公路隧道施工技术规范宣贯

公路隧道施工技术规范宣贯
公路隧道施工技术规范宣贯

最新公路隧道施工技术规范总体要求

公路隧道施工技术规范总体要求 1.0.1为给公路山岭隧道工程的施工和施工管理提供 技术依据和行为准则,特制订本规范。 1.0.2 本规范适用于各级公路山岭隧道。 1.0.3隧道施工应在公路修建总体施工规划下,制订相 应的施工组织设计。编制施工组织设计时,应考虑隧道长度 和断面、工期要求、地质条件和当地自然条件等,确定合理 的施工方法和施工进度。 1.0.4必须执行质量检查制度,严格遵守操作规程,做 好材料试验工作。施工中应做好技术交底工作,进行技术、 质量、安全教育,确保工程质量,并坚持文明施工。 1.0.5应制订安全制度和措施,加强通风、照明、防尘、降温及防水和防止有害气体的工作。并预防塌方事故,保护 施工人员身体健康和安全。 1.0.6施工中应贯彻国家的技术经济政策,积极而慎重 地采用新技术、新材料、新设备、新工艺,使隧道施工符合 技术先进、经济合理、质量可靠、安全实用的要求。 1.0.7应合理安排施工机具设备周转时间,提高机械利 用率。施工中应加强技术管理,并合理安排工序进度和关键 工序的作业循环,组织均衡生产,提高劳动生产效率。 1.0.8隧道施工中必须密切注意围岩及地下水等的变

化情况,当施工方法或支护结构不适应于实际围岩状态时,必须采取应急措施,并经技术负责人批准后及时采用合适的施工方法或支护结构。 1.0.9附属设施安装应按电气、机械、化工等专业有关规定要求办理。 1.0.10施工中应采取环境保护措施,并符合环境保护的有关规定。 1.0.11在施工过程中应随时积累资料、数据,做好各道工序的原始记录。 1.0.12隧道施工应编写全面和单项施工技术总结,隧道竣工后应及时提交竣工文件。 1.0.13公路隧道施工除应按规范执行外,尚应符合国家和交通部现行的有关标准、规范规定。

隧道工程施工监理细则

隧道工程施工监理实施细则 1、工程概况 1.1全线设置枫香溪隧道(K8+460~K8+820)1座/360米,为单洞短隧道,该隧道为短隧道,隧道起讫桩号为K8+460~K8+820,全长360m,最大埋深约48m。隧道平面线形位于直线上,隧道建筑限界尺寸为:2×0.75米(人行道)+2×0.25米(侧向宽度)+2×3.5米(行车道),净宽9米。隧道纵坡坡度为-2.3%下坡。进口端隧道轴线与等高线坡面斜交,出口位于一凹槽中,受线形控制,边仰坡较高,进、出口洞门均采用端墙式洞门。 2、监理依据 2.1设计文件、设计施工图、岩土工程勘察报告等 2.2《锚杆喷射混凝土支护技术规范》(GB50086-2001) 2.3《建筑边坡工程技术规范》(GB50330-2002) 2.4《地下工程防水技术规范》(GB50108-2008) 2.5《公路隧道施工技术规范》(JTG F60-2009) 2.6《钢筋焊接及验收规范》(JGJ 18-96) 2.7《混凝土质量控制标准》(GB50164-92) 2.8《混凝土强度检验评定标准》(GBJ107-87) 2.9《混凝土结构工程施工质量验收标准》(GB 5024-2002) 2.10《公路工程地质勘查规范》(JTJ 064-98) 2.11《公路隧道施工技术规范》(JTG F60-2009) 2.12《混凝土外加剂应用技术规范》(GB 50119-2003) 2.13《公路隧道施工技术细则》(JTG F60-2009) 2.14《公路工程岩石试验规范》(JTG E41-2005)

2.15《公路工程地质勘察规范》(JTJ 064-98)2.16《建设工程施工合同》、《建设工程委托监理合同》3、隧道工程质量控制程序 3.1仰坡、边坡质量监理工作流程如图3-1所示

隧道新规解读及注意事项 《公路隧道养护技术规范》 jtg h

隧道新规解读及注意事项 《公路隧道养护技术规范》(JTG H12—2015) 密码:(改颜色显示) 为进一步健全完善我国公路隧道养护技术体系、提高养护技术水平,近日,交通运输部发布了修订后的公路工程行业标准——《公路隧道养护技术规范》(JTG H12—2015)(以下简称“新《规范》”),在对公路隧道养护技术进行了全面总结分析的基础上,从养护检查、清洁维护、保养维修、病害处置、安全管理等方面对《公路隧道养护技术规范》(JTG H12—2003)(以下简称“原《规范》”)进行了全面修订,补充了技术管理的要求,并重点引入了“养护分级”和“技术状况评定”的内容,为各级隧道管理养护单位把握隧道技术状况和采取对应的养护策略提供了依据和参考。 【修订背景】 满足养护新需求 截至2013年年底,我国公路隧道通车总里程已由2003年年底的1001公里(2175座)增长到9605.6公里(11359座),我国已成为名副其实的隧道大国,积累了大量的隧道养护经验。 原《规范》是2000年开始制定、2003年施行的,当时我国高速公路隧道刚刚大量出现,公路隧道养护技术和管理经验还较缺乏,公路养护技术体系还未形成,原《规范》制定时参考了大量国内外相关技术规范,在发布实施的十多年时间里,对推进我国公路隧道养护规范化和技术进步起到了重要作用。

随着我国公路隧道规模不断发展,公路养护技术逐步提升和体系日趋形成,原《规范》所依托的部分技术和相关规定已不能完全满足目前公路隧道养护管理需要,迫切需要充分吸取实践经验对相关内容进行完善,提高对养护工作具体实施、操作的指导水平。 因此,交通运输部在2011年启动了原《规范》的修订工作。新《规范》编制组以提升公路隧道运营安全为目标、以问题为导向,在原《规范》的基础上开拓思路、兼容并蓄,立足于国内公路隧道养护的成熟技术和成功经验,同时适当吸取国外经验及成果,开展了全面修订工作。 【修订原则】 预防为主 防治结合 本次修订明确提出了“预防为主、防治结合”的工作原则,要求加强预防性养护。预防性养护对于降低隧道全寿命周期成本、提高设施耐久性和使用寿命起到重要作用,同时也是节约资源、保护环境的直接体现。 新《规范》主要是通过养护检查、清洁维护、结构技术状况评定、保养维修、运营监测等方面规定达到预防性养护的目的。如根据调研意见,从检查内容、检查频率出发,将日常巡查从日常检查中分离出来,将日常检查调整为经常检查;增加了清洁维护的覆盖范围,如考虑到诱导灯、轮廓标等设施对运营安全和节能的影响,增加了对其清洁的要求;强化了定期检查的要求,明确了定期检查应进行结构技术状况评定的规定并给出了方法。

公路隧道设计规范JTGD强制性条文

公路隧道设计规范 J T G D强制性条文集团企业公司编码:(LL3698-KKI1269-TM2483-LUI12689-ITT289-

《公路隧道设计规范》J T G D70-2004 强制性条文 1.0.3隧道规划和设计应遵循能充分发挥隧道功能、安全且经济地建设隧道的基本原则。 隧道设计应有完整的勘测、调查资料、综合考虑地形、地质、水文、气象、地震和交通量及其构成。 1.0.5隧道主体结构必须按永久性建筑设计,具有规定的强度、稳定性和耐久性;建成的隧道应能适应长期营运的需要,方便维修作业。 1.0.6应加强隧道支护衬砌、防排水、路面等主体结构设计与通风、照明、供配电、消防、交通监控等营运设施设计之间的协调,形成合理的综合设计。必要时应对有关的技术问题开展专项设计和研究。 1.0.7隧道土建设计应体现动态设计与信息化施工的思想,制定地质观察和监控量测的总体方案;地质条件复杂的隧道,应制定地质预测方案,以及时评判设计的合理性,调整支护参数和施工方案。通过动态设计使支护结构适应于围岩实际情况,更加安全、经济。 3.1.1应根据隧道不同设计阶段的任务、目的和要求,针对公路等级、隧道的特点和规模,确定搜集、调查资料的内容和范围,并认真进行调查、测绘、勘察和试验。调查的资料应齐全、准确,满足设计要求。 3.1.3应根据隧道所通过地区的地形地质条件,并综合考虑调查队阶段、方法、范围等,编制相应的调查计划。在调查过程中,如发现实际地质情况与预计的情况不符,应及时修正调查计划。

7.1.2隧道应遵循“早进洞、晚出洞的原则,不得大挖大刷,确保边坡及仰坡的稳定。 8.1.2隧道衬砌设计应综合考虑地质条件、断面形状、支护结构、施工条件等,并应充分利用围岩的自承能力。衬砌应有足够的强度和稳定性,保证隧道长期安全使用。 10.1.1隧道防排水应遵循“防、排、截、堵结合,因地制宜,综合治理的原则,保证隧道结构物和营运设备的正常使用和行车安全。隧道防排水设计应对地表水、地下水妥善处理,洞内外应形成完整通畅的防排水系统。 15.1.1隧道路基应稳定、密实、匀质,为路面结构提供均匀的支承。 15.1.2隧道路面应具有足够的强度和平整、耐久、抗滑耐磨等性能。 16.1.1公路隧道通风设计应综合考虑交通条件、地形、地物、地质条件、通风要求、环境保护要求、火灾时的通风控制、维护与管理水平、分期实施的可能性、建设与运营费用等因素。

公路隧道施工技术细则JTGT F60-2009题库

《公路隧道施工技术细则》JTG/T F60-2009试题 编制:审核: 一、填空题(请将正确答案填在题中括号内,每题1分,共20题) 1、公路隧道洞内平面控制测量宜采用导线测量,洞内导线应布置成多边形导线环,导线边长在直线地段不宜小于_m,在曲线地段不宜小于_m。 【答案:200,70】【解析:见P13,4.2.5】 2、公路隧道施工中,用中线法进行洞内测量的隧道,中线点点位横向偏差不得大于_mm;中线点间距曲线部分不宜短于_m,直线部分不宜短于100m;直线地段宜采用正倒镜延伸直线法。 【答案:5,50】【解析:见P14,4.3.2】 3、公路隧道洞口爆破可能会影响邻近建筑物时,宜对建筑物下沉、倾斜、_等进行监测。 【答案:裂缝及震动】【解析:见P17,5.1.4】 4、公路隧道明洞防水层施工时,防水卷材应与拱背黏贴紧密,接头搭接长度不小于_mm,铺设应自下而上进行,上下层接缝宜错开,不得有通缝。 【答案:100】【解析:见P18,5.2.6】 5、公路隧道浅埋段的开挖施工中,宜采用单臂导坑法、双臂导坑法或_开挖。围岩的完整性较好时,宜采用台阶法开挖,

不应采用全断面法。 【答案:环形开挖留核心土法】【解析:P19,5.3.1】 6、公路隧道浅埋段的开挖施工中,浅埋段围岩自稳能力差时,可会同设计单位确定采用地表锚杆、管棚、_、注浆等加固围岩稳定地层的辅助工程措施。 【答案:超前小导管】【解析:见P19,5.3.2】 7、公路隧道钻爆设计应根据工程地质、地形环境、_、_、循环进尺、钻眼机具、爆破材料和出渣能力等因素综合 考虑,并根据实际爆破效果及时对爆破设计参数进行调整。 【答案:开挖断面,开挖方法】【解析:见P22,6.4.1】 8、公路隧道锚杆钻孔施工,钻孔应保持直线 ,系统锚杆钻孔方向宜与开挖面垂直 ,当岩层层面或主要结构面明显时 ,尽可能与其成较大交角 ,但与开挖面的垂直偏差不应大于_。 【答案:20°】【解析:见P28,7.3.4】 9、公路隧道模筑混凝土拌制前 ,应测定砂、石含水率并根据测试结果调整材料用量 ,提出_。 【答案:施工配合比(见P35,7.6.7】 10、公路隧道施工中采用硅酸盐水泥、普通硅酸盐水泥或矿渣硅酸盐水泥拌制的模筑混凝土养护时间不得少于_d,有抗渗要求的混凝土养护时间不得少于_d。 【答案:7、14】【解析:见P36,7.6.8】 11、公路隧道施工应加强施工地质工作,以达到地质预测预

《公路隧道运营技术规范》

交通部公路工程行业标准 《公路隧道运营技术规范》 征求意见稿 编制组 2017年4月

目录 1.总则 (1) 2.术语、符号 (1) 3.基本规定 (1) 4.隧道控制区 (3) 4.1 一般规定 (3) 4.2 隧道控制区范围 (3) 4.3 控制区管理 (4) 5.运营环境技术要求 (5) 5.1一般规定 (5) 5.2通风设施技术要求 (5) 5.3照明设施技术要求 (7) 5.4路面技术要求 (8) 5.5土建结构技术要求 (8) 5.6其他设施技术要求 (9) 6.交通阻塞工况技术要求 (10) 7.火灾工况运营要求 (12) 7.1 一般规定 (12) 7.2 火灾工况运营策略 (12) 8. 危化品运输事故工况运营要求 (13) 8.1 一般规定 (13) 8. 2危化品事故工况运营策略 (13) 9.结构灾害工况运营技术要求 (15) 9.1 一般规定 (15) 9.2 结构灾害工况的运营策略 (15) 10 应急体系与预案 (20) 10.1 一般规定 (20) 10.2 应急预案 (20) 10.3 应急组织机构 (22)

10.4 应急保障 (23) 10.5 应急处置 (23) 10.6 应急善后与恢复 (24) 10.7 应急培训与演练 (25) 11 运营监测 (27) 11.1 一般规定 (27) 11.2 土建结构监测作业 (27) 11.3 监测数据处理与应用 (29) 12 公路隧道运营状态评价 (30) 12.1 一般规定 (30) 12.2土建结构评价 (30) 12.3 交通环境评价 (31) 12.4 交通工程与附属设施状态评价 (32) 12.5 隧道交通状态评价 (32) 12.6总体运营状态评价 (33) 13 运营数据标准 (35) 13.1 一般规定 (35) 13.2基本运营数据 (35) 13.3土建结构设施状况数据 (36) 13.4机电设施运行数据 (42) 13.5事件数据 (46) 13.6养护检查数据 (47) 附录A交通工程与附属设施评价 (48) 附录B 数据示例 (58)

公路隧道施工技术规范解读

公路隧道施工技术规范 洞口、明洞与浅埋段工程 一、洞口工程 1、洞口开挖土石方应遵守下列规定: 1.1、进洞前应尽早完成洞口排水系统。 1.2、安设计要求进行边、仰坡放线,自上而下逐段开挖,不得掏底开挖或上下重叠开挖。 1.3、清除洞口上方有可能滑塌的表土,灌木及山坡危石,不留后患1.4、石质地层拉槽爆破后,应及时清除松动石块;土质地层开挖后应及时夯实整平边(仰)坡。 1.5、洞门端墙处的土石方,应视地层稳定程度、洞口施工季节和隧道施工方法等选择施工时机和施工方法。 1.6、不得采用深眼大爆破开挖边(仰)坡。 1.7、开挖中应随时检查边坡和仰坡,如有滑动、开裂等现象,应适当放缓坡度,保证边(仰)坡稳定和施工安全。 1.8、开挖的土石方不得弃在危害边坡及其他建筑物稳定的地点,并不得影响运输安全。 1、9、洞口支挡工程应结合土石方开挖一并完成。 1、10、开挖进洞时,宜用钢支撑紧贴洞口开挖面进行支护,围岩差时可用管棚支护围岩,支撑作业应紧跟开挖作业,稳妥前进。 1、11、洞门衬砌施工应按《钢筋混凝土工程施工及验收规范》 (GBJ202)的有关规定办理,并符合下列要求:

(1)土质地基应平整夯实,土质松软时,应加碎石,人工夯实,将基础置于稳固的地基上。 (2)基础处的渣体杂物、风化软层和积水应清除干净。 (3)洞门衬砌拱墙应与洞内相联的拱墙同时施工,连成整体。如系接唱明洞,则应按设计要求采取加强连接措施,确保与已成的拱墙连接良好。 (4)端墙施工放样时,应保证位置准确和墙面坡度平顺。 (5)灌注砼时应保证模板不移动。 (6)洞门端墙的砌筑与墙背回填两侧同时进行,防止对衬砌边墙产生偏压。 (7)、洞门衬砌完成后,及时处治洞门上方仰坡脚受破坏处,当边(仰)坡地层松软、破碎时,应采取坡面防护措施。 (8)当端墙顶水沟砌筑在填土上时,填土必须夯实。 (9)洞门的排水、截水设施应与洞门工程配合施工,并应与路垫排水系统连通。 二、明洞工程 1、明洞衬砌施工可选用下列几种方法: (1)当边坡能稳定时,可采用先墙后拱法; (2)当边坡稳定性差,但拱顶承载力较好,能保证拱圈稳定时,可采用先拱后墙法; (3)半路堑式明洞施工时,可采用墙拱交替法,且宜先做外侧边墙,继做拱圈,再做内侧边墙;

公路隧道设计规范

公路隧道设计规范(JTG D70-2004) 1 总则 (1) 2 主要术语与符号 (2) 3 隧道调查及围岩分级 (5) 4 总体设计 (11) 5 建筑材料 (17) 6 荷载 (22) 7 洞口及洞门 (25) 8 衬砌结构设计 (27) 9 结构计算 (33) 10 防水与排水 (40) 11 小净距及连拱隧道 (42) 12 辅助通道 (44) 13 辅助工程措施 (48) 14 特殊地质地段 (51) 15 隧道内路基与路面 (54) 16 机电及其它设施…………………………………………………………………68 附录A围岩分级有关规定 (60) 附录B隧道标准内轮廓 (63) 附录C型钢特性参数表 (65) 附录D释放荷载的计算方法 (69) 附录E浅埋隧道荷载的计算方法 (71) 附录F偏压隧道衬砌荷载的计算方法 (74) 附录G明洞设计荷载的计算方法 (75) 附录H洞门土压力荷载的计算方法 (77) 附录I荷载结构法 (78) 附录J地层结构法 (80) 附录K钢筋混凝土受弯和受压构件配筋量计算方法 (88) 附录L本规范用词说明 (94) 在编制过程中,编制组对全国已建和在建的公路隧道进行了较广泛的调查研究,搜集并分析了大量设计文件、工程报告、营运管理报告,就有关专题进行了研究,并听取了全国有关设计院和专家的意见。考虑到我国公路隧道技术起步较晚,其经验和基础性工作不足,因此在我国经验的基础上又采用或借鉴了国外公路隧道的成功经验和先进技术。 本次修订中,充分考虑了与其它相关标准、规范的协调性,并保持一致。同时,在全面修订的原则下,尽量按原《规范》的风格编排撰写。本次修订的重点为调查、围岩分类、总体设计、锚喷支护与衬砌、洞口段工程、结构计算、特殊构造设计、特殊地质地段设计等,并增加了三车道隧道、连拱隧道和小净距隧道等内容。 关于强制性条款 《公路隧道设计规范》(JTG D70-2004)中第1.0.3、1.0.5、1.0.6、1.0.7、3.1.1、3.1.3、7.1.2、8.1.2、10.1.1、15.1.1、15.1.2、16.1.1条为强制性条款,必须 按照国家有关工程建设标准强制性条文的有关规定严 格执行。《工程建设标准强制性条文》(公路工程部

XX公路隧道技术规范

技术规范 说明 一、本项目的技术规范由《公路工程国内招标文件范本(2003年版)》第5篇技术规范和现行国家颁布的有关行业标准、规范(自备,业主不提供)组成。若《公路工程国内招标文件范本(2003年版)》第5篇技术规范与现行国家颁布的有关行业标准、规范不同,承包人均应遵照交通部颁发的有关公路工程建设的现行设计规范、施工技术规范和规程办理。 二、本项目三材中的水泥要求采用国家主管部门认证的免检产品,钢材要求采用经国家主管部门认证的合格产品。 三、现行国家颁布的有关行业标准、规范主要有: (一)、中华人民共和国交通部部颁标准(如有新颁标准、规范,则以新的为准) 1、公路工程技术标准(JTJ001-97) 2、公路路线设计规范(JTJ011-94) 3、公路路基设计规范(JTJ013-95) 4、公路路基施工技术规范(JTJ033-95) 5、公路路面基层施工技术规范(JTJ034-2000) 6、公路桥涵施工技术规范(JTJ041-2000) 7、公路土工试验规程(JTJ051-93) 8、公路工程水泥砼试验规程(JTJ053-94) 9、公路工程石料试验规程(JTJ054-94) 10、公路工程金属试验规程(JTJ055-83) 11、公路工程无机结合料稳定材料试验规程(JTJ057-94) 12、公路工程集料试验规程(JTJ058-2000) 13、公路路基路面现场试验规程(JTJ059-95) 14、公路工程质量检验评定标准(JTJ071-98) 15、公路工程施工安全技术规程(JTJ076-95) 16、公路工程施工监理规范(JTJ077-94) 17、公路设计规范汇编(人民交通出版社) 18、公路试验规程汇编(人民交通出版社) 19、公路施工及验收规范汇编(人民交通出版社) 20、沥青路面施工及验收规程(GBJ92-96) 21、道路交通标志和标线(GB 5768-1999)

最新2018版公路路基施工技术规范

公路路基施工技术规范JTJ033—95 目录 公路路基施工技术规范 (1) 封面及目录 (1) 1 总则 (5) 2 术语符号 (6) 3 施工前的准备 (7) 4 路基施工的一般规定 (10) 5 填方路堤的施工 (12) 6 挖方路堑的施工 (17) 7 路基压实 (26) 8 路基排水 (31) 9 特殊地区的路基施工 (37) 10 季节性路基施工 (51) 11 路基防护与加固 (54) 12 公路绿化工程与环境保护 (58) 13 路基整修检查验收及维修 (60) 附录A 本规范用词说明 (64) 1

公路路基施工技术规范JTJ033—95 公路路基施工技术规范 封面及目录 中华人民共和国行业标准JTJ 033—95 公路路基施工技术规范Technical Specification for Construction of Hihgway Subgrades 1995—11—30发布1996—10—01实施 1

公路路基施工技术规范JTJ033—95 中华人民共和国交通部发布 目次 1 总则···························· 2 术语、符号 ·························································································· 2.1 术语 ································································································ 2.2 符号 ································································································ 3 施工前的准备 ······················································································· 3.1 施工准备 ·························································································· 3.2 施工测量 ·························································································· 3.3 施工前的复查和试验··········································································· 3.4 场地清理 ·························································································· 3.5 试验路段 ·························································································· 4 路基施工的一般规定 ············································································ 4.1 基本要求 ·························································································· 4.2 路基施工排水···················································································· 4.3 路基施工取土和弃土··········································································· 4.4 土方机械化施工················································································· 5 填方路堤的施工 ··················································································· 5.1 一般规定 ·························································································· 5.2 土方路堤的填筑················································································· 5.3 桥涵及其他构造物外的填筑 ································································· 5.4 埴石路堤 ·························································································· 5.5 土石路堤 ·························································································· 5.6 高填方路堤 ······················································································· 6 挖方路堑的施工 ··················································································· 6.1 一般规定 ·························································································· 6.2 土方路堑的开挖················································································· 6.3 石方的开挖 ······················································································· 6.4 深挖路堑的施工················································································· 2

高速公路隧道运行管理规范实用版

YF-ED-J6826 可按资料类型定义编号 高速公路隧道运行管理规 范实用版 In Order To Ensure The Effective And Safe Operation Of The Department Work Or Production, Relevant Personnel Shall Follow The Procedures In Handling Business Or Operating Equipment. (示范文稿) 二零XX年XX月XX日

高速公路隧道运行管理规范实用 版 提示:该管理制度文档适合使用于工作中为保证本部门的工作或生产能够有效、安全、稳定地运转而制定的,相关人员在办理业务或操作设备时必须遵循的程序或步骤。下载后可以对文件进行定制修改,请根据实际需要调整使用。 1.公路隧道管理系统的特点 1.1 环境特征 公路隧道是公路的特殊构造物,在空间上 的限制而使隧道内的环境状况具有以下特 点: 1)行驶车辆排放出的气态及游离固态微粒 混合成的有害废气和车辆携带的尘土及卷起的 尘埃,因隧道内空间的限制,往往不能很快扩 散、消失; 2)因山体丰富的淅沥水和洞内外温差的作

用,而使隧道内常常处于很潮湿的环境中; 3)因隧道的二次衬砌和隧道内的路面均为刚性体,当重车通过隧道时,洞内震动较大; 4)由于隧道内交通繁忙,加上环境恶劣和空间场地的限制,而使设备的日常维护、故障检修工作困难、劳动强度大而效果较差 1.2 公路隧道运营管理设施的特点 长大公路隧道中的运营管理设施具有如下几个特点: 1)设施的种类繁多:主要包括·隧道照明系统、隧道通风系统、隧道消防灭火系统、火灾自动检测及手动报警系统、紧急电话系统、隧道无线调度对讲系统、隧道有/无线广播系统、隧道闭路电视监视系统、交通参数检测及

公路路基施工技术规范

目次 1 总则 2 术语、符号 2.1 术语 2.2 符号 3 施工前的准备 3.1 施工准备 3.2 施工测量 3.3 施工前的复查和试验 3.4 场地清理 3.5 试验路段。 4 路基施工的一般规定 4.1 基本要求 4.2 路基施工排水 4.3 路基施工取土和弃土 4.4 土方机械化施工 5 填方路堤的施工 5.1 一般规定 5.2 土方路堤的填筑 5.3 桥涵及其他构造物处的填筑 5.4 填石路堤 5.5 土石路堤 5.6 高填方路堤 6 挖方路堑的施工 6.1 一般规定 6.2 土方路堑的开挖 6.3 石方的开挖 6.4 深挖路堑的施工 7 路基压实 7.1 一般规定 7.2 填方地段基底的压实 7.3 压实机械的要求与选择 7.4 填方路堤的压实 7.5 路堑路基的压实 7.6 桥涵及其他构造物处填土的压实 7.7 填石路堤的压实 7.8 土石路堤的压实 7.9 高填方路堤的压实 8 路基排水 8.1 一般规定 8.2 地面水的排除 8.3 地下水的排除 8.4 高速公路、一级公路的路基排水 9 特殊地区的路基施工 9.1 水稻田地区路基施工 9.2 河、塘、湖、海地区路基施工 9.3 软土、沼泽地区路基施工

9.4 盐渍土地区路基施工 9.5 风沙地区路基施工 9.6 黄土地区路基施工 9.7 多雨潮湿地区路基施工 9.8 季节性冻融翻浆地区路基施工 9.9 多年冻土地区路基施工 9.10 岩溶地区路基施工 9.11 滑坡地段路基施工 9.12 崩坍岩堆地段路基施工 9.13 膨胀土地区路基施工 10 季节性路基施工 10.1 路基的冬季施工 10.2 路基的雨季施工 11 路基防护与加固 11.1 一般规定 11.2 坡面防护 11.3 路基冲刷防护 11.4 其他加固工程 12 公路绿化工程与环境保护 12.1 公路绿化工程 12.2 空气污染的防治 12.3 防止水、土污染和流失 13 路基整修、检查验收及维修 13.1 路基整修 13.2 检查及验收 13.3 路基维修 13.4 质量标准 附录A 本规范用词说明 附加说明

隧道设计说明

说明 1 设计依据以及总体原则 1.1 设计依据和技术标准 1.1.1 设计依据: 1)勘察设计合同及相关批复文件 《高整公路公路工程勘察设计合同文件》(第三合同); A省交通厅桂交基建函[2010]564号文《关于高整公路公路初步设计的批复》的要求; A省环境保护文件《关于高整公路公路工程环境影响报告书的批复》桂环管字(2009)268号。 1.1.2 执行的交通部颁布的有关技术标准、规范、规程等: ⑴《公路工程技术指标》(JTG B01—2003); ⑵《公路路线设计规范》(JTG D20—2006); ⑶《公路隧道设计规范》(JTG D70—2004); ⑷《公路隧道交通工程设计规范》 (JTG/T D71-2004); ⑸《公路隧道通风照明设计规范》(JTJ 026.1—1999); ⑹《锚杆喷射混凝土支护技术规范》(GB 50086—2001); ⑺《地下工程防水技术规范》(GB 50108—2008); ⑻《公路隧道施工技术规范》(JTG F60—2009); ⑼《公路隧道施工技术细则》(JTG/T F60—2009); ⑽《工程岩体分级标准》(GB 50218—94); ⑾《公路勘测规范》(JTG C10—2007); ⑿《公路工程地质勘察规范》(JTJ 064—98); ⒀《爆破安全规程》(GB 6722-2003); ⒁《公路工程抗震设计规范》(JTJ 004—89); ⒂《公路钢筋混凝土及预应力混凝土桥涵设计规范》 (JTG D62-2004); ⒃《公路桥涵地基与基础设计规范》(JTJ D63—2007); ⒄《公路沥青路面设计规范》TJG D50-2006; ⒅《中国地震动参数区划图》(GB 18306—2001); ⒆《公路项目安全性评价指南》 (JTG/T B05-2004); ⒇《公路建设项目环境影响评价规范》 (JTG B03-2006)。1.1.3 技术标准 ⑴隧道设计行车速度100公里/小时;路基宽度26m; ⑵隧道设计为高速公路双洞单向交通行车两车道分离式隧道; ⑶隧道长度超过100米,设置照明;若L·N≥2×106设置机械通风,否则自然通风; ⑷隧道设计交通量:2033年交通量32562辆/日(小车); ⑸隧道建筑限界净宽:10.75m 净高 5m ⑹ CO设计浓度正常行驶时δco=250ppm 交通堵塞时δco=300ppm(20min) ⑺烟雾设计浓度正常行驶时K=0.0065m-1 事故时 K=0.009m-1 ⑻火灾时,隧道内换气风速为 2.5m/s 1.2 总体原则 遵守现行的有关规范、规程,借鉴、参考国内外类似工程的成功经验,根据隧道所处的总体线形、地形、地质条件,结合施工、运营、管理等情况,遵循“安全、经济、合理、环保”的原则进行设计。 2 初步设计(或技术设计)批复意见以及相关咨询意见的执行情况: 本合同段施工图技术标准按初设批复意见执行,结合新民交投集团有限公司、中交第二公路勘察设计研究院有限公司及新民公路学会对本项目初步设计的审查意见,根据地形、地质条件优化隧道平纵面线形,合理确定轴线、洞口位置和类型,对洞口段支护参数进行了进一步优化调整: 2.1隧道地质勘探工作 根据初步设计批复意见以及相关咨询意见,加强了隧道地质勘探工作,增设了部分钻孔,加大了勘探力度,重点加强对断裂破碎带等不良地质的勘察,通过相关工程试验,取得了可靠的围岩物理力学特性,并对围岩的稳定性作了综合分析评价。 2.2隧道线形优化 根据初步设计批复及相关咨询意见,对本合同段隧道平纵面线形进行了优化。 2.3隧道洞口 根据初步设计批复意见以及相关咨询意见,对隧道的洞口方案进行了合理的方案比较,隧道洞口采用削竹式及端墙式洞门。

高速公路隧道运行管理规范(2020年)

( 安全技术 ) 单位:_________________________ 姓名:_________________________ 日期:_________________________ 精品文档 / Word文档 / 文字可改 高速公路隧道运行管理规范 (2020年) Technical safety means that the pursuit of technology should also include ensuring that people make mistakes

高速公路隧道运行管理规范(2020年) 1.公路隧道管理系统的特点 1.1环境特征 公路隧道是公路的特殊构造物,在空间上的限制而使隧道内的环境状况具有以下特点: 1)行驶车辆排放出的气态及游离固态微粒混合成的有害废气和车辆携带的尘土及卷起的尘埃,因隧道内空间的限制,往往不能很快扩散、消失; 2)因山体丰富的淅沥水和洞内外温差的作用,而使隧道内常常处于很潮湿的环境中; 3)因隧道的二次衬砌和隧道内的路面均为刚性体,当重车通过隧道时,洞内震动较大; 4)由于隧道内交通繁忙,加上环境恶劣和空间场地的限制,而

使设备的日常维护、故障检修工作困难、劳动强度大而效果较差1.2公路隧道运营管理设施的特点 长大公路隧道中的运营管理设施具有如下几个特点: 1)设施的种类繁多:主要包括·隧道照明系统、隧道通风系统、隧道消防灭火系统、火灾自动检测及手动报警系统、紧急电话系统、隧道无线调度对讲系统、隧道有/无线广播系统、隧道闭路电视监视系统、交通参数检测及交通控制和信号提供系统、隧道环境参数检测及通风、照明控制系统、供配电系统。 2)许多子系统内设备数量大,如照明灯具、自动火灾探测器、摄像机、报警按钮。 3)设备价格高,投资大,运营维护工作量大:如能见度仪、照度仪、通风、照明系统。 4)很多专用设备国内无成熟定型产品,需依赖进口。 综上所述,从公路隧道本身具有的特殊性及隧道运营管理系统的特点,可以看出隧道运营管理设施的设计、设置、系统配备与路段上的交通监控系统相比,因涉及更多的因素而更为复杂、要求更

公路隧道施工安全技术规范

公路隧道施工安全技术规范 摘要:现代高速公路施工中,隧道工程是重要的组成部分,隧道施工质量与公路运营质量有很大的联系,因此隧道工程受到各个施工单位的重视与关注。为此,要求各施工单位做好隧道工程施工质量的控制,对现有的施工技术进行优化与改进,以提高高速公路隧道施工质量。本文主要分析了现代高速公路隧道施工常见的施工技术,并探讨隧道施工中需要控制的关键点,希望为相关工程项目提供一些有价值的参考。 关键词:高速公路;隧道施工;施工技术;控制要点 0.引言 随着社会经济的快速发展,我国交通运输业获得了不同程度的发展,公路的规模以及数量也得到大幅度的提升。高速公路由于线路较长,施工过程中常常会遇到山体障碍,在这些特殊的路段,需要进行隧道施工来实现线路的畅通,为了保证隧道施工质量,要求施工单位采取合适的施工技术,并做好各个施工要点的控制。 1.高速公路隧道施工技术 1.1 隧道洞口及明洞施工技术

高速公路隧道施工中,隧道洞口破土施工前,需对当前的地质条件、天气情况、水文变化进行调研,尤其是需要对仰坡以及周边稳定情况进行调研,观察施工山体是否出现悬石或者危石等安全隐患。如果施工区域的雨水比较充足,在洞口施工前,需要设置排水通道,以避免雨水冲刷施工区域周边的坡体。此外,在进行隧道施工前,还需要沿隧道拱部120°的范围内施工自进式锚杆,之后再进行人工开挖进洞操作。常规隧道施工,明洞施工常采用明挖外边的施工方式,对墙体及拱部进行施工,内部采取暗挖的方式,同时利用混凝土喷涂对内部开挖后的内墙进行加固及防护工作。明洞施工完成后,后续还应进行明洞钢筋绑扎施工,完成明洞混凝土浇筑施工,以提高明洞的安全性及稳定性。 1.2 钻爆施工技术 高速公路隧道施工中,使用到爆破技术,爆破钻洞加快隧道开挖速度,因此实际施工中,需要选择合适的爆破炸药,一般选择硝铵炸药,将炸药填充到大中空孔型以及直眼型的挖槽中。在钻爆施工开始前,施工单位需要安排专门的爆破人员,并依据隧道施工的具体要求进行钻爆施工。在施工过程中需要注意的是应充分结合隧道围岩的各种性质,并做好隧道的支护工作,以尽可能提升隧道的安全性及稳固性。高速公路隧道钻爆施工过程,还需针对不同工序采取合适的施工方式,以便提高隧道施工效率以及施工质量。 1.3 锚杆施工技术

《公路隧道设计规范》JTG D70 强制性条文

《公路隧道设计规范》JTG D70-2004 强制性条文 1.0.3 隧道规划和设计应遵循能充分发挥隧道功能、安全且经济地建设隧道的基本原则。 隧道设计应有完整的勘测、调查资料、综合考虑地形、地质、水文、气象、地震和交通量及其构成。 1.0.5 隧道主体结构必须按永久性建筑设计,具有规定的强度、稳定性和耐久性;建成的隧道应能适应长期营运的需要,方便维修作业。 1.0.6 应加强隧道支护衬砌、防排水、路面等主体结构设计与通风、照明、供配电、消防、交通监控等营运设施设计之间的协调,形成合理的综合设计。必要时应对有关的技术问题开展专项设计和研究。 1.0.7 隧道土建设计应体现动态设计与信息化施工的思想,制定地质观察和监控量测的总体方案;地质条件复杂的隧道,应制定地质预测方案,以及时评判设计的合理性,调整支护参数和施工方案。通过动态设计使支护结构适应于围岩实际情况,更加安全、经济。 3.1.1 应根据隧道不同设计阶段的任务、目的和要求,针对公路等级、隧道的特点和规模,确定搜 页脚内容1

集、调查资料的内容和范围,并认真进行调查、测绘、勘察和试验。调查的资料应齐全、准确,满足设计要求。 3.1.3 应根据隧道所通过地区的地形地质条件,并综合考虑调查队阶段、方法、范围等,编制相应的调查计划。在调查过程中,如发现实际地质情况与预计的情况不符,应及时修正调查计划。 7.1.2 隧道应遵循“早进洞、晚出洞的原则,不得大挖大刷,确保边坡及仰坡的稳定。 8.1.2 隧道衬砌设计应综合考虑地质条件、断面形状、支护结构、施工条件等,并应充分利用围岩的自承能力。衬砌应有足够的强度和稳定性,保证隧道长期安全使用。 10.1.1 隧道防排水应遵循“防、排、截、堵结合,因地制宜,综合治理的原则,保证隧道结构物和营运设备的正常使用和行车安全。隧道防排水设计应对地表水、地下水妥善处理,洞内外应形成完整通畅的防排水系统。 15.1.1 隧道路基应稳定、密实、匀质,为路面结构提供均匀的支承。 15.1.2 隧道路面应具有足够的强度和平整、耐久、抗滑耐磨等性能。 页脚内容2

《JTGT 3660—2020公路隧道施工技术规范》解读

《公路隧道施工技术规范》解读近日,交通运输部发布了《公路隧道施工技术规范》(JTG/T 3660—2020)(以下简称《规范》),作为公路工程行业推荐性标准,自2020年8月1日起施行。原《公路隧道施工技术规范》(JTG F60—2009, 以下简称原《规范》)和《公路隧道施工技术细则》(JTG/T F60—2009,以下简称原《细则》)同时废止。为便于理解本次修订的主要内容,切实做好贯彻实施工作,现将有关修订情况解读如下: 一、背景情况 公路隧道施工经常面临断面大、地质条件复杂、施工风险高等困难;原《规范》和《细则》发布后,随着大量的公路隧道工程的实施,我国积累了公路隧道施工的新经验,“四新”技术得到不断应用,新型建筑材料和施工机械不断出现,环保安全要求进一步提升;在此背景下,为进一步保障隧道工程施工的安全和质量,交通运输部组织完成了《规范》的修订工作。 二、《规范》的定位 《规范》定位于以钻爆法为主要开挖方式的新建和改扩建公路的隧道施工。《规范》围绕施工工艺提出技术要求,旨在达到安全环保、经济合理、技术先进、优质高效的目标。 《规范》以成熟使用的研究成果为支撑,依托公路隧道工程实践,广泛征求了意见,与其他标准进行了衔接。《规范》涵盖了公路隧道施工的全过程工序和施工准备、附属设施、辅助工程措施、监控量测和地质预报等,提出了各工序的工艺参数、技术规定和过程控制要求,用于规范施工行为,指导公路隧道施工工艺标准化,提高隧道施工质量和效率。是公路隧道工程的专业施工规范。 三、《规范》的特点 《规范》注重落实高质量发展理念和交通强国建设纲要,对标国际先进水平,吸纳交通运输行业隧道施工的最新研究成果及工程建设经验。《规范》的主要特点包括: (一)行业适用性强。公路隧道的显著特点是三车道、四车道隧道开挖跨度更大。《规范》对三车道、四车道开挖方法选择、支护参数选定、预留变形量设置、对向开挖两工作面安全施工距离控制、质量控制标准、监控量测测点布置等,均给出了规定,用于指导公路隧道施工。