试产总结报告(模板)
1Number of times
√=passed
x=failed Documents
BOM 物料清单CCCF PMP Drawing 工程图纸Equipment 设备Fixture 治具
WI\Flowch art 作业指Sample 样品Comments
Project Manager:
Engineer:PO NO.
ITEM NO.
Pilot Run Description:
Pilot Run summary:Pilot Run Result:Pilot run result need to confirm after review
meeting (需总结会议后确认)
Remark/备注
Pilot Run Date:
Order Quantity:Pilot Run Classification:
Total Input Quantity:Qualified Product Ratio:
(Qualified rate >95%
Total Output Quantity :Balance Efficiency>85%: Pilot Run Results Summary Item :
Total Qty: ( ) PCS Accepted Goods:( ) PCS
Rejects ( ) PCS
Yield : %
FPY : %
Balance Efficiency: %
Quality Manager:Quality Engineer:Henson Conclusion Pre-Pilot Checklist
Note: This is used to determine the production of the required documents, samples, fixtures, equipment, etc already be prepared. 这个是用于确定产品的文件、样品、治具、设备等已经被准备好了。相关人员讨论后对现场发现的问题点改善批复后一起总结的结论
FPY:(FPY)>90%
Defect Quantity: