冲压控制计划范例(中英文)
ce
Technique
47±1
0-300mm(0.02)深度尺
Depth Gages
首末检1件、巡检5件、自检5件first and end inspection 1pcs,inspection 5pcs,self-inspection 5pcs
首末检1次、巡检每2小时、自检每1小时first and end inspection 1,inspection every 2hrs,self-inspection
every hrs
标识、隔离、检查模具Identification ,Separate ,Check
the die B-1
压力
Pressure
◇
上缸Cylinder 15(+1,0)Mpa
下缸Under
cylinder9(+1,0)Mpa
目视Visual
1
每班Every shift
调整设备、上报Adjustment equipment ,reporting
φ142.5(+0.2,-0.3)
0-150mm(0.02)游标卡尺
Calipers 50.5(+1.5,-2.0)
0-300mm(0.02)高度尺
Height Gages
A-3
◇47±1
0-300mm(0.02)深度尺
Depth Gages
首末检1件、巡检5件、自检5件first and end inspection 1pcs,inspection 5pcs,self-inspection 5pcs
首末检1次、巡检每2小时、自检每1小时first and end inspection 1,inspection every 2hrs,self-inspection
every hrs
标识、隔离、检查模具Identification ,Separate ,Check
the die B-1
压力
Pressure
◇
上缸Cylinder 15(+1,0)Mpa
下缸Under
cylinder9(+1,0)Mpa
目视Visual
1
每班Every shift
调整设备、上报Adjustment equipment ,reporting
φ214±0.5
0-300mm(0.02)游标卡尺
Calipers
6×φ8.7±0.25
0-150mm(0.02)游标卡尺
Calipers A-4
◇
HDJ-H0001检具
Gage
首末检1件、巡检5
件、自检5件first and end inspection 1pcs,inspection 5pcs,self-inspection 5pcs
末检1次、巡检每2小时
、自检每1小时first and end inspection 1,inspection every 2hrs,self-inspection
every hrs
φ205±0.75
0-300mm(0.02)游标卡尺Calipers 冲压拉深成形Punch
冲压切边冲孔
Trimming and Punching
JA21-160/160T冲床Presses
整形Shaping
JB21-160B-SM/160T冲床
标识、隔离、检查模具Identification ,Separate ,Check
the die
标识、隔离、检查模具Identification ,Separate ,Check
the die
检验记录Inspection record
检验记录Inspection record
检验记录Inspection record
检验记录Inspection record
首末检1次、巡检每4小时、自检每1小时first and end inspection 1,inspection every 4hrs,self-inspection
every hrs 首末检1次、巡检每4小时、自检每1小时first and end inspection 1,inspection every 4hrs,self-inspection
every hrs 首末检1次、巡检每4小
时、自检每1小时
first and end inspection
首末检1件、巡检3件、自检3件first and end inspection 1pcs,inspection 3pcs,self-inspection 3pcs 首末检1件、巡检3件、自检3件first and end inspection 1pcs,inspection
3pcs,self-inspection 3pcs
首末检1件、巡检3件、自检3件first and end
inspection
40
50
60
直径
Diameter
直径
Diameter 孔径
diameter I.D.
HD146-H011/切边冲孔模Trimming and Punching die
位置度
Location degree
JY32-315/315T油压机Hydraulic Press 直径
Diameter HD134-H014/整形模Shaping Die
高度Height
深度Depth
深度Depth
ce
Technique
10(+2,0)0-300mm(0.02)高度尺
Height Gages
85°±0.5°
0-360°(2′)万能角度尺Universal angle ruler
A-5◇
首末检、巡检0-10mm(0.01)百分表/
自检 0-1mm塞尺
First and end
inspection 0-10mm(0.01) Dial
indicator/
Self-inspection 0-1mm
Feeler
首末检1件、巡检
5件(X-R图)、自检5件first and end inspection 1pcs,inspectio n 5pcs(X-R chart),self-inspection 5pcs
末检1次、巡检每2小
时、自检每1小时
first and end
inspection
1,inspection every
2hrs,self-inspection every
hrs
φ4(+2,-1)
0-150mm(0.02)游标卡尺
Calipers 1±0.25
0-300mm(0.02)高度尺Height Gages
90
无油污No dirt 目测Visual
全检Full inspection
每批per lot
检验记录Inspection record 标识、隔离、退货Identification ,Separate ,Reject
喷塑气压Spray pressure
0.4-0.5MPa
喷塑电压
Spray voltage 50-60KV
烘烤温度Baking
temperature 180-200℃
烘烤时间Baking time
30-40min 无漏喷
No leakage jet
目测Visual
产线
喷塑Spray
XNG-36-1B/粉末喷涂生产线
Powder coating production lines
冲压压字
Pressure logo
冲压翻边成形Flanging
JB21-160B-SM/160T冲床
Presses
标识、隔离、检查模具Identification ,Separate ,Check
the die
标识、隔离、检查模具Identification ,Separate ,Check
the die
调整设备、上报Adjustment equipment ,reporting
检验记录Inspection record
检验记录Inspection record
检验记录Inspection record
检验记录Inspection record
per lot
全检Full inspection
时、自检每1小时first and end inspection 1,inspection every 4hrs,self-inspection
every hrs
首末检1次、巡检每4小时、自检每1小时first and end inspection 1,inspection every 4hrs,self-inspection
every hrs
每班Every shift
目测Visual
件、自检3件first and end inspection 1pcs,inspection 3pcs,self-inspection 3pcs
首末检1件、巡检3件、自检3件first and end inspection 1pcs,inspection 3pcs,self-inspection 3pcs
1
70
80100
外观
Appearance
HD150-H005/压字模Pressure logo die(E32629-1)高度Height
HD150-H006/压字模Pressure logo die(E32629-3)
外协镀锌
Outsourcing galvanized
外观
Appearance
高度Height 角度Angle
HD124-H008/翻边模Flanging die
平面度Flatness
JA21-160/160T冲床Presses
孔径
diameter I.D.
ce Technique
A-5◇
0.15mm塞尺(端盖平放在大理石
台面,上面压5kg物体)/0.15mm
feeler ( cover flat on the
marble countertops, pressure
5kg objects above )
盐雾试验≥1000小时/
Salt spray test≥1000
hrs
盐雾腐蚀试验机/
Salt spray corrosion
test machine
3
每季度
Each quarter
盐雾试验报告
Salt spray test
report
110
丝印完整
Full screen
目测
Visual
全检
Full
inspection
每批
per lot
检验记录
Inspection
record
标识、隔离、退货
Identification ,
Separate ,Reject
A-3◇47±1
0-300mm(0.02)深度尺
Depth Gages
10
A-4◇
HDJ-H0001检具
Gage
10
A-5◇
0.15mm塞尺(端盖平放在
大理石台面,上面压5kg
物体)/0.15mm feeler (
cover flat on the
marble countertops,
pressure 5kg objects
above )
10
包装规范
Packaging
Specifications
点数
Counting
2箱
2 box
标识、隔离、返工
Identification ,
Separate ,Rework
清晰
Clear
目测
Visual
包装规范
Packaging
Specifications
目测
Visual
物资发货单
Material Invoice
点数
Counting
喷塑
Spray
XNG-36-1B/粉末喷涂生
产线
Powder coating
production lines
标识、隔离、返工
Identification ,
Separate ,Rework 入库&出货
Warehousing & shipping
抽检并包装
Sampling inspection and packaging
标识、隔离、返工
Identification ,
Separate ,Rework
标识、隔离、处理
Identification ,
Separate ,Deal
with
检验记录
Inspection
record
检验记录
Inspection
record
物资发货单
Material Invoice
每批
per lot
每批
per lot
每批
per lot
全检
Full
inspection
全检
Full
inspection
100
120 130
平面度
Flatness
数量
Quantity
标识
Label
包装
Package
数量
Quantity
防腐蚀性能
Corrosion
外协丝印
Outsourcing Screen
外观
Appearance
深度
Depth
位置度
Location degree
平面度
Flatness