技术、经济签证核定单范本-副本

技术、经济签证核定单范本-副本
技术、经济签证核定单范本-副本

SG—008

技术、经济签证核定单

受文单位:四川省烟草公司成都市公司 (成都市烟草公司) 编号: 20140630 成都市烟草公司龙泉分工程名称或编号施工单位四川省川鑫建设工程有限公司公司办公区维修工程

分部分项工程名称零星工程图纸编号

核定内容零星工作量(费用)

内容:由于甲方在投标文限工程项目中没有设计到此项目。

现在乙方在施工中出现了此项目,根据甲方要求把院坝水沟清理污泥17m。水瀰子8套。清理化粪池16m?。

搬办公室5个人工。一楼活动室2个人工。综合办公室3个人工。

受文单位签证: 建设单位现场代表:

年月日年月日填表人:(签字) 项目技术负责人:(签字)

年月日年月日

注:本表一式2份,建设单位、施工单位各一份。

四川省建设厅监制

and special tools for emergency response equipment and facilities. Emergency preparedness and response plan 1) emergency response (1) If a major accident occurs, the project should set up emergency response teams, chaired by the project manager, head of production and safety coordinators, professional foreman for the crew, primarily responsible for the orderly rescue when an emergency occurs or processing,

outsourcing, team manager and support staff, assisting the Deputy Project Manager for related auxiliary work. (2) after the accident, the project manager is responsible for field commander, advance the establishment of emergency response team personnel, accountability, seriously injured officers sent out rescue, have procedures to deal with accidents, incidents, maximum reduction in casualties and property loss.

(3) If an accident occurs, press Division in advance for emergency personnel cleared, concentrate manpower and material and financial resources to rescue the injured, decrease of the maximum loss. (4) after the accident processing work (5) identified the cause of the accident and the person responsible. (6) the written report to the supervisor in writing, including the time and place of the accident, injury (death) person's name, sex, age, trades, injuries, injuries. (7) the development of effective preventive measures to prevent such accidents from happening again. (8) education of all personnel of the organization. (9) informed criticism of those responsible. (10) all personnel read out the results, and responsible disposal. (11) maintenance of emergency supplies, maintenance and testing ? strengthening the day-to-day management of the various fire fighting equipment fire-fighting equipment, authorities should be staffed, equipped with fire extinguishers. Fire hydrants identified person responsible for regularly inspecting, testing, at any time in good condition. ? Guard monthly check-fire extinguishers and fire-fighting equipment. ? once every quarter, inspections and tests of a fire hydrant in good condition. 2),

plans to develop (1) casualties occurred in construction, such as accidents or accidents of the direct economic

技术、经济签证核定单

受文单位:四川省烟草公司成都市公司 (成都市烟草公司) 编号: 20140702 成都市烟草公司龙泉分工程名称或编号施工单位四川省川鑫建设工程有限公司公司办公区维修工程

分部分项工程名称零星工程图纸编号

核定内容零星工作量(费用)

内容:根据甲方要求增加蹲便器5个。冲水箱5个。墙面刮操65?。防潮隔段5个蹲位。洗手台2个。沐浴花伞1套。

防水:卫生间做1.8m高。厨房做1.2m高,(一楼办公室做1米高才能达到防潮效果)卫生间有65?。厨房有27?。洗澡间有18?。

一楼办公室有125?。

在施工现场中根据甲方要求,屋面防水必须做到屋顶墙面,会议室屋顶墙面高1.5m,根据装饰施工要求一楼办公室从地平面起1m高涂料全部铲除才能施工防潮处理。

铲除涂料面积有125?。

受文单位签证: 建设单位现场代表:

年月日年月日填表人:(签字) 项目技术负责人:(签字)

年月日年月日

注:本表一式2份,建设单位、施工单位各一份。

四川省建设厅监制

and special tools for emergency response equipment and facilities. Emergency preparedness and response plan 1) emergency response (1) If a major accident occurs, the project should set up emergency response teams, chaired by the project manager, head of production and safety coordinators, professional foreman for the crew, primarily responsible for the orderly rescue when an emergency occurs or processing, outsourcing, team manager and support staff, assisting the Deputy Project Manager for related auxiliary work. (2) after the accident, the project manager is responsible for field commander, advance the establishment of emergency response team personnel, accountability, seriously injured officers sent out rescue, have procedures to deal with accidents, incidents, maximum reduction in casualties and property loss.

(3) If an accident occurs, press Division in advance for emergency personnel cleared, concentrate manpower and material and financial resources to rescue the injured, decrease of the maximum loss. (4) after the accident processing work (5) identified the cause of the accident and the person responsible. (6) the written report to the supervisor in writing, including the time and place of the accident, injury (death) person's name, sex, age, trades, injuries, injuries. (7) the development of effective preventive measures to prevent such accidents from happening again. (8) education of all personnel of the organization. (9) informed criticism of those responsible. (10) all personnel read out the results, and responsible disposal. (11) maintenance of emergency supplies, maintenance and testing ? strengthening the day-to-day

management of the various fire fighting equipment fire-fighting equipment, authorities should be staffed, equipped with fire extinguishers. Fire hydrants identified person responsible for regularly inspecting, testing, at any time in good condition. ? Guard monthly check-fire extinguishers and fire-fighting equipment. ? once every quarter, inspections and tests of a fire hydrant in good condition. 2), plans to develop (1) casualties occurred in construction, such as accidents or accidents of the direct economic

技术、经济签证核定单

受文单位:四川省烟草公司成都市公司 (成都市烟草公司) 编号: 20140803 成都市烟草公司龙泉分工程名称或编号施工单位四川省川鑫建设工程有限公司公司办公区维修工程

分部分项工程名称零星工程图纸编号

核定内容零星工作量(费用)

内容:由于甲方在投标文限工程项目中没有设计到此项目。

现在乙方在施工中出现了此项目,根据甲方要求增加办公室开关30个、插座

65个、空调插座18个。

受文单位签证: 建设单位现场代表:

年月日年月日填表人:(签字) 项目技术负责人:(签字)

年月日年月日

注:本表一式2份,建设单位、施工单位各一份。

四川省建设厅监制

and special tools for emergency response equipment and facilities. Emergency preparedness and response plan 1) emergency response (1) If a major accident occurs, the project should set up emergency response teams, chaired by the project manager, head of production and safety coordinators, professional foreman for the crew, primarily responsible for the orderly rescue when an emergency occurs or processing, outsourcing, team manager and support staff, assisting the Deputy Project Manager for related auxiliary work. (2) after the accident, the project manager is responsible for field commander, advance the establishment of emergency response team personnel, accountability, seriously injured officers sent out rescue, have procedures to deal with accidents, incidents, maximum reduction in casualties and property loss.

(3) If an accident occurs, press Division in advance for emergency personnel cleared, concentrate manpower and material and financial resources to rescue the injured, decrease of the maximum loss. (4) after the accident processing work (5) identified the cause of the accident and the person responsible. (6) the written report to the supervisor in writing, including the time and place of the accident, injury (death) person's name, sex, age, trades, injuries, injuries. (7) the development of effective preventive measures to prevent such accidents from happening again. (8) education of all personnel of the organization. (9) informed criticism of those responsible. (10) all personnel read out the results, and responsible disposal. (11) maintenance of emergency supplies, maintenance and testing ? strengthening the day-to-day

management of the various fire fighting equipment fire-fighting equipment, authorities should be staffed, equipped with fire extinguishers. Fire hydrants identified person responsible for regularly inspecting, testing, at any time in good condition. ? Guard monthly check-fire extinguishers and fire-fighting equipment. ? once every quarter, inspections and tests of a fire hydrant in good condition. 2), plans to develop (1) casualties occurred in construction, such as accidents or accidents of the direct economic

技术、经济签证核定单

受文单位:四川省烟草公司成都市公司 (成都市烟草公司) 编号: 20140720 成都市烟草公司龙泉分工程名称或编号施工单位四川省川鑫建设工程有限公司公司办公区维修工程

分部分项工程名称零星工程图纸编号

核定内容零星工作量(费用)

内容:由于甲方在投标文限工程项目中没有设计到此项目。

现在乙方在施工中出现了此项目,根据甲方要求必须提前预埋此项目。

根据甲方要求前厅、办公室预埋川览成都三电厂10?铜芯线有150m。

弱电开槽,240m。打线盒45个。

受文单位签证: 建设单位现场代表:

年月日年月日填表人:(签字) 项目技术负责人:(签字)

年月日年月日

注:本表一式2份,建设单位、施工单位各一份。

四川省建设厅监制

and special tools for emergency response equipment and facilities. Emergency preparedness and response plan 1) emergency response (1) If a major accident occurs, the project should set up emergency response teams, chaired by the project manager, head of production and safety coordinators, professional foreman for the crew, primarily responsible for the orderly rescue when an emergency occurs or processing, outsourcing, team manager and support staff, assisting the Deputy Project Manager for related auxiliary work. (2) after the accident, the project manager is responsible for field commander, advance the establishment of emergency response team personnel, accountability, seriously injured officers sent out rescue, have procedures to deal with accidents, incidents, maximum reduction in casualties and property loss.

(3) If an accident occurs, press Division in advance for emergency personnel cleared, concentrate manpower and material and financial resources to rescue the injured, decrease of the maximum loss. (4) after the accident processing work (5) identified the cause of the accident and the person responsible. (6) the written report to the supervisor in writing, including the time and place of the accident, injury (death) person's name, sex, age, trades, injuries, injuries. (7) the development of effective preventive measures to prevent such accidents from happening again. (8) education of all personnel of the organization. (9) informed criticism of those responsible. (10) all personnel read out the results, and responsible disposal. (11) maintenance of emergency

supplies, maintenance and testing ? strengthening the day-to-day management of the various fire fighting equipment fire-fighting equipment, authorities should be staffed, equipped with fire extinguishers. Fire hydrants identified person responsible for regularly inspecting, testing, at any time in good condition. ? Guard monthly check-fire extinguishers and fire-fighting equipment. ? once every quarter, inspections and tests of a fire hydrant in good condition. 2), plans to develop (1) casualties occurred in construction, such as accidents or accidents of the direct economic

技术、经济签证核定单

受文单位:四川省烟草公司成都市公司 (成都市烟草公司) 编号: 20140809 成都市烟草公司龙泉分工程名称或编号施工单位四川省川鑫建设工程有限公司公司办公区维修工程

分部分项工程名称零星工程图纸编号

核定内容零星工作量(费用)

内容:现在乙方在施工中出现了此项目,根据甲方要求增加办公室600*600LED

格栅灯20套。会议室增加600*600LED格棚灯12套。办公室过道增加筒灯14套。卫生间、厨房300*300LED灯5个。

受文单位签证: 建设单位现场代表:

年月日年月日填表人:(签字) 项目技术负责人:(签字)

年月日年月日

注:本表一式2份,建设单位、施工单位各一份。

四川省建设厅监制

and special tools for emergency response equipment and facilities. Emergency preparedness and response plan 1) emergency response (1) If a major accident occurs, the project should set up emergency response teams, chaired by the project manager, head of production and safety coordinators, professional foreman for the crew, primarily responsible for the orderly rescue when an emergency occurs or processing, outsourcing, team manager and support staff, assisting the Deputy Project Manager for related auxiliary work. (2) after the accident, the project manager is responsible for field commander, advance the establishment of emergency response team personnel, accountability, seriously injured officers sent out rescue, have procedures to deal with accidents, incidents, maximum reduction in casualties and property loss.

(3) If an accident occurs, press Division in advance for emergency personnel cleared, concentrate manpower and material and financial resources to rescue the injured, decrease of the maximum loss. (4) after the accident processing work (5) identified the cause of the accident and the person responsible. (6) the written report to the supervisor in writing, including the time and place of the accident, injury (death) person's name, sex, age, trades, injuries, injuries. (7) the development of effective preventive measures to prevent such accidents from happening again. (8) education of all personnel of the organization. (9) informed criticism of those responsible. (10) all personnel read out the results, and responsible disposal. (11) maintenance of emergency

supplies, maintenance and testing ? strengthening the day-to-day management of the various fire fighting equipment fire-fighting equipment, authorities should be staffed, equipped with fire extinguishers. Fire hydrants identified person responsible for regularly inspecting, testing, at any time in good condition. ? Guard monthly check-fire extinguishers and fire-fighting equipment. ? once every quarter, inspections and tests of a fire hydrant in good condition. 2), plans to develop (1) casualties occurred in construction, such as accidents or accidents of the direct economic

技术、经济签证核定单

受文单位:四川省烟草公司成都市公司 (成都市烟草公司) 编号: 20140725 成都市烟草公司龙泉分工程名称或编号施工单位四川省川鑫建设工程有限公司公司办公区维修工程

分部分项工程名称零星工程图纸编号

核定内容零星工作量(费用)

根据甲方要求办公室所有门套用600*600地砖做门套,门套2000*1000,每个

门套有5m,共有14个门,有外墙砖门套70m。窗套1500*1200,每个窗套有

5.21m,共有4窗套共有21.6m,总共门窗套91.6m。

受文单位签证: 建设单位现场代表:

年月日年月日填表人:(签字) 项目技术负责人:(签字)

年月日年月日

注:本表一式2份,建设单位、施工单位各一份。

四川省建设厅监制

and special tools for emergency response equipment and facilities. Emergency preparedness and response plan 1) emergency response (1) If a major accident occurs, the project should set up emergency response teams, chaired by the project manager, head of production and safety coordinators, professional foreman for the crew, primarily responsible for the orderly rescue when an emergency occurs or processing, outsourcing, team manager and support staff, assisting the Deputy Project Manager for related auxiliary work. (2) after the accident, the project manager is responsible for field commander, advance the establishment of emergency response team personnel, accountability, seriously injured officers sent out rescue, have procedures to deal with accidents, incidents, maximum reduction in casualties and property loss.

(3) If an accident occurs, press Division in advance for emergency personnel cleared, concentrate manpower and material and financial resources to rescue the injured, decrease of the maximum loss. (4) after the accident processing work (5) identified the cause of the accident and the person responsible. (6) the written report to the supervisor in writing, including the time and place of the accident, injury (death) person's name, sex, age, trades, injuries, injuries. (7) the development of effective preventive measures to prevent such accidents from happening again. (8) education of all personnel of the organization. (9) informed criticism of those responsible. (10) all personnel read out the results, and responsible disposal. (11) maintenance of emergency

supplies, maintenance and testing ? strengthening the day-to-day management of the various fire fighting equipment fire-fighting equipment, authorities should be staffed, equipped with fire extinguishers. Fire hydrants identified person responsible for regularly inspecting, testing, at any time in good condition. ? Guard monthly check-fire extinguishers and fire-fighting equipment. ? once every quarter, inspections and tests of a fire hydrant in good condition. 2), plans to develop (1) casualties occurred in construction, such as accidents or accidents of the direct economic

技术、经济签证核定单

受文单位:四川省烟草公司成都市公司 (成都市烟草公司) 编号: 20140815 成都市烟草公司龙泉分工程名称或编号施工单位四川省川鑫建设工程有限公司公司办公区维修工程

分部分项工程名称零星工程图纸编号

核定内容零星工作量(费用)

内容:由于甲方在投标文限工程项目中没有设计到此项目。

现在乙方在施工中出现了此项目,根据甲方要求增加此项目。根据甲方要求将2楼走廊下的滴水外墙砖拆除,安装外墙砖,24000*400 共9.6?。

根据甲方要求,将办公楼会议室安装地砖地脚线,共计360m。

受文单位签证: 建设单位现场代表:

年月日年月日填表人:(签字) 项目技术负责人:(签字)

年月日年月日

注:本表一式2份,建设单位、施工单位各一份。

四川省建设厅监制

and special tools for emergency response equipment and facilities. Emergency preparedness and response plan 1) emergency response (1) If a major accident occurs, the project should set up emergency response teams, chaired by the project manager, head of production and safety coordinators, professional foreman for the crew, primarily responsible for the orderly rescue when an emergency occurs or processing, outsourcing, team manager and support staff, assisting the Deputy Project Manager for related auxiliary work. (2) after the accident, the project manager is responsible for field commander, advance the establishment of emergency response team personnel, accountability, seriously injured officers sent out rescue, have procedures to deal with accidents, incidents, maximum reduction in casualties and property loss.

(3) If an accident occurs, press Division in advance for emergency personnel cleared, concentrate manpower and material and financial resources to rescue the injured, decrease of the maximum loss. (4) after the accident processing work (5) identified the cause of the accident and the person responsible. (6) the written report to the supervisor in writing, including the time and place of the accident, injury (death) person's name, sex, age, trades, injuries, injuries. (7) the development of effective preventive measures to prevent such accidents from happening again. (8) education of all personnel of the organization. (9) informed criticism of those responsible. (10) all personnel read out the

results, and responsible disposal. (11) maintenance of emergency supplies, maintenance and testing ? strengthening the day-to-day management of the various fire fighting equipment fire-fighting equipment, authorities should be staffed, equipped with fire extinguishers. Fire hydrants identified person responsible for regularly inspecting, testing, at any time in good condition. ? Guard monthly check-fire extinguishers and fire-fighting equipment. ? once every quarter, inspections and tests of a fire hydrant in good condition. 2), plans to develop (1) casualties occurred in construction, such as accidents or accidents of the direct economic

技术、经济签证核定单

受文单位:四川省烟草公司成都市公司 (成都市烟草公司) 编号: 20140723 成都市烟草公司龙泉分工程名称或编号施工单位四川省川鑫建设工程有限公司公司办公区维修工程

分部分项工程名称零星工程图纸编号

核定内容零星工作量(费用)

我公司在施工一楼办公室过程中,甲方要求对一楼四个办公室开窗洞,原有4

个窗洞用红砖封墙。现在乙方在施工中出现了此项目,根据要求办公室一楼开4

个窗洞,每个窗洞尺寸为1500*1200*240原有4个窗洞用红砖堵后水泥河沙找平抹灰再做乳胶漆,每个窗洞尺寸为1500*1800*240。

受文单位签证: 建设单位现场代表:

年月日年月日填表人:(签字) 项目技术负责人:(签字)

年月日年月日

注:本表一式2份,建设单位、施工单位各一份。

四川省建设厅监制

and special tools for emergency response equipment and facilities. Emergency preparedness and response plan 1) emergency response (1) If a major accident occurs, the project should set up emergency response teams, chaired by the project manager, head of production and safety coordinators, professional foreman for the crew, primarily responsible for the orderly rescue when an emergency occurs or processing, outsourcing, team manager and support staff, assisting the Deputy Project Manager for related auxiliary work. (2) after the accident, the project manager is responsible for field commander, advance the establishment of emergency response team personnel, accountability, seriously injured officers sent out rescue, have procedures to deal with accidents, incidents, maximum reduction in casualties and property loss.

(3) If an accident occurs, press Division in advance for emergency personnel cleared, concentrate manpower and material and financial resources to rescue the injured, decrease of the maximum loss. (4) after the accident processing work (5) identified the cause of the accident and the person responsible. (6) the written report to the supervisor in writing, including the time and place of the accident, injury (death) person's name, sex, age, trades, injuries, injuries. (7) the development of effective preventive measures to prevent such accidents from happening again. (8) education of all personnel of the organization. (9)

informed criticism of those responsible. (10) all personnel read out the results, and responsible disposal. (11) maintenance of emergency supplies, maintenance and testing ? strengthening the day-to-day management of the various fire fighting equipment fire-fighting equipment, authorities should be staffed, equipped with fire extinguishers. Fire hydrants identified person responsible for regularly inspecting, testing, at any time in good condition. ? Guard monthly check-fire extinguishers and fire-fighting equipment. ? once every quarter, inspections and tests of a fire hydrant in good condition. 2), plans to develop (1) casualties occurred in construction, such as accidents or accidents of the direct economic

相关主题
相关文档
最新文档