整车开发通用英文缩写(按首字母排序)-通用GVDP
英文缩写
(按首字母排序)
100% Cal
100% Calibration 100% IVER
100% Integration Vehicle Engineering Release 100% PPAP
All parts at full PPAP for Vehicle program 100% SVER
100% Structure Vehicle Engineering Release 65% Cal
65% Calibration 80% Cal
80% Calibration 8D
8 Disciplines A
Alpha A MRD
Alpha Material Required Date A/T
Automatic Transmission A/T
Automatic Transmission AA
Architecture Approval AAM
Alliance of Automobile Manufactures ABS
Anti-lock Brake System or Anti-Block Steering AC
Architecture Confirmation ACE
Assistant Chief Engineer ACT
Activity ACT BOM
Assembly Component Tree BOM AD
Alternatives Development ADV
Analysis / Development / Validation ADV
Analysis, Development and Validation AE
Application Engineer AE
Application Engineer AEM
Assimilability evaluation method AFI
Architecture Framing Initiation AIAC
Automotive Industry Action Group ALY
Alloy AMT
Automatic Machincal Transmission ANSI
American National Standards Institute AP
Advanced Purchasing AP
Assembly Plant APB
Automotive Product Board APD
Approved Product Description APE
Annual Program Execution APEC
Asia Pacific Economic Cooperation APQP/CP
Advanced Product Quality Planning and Control Plan APSB
Asia Pacific Strategy Board AR
Appropriation Request ARC
Architecture Refinement Complete ASB
Automotive Strategy Board ASC
ASE
Automotive Safety Engineering 整车开发通用英文缩写(按首字母排序)英文全称
ASN
Advanced shipping notice ASSI
Architecture Statement of Strategic Intent Assy PPAP
Assembly Line PPAP Assy PPV
Assembly Line Products and Process Validation Assy PPV
Assembly Line Production and Process Validation Assy Run-off
Assembly Line RUN-Off Assy Run-off MRD
Assembly Line RUN-Off Material Requied Date ATC
Auto Temperature Controller ATF
Automatic Transmission Fluid ATT
Attachment ATT
Actual takt time AVD
Advanced Vehicle Development AVDC
Advance Vehicle Development Center AVD-LT
Advanced Vehicle Development-Leadership Team AVDP
Advanced Vehicle Development Process (Time between DSI and VPI)AVPM
Advanced Vehicle Planning Manager B
Beta B
Build B MRD
Beta Material Required Date B+U
Building and Utility BAD
Build Authorization Document BC
Business Case BCM
Body Control Module BDC
Body Distributon Central BESC
Base Engine Steering Committee BIQ
Building in Quality BIR
Prototype Build Issue Report BIR
Build Issues Resolution BIR
Build Incident Report BIR
Bulding issue report BIW
Body-In-White BIW
Body in White BOD
Bill of Design BOE
Bill of Equipment BOM
Bill of Material BOM
Bill of Material BOM
Bill of Material BOM
Bill Of Material BOM
Bill Of Material BOM
Bill of Material Assy PPAP
Assembly Line PPAP Assy Check-in
Assembly Line Check-in Assy Run-Off
Assembly Line Run-Off
BOP Bill Of Process
BP Break Point
BPD Business Plant Deployment
BPP Best people practices
BPR Business plan recompose
BS Body Shop
BSD Build Site Direction
BUFFER Buffer
C/CAP Construction/Conversion and Acceleration Plan CAB Change Approval Board
CAC
CAFE Corporate Average Fuel Economy
Cal Calibration
CARE Customer acceptance review evaluation CARE Customer Acceptance & Review Evaluation CC Concept Confirmation
CC Consolidation Center
CC Confirmation Clinic
Cert LSO Certification Lift Stop Order
CET Cold Environment Test
CH Chassis Department
CI Concept Initiation
CIM Customer Interface Manager
CIP Continue Improve Process
CIP Continue Improve Process
CIT Continuous Improvement Team
CIT Compartment Integration Team
CMC Container Management Center
CME Change Management Engineer
Cmk N/A
Cmk Capability Machine Index
CMM
C-NCAP China New CAR Assessment Process
COC Centre of Competence
COE Center of Expertise
CP Control Plan
CPIT Current Product Improvement Team
Cpk Complex Process Capability
Cpk Process Capability Index
CPQE Current Product Quality Engineer
CPV Cost per Vehicle
CR/DN Change Request / Decision Notice
CR/DN Change Request/Decision Notice
CRB Change Review Board
CS Contract Signing
CS Contract Signing
CS1Controled Shipping 1
CS2Controled Shipping 2
CSC Controls Steering Committee
CSI Customer Satisfaction Index
CSN Current Sequence Number
CSO Contract Sign-Off
CSO Contract Sign-Off (VDP)
CSO HC Contract Sign-Off Health Check
CSO HC Contract Sign-Off Health Check
CT Cycle Time
CT Cycle time
CT Creativity Teams
CT Critical Test
CTS Component Technical Specification
CTT Common Timing Template
CVER Concept Vehicle Engineering Release
CVER LL Concept Vehicle Engineering Release Long Lead CVIS Completed Vehicle Inspection Standards
CVQC Completed vehicle quality ceter
CVQCB Completed vehicle quality ceter board
CVT Continuously Variable Transmission
D.Q.R
DAS Design & Analysis Section
DC Deliver Charter
DCN Design Change Notice
DCN Design Change Notice
DCP Dimension Control Plan
DCS Design Concept Sheet
DCT Double Clutch Transmission
DD Direct Delivery
DDSP Driver Door Switch Pack
DEI Die Engineering Integration
DFA Design for Assembly
DFM Design for Manufacturability
DFMEA Design failure mode and effects analysis DFMEA Design FMEA
DIFF Differential
DL 3b Design Level 3b
DMS Dealer Manage System
DOL Dealer On Line
DP Demand Plan
DPV Defects per vehicle
DPV Defect per Vehicle
DQ&V Design Quality & Validation
DR Direct run
DRC Design Review Committee
DRE Design Responsible Engineer
DRE Design Release Engineer
DRE Design release engineer
DRL Direct run loss
Drop Off Drop Off
DS44HIGH SPEED DURABILITY TEST
DSG Direct shift gearbox
DSI Document of Strategic Intent
DSO Design Sign Off
DTA Design Theme Alternatives
DTC Diagnostic Trouble Code
DV Design Validation
DV Design Validation
DVP Design Validation Plan
DVT Dynamic vehicle test
E/T/C Engine/Transmission/Controller
EBA Emergency Brake Assistant
EBD Electronical Brake Distribute
EBOM Engineering BOM
EC Embedded Controller
ECC ERP Central Component
ECR Engineering Change Request
ECR Engineering Change Request
ECR Engineering Change Request
ECR Engineering Change Request
ECS Engineering Change Summary
ECT Emission Control System
EDS Electronic Data Systems
EEVC European Enhanced Vehicle-Safety Committee EFEO Emissions & Fuel Economy
EGM Engineering Group Manager
EI&S Electronics Integration & Software
ELV End of life vehicle
EMlS Emission
EMS Engine Management System
ENB Build-Test Section
E-NCAP Euro New Car Assessment Process
ENG Engineer
EOA End of Acceleration
EOLT End of Line Test
EP Engineering Prototype
EPA Environmental Protection Agency
EPC Engineering Program Committee
EPN Engineering Project Number
ERD Early Requirement Document
ESB European Strategy Board
ESO Engineering Sign Off
ESO Engineering Sign Off
ESO Engineering Sign-off
ET Engineering Technology
EV Engineering Vehicle
EWO Engineering Work Order
EWO Engineering Work Order
EWO Engineering workorder
Exp Cal Experimental Calibration
FA Final Approval
FATG Final Approval to Grain
FBIW First Body in White Complete
FE Functional Evaluation
FE LSO Fuel Economy Label Lift Stop Order
FIVC First Integration Vehicle Complete
FIVC First Integration Vehicle Complete
FLO Factory Layout
FM
FM Finance Manager
FMC First Mule Complete
FMC
FMEA Failure model effectiveness analysis
FMEA Failure model effectiveness analysis
FMEA Failure Mode and Effects Analysis
FMEA Failure mode and effects analysis
FMEA Failure Mode and Effect Analysis
FMS Flexible manufacturing systems
FMVSS Federal Motor Vehicle Safety Standards FPPV BIW First Product/Process Body in White Complete
FPPVC First Product/Process Validation Vehicle Complete
FPS Fixed Point Stop
FTC First Time Capability
FTP/FTQ First time pass/quality
FTQ First time quality
FWD Four Wheel Drive
G Gamma
G MRD Gamma Material Required Date
G/L Group leader
GA General Assembly
GA General Assembly
GADT Global Architecture Development Team GBOM Global Bill of Material
GMNA General Motors North America
GMPT General Motors Powertrain
GPDC Global Product Development Council GPDP Global Powertrain Development Process GPDS Global Product Description System GSD Global Segment Director
GSS Global Sales and Service
GVDP Global Vehicle Development Process GVDP Global Vehicle Development Process GVDP Global Vehicle Development Process GVDP Global Vehicle Development Process GVDP Global Vehicle Development Process GVDP Global Vehicle Development Process GVLE Global Vehicle Line Executive
GVW Gross Vehicle Weight
GW Gateway
HRC
Hardware Release Center ICD
Interface Control Document IDR
Initial Data Release IDSR
Integration Driven Subsystem Requirement ILP
Inbound Logistic Planning IMES
Integration Manufacturing Executive System Initial Cal
Initial Calibration IOM
Inspection operator method IOS
Inspection operator summary IPPE
integrated Product and Process Engineering IPTV
Incident per Thousand Vehicles IPTV
Incidents Per Thousand Vehicles IPTV
Incidents Per Thousand Vehicles IPTV
Incidents Per Thousand Vehicles IR
Incident Report IRP
Issue Resolution Process IRR
Internal Rate of Return ISO
International Standard Organization IV
Integration Vehicle IV MRD
Integration Vehicle Material Required Date IVBR
Integration Vehicle Build Readiness Review IVER
Integration Vehicle Engineering Release JIS
Just In Sequence JIS
Just In Sort JIS
Job Instruction Sheet JIT
Just In Time JIT
Just In Time JPH
Job per Hour JRS
Joint Ride Session JSC
JSC-GP
Joint Sourcing Committee - General purchase Kcc
Key Control Characteristic KCC
Key Control Character KCDS
Key Characteristic Designation System KO
Kick-Off Kpc
Key Product Characteristic KPC
Key Product Characteristic KPC
Key product characteristic KPC
Key product characteristic KPC
Key process control KPC
Key process control LAAMSB
Latin America, Africa, Middle East Strategy Board LCL
Lower Control Limit LCS
Logistic Confirmation Sheet LL
Learning Loop LL
Long Lead LLPR
Long Lead Production Release LM
Launch Manager LOU
Line of Usage BOM LSL
Lower Specification Limit
LTR Launch Team Release
LWO Logistic Work Order
M+E Machine & Equipment
MAC
MBOM Manufacturing BOM
MDS Materiel Data Sheet
ME Manufacture Engineer
ME Machine and Electronic
ME Manufacturing Engineering
ME Manufacturing Engineering
MEC
MEIS Manufacturing Engineering Info System
MES Manufacturing Execution System
MES Manufacturing Execution System
MFG Site Dec Manufacturing Site Decision
MIC Marketing Information Center
MILKRUN Milkrun
MKT Marketing
MMR Manufacturable Math Release
MO Manufacturing Operations
MP OTS 100%100% Made Parts in OTS
MP OTS 100%100% Made Parts in OTS
MP PPAP Made Parts PPAP
MP PPAP Made Parts PPAP
MP PPV Made Parts Production and Process Validation MP PPV Made Parts Production and Process Validation MPS Master Planning System
MPV Multi-Purpose Vehicle
MR Manufacturing Requirements
MRD Material Required Date
MRD Material Requirement Date
MRD Material Required Date (for physical builds) MRD Math Required Date (for virtual builds)
MRE Manufacturing Responsible Engineer
MS Manufacturing Studies
MSA Measurement System Analysis
MSA Measurement System Analysis
MSA Measure System Analyse
MSA Measurement system analysis
MSS Market Segment Specification
MSS
MSS Market Segment Specification
MT Manual Transmission
MT&E Machines, Tools and Equipment
MTS Manufacturing Technical Specification
MVB Manufacturing Validation Build
MVB Manufacturing Validation Build
MVB (ns)Manufacturing Validation Build (non saleable)
MVB (s)Manufacturing Validation Build (saleable) MVBns Manufacturing Validation Build Non-Salable MVBs Manufacturing Validation Build Salable MVSS Motor Vehicle Safety Standards
MWO Manufacture Work Order
MY Model Year
MYM Model Year Manager
NAO North American Operations
NEO New Employee Orientation
NOA Notice of Authorization
NOD Notice of Decision
NOD Notice of Decision
NPV Net Present Value
NRD Normal Road
NSB North American Strategy Board
OBD On Board Diagnostics
OEM Original Equipment manufacturers
OEM Run-Off Original Equipment Manufacturer Run-Off OEM Run-off Original Equipment Manufacturer Run-off OJT On Job Training
OPO Office of Product Operations
ORS Occupant Restraint System
OT Overtime
OTD Order to Delivery
OTP On Time Performance
OTS
OTS Off-tool Sample
OTS Off-tool Sample
OTS Off-tool Sample
OTS OFF-TOOL-SAMPLE
OTS QV OTS Quality Valve
OTS QV OTS Quality Valve
OTS TG2Off Tooling Samples Tooling Go Level 2 OTS TGL2Off Tooling Samples Tooling Go Level 2
P Pilot
P Pilot
PA Production Approval
PA Program Administrator
PaC Physical Alpha for Customer
PACK Packaging
PAD Product Assembly Documentation
PAM Product Assemble Manual
PAM Product Assemble Manual
PAPIR Product and Process Integration Review
PAS Parking Aid System
PAS Parking Aid System
PbC Physical Beta for Customer
PBS Painted Body Store
PC Deliver Pilot to Customer
PC Pullcord
PC Problem Communication
PC&L Production Control and Logistics
PCL Production Control Manager
PCM Powertrain Control Module
PCM Process Control Manager
PCN Project Cost Change Notice
PCN Project Costbook Change Notice
PCR Problem communication report
PCR Problem communication report
PCR Problem Communication Report
PCR Problem Communication Report
PDC Parking Distance Control
PDC Parking Distance Control
PDCA Plan、Do、Check、Action
PDCA Plan-Do-Check-Action
PDI Product delivery inspection
PDI Preliminary Data Indicator
PDI Pre-delivery Inspection
PDS Product Data Structure
PDT Product Development Team
PDT Product Development Team
PDT Product Development Team
PDT Product Development Team
PDT Product Development Team
PE Product Engineering
PET Program Executive Team
PET Program Execution Team
PET Program Execution Team
PFI Program Framing Initiated
PFMEA Process failure mode and effectsanalysis PFMEA Process FMEA
PFMEA Process failure mode & effects analysis PFSE Product Focus Systems Engineer
PG3Powertrain Gateway
PgC Physical Gamma for Customer
PGM Program Management / Project Management PGM Program Management
PGM Program Management
Pilot Pilot
Pilot Pilot
Pilot QV Pilot Quality Valve
Pilot MRD Pilot Material Requied Date
PIM
Powertrain Interface Manager PLM
Production Launch Manager PLP
PM
Programme Manager PM
Program Manager PM
Program Manager PM
Plan maintain PM
Prevention Maintenance PM
Program Manager PMO
Program Management Office PMP
PMT
Product Management Team PN
Part NO.PP
Pre-pilot PP
Pre-Pilot PP
Pre-pilot P-P
Pre-Pilot PP PPAP
Purchased Parts Production Parts Approval Process PP ESO
Purchased Parts Engineering Sign Off PP OTS 100%
100% Purchased Parts in OTS PP OTS 80%
80% Purchased Parts in OTS PP OTS 80%
80% Purchased Parts in OTS PP PPAP
Purchased Parts PPAP PPA
Product Planning Approval PPAP
Production Parts Approval Process PPAP
Production Part Approval Process PPAP
Production Part Approval Process PPAP
Production Part Approval Process PPAP
Production Parts Approval Process PPAP
Production Part Approval Process PPAP
Production Part Approval Process PPAP
Production Part Approval Process PPC
Deliver Pre-Pilot to Customer PPC
Product Program Content PPH Problems per Hundred
PP Appr.
Purchased Parts Approved Pilot QV
Pilot Quality Valve
排序)
中文含义
100%标定
100%集成车工程发布
为了整车项目,所有零件须完全通过
PPAP
100%结构车工程发布
65%的动力总成标定
80%的动力总成标定
问题解决8步法
Alpha阶段(动力总成产品开发的一个阶
段)
Alpha样件需求日期
自动变速器
自动变速器
架构批准
汽车制造商联盟
防抱死制动系统
架构确认
总工助理
工艺路线
总成件树形BOM
主题开发
分析/开发/验证
分析,开发和认证
应用工程师
应用工程师
可装配性评估方法
架构框架启动
美国汽车工业行动集团
铝合金
机械式自动变速器
美国国家标准协会
提前采购
总装厂
汽车产品委员会
批准的产品描述
年度项目执行
亚太经济联盟
先期产品质量规划和控制计划
亚太战略委员会(通用汽车的高层管理组织)
项目预算
架构优化完成
汽车战略委员会(通用汽车的高层管理组织)
经销商售后管理系统
汽车安全工程
战略意向的架构陈述
装配线进场
启动现场安调
装配线
通过PPAP
装配线通过PPAP
装配线交付后的产品工艺验证
装配线交付后产品工艺验证
装配线试装
交样日期
装配线整线打通,启动试装,允许手工装配
装配线
自动空调控制器
自动变速箱油
附件
实际单件工时
先期车辆开发
先期车辆开发中心
前期整车开发-领导小组
先期车辆开发流程(在DSI与VPI之间)先期车辆计划经理
Beta阶段(动力总成产品开发的一个阶段)
制造
Beta样件需求日期
土建公用
试制授权文档
业务计划
车身控制器
车辆调配中心
发动机总成战略转向委员会
制造质量
试制问题报告
试制问题
装车问题报告
造车问题报告
白车身
白车身
设计清单
设备清单
物料清单
物料清单
物料清单
物料清单
物料清单
物料清单
断点
业务计划实施
最佳人员准则
业务流程重组
车身车间
试制现场指导书
线边缓存区
土建/改造和生产提速计划更改审批会
服务热线专员
公司平均油耗
动力总成标定
整车报交检查
用户接受度和审查评估
验证概念
集散中心
确认临床
通过排放认证通知
寒区试验
底盘部
提出项目概念
客户服务经理
持续改进
持续改进
不断改进小组
车厢集成小组
空箱管理中心
更改管理工程师
临界机器能力指数
机器设备能力
三坐标测量
中国标准新车评估体系
能力中心
经验总结中心
控制计划
现有产品改进小组
过程能力指数
稳定过程的能力指数
现有产品质量工程师
单车成本
更改决议
变更申请/决议通知
更改评审小组
动力总成签署项目合同
合同签订
一级受控发运
二级受控发运
控制模块战略转向委员会用户满意度指标
合同签署
整车签署项目合同(VDP术语)合同签署健康检查
合同签署健康检查
制程周期
周期时间
创造性工作小组
关键试验
零部件技术标准
标准2级进度模板
概念车工程发布
概念车工程发布--长周期
整车检验标准
整车质量中心
整车质量目视板
无级变速器
合格率概况
设计分析科
递交项目章程
设计更改通知
设计更改通知
尺寸控制计划
概念设计表
双离合器变速箱
直接投线
驾驶席门控开关
模具工程集成
装配工艺性设计
制造工艺性设计
设计失效模式和效果分析
设计失效模式分析
差速器
设计阶段3b
经销商管理系统
经销商在线系统
需求计划
单车缺陷数
单车缺陷数
设计质量和验证
直接通过率
设计评审委员会
设计和发布工程师
设计发布工程师
设计发布工程师
直接通过损失率
停产
高速耐久试验(MGRES 标准)双离合器变速箱
战略意向书
设计主题选项
诊断故障码
设计验证
产品设计验证
设计验证计划
整车综合动态测试
发动机/变速器/控制模块
紧急制动辅助系统
电子制动力分配系统
工程BOM
控制模块
ERP核心组建
工程更改请求
工程更改请求
工程更改申请
工程项目变更申请
工程变更摘要
电子控制自动变速器
电子数据系统
欧洲提高车辆安全性委员会
排放和燃料经济
产品工程小组经理
电器零件集成和软件
整车寿命结束
排放
发动机管理系统
试制试验科
欧洲标准新车评估体系
工程师
生产提速的完成
生产线试验结束
工程样车(件)
环境保护厅
工程项目委员会
工程项目数目
早期的要求文件
欧洲战略委员会(通用汽车的高层管理组织)
发动机整机
工程签署
工程签署
工程签署
工程技术
工程样车
工程工作指令
工程更改号
工程更改流程
尝试性标定
批准正式生产
生产最终批准
第一轮白车身完成
功能评估
通过油耗认证的通知
第1辆集成车制造完毕
第一轮集成车完成
工厂布局
功能尺寸
财务经理
第一轮骡子车完成
区域售后支持
失效模式分析
失效模式分析
潜在失效模式及后果分析
失效模式和后果分析
失效模式和影响分析
柔性制造系统
联邦汽车安全标准
第一轮产品/工艺白车身完成
第一轮产品/工艺验证车辆完成
固定停止位置
首次能力
一次通过合格率
下线合格率
四轮驱动
Gamma阶段(动力总成产品开发的一个阶段)
Gamma样件需求日期
工段长
总装
总装
全球架构开发小组
全球物料清单
通用汽车北美分部
通用汽车动力总成分部
全球产品开发理事会
全球动力总成开发流程
全球产品管理系统
全球细分主管
全球销售和服务
全球整车开发流程
整车开发流程
整车开发流程
全球汽车开发流程
全球整车开发流程
整车开发流程
整车平台执行
车辆总重
网关
硬件发布中心
接口控制文件
初始数据发布
集成驱动子系统要求
入厂物流规划
生产执行系统
初始标定
检验操作方法
检验操作概要
集成产品与工艺工程
每千辆车的故障率
每一千台车事故率
每千辆车的故障率
千辆车故障率
事故报告
问题解决流程
内含报酬率
国际标准化组织
集成车
集成车的物料需求日期
集成车制造准备评审
集成车工程发布
排序供货
供应商排序供货方式
岗位指导书
及时供货
供应商及时供货方式
生产节拍
联合评审
生产采购委员会
联合采购委员会-一般采购
关键过程控制特性
关键控制特性
产品关键特性定义系统
启动
关键产品特性
关键产品特性
主要产品特性
主要产品特性
关键过程控制
关键过程控制
通用的拉美,非洲,中东战略委员会管制下限
物流确认单
学习周期
长周期
长周期的产品发布
启动经理
整车BOM行
规格下限
启动小组释放
物流属性更改号
机器设备
区域经理
制造BOM
物料数据单
样车试制工程师或生产线制造工程师
电器设备
制造工程
制造工程
区域市场支持
制造工程信息系统
制造执行系统
制造执行系统
确定生产厂址
市场信息中心
循环取货
营销
制造数模发布
生产管理部门
100%自制件达到OTS状态
100%自制件达到OTS状态
自制件
通过PPAP
自制件通过PPAP
自制件生产线交付后的产品工艺验证
自制件生产线交付后的产品工艺验证
主计划系统
多用途轿车
制造要求
交样日期
物料需求日期
物料需求日期(用于制造样机)
数模需求日期(用于虚拟制造)
制造工程师
制造车间
测量系统分析手册
测量系统分析
测量系统分析
测量系统分析
市场细分规范
区域销售支持
市场分割规范
手动变速箱
机床,工装和设备
制造技术标准
用于认证制造工艺的整车制造
制造验证造车
用于认证制造工艺的整车制造(不可销售的)
用于认证制造工艺的整车制造(可销售的)
非销售制造验证造车
销售制造验证造车
汽车安全标准
制造属性更改号
年度款
车型年经理
通用的北美分部
新员工培训
授权书
决议
决议通知
净现值
一般公路
通用的北美传略委员会(通用的高层管理组织)
车载诊断系统
原始设备制造商(主机厂)
零件供应商
工装设备具备试生产条件
零件供应商工装设备具备试生产条件
在岗培训
产品高层管理组织
乘员约束系统
加班
订单到货时间
及时性能
装车评审
工装样件
工装样件
工装样件
工装样件
OTS质量阀
OTS交付状态满足质保的开阀要求
OTS质量阀,OTS交付状态满足质保的开阀要求
OTS设计达到TG2阶段,发布图纸用于供应商启动工装和设备投入
OTS设计达到TG2阶段
批量试生产
小批量生产
批准正式生产
项目管理专员
提交客户的Alpha样机
包装规划
产品装配文件
样车装配指南
产品装配手册
产品和工艺集成会议