改哪一项,直至合格。再申请验收。 作为县级安监部门要会同市级安检部门和安全评价机构,按照可行性研究报告中提出的任务进行验收。 竣工验收办理指南 一、部门名称某某安全生产监督管理局 二、行政许可事项名称某某建设项目(新建、改建、扩建)安全设施“三同时”审批及竣工验收 三、有关法律、法规、规章依据 《中华人民共和国安全生产法》 《某市安全生产管理规定》 四、申请行政许可需具备的条件 本区受理的新建、改建、扩建的某某建设项目; 1.符合国家有关安全生产政策、法律和法规;2.建设项目的安全设施必须符合国家规定的标准,必须与主体工程同时设计、同时施工、同时投入生产和使用 五、行政许可数量规定要求 无数量要求 六、申请书文本和示范文本(略) 七、需要提交的全部材料的目录申请办理《新建、改建、扩建危险化学品建设项目安全 设施“三同时”审批(竣工验收)》的单位时,应提交下列申请文件、资料,并对其真实性负责: (一)安全设施“三同时”审批; 1.《建设项目安全设施“三同时”审批表》一式五份; 2.可行性研究报告; 3.安全预评价报告书; 4.安全设施设计资料。 (二)安全设施“三同时”竣工验收; 1.验收申请报告; 2.《建设项目安全设施竣工“三同时”验收表》一式五份; 3.主要安全设施特种设备检测检验报告(复印件); 4.施工单位资质证明材料; 5.企业主要负责人、安全管理人员及特种作业人员安全资格的有关资料; 6.安全验收评价报告书; 7.安全规章制度,应急预案。 八、收费依据及标准 无收费(外聘专家现场审查费按照国家规定收取)。 九、办理程序 1.申请事项不属受理规定范围的,即时出具《新建、改建、扩建危险化学品建设项目安全设施“三同时”审批(竣工验收)申请不予受理通知书》,并告知申请人理由或告知向其他 有关行政机关申请; 2.申请材料不齐全或者不符合要求的,当场或 5 日内书面一次告知申请人需要补正的全部内容;

调试报告

合同编号* 项目名称/工段 用户名称 系统型号 实施人员* 调试日期* 用户确认上述调试情况。 (签名/日期) 注:带*项为必填项;在选项上标注“√”;没有该项请标注“○”。 设备上电调试情况 控制柜编号* CCTV1 放置在哪个控制室 中控室 电源(包括直流电源)正常* □是 □否 □是 □否 □是 □否 □是 □否 □是 □否 其它情况描述 操作台编号* 放置在哪个控制室 中控室 上电正常* □是 □否 □是 □否 □是 □否 □是 □否 □是 □否 通讯正常* □是 □否 □是 □否 □是 □否 □是 □否 □是 □否 文件放置规范、共享正常* □是 □否 □是 □否 □是 □否 □是 □否 □是 □否 其它情况描述 视频监控网络调试情况 确认内容 确认结论 控制故障诊断软件诊断网络工作正常* □是 □否 操作网工作正常 □是 □否 其它情况描述 周界红外对射调试情况 调试内容及方法 调试情况 测点位号 标准量程 调试量程 备注 一、周界红外对射光轴调整。 1、调整上下角度调整螺钉及水平调整架,使对面的探测器影像落入瞄准孔中间部位。 2、距瞄准镜10cm 左右观察瞄准效果。 3、将测试笔插入测试孔位,先调水平角度,直至测试孔电压输出最大,然后作垂直调整。 4、观察测试仪显示电压能否获得3V 或以上,否则投光器及受光器要再作调整。 5、调试完成进行测试,在投江器和受光器之间进行遮挡,查看继电器动作情况。 □已调试,正常 测试孔电压3V -3.8V 3.5V 3.3V 3.6V 3.6V 3.2V 3.75V 3.2V 3.3V 3.2V 3.2V 3.7V 3.5V 3.7V 注:上述调试方案将通过最终用户 参与调试,签订最终调试确认报告。 上述调试方案如有问题,可以根据现场情况进行修改,在备注里面注明修改原因。

安全验收评价报告

报告编号: ******燃气有限责任公司 CNG储配站 安全验收评价报告 (送审稿) @@@安全工程技术有限公司 资质证书编号:APJ- 二零零八年四月

******燃气有限责任公司 CNG储配站 安全验收评价报告 (送审稿) 法人代表人: 技术负责人: 评价项目负责人: 二零零八年四月

前言 随着国家“西气东输”工程的实施,为了改善某某市城区居民生活环境及投资环境,调整能源结构减轻大气污染,提高居民生活质量,根据某某市政府办阅[2006]22号《关于天然气利用工程建设有关问题的会议纪要》精神,经研究,同意******燃气有限责任公司新建某某市城市天然气建设工程,一期工程CNG储配站已于2007年12月28日竣工,并于2008年3月初购置第一车天然气,经过保压、投产置换等试验,2008年3月23日上午8:30分,投产工作开始,3月24日上午开始向城网供气,3月25日小区置换并点火成功,整个试投过程圆满结束,至今该公司已为某某三小区计78家居民用户通气。 受******燃气有限责任公司委托,安全评价机构安全技术工程有限公司对CNG储配站工程承担安全验收评价工作。 在接受安全评价工作之后,本公司立即组织有关安全评价人员成立安全评价小组,依据《安全评价通则》、《安全验收评价导则》等法律法规、技术规范和《某某市城市天然气供气工程某某市CNG储配站施工图》、《竣工资料》等相关资料,广泛收集燃气安全生产管理的专业文献及参考书籍,组织实施安全评价工作。评价组在实施安全评价的过程中,以“科学、客观、公正”的工作态度,对CNG储配站现场进行了察看,与企业的安全管理人员进行充分的访谈。评价组根据设计资料进行严谨的技术分析,全面、客观、公正地辨识和分析CNG储配站的主要危险、有害因素,采用安全检查表法、事故树法及事故后果模拟分析法对CNG储配站进行了定性、定量安全评价,提出合理可行的安全对策措施建议。在此基础上,编制完成《******燃气有限责任公司CNG储配站安全验收评价报告(送审稿)》,为建设项目安全设施验收提供依据。

建设工程竣工验收报告表

建设工程竣工验收报告 工程名称:云城区玉皇路(星岩路至建设路段) 人行道改造工程 建设单位名称:云浮市云城区城镇综合管理和执法 局 竣工验收时间:2017年12 月29 日

建设工程竣工验收报告 单位工程名称人行道 建筑面积3172.9㎡ 施工单位广东侨福建设有限公司 勘察单位/ 设计单位北京特希达交通勘察设计院有限公司 监理单位广州穗峰建设工程监理有限公司 开工时间2017.12.1 工程造价1020717.04元 竣工时间2017.12.29 工程概况:云城区玉皇路(星岩路至建设路段)人行道改造工程,起点位于星岩路与玉皇路接点,起点桩号为K0+000,终于建设路与玉皇路相交处,终点K0+292,路线全长292m 竣工验收程序: 该工程在预验收的基础上整改到位,建设单位已收集勘察、设计、施工、监理单位的工程质量评估报告,同时组织成立了以建设单位为主的竣工验收小组。

竣工验收内容: 该工程能履行合同,在整个建设工程的各个环节按照法律、法规强制性标准执行,验收小组对工程实体进行了目测,得出总体评价,验收合格。 依据该项目工程的《建设工程施工合同》、设计文件、现行的有关验收规范,对该项目工程的资料,实体检查,验收小组对工程实体及资料总体评价为:合格。 竣工验收组织: 竣工验收标准: 对勘察单位评价: 按《建筑法》及《建筑工程质量管理条例》的内容,对勘察单位的意见为:勘察的实物质量与勘察报告相符,勘察的内容符合工程建设强制性标准,勘察单位的行为合法,我方予以认可。 对设计单位评价: 按《建筑法》及《建筑工程质量管理条例》的内容,对设计单位的意见为:设计单位各专业设计人员能严格按设计规范及执行强制性

安全验收评价报告模板

XX项目安全验收评价报告模版 1编制说明 1.1评价依据 1、中华人民共和国主席令第70号《中华人民共和国安全生产法》 2、劳动部令第3号《建设项目(工程)劳动安全卫生监察规定》 3、劳动部劳安字[1992]1号《建设项目(工程)职业安全卫生设施与技术措施验收 办法》 4、国家安管局安监管技装字[2003]37号《安全评价通则》 5、国家安管局安监管技装字[2003]79号《安全验收评价导则》 6、天津市安管局津安监管字[2002]84号《天津市安全评价管理办法》 7、SJ30002-92《电子工业职业安全卫生设计规定》 8、国家、地方、行业有关劳动安全的法规、规定、规范和标准(详见附件1) 9、建设单位提供的《中芯国际集成电路制造(天津)有限公司项目》安全验收的相 关资料。 10、中芯国际集成电路制造(天津)有限公司委托天津泰山安全科技有限公司进行《中 芯国际集成电路制造(天津)有限公司项目》安全验收评价合同书。 1.2评价目的及评价范围 1、评价目的及评价内容 1)安全验收评价的目的是贯彻“安全第一,预防为主”的方针,为建设项目安全验收提供科学依据,对建设项目未达到安全目标的系统或单元提出安全补偿及 补救措施,以利于提高建设项目本质安全程度,满足安全生产要求。 2)安全验收评价内容 ①检查建设项目中安全设施是否已与主体工程同时设计、同时施工、同时交 付生产和使用;评价建设项目及与之配套的安全设施是否符合国家有关安 全生产的法规、规定和技术标准。 ②从整体上评价建设项目的运行状态和安全管理是否正常、安全、可靠。 2、评价范围 根据本项目安全验收评价技术服务合同书的规定内容,经与建设单位商定:对中芯 天津芯片生产厂房、化学品库、污水处理站以及变配电站、锅炉房、油库、空压站、

竣工验收报告模板

竣工验收报告模板

工程竣工报告 工程名称: 福安市街尾片区B-02地块危旧房改造项目工程项目经理: 企业技术负责人: 企业法定负责人: 福建二建建设集团公司 12月20日

我司施工的三坊七巷保护改造工程一坊二期工程已全部完工,经初步验收,本工程符合有关法律、法规和工程建设强制性标准的要求,以及设计文件和合同文件要求。根据“福建省建设厅关于转发《房屋建筑工程和市政基础设施工程竣工验收管理暂行规定》的通知”(闽建[ ]57号)的要求,现提交《工程竣工报告》,申请工程竣工验收。 一、工程及施工概况 1、工程简介 (1)建设开发概况 工程名称:三坊七巷保护改造工程一坊二期工程 工程地点:本工程位于福州市杨桥路19号 建设单位:建闽长置业有限公司 设计单位:福州市国伟建筑设计院 监理单位:福建天正建筑监理咨询事务所 施工单位:福建二建建设集团公司 (2)建筑设计概况 本工程总建筑面积为10698.135㎡(含阳台面积),建筑高度64.6m。建筑层数:22层,建筑面积约1692.575㎡. 墙体: 外墙200厚采用600×200×200加气混凝土砌块,强度等级A5.0,采用Mb5专用砂浆砌筑。内墙200厚采用600×200×200加气混凝土砌块,强度等级A5.0,采用Mb5专用砂浆砌筑。内墙100厚采用600×100×200加气混凝土砌块,强度等级A5.0,采用

Mb5专用砂浆砌筑。 防水: 屋面:防水等级为二级,两道防水设防,防水层为3厚高聚物改性沥青防水卷材、1.5厚合成高分子防水涂料。 卫生间、厨房:楼地面防水层应向上翻300,并加做一道1.5厚聚合物水泥基防水涂料,厨房上翻墙面高度0.3m,卫生间上翻墙面高度1.8m。 地下室:防水等级为Ⅰ级,顶板防水层采用4.0厚SBS改性沥青耐根穿刺防水卷材加 2.0厚聚氨脂防水涂料,结合主体钢筋砼结构自防水。侧墙防水层采用 2.0厚自粘聚合物改性沥青防水卷材(无胎)加20厚1:2防水砂浆,结合主体钢筋砼结构自防水。底板防水层采用2.0厚自粘聚合物改性沥青防水卷材(无胎)加2.0厚聚氨脂防水涂料,结合主体钢筋砼结构自防水。 装饰部分:

安全验收评价报告(2)

(建设单位名称) (建设项目名 称) 安全验收评价报告 建设单位: 建设单位法定代表人: 建设项目单位: 建设项目单位主要负责人: 建设项目单位联系人: 建设项目单位联系电话: (建设单位公章)

(建设单位名称) (建设项目名称) 安全验收评价报告 评价机构名称: 资质证书编号: 法定代表人: 审核定稿人: 评价负责人: 评价机构联系电话:: (安全评价机构公章)

评价人员三号宋体加粗)

(此表应根据具体项目实际参与人数编制) 技术专家 签字姓名 (列出各类技术专家名单) (以上全部用小四号宋体) 资质证书复印件

8 〔安全评价〕概述 ............... 1.1安全评价对象和范围 ......... 1.2评价经过和程序 .............. 建设项目概况 ..................... 2.1建设项目简介 ................ :2.2投资单位组成及出资比例] :2.3建设单位基本情况]..... 2.4 2.5 2.6 2.7 地理位置、周边情况及自然条件 建、构筑物及总图布置 ........ 主要工艺过程(或技术)....... 主要原辅材料和产品 ............ 主要设备、设施 ............... 配套和辅助工程 ................ 2.8 2.9 2.10安全设施(?) .................. 2.11安全管理机构及管理制度(?) 2.12〔建设项目前期三同时工作情况〕 危险有害因素的辨识结果及依据说明 3.1 3.2 3.3 3.4 原料、中间产品、最终产品理化特性分析结果 . 危险化 学品的包装、储存、运输的技术要求 ...… 爆炸、火灾、中毒、灼烫事故的危险有害因素及分布 其他危险、有害因素及其分布 ....................... 重大危险源辨识结果 ............................ 防爆区域划分结果 ............................... 3.5 3.6 评价单元划分结果及理由说明 ................. 评价方法选择及理由说明 ..................... 危险、有害程度分析结果 ..................... 6.1固有危险程度分析 ....................... 6.2风险程度分析结果 ....................... 安全条件和安全生产条件分析结果 ............. 7.1安全条件分析结果 ....................... 7.2安全设施的施工、检验、检测和调试情况 7.3安全生产条件分析结果 .................. 7.3.1 7.3.2 7.3.3 7.3.4 7.3.5 7.3.6 建设项目安全设施的法规符合性分析结果 安 全生产管理分析结果 ................... 主要生产技术、工艺分析结果 .......... 主要装置、设备或设施分析结果 ........ 原料、辅助材料和产品分析结果 ........ 作业场所分析结果 ...................... 事故及应急管理分析结果 .............. 其它方面.............................. 7.3.7 7.3.8 7.4可能发生的危险化学品事故及后果、对策 安全对策与建议 .................................. 安全评价结论 ................................ .9 10 10 10 11 14 14 15 16 16 17 17 17 18 18 19 19 19 19 20 22 22 22 23 23 23 23 24 24 24 24 24 .24 25 25