模板安装与拆除作业指导书

模板安装与拆除作业指导书
模板安装与拆除作业指导书

35KV夏石变增容改造工程

模板安装与拆除作业指导书

审批:

审核:

编写:

施工单位:广西百捷电气有限公司

二零一二年七月

目次

1适用范围········································································································································

(1)

2编写依据········································································································································

(1)

3作业流程········································································································································

(1)

4工作前安全风险辨析及控制措

施 (1)

5作业准备········································································································································

(2)

6作业方法········································································································································

(4)

7质量控制措施及检验标

准 (6)

表2-1编写依据

3作业流程

1适用范围

本作业指导书适用于110~500kV电网工程的现浇混凝土基础、框架、楼板、墙体(防火墙、水池、

沟道结构模板安装与拆除。

2编写依据

作业(工序)流程图见图3-1。

图3-1作业(工序)流程图

4安全风险辨析及预控

4.1模板安装与拆除作业前,施工项目部根据该项目作业任务、施工条件,参照《电网建设施工安全基准风险指南》(下简称《指南》)开展针对性安全风险评估工作,形成该任务的风险分析表。

4.2《指南》中与模板安装与拆除作业相关联《电网建设安全施工作业票(编码BDTJ-ZW-07-01/01

结合现场实际情况进行差异化分析,确定风险等级,现场技术员填写安全施工作业票,安全员审核,施工负责人签发。

4.3施工负责人核对风险控制措施,并在日站班会上对全体作业人员进行安全交底,接受交底的作业人员

负责将安全措施落实到各作业任务和步骤中。

4.4安全施工作业票由施工负责人现场持有,工作内容、地点不变时可连续使用10天,超过10天须重新

序号引用资料名称

1GB50204—2002《混凝土结构工程施工质量验收规范》

2JGJ162—2008《建筑施工模板安全技术规范》

3DL/T52101.1—2005《电力建设施工质量验收及评定规程第1部分:土建工程》

4《10kV~500kV输变电及配电工程质量验收与评定标准第3部分:变电土建工程》

5Q/CSG11105—2008《南方电网工程施工工艺控制规范》

6工程设计图纸、施工组织设计(方案)等技术文件

加工作业指导书

铣销加工作业指导书 1.铣刀的选择及装夹 1.1铣刀直径及齿数的选择。 1.1.1铣刀直径应根据铣销宽度、深度选择,一般铣销宽度和深度越大、越深,铣刀直径也应越大。 1.1.2铣刀齿数应根据工件材料和加工要求选择,一般铣销塑性材料或粗加工时选择粗齿铣刀;铣削脆性材料或半精加工经加工时,选用中细齿铣刀。 1.2铣刀装夹 1.2.1在卧式铣床上装夹铣刀时,在不影响加工的情况下,尽量使铣刀靠近立轴,支架靠近铣刀,若需铣刀离立轴较远时,应在立轴与铣刀间装一个辅助支架。 1.2.2在立式铣床上装夹铣刀时,在不影响铣削情况下尽量选用短刀杆。 1.2.3铣刀装夹好后,必要时应用百分表检查铣刀的径向跳动和端面跳动。 1.2.4若同时用两把圆柱形铣刀铣完平面时,应选旋方向相反的两把铣刀。 2.工件的装夹 2.1在平口钳上装夹。 2.1.1要保证平口钳在工作台上的正确位置,必要时应用百分表找正固定钳口面,使其与机床工作台运动方向平行或垂直。 2.1.2工件下面要垫放适当厚度的平行垫铁,加紧时应使工件紧密的靠在平行垫铁上。 2.1.3工件高出钳口或伸出钳口两端不能太多,以防铣削时产生震动。 2.2使用分度头的要求 2.2.1在分度头上装夹工件时,应先锁紧分度头主轴。在紧固工件时,禁止用袋子套在手柄上施力。 2.2.2调整好分度头主轴仰角后,应将基座上部四个螺钉拧紧,以免零位移动。 2.2.3在分度头两顶尖间装夹轴类工件时,应使前后顶尖的中心线重合。 2.2.4用分度头分度时,分度手柄应朝一个方向摇动,如果摇过位置,需反摇多于超过的距离,再摇回到正确位置以消除间隙。 2.2.5分度时,手柄上的定位销慢慢插入分度盘的孔内,切勿突然撒手以免损坏分度盘。 3.铣削加工 3.1铣削前把机床调整好后,应将不用的运动方向锁紧。

模板工程作业指导书

编制说明: 本作业指导书(模板工程作业指导书)自签发之日起生效。 1、操作人员必须持证上岗。 2、检验人员必须有质检证或助工以上的技术职称。 3、对特殊工序的施工机械设备,施工前应进行验证。 4、操作过程中的施工记录必须满足施工及设计要求。 5、情况发生变化时,对以上内容进行再确认。 6、本作业指导书解释权中铁工程总公司三分部,分部所属各施工度必须遵照执行。

模板工程作业指导书 一、适用范围 本《作业指导书》适用于我分部所有就地浇注和预制的砼、钢筋砼、预应力砼与圬工结构所用的模板、拱架、支架、脚手架的制作、安装与拆除的有关作业。以便对这一工序进行监控,确保工程质量。 模板(含支架、拱架)应优先采用钢材制作,也可因地制宜,经过试验鉴定,选用其他材料制作。但模板应符合下列规定: 1、保证砼结构和构件各部分设计形状、尺寸和相互间位置正确。 2、具有足够的强度、刚度和稳定性,能承受新浇筑砼的重力、侧压力及施工中可能产生的各项荷载。 3、接缝不露浆,制作简单,安装方便,便于拆卸和多次使用。 4、能与砼结构和构件的特征、施工条件和浇筑方法相适应。 模板与脚手架之间不宜相互连接,模板与砼相接触的表面应涂刷脱模剂。钢模板用的脱模剂应同时具有防锈作用。模板使用后应按规定修整保存。 二、作业程序 (一)模板用材 1.木材: 1)木材应符合承重结构选材标准,材质不宜低于A—3级; 2)木模板厚度至少为1cm,没有节孔、环裂或表面翘曲,含水量应小于25%。所有用于结构物外露面的模板都应为“精制”木材(即一个面二个边都刨光),或是以粗面木材衬胶合板或金属板; 3)原材料必须是坚固、平直、风干的,没有腐朽、虫蛀、甲虫、朽节

外发加工流程

外发初步流程 1、厂家条件: A、电子厂,有电子产品相关品质意识。 B、有流水作业生产线。 C、有足够的空间,以备后续发展需要。 D、有充足的热情和合作诚意。 2、寻找厂家: A、初步了解该厂家实力。 B、联系厂家,去该公司考察。 C、加工商提供自身优势特点介绍给我司。 D、适合者约至工厂参观,并提供样品供他们评估。 E、提供工艺流程给厂家参考(不包括详细工艺指导书)。 F、加工商根据我司产品特点提供对产线等改造的方案及时间。 G、初步报价。 3、厂家筛选: A、对寻找的几家供应商进行对比汇总。 B、上报上级。 C、上级组织考察。 D、筛选出初步的合作厂商。 4、试装: A、我司提供具体工艺指导书(包含工序和品质要求)。 B、我司提供5-10套物料给加工商。 C、加工厂按照作业指导书进行试装。 D、我司派人员现场监督指导。 E、我司组织人员对装配完成的成品进行综合评定。 F、确认合格后有加工商进行最终的报价。 5、加工商确定: A、根据加工商的加工能力、品质保证、价格等方面综合评定。 B、确认最终的加工商。 6、生产流程确定: A、确定外发生产流程,包括领料,送货等。 B、确定双方窗口对接人。 C、异常处理流程。 D、品质把控流程。 E、确定驻厂人员等。 7、加工商生产准备: A、加工商按照我们产品特点进行场地改造。(我司可提供部分设备) B、改造包括产线、仓库、老化场所等。 C、加工商根据我司产品特点组织加工团队。 D、加工商根据我司产品特点及流水线特点做出适合自己的作业指导书。 E、我司安排相关人员对加工商生产各部组骨干人员进行培训。 F、加工商各骨干人员对参与我司产品生产的普通员工进行充分的培训。 8、小批量试产: A、我司按照之前制定的生产流程提供一小批物料给加工商。

水利水电工程模板作业指导书

水利水电工程模板作业指导书 1、目的 为规模板的操作,更好地使用模板、降低损耗、提高周转次数,保证砼浇筑后结构物的形状、尺寸及相互位置符合设计要求,最终使工程达到优良等级。 2、适用围 本作业指导书适用于XXXXXXXX。 3、引用文件 3.1 《水工砼施工规》 SDJ-207-82 3.2 招投标文件《技术规》 3.3 《砼结构工程施工及验收规》 3.4 未提及的按设计文件和有关规执行 4、模板施工 4.1 模板安装必须按设计图纸测量放样,重要结构应多设控制点,以顺利检查校正。 4.2 模板施工应按配板图准备材料,材料堆放应分类整齐、严禁乱堆、乱放。模板安装完后应及时清理多余材料。 4.3 模板安装过程中,必须经常保持足够的临时固定设施,以防倾覆。 4.4 支架必须支承在坚实的地基或老砼上,并应有足够的支承

面积,斜撑应防止滑动。 4.5 支架的立柱必须在两个互相垂直的方向上,且用斜拉杆固定,以确保稳定。 4.6 模板的钢拉条不应弯曲,直径宜大于8mm,拉条与锚环的连接必须牢固,拉条与砼面呈40度为宜。(拉条布置见图1) 图1 模板拉条布置图 4.7散装钢模板横、竖围令均采用两根ф48×3.5mm钢管,竖围令间距75cm。当竖围令采用单根钢管时,其间距为37.5cm。钢模板与围令之间用M12钩头螺栓、3形扣件连接。每块钢模板上使用8个U形卡。多卡模板相邻两块之间使用大U形卡连接,U 形卡数量不少于4个。 4.8 预埋在下层砼中的锚固件(螺栓、钢筋环等),在承受荷载时,必须有足够的锚固强度。 4.9 模板与砼接触的面板、各块模板接缝处必须平整严密,以

保证砼表面的平整度和砼的密实性。建筑物分层施工时,应逐层校正下层偏差,模板下端不宜“错台”。 4.10 模板的面板应涂脱模剂,但应避免因污染而影响钢筋和砼的质量。 4.11 钢承重骨架的模板,必须按设计位置可靠地固定在承重骨架上,以防运输及浇筑时错位。 4.12 模板及支架上严禁堆放超过设计荷载的材料及设备。砼浇筑时,必须按模板设计荷载控制浇筑顺序、速度和施工荷载。 4.13 砼浇筑过程中,应设置专人负责调整模板的形状和位置。对承重模板的支架,应加强检查、维护,模板如有变形走样,应立即采取措施处理。 4.14 砼预制模板运输时,应达到设计要求的吊装强度或不低于砼设计强度的70%;模板安装时,应铺砂浆找平垫实,以保证模板稳固及与下层砼结合牢固;砼浇筑前,应清洗砼预制模板面,保证模板面湿润;砼浇筑时模板面不得沾染松散砂浆等污物,同时应适当加强平仓振捣,以确保模板与砼的可靠结合。 5、模板拆除 5.1 不承重的侧面模板,应在砼强度达到25公斤/cm2以上,能保证其表面及棱角不因拆模而损坏时才能拆除,拆除时间应通过试验确定,当无试验资料时可参照表1。 表1. 不承重侧面模板拆除时间(单位:天)

装配作业指导书

设备型号---- 设备名称手动工装编号---- 工装名称 作业前准备1.从仓库中领取合格的球壳半成品; 2.从仓库中领取合格的球销、球座以及油脂; 3.臂体干净无赃物,摆放整齐; 4.配件置于相应的容器内,摆放整齐。 操 作 步 骤 1.如图所示,先在球销上涂1-1.5g油脂,并装入球座; 2.均匀转动球销,使球座与球销之间油脂均匀且充分; 3.再将装配好的球销球座压入球壳中。 质量控制代 号 检验 项目 精度 范围 检测 手段 控制 手段 容量/ 频率 重要 度 安全 要求 人体任何部位不得位于压机下面。 1 外观 球座方 向如图 目测 自检100% 【C】 巡检3件/2时 反映 计划 在工作过程中发现异常,应该立即停止操作 并向车间主任或班组长报告。 2 外观 油脂 足量 目测 自检100% 【S】 巡检3件/2时 装配前简图:装配后简图: 1.球座球销之间油脂1-1.5g; 2.球销球座一并压入球壳中 3.球座开口方向如下图所示:

设备型号---- 设备名称旋铆机工装编号---- 工装名称作 业前准备1.从仓库中领取合格的垫圈; 2.臂体干净无赃物,摆放整齐; 3.配件置于相应的容器内,摆放整齐。 操 作 步 骤 1.如图所示,旋铆牢固,无缝隙、裂纹、毛刺等; 2.检查产品表面是否有压伤、划伤等; 3.将旋铆后的产品放置相应的容器中流入下道工序。 质量控制代 号 检验 项目 精度 范围 检测 手段 控制 手段 容量/ 频率 重要 度 安全 要求 人体任何部位不得位于旋铆机下面;每班检 查铆轮紧固情况,防止意外脱落。 1 外观 无毛刺 无裂纹 目测 自检100% 【C】 巡检3件/2时 反映 计划 在工作过程中发现异常,应该立即停止操作 并向车间主任或班组长报告。 2 外观 无划伤 无压伤 目测 自检100% 【S】 巡检3件/2时 装配前简图:装配后简图: 1.旋铆 注: 1)铆接部位不得有毛刺、裂纹; 2)铆接部位密封性良好。 3)旋铆支撑座不得划伤、压伤产品表面。

机加工作业指导书

南京市江宁区怀银五金加工厂质量体系文件 产品图纸目录 RX/CP-7.5.1-01 受控状态: 版本号: A 编辑: 批准: 发放号: 2013-3-20 发布 2013-4-01实施

南京市江宁区怀银五金加工厂质量体系文件 机加工作业指导书 RX/CP-7.5.1-03 受控状态: 版本号: A 编辑: 批准: 发放号: 2013-3-20 发布 2013-4-01实施

HS/CP7.5-03 车床作业指导书及操作规范 1.目的:规范安全操作,防患于未然,杜绝安全隐患以达到安全生产并保证加工质量。2.范围:适用于本公司车床所有操作者。 3.作业内容及要求: 3.1.开机前检查机床各手柄位置及传动部位是否合理,并擦拭各滑动导轨,加施润滑油, 各油池、油盒、弹子油盅等按规定进行加油。 3.2.车头箱手柄挂到最低档,开机运行3分钟。并查看油窗油位是否达到了1/3油窗位置,否则通知有关人员按规定加油。 3.3.为了保证加工质量和提高工作效率,应根据工件材料、精度要求和机床、刀具、夹具等情况合理选择切削用量。加工铸件时,为了避免表面夹砂、硬化层等损坏刀具,在许可的条件下切削深度应大于夹砂或硬化层深度。 3.4.当粗、精加工在同一台机床上进行时,粗加工后一般应松开工件,待其冷却后重新装夹,松紧劲适中控制变形,否则要借助工装。 3.5.凡下面工序需要进行淬火、磨削或超声波探伤的工件表面,本工序加工的表面粗糙度Ra值不得大于6.3um。 3.6.粗加工时的倒角、倒园、槽深等都应按精加工余量加大或加深,以保证精加工后达到设计要求。 3.7.在本工序后无去尖角毛刺工序时,本工序加工产生的毛刺应在本工序去除。 3.8.在切削过程中,若机床、刀具、工件等发出不正常的声音,或加工表面的粗糙度突然变差,应立即退刀停车检查。 3.9.在批量生产中,必须进行首件检查,合格后方能继续加工。 3.10. 加工中进行自检测量时要正确使用量具。使用塞规、千分尺等时必须轻轻推入或旋入,不得用力过猛;使用卡尺、千分尺、百分表、千分表等时,事先应调好零位。3.11. 凡加工件成组或配加工的工件,加工后应作标记(或编号)。 3.12. 细长容易弯曲的轴类零件,在加工过程中如间断加工较长时间时,需在轴中间加中心托架,或将轴落下采取吊挂式存放。 4. 程序

模板工程施工作业指导书

3.2 模板工程施工作业指导书 3.2.1适用范围 适用于现浇框架、剪力墙结构钢木模板、大模板的安装与拆除。模板支撑工 程搭设高度8m及以上;搭设跨度18m及以上,施工总荷载15kN/卅及以上;集中线荷载20kN/m 及以上和承重支撑体系用于钢结构安装等满堂支撑体系,承受单点集中荷载700Kg以上的需要专家论证后实施。 3.2.2作业准备 1、技术准备 1)作业指导书编制后,应在开工前组织技术人员认真学习设计图纸、会审记录、规范、规程和作业指导书; 2)熟悉施工环境,掌握施工特点,制定施工安全保证措施,提出应急预案; 3)对施工人员进行技术交底,对参加施工人员进行上岗前安全培训; 3)熟悉图纸,做好模板设计。根据施工流水段和图纸中的具体节点,提前进行模板翻样工作,找出模板工程中施工难点(梁墙交接节点、墙边洞口等)、安全质量施工注意点等,确定施工方法,做好技术交底工作; 2、人员准备 根据施工难度、质量和工期特点,选用综合素质好、参加过同类工程施工的 劳务队伍,施工过程中可根据进度要求随时增加人员。 3、机械设备及工器具准备 根据工程特点和进度要求,配备满足要求的机械设备及工器具,如斧子、锯、刨子、扳手、打眼电钻、线坠、靠尺板、方尺、铁水平、撬棍、吊装索具等。 4、材料准备

1)根据施工进度要求进行材料供应分析,编制施工材料用量计划和材料采购计划; 2)选定墙体大钢模板的加工厂家并提前加工制作;组织模板进场并进行验收; 3)模板进场后,必须按照模板的设计要求验收,校正调整达到标准后先用抛光机磨光,刷两遍纯机油,纯机油应当涂刷均匀无漏刷现象,使用后用水性脱模剂。 5、现场准备 1)按施工现场平面图规定的位置,将模板存放区进行硬化; 2)弹好楼层的墙边线、柱边线、楼层标高线和模板控制线、门窗洞口位置线,打楼板混凝土时墙柱根部200mn宽范围模板底口已严格找平,安装大模板时用2m靠尺检查。在墙皮线外5mm占贴20mm厚海绵条。 3)墙、柱钢筋绑扎完毕,水电预埋、箱盒、预埋件、门窗洞口安装完毕,检查保护层厚度已满足要求,办完隐蔽工程验收手续; 4)施工缝处混凝土已剔凿到密实层,用水冲洗干净,并办理隐预检手续; 5)钢模板前应将模板表面清理干净,刷好隔离剂,涂刷均匀,不得漏刷,不汪油、不淌油。 323 技术要求 1)保证混凝土结构和构件各部分设计形状、尺寸和相互间位置正确; 2)模板及支架要具有足够的强度、刚度和稳定性;能承受所浇筑混凝土的重力、侧压力及施工荷载; 3)施工过程中对模板及支架进行观察和维护,发生异常情况时,及时解决;

新产品试产作业指导书精编版

新产品试产作业指导书 精编版 MQS system office room 【MQS16H-TTMS2A-MQSS8Q8-MQSH16898】

新产品试产作业指导书 1、目的 为规范产品试制、试产的管理,保证新产品顺利放产及提升原有产品质量,特制定本指导书。 2、适用范围 本指导书适用于公司新产品及原有产品重大设计更改的试制、试产全过程的管理。 3、定义 试制范围:新产品在投入试产前,主要为验证装配工艺(包括工艺方案、工艺流程、操作方法、特殊工艺检测手段和控制方式等)能否适应批量稳定合格生产的要求而进行的样品试装配;或开发部门、工程部PIE等对产品进行重大设计更改或对产品采用新材料、新工艺、新部件等改进后,为验证能否适应批量稳定合格生产的要求而进行的样品试装配 试产范围:开发部门完成新产品技术设计并编制必要的技术文件(如总装图、图纸等)后,主要为验证生产全过程(包括工艺方案、工艺流程、操作方法、特殊工艺检测手段和控制方式、生产组织、物料供应等)的试产活动;或开发部门、工程部PIE等对原有产品进行了重大设计更改,为验证生产全过程而进行的试产活动。 试产频次:常规(含派生)产品试产次数不多于2次;较复杂项目试产次数不多于3次。 试产数量:每次试产数量不少于20PCS/次(如属系列产品,试产的每款产品试产数量均不少于20PCS/次)。

4、职责 项目负责人在试制、试产过程中主要职责如下: a、填写《样品制作申请单》,注明各项要求,并提供必要协 助,使样品顺利试装; b、根据项目开发进度负责提前十天编制《试产通知单》; c、负责落实试产文件提前十五天下发至相关部门,承担因试产 文件下发不及时或不齐全而导致试产不能如期进行的责任; d、负责新开发塑料件及五金件试产物料的确认及跟进,负责对 试产BOM进行最终确认; e、负责带领项目组成员从样品试制、试产到试产总结等各环节 全过程的组织和跟进,包括提请工装夹具制作、生产性辅料、检 验测试设备的准备等; f、负责组织试产总结会议及试产整改会议; g、委托品质部门对试制、试产样品进行综合测试; h、试制、试产后多余物料及试产样品的处理。 项目组成员包括结构工程师、包装工程师、电子工程师及相关PE工程师等。项目组成员在试制、试产过程中主要职责如下: a、编制个人所负责部分的技术图纸及文件,并跟进文件的发 放; b、现场指导试产工作,对试产过程中发现的技术、工艺、测 试、设备工装、质量和文件等方面的问题作好记录; c、PE工程师根据试产过程中发现的试产结构等方面的问题编 制《试产报告》,供试产总结会议分析讨论;

项目施工作业指导书模板

项目施工作业指导 书

项目施工作业指导书 编制: 审核: 批准: 工程管理中心 06月01日

目录 一、基础分部 二、主体分部 三、装饰分部 (一)防水施工 (二)室内找平层( 地砖) 施工 (三)墙面抹灰饰面与瓷砖粘贴 (四)铝合金施工 (五)内墙腻子涂料施工 (六)成品木门、防火、防盗门安装 (七)铝合金栏杆、铁花栏杆安装 四、电气安装分部 五、重要提示 所有工序必须进行100%的检查, 关键部位及关键工序必须进行旁站监理。施工单位必须有监理工程师对上一道工序质量的认可签字, 方可进

入下道工序施工。监理对施工的全过程负责! 一、基础分部 从土方开挖到基础施工、地下室的防水、回填土作业都必须有针对性的施工方案, 经监理、甲方审核经过后, 方能满足进度和质量要求。 ( 一) 土方开挖: 基础土方采用机械开挖, 地下室、筏板及独立柱均采用大开挖方式, 土方外运, 基坑周边采用喷锚护壁, 基坑周边设置降水井进行降水作业。 ( 二) 基础、地下室、半地下室施工 1.降水及排水: 根据地质情况, 基坑周边宜设置降水井, 地下室内部在地下室底板上另外设置降水井。 2.护壁: 地下室周边宜采用喷锚护壁进行支护。 3.基坑验槽: 基坑开挖到设计基底标高以上300mm后, 施工单位、监理及地勘单位现场作钎探试验, 钎探合格后进行地基捡底。施工单位捡底至设计标高后, 施工单位必须请质监站、设计、地勘、监理、建设单位共同参加验槽, 验槽合格后应立即用砼封闭基坑。 4.基础部分的钢筋、砼施工, 可参照主体结构施工部分进行, 应强调的是钢筋的保护层必须满足设计要求。 5.防水工程: 严格按照设计施工图纸进行施工。 (三) 回填土的选择与夯填要求: 基坑回填土选用不得含有腐质物、淤泥等, 对颗粒的限制执行不大于300*300*300。回填夯实按照每300mm高分层夯实, 采用压路机、蛙式打

《组装作业指导书》

组装作业指导书及相关奖惩条例 1.总则 为了确保产品质量在组装过程中的稳定和提高,必须严格加强现场管理人员和操作人员的质量意识,明确各个岗位的工作职责和范围。根据本公司产品的生产工艺要求,特制定《组装作业指导书》及相关奖惩条例,希望该组全体员工在遵循职业道德,加强工作责任心、端正劳动态度、树立团队精神、努力提高个人操作技能和综合素质的前提下,严格按照《组装作业指导书》进行规范操作,坚决杜绝违章违规现象和粗制滥造,保障产品质量合格。 如果上岗员工自行其事、为所欲为,不按规定操作,将受到严厉的处罚,轻则调岗,重则辞退,而因此所造成的一切经济损失和其它后果均由责任人承担。每道工序均应严格把关,精益求精,除了保证本道工序的制作质量,还有义务检查上道遗留的问题,消除质量事故的隐患;下道工序如发现了上道工序的问题,上报后经查实可给予表彰和奖励,如发现异常而继续机械性操作把隐患流入下道工序,则应承担连带责任。所有人为因素造成的损失,都应由责任人承担后果,如损失严重,公司保留通过法律手段向责任人追诉的权力。 1.1 组装组共分备料清洗、装配、试压、加油、跑合五个工序。 2.备料、清洗 2.1 备料、清洗是组装前的准备工作,操作工从现场管理人员处接到领料单后,按先后顺序将当 日当班或次日需组装的产品配件依次从半成品库或其它工序领出,清查规格型号和数量准确无误之后,逐件检查,清洗干净再移交到组装工位。 2.2 严格区分每批次生产任务的配件中如支架、侧盖、封盖和托底坐上的产品或其它特殊标记, 如果配件上的标记不符合本批次生产任务的规定或者配件上应有标记而没有标记、一件配件上有两种不同的标记,均应视为异常问题品,必须上报现场管理,由现场管理查明原因,处理好后方可继续操作。 2.3 产品配件在运送和清洗过程中要轻拿轻放,不得野蛮操作、乱扔乱砸、碰伤任何部位,特别 要注意保护工件的配合面,切忌损伤。 2.4 必须使用安全性能稳定、没有隐患的清洗剂,定量更换,未经生产部或以上部门特批,严禁 使用易燃物品,如汽油、除油剂等作为清洗剂。 2.5 在清点数量和清洗过程中必须认真负责,仔细检查每件配件,凡外观存在缺陷,配合面存在 严重损伤,明显会造成漏油或其它不良后果,严重影响外观质量,包括未打磨飞边、毛刺的

外发加工作业指导书Operation instruction for outward processing

Operation instruction for outward processing 外发加工作业指导书 Due to the production capacity and production level of our company can’t meet the requirement, we should entrust an outside processing enterprise which has strong processing capability to produce in accordance with the requirement of Purchase Dept., Logistics Dept. needs to go through the relevant formalities with the competent Customs. 由于企业的技术、工艺达不到产品要求,经采购部门提出要求,委托区外企业进行某项工序的加工,物流部根据海关的审批要求办理相关手续: 1、Apply to the competent customs for outward processing and provide the declaring documents as follow: 向海关申请外发加工,并提供以下单据: a. The written application of outward processing (situation statement) 书面的外发加工的申请(外发加工情况说明) b. Fill out the application form for outward processing. 填写《外发加工申请表》 c. Entrusted processing contract 委托区外企业生产加工的合同 d. Business license/ Licensed in department of tax/ Certification for production capacity of the enterprise beyond the EPZ. 区外企业的营业执照、税务登记证明、生产能力证明 e. Fill out the shipping list for outward processing 填写《加工贸易外发加工货物外发清单》 f. Fill out the return list for outward processing 填写《加工贸易外发加工货物运回清单》 2、After get the approval of the competent Customs, fill out the below documents: 经主管海关同意办理外发加工业务后,填写以下资料: a、The Approval Form for outward processing. 《加工贸易货物外发加工申请审批表》 b、The Operation Form for outward processing. 《加工贸易保税货物外发加工审批作业单》

模板工程施工作业指导书范本

模板工程施工作业 指导书

3.2 模板工程施工作业指导书 3.2.1适用范围 适用于现浇框架、剪力墙结构钢木模板、大模板的安装与拆除。模板支撑工程搭设高度8m及以上;搭设跨度18m及以上,施工总荷载15kN/㎡及以上;集中线荷载20kN/m及以上和承重支撑体系用于钢结构安装等满堂支撑体系,承受单点集中荷载700Kg以上的需要专家论证后实施。 3.2.2 作业准备 1、技术准备 1)作业指导书编制后,应在开工前组织技术人员认真学习设计图纸、会审记录、规范、规程和作业指导书; 2)熟悉施工环境,掌握施工特点,制定施工安全保证措施,提出应急预案;3)对施工人员进行技术交底,对参加施工人员进行上岗前安全培训; 3)熟悉图纸,做好模板设计。根据施工流水段和图纸中的具体节点,提前进行模板翻样工作,找出模板工程中施工难点(梁墙交接节点、墙边洞口等)、安全质量施工注意点等,确定施工方法,做好技术交底工作; 2、人员准备 根据施工难度、质量和工期特点,选用综合素质好、参加过同类工程施工的劳务队伍,施工过程中可根据进度要求随时增加人员。

3、机械设备及工器具准备 根据工程特点和进度要求,配备满足要求的机械设备及工器具,如斧子、锯、刨子、扳手、打眼电钻、线坠、靠尺板、方尺、铁水平、撬棍、吊装索具等。 4、材料准备 1)根据施工进度要求进行材料供应分析,编制施工材料用量计划和材料采购计划; 2)选定墙体大钢模板的加工厂家并提前加工制作;组织模板进场并进行验收; 3)模板进场后,必须按照模板的设计要求验收,校正调整达到标准后先用抛光机磨光,刷两遍纯机油,纯机油应当涂刷均匀无漏刷现象,使用后用水性脱模剂。 5、现场准备 1)按施工现场平面图规定的位置,将模板存放区进行硬化; 2)弹好楼层的墙边线、柱边线、楼层标高线和模板控制线、门窗洞口位置线,打楼板混凝土时墙柱根部200mm宽范围模板底口已严格找平,安装大模板时用2m靠尺检查。在墙皮线外5mm粘贴20mm厚海绵条。 3)墙、柱钢筋绑扎完毕,水电预埋、箱盒、预埋件、门窗洞口安装完毕,检查保护层厚度已满足要求,办完隐蔽工程验收手续;

模具外发管理作业指导书

模具外发管理作业指导书-制度大全 模具外发管理作业指导书之相关制度和职责,模具外发管理作业指导书1.0[目的]对模具的配置申请、发外加工、验收、使用和维护保养,检修和报废等过程进行控制,确保模具加 工的产品能符合规定要求。2.0[适用范围]适用本公司所有模具。3... 模具外发管理作业指导书 1.0 [目的]对模具的配置申请、发外加工、验收、使用和维护保养,检修和报废等过程进行控制,确保模具加工的产品能符合规能要求。 2.0 [适用范围]适用本公司所有模具。 3.0 [定义]无 4.0 [职责] 4.1模具商:负责模具的设计、制图及制作。 4.2采购部:负责组织进行供方的选择及模具的发外加工。 4.3开发部:部门模具的验收。 4.4使用单位:负责模具的正常使用、维护及保养。 5.0 [运作办法] 5.1模具的配置申请、制图: 5.1.1新产品鉴泄合格后,需开模具之物料,由采购部提出书而申请。 5.1.2新产品负责开发部门,根据设计要求,绘制模具图纸,或提供样品给采购部。 5.1.3采购部门根据相关技术要求,通过与同类模具供访的质量、价格进行比较,选择合适的合格供应商。并与合格供应商签泄《模具合约书》,《模具合约书》必须经经理批准。 5.1.4采购部门选择合适的模具供方后,按照签左的《模具合约书》的要求由采购部跟进进度。 5.2模具的制作: 5.2.1供方根据我司提供的模具图柢、样品、模具实物等对其结构进行分析,并按标准进行模 具制作。 5.2.2模具开好后,试啤样品。 5.3模具的验收: 5.3.1模具制造厂提交模具和试啤样品的给采购部,由采购交负责开发部门确认。 5.3.2负责开发部门相据图纸、样品和技术等对模具和试制样品进行验收。 5.3模具的管理: 5.3.1经验收的模具由采购进行编号,并建立《模具管理卡》予以登记管理。 5.3.2模具须发外的,由采购与供应商签左《发外模具合约书》,采购部将发外之登记于《模具去向登记表》进行管理。 5.4模具的使用保养: 5.4.1使用单位根据工作安排选择相应的模具进行生产。 5.4.2模具应由使用厂商予以淸洁、上油、防尘、防潮等维护,并作泄期保养,以确保模具及产品质量。 6.0 [流程图]:无 7.0 [记录]:《模具合约书》、《发外模具合约书》、《模具去向登记表》 8.0 [相关文件]:无

模板施工作业指导书

木(竹)胶合板模板工程 1编制依据 电力部《电力建设施工质量验收及评定规程》(土建工程) 《砼结构工程施工质量验收规范》(GB50204-2002) 广电一局《工程质量管理办法》(1999-9) 广电一局《电力建设工程施工技术管理制度》(1999-9) 2施工准备 2.1 材料及主要机具: 2.1.1 木(竹)胶合板:木胶合板(含覆膜板)规格为915×1830×18mm、1220×2440×18 mm,竹胶板规格为1000×2000×12(15)mm、1220×2440×12(15)mm。 2.1.2 钢框木(竹)胶合板块:长度为900、1200、1500、1800和2400mm;宽度为300、450、600和750mm。 2.1.3 定型钢角模:阴角模100×100×900(1200、1500、1800)mm;阳角模100×100×900(1200、1500、1800)mm。 2.1.4 连接附件:U形卡、扣件、紧固螺栓、钩头螺栓、L型插销、穿墙螺栓、防水穿墙拉杆螺栓。 2.1.5 加固件:柱梁槽钢、方型空腹钢楞围楞,对拉螺栓,直径¢8\10\12mm圆钢柱梁抱箍。 2.1.6 支承件:、钢管支架、定型门架、剪刀撑、管扣、顶托、底座、双可调早拆翼托、单可调早拆翼托、枋木、100×100mm空腹方管 2.1.7 脱模剂:水质隔离剂。 2.1.8 机具:活动(套口)扳子、水平尺、钢卷尺、托线板、轻便爬梯、脚手板、滑轮、木工锯、钻床等。 2.2 作业条件:

2.2.1 模板设计: 2.2.1.1 确定所建工程的施工区、段划分。根据工程结构形式、特点及现场条件,合理确定模板工程施工的流水区段,以减少模板投入,增加周转次数,均衡工序工程(钢筋、模板、混凝土工序)的作业量。 2.2.1.2 设计结构模板平面施工总图。在总图中标志出各种构件的型号、数量、尺寸、标高及相同或略加拼补即相同的构件的替代关系并编号,以减少配板的种类、明确模板的替代流向与位置。 2.2.1.3 确定模板配板平面布置及支撑布置。根据平面布置图中对梁、板、柱等尺寸及编号设计出配板图,标志出不同型号、尺寸单块模板平面布置,纵横龙骨规格、数量及排列尺寸;柱箍选用的形式及间距;支撑系统的竖向支撑、侧向支撑、模向拉接件的型号、间距。预拼装时,绘制标志出组装定型的尺寸及其与周边的关系。 2.2.1.4 绘图与验算:在进行模板配板布置及支撑系统布置的基础上,要严格对其强度、刚度及稳定性进行验算,合格后要绘制全套模板设计图,其中包括:模板平面布置配板图,分块图、组装图、节点大样图、零件及非定型拼接件加工图。模板、围楞、双头螺栓的刚度、强度根据砼的侧压力进行内力计算;支撑系统的强度、稳定性根据砼的施工荷载进行内力计算。砼侧压力按如下公式计算: F= 4 + P=25H 式中 F 、P ——新浇混凝土的最大侧压力(kN/m 2); V ——混凝土的浇筑速度(m/h ); T ——混凝土的温度(℃); H ——混凝土侧压力计算位置处至新浇筑混凝土顶面的总高 度(m ); K 1——外加剂影响修正系数。不掺外加剂时取1.0,掺具有缓 凝作用的外加剂时取1.2; K 1·K 2·V 1/3 1500 T+30

外发加工产品检验作业指导书

外发加工产品检验作业指导书 1.0目的 为来料检验人员明确来料品质质量要求,特制定此通用标准作为来料检验的标准,同时提供给供应商了解本公司的品质水平要求,加强品质管理。 2. 适用范围 适用于本厂所有外发加工产品(电镀件、导电漆、喷油件、镭雕件、移印件、丝印件)入厂时的检验。 3.权责单位 3.1检验规范由品保单位制定,品保单位经理核准后发行。 3.2所制定之规格,如有修改时,须经原核准单位同意后修改之。 4.0检验依据 4.1依据工程提供产品图纸进行检验。 4.2依据工程提供的产品样板进行检验。 4.3依据制定的检验标准以及相关的资料进行检验。 5.0检验标准 5.1检验工具 卡尺、工具显微镜、投影仪、点卡、刀片、3M600胶纸、RAC耐耐磨仪、硬度测试仪、酒精、棉布等。 5.2允收标准 a. 外观按照MIL-STD-105E一般检验水准II抽样,AQL定为CRI=0、MAJ=0.65、

MIN=1.0; b. 性能测试按照MIL-STD-105E特殊检验水准S-1抽样,AQL定为C=0; c. 尺寸按照MIL-STD-105E特殊检验水准S-3抽样,AQL定为C=0. 5.3缺陷定义 a. 缺陷(CRI):产品功能完全失常或会导致使用者或操作者生命安全之缺陷。 b. 缺陷(MAJ):产品部分功能、结构失常或严重的外观不良会导致客户拒收或抱怨的缺陷。 c. 缺陷(MIN):产品明显的外观不良可能会导致客户抱怨或包装方面的缺陷。 5.4检验条件 a. 光源:标准光源灯光; b. 检物表面与眼睛距离:30~40cm; c. 视线与被检物表面角度: 45±15o; d. 检验时间:≤10S; e. 视力:裸视或矫正视力在1.0以上且无色盲。 6.0检验内容 ①电镀件

机加工作业指导书范文大全

机加工作业指导书范文大全 一次),保证在润滑正常情况下启动机床(30#机械油、3#钙基润脂)。 2. 3. 停车时间较长,开动设备时,应低速运转3~5分钟,确认润滑、液压、电 气系统及各部运转正常,再开始工作。 4. 装卸及测量工作时,必需使刀具退离,并停车。 5. 正确安装刀具,合理选择刀具和切削用量,并经常检查刀具的紧固及磨损情况。 6. 各滑动面应清洁、润滑、无障碍。 7. 每班工作完毕,一定要清除刀屑,擦净机床各部位,并上油。 8. 用顶尖顶持工作时,尾架套筒的伸出量不得大于套筒直径的两倍。在主轴、尾架锥孔 安装工胎具、刀具,其锥度必须相符,锥面清洁、无伤痕。 9. 操作时应配戴防护镜。

XXXX机械有限公司设备操作规程编号:Q/RP-02-2-04 1. 每班工作前,给移动轴加油,保持润滑。 2. 严禁戴手套操作钻床。 3. 装卡工件要牢固,钻透孔工件底部应加垫。 4. 合理选择刀具和切削用量,并经常检查刀具的紧固和磨损情况。 5. 禁止在机床上重力敲击、修焊工件。 6. 正确调整变速、进给、限位、夹紧等装置,调整时必需停车。 7. 经常注意各部分运转情况,如有异常现象,立即停车排除故障。 8. 离开机床时,必须切断电源,下班前应将总电源切断。

XXXX机械有限公司设备操作规程编号:Q/RP-02-3-04 1. 每班工作前,根据机床的润滑要求,加油润滑。 2. 停车时间如较长,开动设备时,应低速运转3~5分钟,确认润滑、液压、电气系统及 各部运转正常,再开始工作。 3. 装卸及测量工件时,必须使刀具退理并停车,装卸较重工件、胎具时,要选用安全可 靠的吊具和方法,防止碰伤机床,使用“ T”型螺栓应符合标准,偏重工件要支撑牢固,避免压力集中。 4. 正确安装刀具,合理选择刀具和切削用量,并经常检查刀具的紧固及磨损情况。刀杆 锥面、锥肩平面应清洁、无伤痕、锥度要相符。铣削平面时应使用多刀头,防止过大冲击振动。 5. 铣削前后应清理机床上的工具、杂物。 6. 悬臂(卧式镗床)工作台和升降台在移动以前应将紧固螺丝松开,各滑动面应清洁、 润滑、无障碍。使用工作台纵向工作时,应将横向和垂直芳向紧固,使用横向工作时,应将纵向和垂直方向紧固。 7. 变换速度及调整行程定位装置时应停车。 8. 机动对刀在接近工件时,应改为手动。 9. 切削到具未脱离工件时,不得停车。 10. 经常注意各部分运转情况,如有异常现象,立即停车排除故障。 11. 离开机床时必须切断电源,下班前应使刀具与工件(工作台或胎夹具)之间留有安全 距离,并将各手柄位置置于工作位置。 12. 操作时应配戴防护镜。

模板施工作业指导书

模板施工作业指导 书

木(竹)胶合板模板工程 1编制依据 电力部《电力建设施工质量验收及评定规程》(土建工程)《砼结构工程施工质量验收规范》(GB50204- ) 广电一局《工程质量管理办法》(1999-9) 广电一局《电力建设工程施工技术管理制度》(1999-9) 2施工准备 2.1 材料及主要机具: 2.1.1 木(竹)胶合板:木胶合板(含覆膜板)规格为915×1830×18mm、1220×2440×18 mm,竹胶板规格为1000××12(15)mm、1220×2440×12(15)mm。 2.1.2 钢框木(竹)胶合板块:长度为900、1200、1500、1800和2400mm;宽度为300、450、600和750mm。 2.1.3 定型钢角模:阴角模100×100×900(1200、1500、1800)mm;阳角模100×100×900(1200、1500、1800)mm。 2.1.4 连接附件:U形卡、扣件、紧固螺栓、钩头螺栓、L 型插销、穿墙螺栓、防水穿墙拉杆螺栓。 2.1.5 加固件:柱梁槽钢、方型空腹钢楞围楞,对拉螺栓,直径¢8\10\12mm圆钢柱梁抱箍。 2.1.6 支承件:、钢管支架、定型门架、剪刀撑、管扣、顶

托、底座、双可调早拆翼托、单可调早拆翼托、枋木、100×100mm空腹方管 2.1.7 脱模剂:水质隔离剂。 2.1.8 机具:活动(套口)扳子、水平尺、钢卷尺、托线板、轻便爬梯、脚手板、滑轮、木工锯、钻床等。 2.2 作业条件: 2.2.1 模板设计: 2.2.1.1 确定所建工程的施工区、段划分。根据工程结构形式、特点及现场条件,合理确定模板工程施工的流水区段,以减少模板投入,增加周转次数,均衡工序工程(钢筋、模板、混凝土工序)的作业量。 2.2.1.2 设计结构模板平面施工总图。在总图中标志出各种构件的型号、数量、尺寸、标高及相同或略加拼补即相同的构件的替代关系并编号,以减少配板的种类、明确模板的替代流向与位置。 2.2.1.3 确定模板配板平面布置及支撑布置。根据平面布置图中对梁、板、柱等尺寸及编号设计出配板图,标志出不同型号、尺寸单块模板平面布置,纵横龙骨规格、数量及排列尺寸;柱箍选用的形式及间距;支撑系统的竖向支撑、侧向支撑、模向拉接件的型号、间距。预拼装时,绘制标志出组装定型的尺寸及其与周边的关系。 2.2.1.4 绘图与验算:在进行模板配板布置及支撑系统布

装配作业指导书精典

XXXX科技有限公司 产品装配作业指导书 工位内容:装上转动支架至支架底座 YL-ZB-YD-604A 文件编号 S/PCS) 15 13 总人数料号版次 v.0 标准工时(装配工位名称产品名称工位人数XXXXXX 标准产量(1 PCS/H)工位号 1 200 4 、操作说明: 1、使用材料 7、图示 1、1、准备好上转动支架、螺丝、支架底座于工位前(图配件名称单件用量物料编码 3);2、1 上转动支架、自检各装配部件有无不良品质项,将挑出的不良部件2 分开放于指定位置;1 螺丝 M5*5.5BB 、左手拿取支架底座放台面,右手拿取上转动支架与支33 2 1 4);架底座所示装配孔位对齐(图1 支架底座右手拿电批将M5螺丝放上转动支架螺丝孔位,4、左手取 );螺丝锁紧(图5所示,自检装配好半成品,并摆放65、装好的组件如图、操作前准备2 在托盘内流入下工序装配;样件作参照确认生产物料及图纸、领取作业指导书1//4 生产工具;治/按照作业指导书排拉,并调试好所有设备和夹2、 具; 5、技术要求生产前确认首件,并了解产品工序工艺相关操作方3、 1、螺母需拧紧且不滑牙及损坏螺纹;4 法和品质要求;、锁螺丝时注意不能弄花支架底板及转动支架;25 3、使用工具

6电批/十字螺丝刀、注意事项3.1 3.2 1、不良品必须单独摆放并做好标示待管理人员统一处理; 2、保持台面整洁,注意工作区域5S 3.3 ; 3.0±0.5 Kgf;、调整电批扭力36 5 3.4 页13页,共1第 审核::编制 XXXX科技有限公司 产品装配作业指导书 工位内容:装下转动支架至支架固定座 YL-ZB-YD-604A 文件编号 15 标准工时(S/PCS)总人数料号 13 版次 v.0 装配工位名称)工位人数产品名称 XXXXXX 标准产量(1 PCS/H 工位号 2 200 14 、操作说明:7、使用材料、图示 、准备好吸板固定座、吸板固定介子、下转动支架、螺1 单件用量物料编码配件名称); 丝M5*10KB于工位前(图1 1 吸板固定座、自检装配部件有无不良品质项,将挑出的不良部件分 2 开放于指定位置;1 吸板固定介子螺丝,右手拿取吸板固定座,将螺丝从吸M5 3 、左手拿取1 (图),用左手中指抵住螺丝板固定座中间孔位穿过(图21 下转动支架

模板工程施工作业指导书

模板工程施工作业指导书 一、适用范围 适用于现浇框架、剪力墙结构钢木模板、大模板的安装与拆除。模板支撑工程搭设高度8m及以上;搭设跨度18m及以上,施工总荷载15kN/㎡及以上;集中线荷载20kN/m及以上和承重支撑体系用于钢结构安装等满堂支撑体系,承受单点集中荷载700Kg以上的需要专家论证后实施。 二、作业准备 1、技术准备 1)作业指导书编制后,应在开工前组织技术人员认真学习设计图纸、会审记录、规范、规程和作业指导书; 2)熟悉施工环境,掌握施工特点,制定施工安全保证措施,提出应急预案;3)对施工人员进行技术交底,对参加施工人员进行上岗前安全培训; 3)熟悉图纸,做好模板设计。根据施工流水段和图纸中的具体节点,提前进行模板翻样工作,找出模板工程中施工难点(梁墙交接节点、墙边洞口等)、安全质量施工注意点等,确定施工方法,做好技术交底工作; 2、人员准备 根据施工难度、质量和工期特点,选用综合素质好、参加过同类工程施工的劳务队伍,施工过程中可根据进度要求随时增加人员。 3、机械设备及工器具准备 根据工程特点和进度要求,配备满足要求的机械设备及工器具,如斧子、锯、刨子、扳手、打眼电钻、线坠、靠尺板、方尺、铁水平、撬棍、吊装索具等。 4、材料准备 1)根据施工进度要求进行材料供应分析,编制施工材料用量计划和材料采购计划; 2)选定墙体大钢模板的加工厂家并提前加工制作;组织模板进场并进行验收; 3)模板进场后,必须按照模板的设计要求验收,校正调整达到标准后先用抛光机磨光,刷两遍纯机油,纯机油应当涂刷均匀无漏刷现象,使用后用水性脱模剂。 5、现场准备 1)按施工现场平面图规定的位置,将模板存放区进行硬化; 2)弹好楼层的墙边线、柱边线、楼层标高线和模板控制线、门窗洞口位置线,打楼板混凝土时墙柱根部200mm宽范围模板底口已严格找平,安装大模板时用2m靠尺检查。在墙皮线外5mm粘贴20mm厚海绵条。 3)墙、柱钢筋绑扎完毕,水电预埋、箱盒、预埋件、门窗洞口安装完毕,检查保护层厚度已满足要求,办完隐蔽工程验收手续; 4)施工缝处混凝土已剔凿到密实层,用水冲洗干净,并办理隐预检手续; 5)钢模板前应将模板表面清理干净,刷好隔离剂,涂刷均匀,不得漏刷,不汪油、不淌油。 三、技术要求 1)保证混凝土结构和构件各部分设计形状、尺寸和相互间位置正确;