成都地铁2号线东门大桥站基坑锚固技术

杨光毅钟磊

【摘要】本文结合成都地铁2号线东门大桥车站支护体系施工实例,分析“土钉喷锚+混凝土灌注桩+预应力锚索+钢管内支撑”支护形式在地铁车站明挖基坑支护应用中的特点及原理,阐明了土钉喷锚支护及预应力锚索结构的构造要点、施工技术要点和施工工艺,对于类似深基坑施工具有一定的指导意义。

【关键词】地铁车站深基坑土钉喷锚预应力锚索

Chengdu Metro Line 2 East Gate Bridge Station

Foundation Anchor technology

Yang Guangyi,Zhong Lei

Abstract:In this paper under the engineering background of Chengdu Metro Line 2 East Gate Bridge station, supporting system including soil nail anchor spray,concrete pile, prestressed cable and pipe within the support is analyzed which is used in subway station foundation pit. Structural elements,construction techniques and construction technology of nail anchor spray and prestressed cable are clarified.It provide reference for a similar deep foundation construction.

Key words:subway station; deep foundation;soil nail anchor spray;prestressed cable

1 工程概况及周围环境

成都地铁2号线东门大桥站位于府河以东的芷泉街下方,且主体基本位于东大街芷泉街段的南半幅路面下,车站西段临东门大桥。芷泉街双向八车道,交通繁忙。车站北侧有已建的启明公寓、四川省民政厅办公大楼,南侧为正在修建的天府时代广场,车站两端为盾构区间。

车站总长134m,纵向坡度2‰,为地下三层岛式车站,采用明挖法施工。车站标准段宽25m,基坑开挖深度20.345m,东西两端盾构井开挖深度约22.3m。

芷泉街地下管线密集,经过前期管线迁改后,车站北侧仍然有大量管线,依次为DN160煤气、DN1000自来水、DN1200污水管、DN1200雨水管,700*500通信排管、DN300自来水和1000*1000的电力管沟。

杨光毅:(1977—)工程师,毕业于西南交通大学,2003年加入中铁隆公司,现任项目总工程师。

钟磊:(1981—)助理工程师,毕业于中国地质大学,2006年加入中铁隆公司,现任项目工程部长。

2 车站围护结构设计概况

东门大桥站底板埋置较深,车站南侧的天府时代广场基坑为挖开的深基坑,深约13m左右,导致地面下13m范围内没有任何支挡结构供地铁东门大桥车站基坑开挖时支护使用;地面下5m范围内管线密集,预应力锚索距离管线距离非常近,锚索施工期间难以保证管线的安全,故本站围护结构形式多样:车站西端上部采用“放坡喷锚支护”,下部采用“围护桩+钢管内支撑”;车站西端北侧及标准段采用“放坡喷锚支护+围护桩+预应力锚索+钢管内支撑”;东端盾构井的北侧采用“围护桩+预应力锚索+钢管内支撑”;车站东侧被用为基坑开挖期间出土的通道,所以上部采用全放坡,下部采用“围护桩+钢管内支撑”。

3 本站地质、水文地质情况简介

3.1 站区地层情况

车站地处川西平原岷江I级阶地,为侵蚀~堆积地貌。站区地形平坦,地面高程498.79~498.82,相对高差0.03m。本站范围内岩土层特征从上至下分述如下:

1)第四系全新统人工填土(Q4ml)

杂填土:褐灰、灰褐等杂色,松散~稍密,湿。由碎石、砂土、砖瓦碎块等建筑垃圾组成,其间充填粘粒,表层0.2为沥青混凝土路面。层厚2.0~6.8m。

素填土:褐灰、灰褐等杂色,可塑,湿。由粘性土混少量砖瓦碎块、木炭屑等组成,该层仅分布于杂填土下面,局部缺失。层厚0.5~3.8m。

2)第四系全新统冲积层(Q4al)

粉质粘土:灰黄色,可塑,含铁,锰质斑痕。层厚1.1m。

砂土:灰色,湿,松散,夹少量卵砾石,由长石、石英、云母细片及岩屑组成,砂质较均匀。厚度1.0~1.8m。

卵石土:黄灰色,灰色,湿~饱和。卵石成分主要为中等风化的岩浆岩、变质岩、砂岩等硬质岩组成。磨圆度较好,以亚圆形为主,少量圆形,分选性差,卵石含量55~85%,粒径以30~80㎜为主,钻探揭示最大粒径120㎜,夹零星漂石,充填物为中砂及圆砾。本层顶板埋深5.4~6.5m。层厚约为10.7m。

3)白垩系上统灌口组(K2g)

基岩顶板埋深约为17.3m,本次勘察末揭穿。

全风化泥岩(W4):红褐、紫红色激动回旋钻进极易。岩体结构已全部破坏,全风化呈粘土状,岩质很软,岩芯遇水大部分泥化。

强风化泥岩(W3):红褐、紫红色,岩质软,泥质结构,块状构造,节理裂隙发育。岩芯多呈碎块状,手

可折断。岩体基本完整。层位顶板埋深约为24.7m,层厚约为7.4m。

中等风化泥岩(W2):红褐、紫色,泥质结构,块状构造,岩质较硬,锤击声半哑~较脆。节理裂隙较发育。岩芯多呈短柱状,少量长柱状及碎块状。本层顶板埋深约为28.9m,本次勘探未揭穿。

3.2 水文地质条件

1)地表水

根据调查,站区以西有一条流向由北向南的府河,隧道自府河东门大桥下穿过。府河属川西平原岷江水系,具丰富的地表径流,为本地区地下水的形成提供了丰富的补给来源。府河宽约42m,河床深约4.85m。勘察期,河水深度1.6m,流速缓慢,约为0.12m/s。府河河身为人工条石U型河堤,边坡稳定。东门大桥1947年最高洪水位标高497.56m。

根据府河河水PH值为7.28-7.30.河水对混凝土结构无腐蚀性;对钢筋混凝土结构中钢筋无腐蚀性;对钢结构具弱腐蚀性。

2)地下水

根据成都区域水文地质资料及地下水的赋存条件,地下水主要有两种类型:一是第四系松散土层的孔隙潜水,二是基岩裂隙水。

由于区间沿线范围内多处在建的高层楼房正在进行施工降水,引起该区间的地下水位大幅度下降,相对标高为14.0m,相应标高约为484.79m,该区间平水期正常的水位约3.0左右,标高495.80m。基岩裂隙水主要赋存在岩石强风化带中,强风化岩石裂隙发育,岩石透水性、富水性均较差。本车站区地下水主要受大气降水、地表河水及NW方向的侧向地下径流补给。土层孔隙水相互间的水力联系较为密切,相互补给。站区内地下水水位较高,且随季节及降雨量而变化,枯水期水位埋藏较深,雨季水位埋藏较浅,水位年变化幅度一般在1.5~2.0m之间。

4 围护结构详细设计型式

4.1 车站西端

西端因地下管线和盾构区间的影响,结合现场周边环境、交通疏导要求和围挡实际情况,上部采用“放坡喷锚支护”,下部采用“围护桩+钢管内支撑”。上部因天府时代广场基坑先开挖基坑南侧无任何支挡,采用“放坡喷锚支护”可以最大限度的起到卸载、减压作用,增加基坑安全性;下部因受交通条件影响和现场实际情况采用“围护桩+钢管内支撑”。详见图1所示。

图1 车站西端围护结构断面图

4.2 车站西端北侧及标准段

西端北侧及标准段因地下管线的影响和道路北侧交通疏导要求,上部采用“放坡喷锚支护”,同样,采用“放坡喷锚支护”可以最大限度的起到卸载、减压作用,增加基坑安全性;中部因道路北侧交通疏导要求无法满足放坡要求且基坑南侧因天府时代广场基坑先开挖基坑南侧无任何支挡采用“围护桩+预应力锚索”,下部采用较常见的“围护桩+钢管内支撑”。详见图2所示。

图2 车站西端北侧及标准段围护结构断面图

4.3 车站东端盾构井北侧

东端盾构井的北侧因有3号通道外挂部分,结合交通疏解要求,采用“围护桩+预应力锚索+钢管内支撑”的支护型式。详见图3所示。

图3 车站东端北侧围护结构断面图

4.4 车站东端

车站的东端被用为基坑开挖期间出土的通道,所以上部采用“全放坡”,下部采用“围护桩+钢管内支撑”。详见图4所示。

图4 车站东端围护结构断面图

5 喷锚支护施工

本站西端盾构井西端第一级边坡高3.3m,坡度为1:0.6,设置三排钢花管,长度分别为12m、12m、10m,水平和竖向间距均为1m;第二级边坡高5.7m,坡度为1:0.6,设置五道钢花管,长度均为9m,水平和竖向间距均为1m。车站北侧标准段第一级边坡高2.0m,坡度为1:1,设置两道钢花管,长度分别为7m和13m,水平和竖向间距均为1m;第二级边坡高4.0m,坡度为1:0.5,设置三道钢花管,长度分别为11m、9m、9m,水平间距1m,竖向间距1.2m。钢花管采用D48×3.5(Q235-B)热轧电焊钢管,钢筋网采用Φ8@200×200,以42.5号水泥浆液(水灰比0.45)全段注浆。施工时钢花管、钢筋网等需要提前加工,锚喷支护必须紧跟土方开挖。混凝土采用现场自拌,用TK1061型湿喷机喷射混凝土。

6 预应力锚索施工

本站西端盾构井北侧设置三排锚索,标准段北侧设置两排锚索,外挂段(包括东端盾构井段)设置四排锚索,具体参数见下表1~3。

6.1 机具配备

6.2 预应力锚索施工工序

6.3 预应力锚索构造

预应力锚索采用拉力集中型粘结式预应力锚索体系,锚索由锚固段、自由段和紧固头三部分构成,紧固头由腰梁、钢垫板和锚具组成。锚索长度包括锚固段、自由段、张拉段三部分(见图5:预应力锚索大样图)。本工程锚索采用高强度低松弛的直径为15.2mm的钢绞线制作,钢绞线设计强度为1320MPa。锚索实际制作时,下料长度要比锚索设计值长1.2~1.5m作为张拉段。

6.4 施工方法以及施工要点

6.4.1 钻孔

钻机正常工作需不小于8m的操作面,而工作平台的高度在锚孔以下0.5m~1m左右。为使锚孔在施工过程中及成孔后其轴线的俯角和方位角符合设计要求,必须保证钻机就位的准确性和稳固性,因此,钻机安放平台要平整、坚实、不变形、不振动等,施工时设置扶正器以保证钻孔方向。

例如,本站东端外挂段的第一排锚索标高为496.2,锚孔俯角为23°,孔径150mm。钻孔施工前,土方开挖至标高495.2处,紧接着进行围护桩护壁混凝土破除、进行了桩间网喷支护,再用激光全站仪测定锚孔

位置,并以红油漆标识出来。

图6 罗盘测量倾斜角

钻机操作员首先通过罗盘(见图6)测量的方法调整入射角度,然后测量组再通过全站仪,测量钻杆三维坐标,计算其实际角度进行复核。如果角度误差在1°以内方为合格,然后开始钻进(见图7)。有效孔深:20cm<+△L≤50cm(△L=实际孔深-设计孔深)。

图7 锚孔钻进

6.4.2 锚索制作与安装

1)锚索的制作

本工程锚索采用高强度低松弛钢绞线制作,钢绞线设计强度为1320Kpa。锚盘采用适应φ15.2钢绞线的2-7孔锚具。承压板均采用300×300×20的Q235-B钢板,板中心于开φ80孔。

钢绞线应根据钻孔的实际长度加上1.5m进行下料,采取砂轮锯切断,同一孔的钢绞线必须等长,其两端用铁丝扎牢。清除钢绞线上的污物、锈斑。架线环按间距1m布置于内锚固段,在两个架线环之间,用紧箍环将钢绞线束拢,将钢绞线串进导向尖锥后将两者用铁丝绑成一体。钢绞线安装要求顺直、不扭不叉。本工程的预应力锚索属于临时工程,自由段需要涂抹防腐涂料并套PVC管。见图8:为已制作好的锚索束。

图8 制作完毕的锚索束

2)锚索的安放

由于钻孔过程中采取全程跟管,所以在清孔结束后,可以直接将制作好的锚索束塞入锚孔之中(见图9)。锚索入孔就位后,应检查锚索束是否扭曲、弯曲,并保证自由段波纹管不受损伤。

图9 外挂段第一排某锚孔下锚索

锚索安置完毕后才能逐节拔出套管(见图10)。

图10 拔套管

6.4.3 注浆

锚索安设完毕,对锚孔及钢绞线验收合格后进行注浆,注浆采用UHB-ZK压浆泵(见图11),水泥浆水灰比为0.45,水泥用42.5号普通硅酸盐水泥,加适量的早强剂,要求浆液固结体28天强度不小于30MPa。

图11 水泥浆制备

锚索采用两次注浆,自由段钢绞线涂抹润滑脂(黄油)后穿套管,注浆管用一根φ20的软塑料管,并固定在5束钢绞线中间。另埋设一根φ20塑料管至孔口300~500mm处作为排气管,以保证注浆过程中空气排出,锚固体才能密实。锚索安装完毕后,采用强制式搅拌桶配制水泥浆,水泥标号为42.5,水灰比0.45,用稠度仪稠度控制在12"~18"之间.利用挤压式水泥浆泵进行锚固段注浆。

注浆采用二次注浆工艺,第一次注浆采用反向注浆,注浆管随锚索一并放入到孔底,由底向外注浆,直至孔口冒出浓浆;待第一次注浆初凝后,一般是在注浆后8-12小时,要进行第二次高压注浆,注浆压力大于2.0Mpa,理论注浆量以每米1包水泥控制。在注浆材料固化前不得移动锚索。

针对中粗砂地层容易出现充满砂石空隙,造成注浆外流,采用浆液中掺减水剂或速凝剂及间歇式反复注浆的办法,控制浆液向周边流动,直至注浆压力达到设计压力为止。

6.4.4 腰梁及承压板安装

为了使预应力锚索能形成整体发挥作用,按设计要求,用2道[36b热轧普通槽钢对锚头进行锁定,增加锚拉桩的整体稳定性,抵抗基坑壁的过量变形。

腰梁槽钢安装前,设支承架,以便在施加预应力锁定前承载槽钢重量。支承架高度应与锚索位置相适应,然后在支承架上安放槽钢。腰梁采用焊接连接构成整体。腰梁安装好后,安装承压板,承压板均采用Q-235B,300×300×30mm钢板,并保证钢板的上表面与锚索垂直(见图12)。

图12 钢腰梁、锚具安装

6.4.5 张拉锚定

张拉锚定是预应力锚固的关键工序,主要包括张拉设备配套标定、设备组装、张拉和锁定荷载等内容。张拉设备采用预应力穿心式液压千斤顶,锚具采用OVM锚具,以高压油泵提供动力。

锚索的张拉宜采用单根预紧、整体张拉、一次锁定原则进行。即当内锚固段注浆强度达到强度的70%后,

强度的测定工作由现场取样试块同条件养护,试压达到强度标准后方可进行锚索张拉。张拉前应检查锚具等设备,并应对张拉千斤顶油泵进行标定。

张拉预加力按设计值张拉锁定,张拉程序按以下要求分级张拉:初应力0→30%→60%→100%(预加力),持荷2~5min→锚固。

锚索的张拉宜采用单根预紧、整体张拉、一次锁定原则进行。即当内锚固段注浆强度达到强度的70%后,强度的测定工作由现场取样试块同条件养护,试压达到强度标准后方可进行锚索张拉。张拉前应检查锚具等设备,并应对张拉千斤顶油泵进行标定。

张拉预加力按设计值张拉锁定,张拉程序按以下要求分级张拉:初应力0→30%→60%→100%(预加力),持荷2~5min→锚固。

张拉时,要均匀加压,使压力稳定上升,并测定锚索实际伸长值(见图13),与理论伸长值对比,如有异常,立即停止张拉,分析原因。在稳压期间,若出现压力表返回,应进行补偿张拉。

图13 锚索张拉

对锚索张拉的质量采用控制张拉力和伸长量双项指标控制,锚索拉力用钢弦式锚索应力计(见图14)测

量,对每一级张拉进行钢绞线伸长量的记录,保证理论伸长量和实际伸长量之差≤40mm。

图14 振弦式锚索拉力计安装

张拉锁定经验收合格后,将张拉段多余束体切除。对于钢纹线的松弛、地层土的徐变、伸长量超标等因素造成的预应力损失和质量问题,应校正千斤顶并重新张拉或在张拉后进行补张拉然后锚定。

7 结语

地铁明挖车站采用“土钉喷锚+混凝土灌注桩+预应力锚索+钢管内支撑”支护形式非常少见,成都地铁2号线东门大桥车站深基坑的这种支护体系复杂多样,非常典型。不管是从设计方面来说,还是从施工方面来说,都给我们在复杂环境下选择支护形式和组织施工都具有很强的借鉴作用。

参考文献:

[1]程良奎,李象范编著.岩土锚固土钉喷射混凝土—原理、设计与应用.中国建筑工业出版社.2008.12

锚索(套管成孔)施工方案

锚索施工工艺 § 1.1.1 施工工艺要求 1、本工程由于淤泥质砂层较厚,泥浆护壁成孔困难时,须加套管跟进成孔; 2、锚索采用nx7φ5钢绞线,钢绞线强度标准值为1860MPa。成孔直径为150mm; 3、一次注浆材料选用水灰比为~的纯水泥浆,并加入适量的早强剂、及膨胀剂,一次注浆压力为~;二次注浆材料选用水灰比为~的纯水泥浆,注浆压力为2~3MPa; 4、钢绞线锚固段架线环与紧箍环每隔1m间隔设置,紧箍环系16号铁丝绕制,不少于两圈,自由段每隔2m设置一道架线环,以保证钢绞线顺直; 5、待注浆体及压顶梁砼达到设计强度的70%后方可进行锚索张拉; 6、锚索锁定前先张拉至设计抗拔力的倍,保持15min,然后卸荷至零,再重新张拉至锁定荷载预应力进行锁定作业。锚索张拉荷载分级及观测时间应遵守规范进行。 7、锚索施工过程中为尽可能减少成孔对地层产生的影响,应尽量进行跳打。§ 1.1.2 施工工艺流程

锚索套管施工工艺流程图

§ 1.1.3 施工方法及技术措施 1、场地平整 土方开挖至锚索标高以上30~50cm时留设施工平台,施工平台宽6~8米,平台平整干爽。然后复核每排锚索的水平标高,按设计的锚索水平间距要求拉通线进行布孔,并用木桩或钢筋作为标记并编号。锚索孔位置允许偏差±50mm。锚索定位后向监理及业主申请复验。 2、钻机就位 根据锚索孔位移机就位,用木枋或钢板将钻机垫平稳,保证施钻过程中钻机不会有较大的晃动而影响成孔质量。对淤泥质场地应换填或铺设钢板保证钻机在施钻过程中不发生移位。 3、套管安装 安装前先检查潜孔锤及套管直径,要求直径偏差小于10mm。然后先安装第一节钻杆,装好后安装首节带牙套管,然后将带牙套管及钻头对准所要施工的锚索孔位。最后用罗盘仪按设计图纸的要求调整好钻机角度,角度偏差±1°。 4、成孔 成孔的质量直接影响到锚索的锚固效果及有效时间,本工程采用DPJ-300型履带式潜孔钻机,钻孔直径为150mm,钻孔位偏差不得大于±50mm,钻机就位后,按35°的设计角度以φ150mm孔径钻至超过设计深度~0.3m,钻孔深度达

预应力锚杆锚索施工方案

高速公路第5合同段 (K148+400~148+600)预应力锚固案方施工技术

目录 一、工程概况 二、编织依据 三、施工准备 1、施工组织机构 2、施工人员安排 3、机械设备、试验检测及测量仪器配置 4、施工临时场地建设 5、测量准备工作 6、施工详图 7、原材料准备 8、试验 9、技术交底 四、施工计划. 1、施工总体安排

2、平面布置图 3、锚体图 五、施工阶段 1、施工程序 2、施工工艺 3、施工方法 六、工序报验 七、质量控制措施 八、安全生产保证措施 九、环保措施 十、文明施工 十一、附录(检验申请表) 高速公路第5合同段特殊路基边坡 K148+400~K148+600段锚固施工技术方案 一、工程概况 1、设计情况 148+400~148+600特殊路基锚固边坡段,设四到六级边坡、每级坡高10m。二、 三、四级边坡为锚杆加固,五、六级边坡为锚索加固。每级边坡坡率均设为1∶ 0.75。待每级边坡开挖至设计坡率后,锚杆加固采用Φ32高强度精轧螺纹钢筋预应力锚杆框架护坡,每孔施加预应力为250KN。锚索加固采用直径Φj15.24无粘结钢绞线,强度为1860Mpa(270级),每孔施加预应力1200KN。砼框架内采用客土植被护坡。 2、主要工程数量见表1〈主要工程数量表〉

表1主要工程数量表 j15.2无3锚Ⅰ级钢Ⅱ级钢C2M7.浆片() ) 凝k(kg(结钢绞线k k 预应力锚 预应力锚杆 3、工程地质情况 本挖方边坡主要分布在三叠系嘉陵江组薄层夹中厚层灰岩中,岩层倾角方向与路基边坡方向相同,岩层倾向与坡面倾向小角度相交(约15度),岩层倾角(约36度)小于边坡角,边坡属于硬岩中倾顺向坡。边坡表层为强风化破碎层。岩层间存在较软弱的岩层面或夹层,在路基切挖坡角后,在降雨(尤其是在长时间连续降雨)的作用下,雨水的大量渗入,会大大降低软弱夹层岩土的力学强度,使边坡岩体沿软弱夹层面顺层向下滑动,导致边坡失稳。 在K148+380~K148+440段有部分风化严重的泥质灰岩出露,并沿路线前进方向深入到K148+500处。该类岩石其岩性软弱,岩质松软,耐风化及耐水能力差,岩体风化层厚度较大,力学强度低。在自然状态下易成散体状,自然边坡坡体稳定性较差,遇水易软化或泥化而构成软弱面,在路基开挖(边坡形态的改变、工程荷载、振动等)后导致路堑边坡失稳。. 二、编制依据 1、 (K148+400~K1148+600)边坡设计图,边坡锚固防护设计图; 2、《监理实施细则》; 3、施工组织设计; 4、技术规范质评标准:《公路工程质量检验评定标准》(JTG F80/1-2004);《混凝土结构设计规范》(GBJ10-89);《混凝土结构工程施工及验收规范》 (GB50204-92);《土层锚杆设计与施工规范》(CECS22:90);《水利水电工程预应力锚索施工技术规范》(DL/T5083-2004);《锚杆喷射混凝土支护技术规范》(GB50086-2001);《预应力混凝土用钢绞线》GB5224-85。 三、施工准备 1、施工组织机构 结合本段边坡工点地质条件复杂的特点,为了优质、高效地完成预应力锚固边坡的施工任务,按照精干管理层,强化作业层的原则,成立5标三工区,负责完成该段边坡锚固施工任务。工区主要职能是按照合同规定及业主、监理工程师的指示,按计划进行有序地组织边坡施工。横向负责对外与业主、监理工程师及地方政府保持联系,建立良好的关系,保证创造一个良好的外部施工条件,服务于生产;纵向对生产各小组成员进行有效和及时的调度和协调,以确保对工程进度、工程质量和工程成本进行有效地控制。 三工区组织机构见图1〈组织机构图〉。 2、施工人员安排 根据施工现场具体情况,我工区组织专业施工班组进行施工,施工班组和施工人员安排详见表2〈施工投入人员一览表〉。 3、机械设备、试验检测及测量仪器配置情况 主要机械设备已全部到场,机械设备已全面检修与保养,可正式投入生产。

锚索施工技术方案

基坑索锚索及腰梁施工方案 1.项目概况本项目分为A、B、C、D四个区,本项目的地块总用地面积约15.83万平方米,其中规划用地面积约12.18万平方米,总建筑面积约100.5万平方米,其中地上建筑面积80万平方米,二层地下室建筑面积20.5万平方米。 (锚索制作图见设计)https://www.360docs.net/doc/a86493668.html,/view/8a0ff0edaeaad1f346933fda.html 腰梁共设置三道,三道腰梁的竖向间距为2300~2500mm,槽钢和各构件钢板均采用A3钢,制作各构件的钢板厚度均为20mm,钢板槽钢焊接满足规。 2.施工难点 本工程工期紧。四道锚索近35000m,三道腰梁总长大约1500m,喷射砼约10000㎡,业主规定工期只有40天左右。施工期间正是长沙雨季,雷雨天气频繁,同时还要面临长沙高温天气的考验。3.选用机械设备 根据本工程的特点和工期要求,选用钢筋切断机3台、锚索钻机12台、压力注浆机8台、压力喷浆机6台、液压张拉设备4套、电焊机8台、挖掘机2台。各种机械设备根据施工现场的进度需要过程中及时增加。 4、施工准备 ( 1)锚索施工区段的支护桩、旋喷止水桩完成,并且已经达到

一定强度。 (2)用挖掘机将操作面开挖平整出来。 (3)锚索材料、注浆管、水泥等材料准备就位。 (4)机械设备及劳动力准备到位。 二﹑锚索腰梁及挂网喷砼施工艺 (一)﹑锚索施工工艺 本工程的锚索是通过外端固定于坡面,另一端锚固在滑动面以内的稳定岩体中。穿过边坡滑动面的预应力锚索(钢绞线),直接在滑面上产生抗滑阻力,增大抗滑摩擦阻力,使结构面处于压紧状态,以提高边坡岩体的整体性,从而从根本上改善岩体的力学性能,有效地控制岩体的位移,促使其稳定,达到整治顺层、滑坡及危岩、危石的目的。 1.施工工艺及流程图如下: 2.钻孔。钻孔是锚索施工中控制工期的关键工序。为确保 钻孔效率和保证钻孔质量,采用全套管锚索钻机,钻头直径为150mm 。钻机钻孔时,按锚索设计长度将钻孔所需钻杆摆放整齐,钻杆用完,孔深也恰好到位。

锚索施工方案 (1)

目录 目录 (1) 一、编制依据 (2) 二、编制原则 (2) 三、工程概况 (2) 四、预应力锚索工程施工方案 (4) 预应力锚索施工流程 (4) 预应力锚索施工顺序 (5) 五、施工计划 (8) 工期安排原则 (8) 计划开工、完工日期 (8) 六、资源配置 (9) 劳动力配置 (9) 主要机械配置 (9) 材料供应 (9) 七、质量、安全、环境保护措施 (9) 质量保证措施 (9) 安全保证措施 (11) (11) (12) 环境保证措施 (14) (14) (14) (14) (15) (15) (15) (15) 一、编制依据 1、本标段地质详勘报告; 2、本场地管线调查资料; 3、建筑地基基础设计规范; 4、广州地区建筑基坑支护技术规定(GJB02-98); 5、建筑基坑支护技术规程(DBJ/T15-20-97); 6、建筑基坑支护技术规程(JGJ120-99); 7、建筑桩基技术规范(JBJ94-94); 8、混凝土结构工程施工质量验收规范(GB50204-2002); 9、岩土锚杆(索)技术规程(CECS22:2005)

10、本工程基坑设计图纸; 11、我单位现有的管理、技术水平; 12、设备及其他资源投入情况; 13、以往类似工程的施工经验; 14、业主的相关管理文件及本单位的投标承诺。 二、编制原则 1、确保施工方案安全可靠,针对性强、操作性强,设备选型合理; 2、坚持技术先进性,科学合理性,经济适用性与实事求是相结合; 3、确保工期、安全、质量等指标,确保全面履约。 三、工程概况: 盾构始发井(兼轨排井)锚索平面及立面图分别如图1、图2、图3所示。 四、预应力锚索工程施工方案 预应力锚索概况及施工流程 本工程锚索按永久锚索设计,共计11716m ,第一~第五道水平间距, 第六、第七道水平间距为和,竖向间距~,盾构始发井段沿基坑深度方向设置5道锚索,轨排井段沿深度方向设置7道锚索,除东山口站方向第五道倾角为15o 外,其余倾角均为20o (北面一列锚索倾角为22o )。锚索采用φ的钢绞线,锚具采用OVM15锚具,锚索成孔直径150mm (第一道锚索部分调整为200mm )。 轨排井段布置如下:第一道锚索设计为3根Φ钢绞线,P=340KN ,Py=200KN ,L=,Lf=, La =;第二道锚索设计为4根Φ钢绞线,P=530KN ,Py=300KN ,L= ,Lf=,La = ;第三道锚索设计为4根Φ钢绞线,P=650KN ,Py=400KN ,L=,Lf=,La =;第四道锚索设计为4根Φ钢绞线,P=640KN ,Py=400KN ,L=,Lf=,La =;第五道锚索设计为4根Φ钢绞线,P=620KN , Py=400KN ,L=,Lf=,La =;第六道锚索设计为4根Φ钢绞线,P=520KN ,Py=350KN ,L=,Lf=,La=;第七道锚索设计为4根Φ钢绞线,P=460KN ,Py=350KN ,L=,Lf=,La =;其中东湖站方向第一~第五道为13列,第六、第七道为7列。轨排井段左侧第一~第五道为 图2 第六~七道锚索及内支撑平面图 图3 盾构始发井(兼轨排井)锚索立面图 图1 盾构始发井(兼轨排井)第一~五道锚索平面图

锚索施工工艺设计

2.1 锚索的工作原理 锚索就是高挖方路段为了减少对原状土的挖方数量,保护生态环境而设计的一种特殊挡防结构。主要解决破裂面至土体临空面之间破裂土体的稳定。其作用原理是:依靠对锚索的张拉预应力,用锚具锁定在桩身上,锚索产生的反作用力通过桩身传递到破裂土体,使破裂土体在外力作用下稳定。锚索预应力一头靠锚固段承受,另一头靠桩身承受,中间穿过破裂土体。 2.2 预应力锚索在高边坡防护中有如下作用机理 (1)葫芦串机理:通过锚索进入山体,将破碎风化的孤立岩体串集在一起,象葫芦串一样形成整体,达到稳定。 (2)骨架机理:锚索进入山体与端头连接在一起,在整个边坡内外形成了钢骨架结构。 (3)组合机理:锚索孔内注入砂浆,将周边围岩组合在一起,形成一体。 3 锚索施工工艺及施工方法 第五章 施工方法及工艺要求 5.1操作平台的回填 因挡墙较高、 钻机体积较大所以采用渣土回填碾压长堤型操作平 台。可利用现场的挖方渣土回填,完工后清运至填方区。 5.2

锚索的施工 5.2.1 施工流程 施工准备→钻机就位→钻钻杆→校正孔位→调整角度→打开空压机→钻孔(接钻杆)→钻到设计深度→冲洗→制作、安装锚索→一次注浆→二次高压注浆→养护→安装锚索围檩→焊锚具→张拉锚索→锚头锁定→割除锚头多余钢铰线,对锚头进行保护。 5.2.2施工要点 1、材料 (1)预应力锚索使用的钢绞线符合《SL46-94》的规定,运输中防止磨损,其性能参数必须符合《预应力混凝土用钢绞线》的规定,同时对运达工地的每批钢绞线作100%的外观检查和10%的抽样拉力试验,抽样结果和出厂产品质量证书、标志、说明书等报监理工程师批准后使用。 (2)预应力锚索的锚具必须有厂家产品合格证书,并且应符合 国家关于钢材质量的规定。 (3)采用425R普通硅酸盐水泥,水泥质量应符合《硅酸盐水泥、普通硅酸盐水泥》(GB175-1999)的规定。过期、变质水泥不得使用。 (4)水、砂的质量必须满足《水工混凝土施工规范》(SDJ207-82 )有关条款的规定。 2、钻孔 在操作平台上铺设木楞及模板,作为钻机的安装平台,模板与脚

锚索施工工艺

锚索施工工艺 锚索是通过外端固定于坡面,另一端锚固在滑动面以的稳定岩体中穿过边坡滑动面的预应力钢绞线,直接在滑面上产生抗滑阻力,增大抗滑摩擦阻力,使结构面处于压紧状态,以提高边坡岩体的整体性,从而从根本上改善岩体的力学性能,有效地控制岩体的位移,促使其稳定,达到整治顺层、滑坡及危岩、危石的目的。 一、施工工艺: 1.钻孔 钻孔是锚索施工中控制工期的关键工序。为确保钻孔效率和保证钻孔质量,采用潜孔冲击式钻机。钻机钻井时,按锚索设计长度将钻孔所需钻杆摆放整齐,钻杆用完,孔深也恰好到位。钻孔深度要超出锚索设计长度0.5m左右。 钻孔结束,逐根拔出钻杆和钻具,将冲击器清洗好备用。用一根聚乙烯管复核孔深,并以高压风吹孔,待孔粉尘吹干净,且孔深不少于锚索设计长度时,拔出聚乙烯管,

塞好孔口。 两种特殊情况的处理: 渗水的处理。在钻孔过程中或钻孔结束后吹孔时,从孔中吹出的都是一些小石粒和灰色或黄色团粒而无粉尘,说明孔有渗水,岩粉多贴附于孔壁,这时,若孔深已够,则注入清水,以高压风吹净,直至吹出清水;若孔深不够,虽冲击器工作,仍有进尺,也必须立即停钻,拔出钻具,洗孔后再继续钻进,如此循环,直至结束。有时孔渗水量大,有积水,吹出的是泥浆和碎石,这种情况岩粉不会糊住孔壁,只要冲击器工作,就可继续钻。如果渗水量太大,以至淹没了冲击器,冲击器会自动停止工作,应拔出钻具进行压力注浆。 塌孔、卡钻的处理。当钻孔穿越强风化岩层或岩体破碎带时,往往发生塌孔。塌孔的主要标志是从孔中吹出黄色岩粉,夹杂一些原状的(非钻头碎的、非新鲜的、无光泽的)石块,这时,不管钻进深度如何,都要立即停止钻进,拔出钻具,进行固壁注浆,注浆压力采用0.4 MPa,浆液为水泥砂浆和水玻璃的混合液,24小时后重新钻孔。雨季,常常顺岩体破碎带向孔渗流泥浆,固壁注浆前,必须用水和风把泥浆洗出(塌入钻孔的石块不必清除),否则,不仅固壁注浆效果差,还容易造成假象。 2.锚索制作

地铁车站锚索施工方案

目录 1 编制依据............................................................... - 1 - 2 工程概况............................................................... - 1 - 2.1设计概况 (1) 2.2工程地质与水文地质 (2) 2.2.1工程地质......................................................... - 2 - 2.2.2水文地质......................................................... - 2 - 3 施工准备............................................................... - 2 - 3.1施工场地准备 (2) 3.2技术准备 (2) 3.3施工组织 (3) 3.4施工机械准备 (3) 3.5物资供应准备 (4) 4 施工安排............................................................... - 4 - 4.1工期计划 (4) 4.2工期保证措施 (4) 4.2.1材料供应保证措施................................................. - 4 - 4.2.2设备供应保证措施................................................. - 4 - 4.2.3技术保证措施..................................................... - 5 - 5 锚索施工............................................................... - 5 - 5.1可回收锚索概述 (5) 5.2施工方法与要求 (5) 5.2.1钻孔成孔......................................................... - 6 - 5.2.2 锚索制作与安装................................................... - 7 - 5.2.3 注浆............................................................. - 9 - 5.2.4围檩施工........................................................ - 10 - 5.2.5 张拉锁定........................................................ - 11 - 5.2.6锚索回收........................................................ - 12 - 6 管线保护措施.......................................................... - 12 - 6.1施工前管线调查 (12) 6.2管线保护措施 (13) 7质量保证措施........................................................... - 13 - 7.1质量目标 (13) 7.3质量保证措施 (14)

预应力锚索加固工程施工方案

K****~K0+***段预应力锚索加固工程施工方案 一、概述 *******************************范围基础上增加了若干部位的施工支护。支护手段主要包括预应力锚索、喷砼、锚杆、砼柱等,各施工部位的具体支护方式、主要部位的合同工程量及实际完成工程量见附件一。 工程进度执行情况(施工大事记)见附件二。 二、施工依据 1、合同文件 2、往来文函 3、现行施工规范和标准 4、地方法规和标准 三、施工布置 1、施工道路 利用现场已形成的道路。 2、施工用风 采用20m3移动式柴油空压机,布置在道路旁供风。 3、施工用水、电 施工用水利用双排座装上2个2m3水箱运至施工部位附近,然后利用50m扬程水泵引至施工部位,并在临近道路相应布置备用水箱; 施工用电采用自备发电机架设输电线路接引施工部位。 4、材料加工、堆放及临建设施 临建设施参见相关审批的施工措施,锚索编制在施工排架上进行。 5、灌浆系统及砼拌合系统 灌浆系统及混凝土拌和系统布置道路旁边,人工提至施工排架上。

四、施工主材、机具设备 4.1施工主材及机具 4.1.1钢绞线 采用符合设计标准φ15.24mm有粘结钢绞线。 4.1.2水泥 采用普硅P.O.42.5水泥。 4.1.3锚具 采用广西柳州欧维姆建筑机械有限公司生产的OVM15系列锚具。 4.2主要施工机具、设备投入表 序号设备名称规格型号单位数量备注 1钻机MZ165台套160m钻杆2 柴油空压机 20m3/min台1 33m3/min台1 4张拉千斤顶 YCW250台2 YDC240Q台1 5高压油泵ZB4-500台2 6灌浆机2SNS-1台1含浆液搅拌机7砼拌合机0.2m3台2 8 8电焊机 立式台1 便携式台2 9振捣器?50台3 10车 辆 5平柴台1其它车辆台1 11 发电机40KW台1 128KW台1 13潜水泵扬程50m台3 14切割机台2 15角磨机台4 16打捞器?165孔径套1 17对讲机部6 18手风钻Y-40台套2 19台式钻机台1

预应力锚索施工工艺措施

预应力锚索施工工艺措施 预应力锚索支护一般分为自由式单孔多锚头防腐型预应力锚索(对穿预应力锚索)和普通预应力锚索两种。预应力锚索的施工一般分为施工准备、钻孔、锚索制作、锚索安装、锚墩浇筑(对穿锚索施工)、注浆、锚墩浇筑、张拉锁定和封锚等几个步骤,具体工艺措施如下: 一、施工准备 锚索施工前应完成材料、现场试验、施工设备、测量放线及其它等一系列的施工准备。 1、材料 预应力锚索一般使用的钢绞线采用高强度(1860MPa)低松弛无粘结钢绞线,其性能指标应符合GB/T5224-1995和ASTMA416-98的规定。钢绞线在运输中应防止磨损。预应力锚索所使用的未镀锌的钢绞线应采取防腐措施。所有上述材料均应有出厂合格证书和标牌,经监理人检查合格后方可使用。每批预应力钢绞线均应有材质成份的质量证明书,承包人应按监理人的指示按GB/T5224-1995的规定,对预应力钢绞线抽样进行力学性能试验,并应将试验成果报送监理人。运输和贮存:在运输中应防止磨损和免受雨淋、湿气或腐蚀性介质的侵蚀。存贮期间应架空堆放,如储存时间过长,对未镀锌的钢绞线应使用乳化防锈剂喷涂表面。自由式单孔多锚头防腐型预应力锚头静载锚固性能指标为:极限拉应力≥262KN时,其静载锚固性能应符合GB/T14370-2000的规定(即锚固系数ha≥0.95,总应变εapv≥2.8%),并应具备良好的防腐性能。 水泥采用标号一般不低于P.O42.5的普通硅酸盐水泥;水泥砂浆标号满足设计图纸要求;砂采用最大粒径不大于2.5mm的中细砂;速凝剂和其它外加剂符合施工图纸要求,并不得含有对锚索产生腐蚀作用的成分。 2、现场试验 锚索施工应按《规范》SL46-94、DL/T5083-2004要求先进行现场试验,检验施工工艺和测试张拉锁定后应力衰变规律,提拱超张拉或补偿张拉依据,以便指导正常施工。通过室内试验,结合设计图纸要求,筛选2~3种砂浆、外锚墩混凝土配合比并编写试验大纲报批进行生产性试验;对张拉机具、设备和仪表进行配套率定,报监理人审批;根据监理人指令,选择有代表性的锚索进行现场生产性试验;整理试验报告报送监理、设计单位审批。 3、施工设备 施工前42天,向监理人提交一份包含锚固张拉的机具、设备和仪器配置以及锚固程序和方法的施工工艺报告,报送监理人审批。张拉设备、机具和仪表进行成套标定,报监理人审批,并按标定结果配套进行使用。

预应力锚索施工方法试验

预应力锚索施工方法试验 预应力锚索施工方法与试验 一、预应力锚杆施工: 预应力锚杆与土方开挖相互配合好,挖土标高至锚索以下500mm时,进行锚索施工,锚索锚固体强度达设计要求15MPa即锚索注浆养护5~7天时方可张拉锚固,再进行下部土方开挖。 1、定位成孔: 基坑开挖至要求标高后,进行锚索定位,按设计位置及标高严格放点,并做好标记,孔位偏差小于50mm,钻孔倾角偏差允许±2.0,钻机就位后,按设计要求的倾角对中进行成孔,成孔直径Ф140。 由于本工程地质条件差,采用锚索钻机进行套管跟进、高压水和冲击钻具切削冲洗土体钻孔,以防止成孔时出现塌孔、缩径现象,影响成孔质量。套管外径Ф133,钻孔时,尽可能使各孔口横向成一线,要求偏差±5㎝。成孔完成后,在孔内注入清水将孔内泥浆置换出孔口,完成清孔作业。 为保证文明施工及不影响土方开挖,沿基坑底边挖设排水沟槽,将泥浆引至集水坑集中抽走。 2、一次注浆: 水泥采用普P.O32.5R,水灰比0.5,清孔完后用BW-150高压泵进行一次注浆,将一次注浆管插至孔底,以慢速连续速度注浆,直至钻孔内的水及杂质被置换出孔口,孔口流出水泥浓浆为止。待杆体置放后,随即将一次注浆管拔出。 3、杆体制作及置放: 杆体制作时应比设计长出1.0~1.5m,以满足锁定需要,定位骨架间距1.5~2.0m,钢绞线用铁丝均匀捆于骨架周围,二次注浆管固定于定位骨架中心,在锚索自由段,钢绞线上满涂黄油,以塑料套管包裹,以保证钢绞线与水泥浆体脱开。在制作好的杆体及二次注浆管缓慢施入锚索孔内。 4、二次高压注浆: 一次注浆完成2.0~3.0h后,用止浆袋将孔口封堵密实,进行二次高压注浆,注浆压力保持2.5Mpa,一次和二次注浆水泥用量总和不得低于50㎏/m。 5、锚索验收及张拉锁定 本工程锚索验收根据规范验收数量不小于锚索总数的5%。预埋件、腰梁安装完毕和锚固体强度达14Mpa时,对锚杆进行张拉、锁定。检验属于对锚索施工后实际抗拔能力的检验,而非破坏性试验,故检验方法按照《xx地区建筑深基坑支护技术规范》(SJG05-96)以及《土层锚杆设计与施工规范》(CECS22:90)检验方法,本工程按临时性工程要求进行检验。最大检验加荷为锚索设计轴向拉力的1.2倍,其初始荷载取锚索设计轴向接力的0.1倍,然后按0.25倍,0.50倍,0.75倍,1.00倍,1.20倍分级加载,各级观测时间除最大级别1.2倍15分钟外,其余各级均为5分钟。每次测得三次锚头位移量。检验设备采用YCW-100穿心千斤顶电动油泵加载,通过油泵上油表控制加荷吨位,通过量测千斤顶活塞出露量与整体下沉量来求得锚杆拔出量。锚索验收合格后可对每根锚索逐根予以锁定,锁定荷载20KN,锚索张位采用1000KN级穿心千斤顶,张拉设备在锚索验收前须经计量部门进行标定,以标定参数作为现场张拉的依据。 二、锚索试验 在锚索养护7天后进行拉拔力检验。由于养护期未达到14天,养护7天的强度仅达到设计值的70%,故检验时按70%的设计承载力乘以1.2倍进行检验,检验方法参考《xx地

锚索施工方案

锚索施工方案

目录 一、编制依据 (1) 二、工程概况 (1) 2.1 预应力锚索情况 (1) 2.2 基坑平面布置图 (2) 2.3 各区段剖面图 (2) 2.4 地质土层情况 (4) 三、施工难点 (8) 3.1 统筹安排,紧密协调 (8) 3.2 持续降水 (8) 3.3保证钻孔质量 (8) 四、人工、材料、机械配置 (8) 4.1锚索人员配备表 (8) 4.2锚索施工配备主要机械设备表 (9) 4.3主要材料 (9) 4.4主要测量、试验、质检、监测仪器设备表 (9) 4.5施工计划 (10) 五锚索施工工艺 (10) 5.1施工准备 (10) 5.2 工艺性试验 (11) 5.3张拉要求 (11) 5.4工艺及流程 (11)

5.5锚索成孔 (11) 5.6 地下水影响的处理 (13) 5.7 锚索制作 (13) 5.8锚索安装 (14) 5.9锚索一次注浆 (14) 5.10锚索二次注浆 (14) 5.11锚索腰梁 (14) 5.12锚索的张拉 (15) 5.13封孔注浆 (15) 5.14外部保护 (15) 5.15锚索施工技术要求 (15) 六、安全措施保证 (17) 6.1机械设备安全措施 (17) 6.2施工安全预防措施 (17) 七、环境保护文明施工 (18)

一、编制依据 二、工程概况 2.1 预应力锚索情况 本项目共分为6个剖切断面,锚索工作面长1093米,间距2.3米2.5米,沿高度方向设置为三至四层,总工程量约为50327延长米。其中:1-1剖面,工作面长137.9米,锚索设置为四层,间距2.3米,锚索240根,6360延长米;2-2剖面,工作面长421.4米,锚索设置为三层,间距2.3米,锚索549根,14823延长米;3-3剖面,作面长128.3米,锚索设置为四层,间距2.0米,锚索256根,6876延长米;4-4剖面,工作面长131.6米,锚索设置为四层,间距2.0米,锚索264根,7194延长米;5-5剖面,工作面长158.6米,锚索设置为四层,间距2.0米,锚索320根,8720延长米;6-6剖面,工作面长115.2米,锚索设置为四层,间距2.0米,锚索236根,6254延长米。

预应力锚索施工工艺设计

预应力锚索施工工艺 一、适用围 新建铁路至客运专线四标段(XXTJIV)第六单元顺层路堑、高边坡的加固。 二、施工准备 1、清理坡面。 2、准备所需的原材料,并做好检测试验。 三、施工工艺 工艺流程见图2。 1、钻孔 钻孔是锚索施工中控制工期的关键工序。为提高钻孔效率和保证钻孔质量,一般采用潜孔冲击式钻机。该钻机所配钻杆是统一规格,按锚索设计长度将钻孔所需钻杆摆放整齐,钻杆用完,孔深也恰好到位。由于钻杆长度有±5mm的误差,要求钻孔深度超出锚索设计长度O.5m左右。 钻孔结束,逐根拔出钻杆和钻具,将冲击器清洗好备用。用一根聚乙烯管复核孔深,并以高压风吹孔,待孔粉尘吹干净,且孔深不少于锚索设计长度时,拔出聚乙烯管,以织物或水泥袋纸塞好孔口待用。 两种特殊情况的处理:

渗水的处理。在钻孔过程中或钻孔结束后吹孔时,从孔中吹出的都是一些小石粒和灰色或黄色团粒而无粉尘,说明孔有渗水,岩粉多贴附于孔壁,这时,若孔深已够,则注入清水,以高压风吹净,直至吹出清水;若孔深不够,虽冲击器工作,仍有进尺,也必须立即停钻,拔出钻具,洗孔后再继续钻进,如此循环,直至结束。有时孔渗水量大,有积水,吹出的是泥浆和碎石,这种情况岩粉不会糊住孔壁,只要冲击器工作,就可继续钻。如果渗水量太大,以至淹没了冲击器,冲击器会自动停止工作,应拔出钻具进行压力注浆。 塌孔、卡钻的处理。当钻孔穿越强风化岩层或岩体破碎带时,往往发生塌孔。塌孔的主要标志是从孔中吹出黄色岩粉,夹杂一些原状的(非钻头击碎的、非新鲜的、无光泽的)石块,这时,不管钻进深度如何,都要立即停止钻进,拔出钻具,进行固壁注浆,注浆压力采用0.4MPa,浆液为水泥砂浆和水玻璃的混合液,24小时后重新钻孔。雨季,常常顺岩体破碎带向孔渗流泥浆,固壁注浆前,必须用水和风把泥浆洗出(塌入钻孔的石块不必清除),否则,不仅固壁注浆效果差,还容易造成假象。 2.锚索制作 锚索可在钻孔的同时于现场进行编制,锚固段采用波纹形状,拉段采用直线形状。锚索长度是从钻孔孔口算起,因此,钢绞线下料长度应为锚索设计长度、锚头高度、千斤顶长度、工具锚和工作锚的厚度以及拉操作余量的总和。正常情况下,钢绞线截断余量取50mm。将截好的钢绞线平顺地放在作业台架上,量出锚固段和锚索设计长度,分别作出标记;在锚固段的围穿对中隔离支架,间距60~100cm,两对中支架之间扎紧固环一道;

锚索施工技术要求

预应力锚索施工技术要求 1、说明 1.1 本技术要求适用于滑坡支护系统施工图纸所示各种类型的需要预应力支护的边坡,招标文件中有关内容与本技术要求不一致时,以本技术要求为准。 1.2 在预应力锚固工程开工前,承包商必须按招标文件或试验任务书要求的规定及时进行相应项目的生产性实验、基本试验、验收试验并将试验成果报监理人和设计单位,经监理人批准后,方可用于大规模施工。 1.3 在预应力锚索施工前,承包商应全面掌握本工程边坡地质资料,并根据设计图纸、招标文件和技术要求,制定切实可行的施工组织设计,施工组织设计一般应包括一下内容: ●施工现场布置图 ●锚索结构图 ●主要施工方法及施工工艺流程图 ●工程进度计划表 ●施工技术人员配置情况 ●主要施工机械设备及材料表 ●质量、工期及安全保证措施 以上各项必须报监理人批准后,才可实施。 1.4 在预应力锚索施工前,承包商应按设计图纸的要求进行施工测量、放点,并经监理人批准后方可实施。 1.5 应力锚索施工中,如果发现边坡的地质条件与地质资料不符时,设计可据实际地质资料及时修改支护参数。1.6 本技术要求应结合相应的预应力锚索结构图、布置图、设计通知单和招标文件等设计文件使用。 1.7 本技术要求由设计单位负责解释,在实施过程中将根据情况作进一步补充修改。 2、规程规范 本施工技术要求未作具体规定的,施工时可按下列规程、规范(不限于)和招标文件的有关规定执行,包括: ●《招标文件—技术条款—开挖技术要求》 ●《锚杆喷射混凝土支护技术规范》GB50086—2001 ●《水工预应力锚固设计规范》SL212—98 ●《水工预应力锚固施工规范》SL46—94 ●《预应力混凝土用钢绞线》GB/T5224—1995 ●《预应力筋锚具、夹具和连接器》GB/T14370—2001 ●《混凝土质量控制标准》GB50164—92 ●《硅酸盐水泥、普通硅酸盐水泥》GB175—1999 ●《混凝土强度检验评定标准》GBJ107—87 ●《建筑边坡工程技术规范》GB50330—2002 3、材料3.1 钢绞线 3.1.1本工程采用的预应力锚索应选用高强度、低松弛钢无粘结绞线,其性能应符合GB5224,并符合美国标准(ASTMA416—87a)、其公称直径d=15.24mm(7-φ5)、强度等级为1860MPa;钢绞线的基本材料应是碳素钢。钢绞线技术指标见下表。 钢绞线技术指标表 注:①松弛率≦3.5为最小荷载的80% ②机械性能的试验方法执行ASTMA37—92 ,低松弛试验按E328 方法进行; ③屈服强度——在因外力而伸长1% 的情况下测出的最低屈服强度; ④延伸率——标距为610mm时,在荷载的作用下,钢绞线的总延伸率; ⑤松弛性能——低松弛钢绞线在规定的条件下,试验不少于1000h。 3.1.2钢绞线的中心丝直径都必须大于外层钢丝的直径,偏差值最小为0.1016mm。 3.1.3 公称直径Φ15.24mm低松弛钢绞线按边丝凸缘测得的直径与公称直径的偏差应满足+0.5mm~ -0.15mm。3.1.4 对运达工地的每批钢绞线作100%的外观检查,在不同的卷号中抽取样品,在国家认可的实验室进行抽样拉力试验。抽样结果和出厂产品质量证书、标志、说明书等报监理工程师批准后使用。 3.1.5 钢绞线及锚具的型号应以详图为准。 3.2 套管 锚索体套管主要有以下功能: ●用于锚索体防腐,阻止地层中的有害气体和地下水通过 浆体向锚索体渗透。 ●无粘结钢绞线PE套管有隔离效果,将锚索体与周围注 浆体隔离,使锚索体能自由伸缩,达到应力和应变全长均匀分布的目的。 ●钢质导向套管的作用是确保外锚段联结索体与反力结 构的安装精度,以及该段在结构上不被外力损伤。 无粘结PE套管宜选用聚乙烯塑料管,并具有检测报告和出厂合格证。选用的套管应具有足够的厚度、韧性和抗老化性能,能承受施工的外力冲击和摩擦损伤,并能在锚索有 SIV-1-2

【精品文档】预应力锚索施工方案

【专业知识】预应力锚索施工方案 【学员问题】预应力锚索施工方案? 【解答】(1)施工工艺流程 施工工艺流程 (2)主要工序施工方法 ①钻机就位、成孔 锚索在基坑开挖至锚索设计标高下0.5m后开始施工。采用套管护壁成孔工艺,锚孔直径为φ150mm及200mm,钻机就位后用量角器量立轴倾角,锚索倾角 20°,安装牢固。当锚索有可能碰到地下管线或隐蔽物时,锚孔倾角须做适当调整。 锚索钻孔不得扰动周围土层;钻孔前,根据设计要求和地层条件,定出孔位、做出标记。 锚索水平、垂直方向的孔距误差不应大于100mm.钻头直径不应小于设计钻孔直径3mm;钻孔轴线的偏斜率不应大于锚杆长度的2%. 锚索钻孔深度不应小于设计长度,也不宜大于设计长度500mm;向孔内安放锚索前,应将孔内岩粉和土屑清洗干净。 ②锚索制作、存储 锚筋采用抗拉强度为1860MPa的钢绞线。压浆管用ф25塑料管,内端距孔底 0.2m,出浆口及端头封闭。

锚索自由段涂黄油并套PVC管,锚孔外预留1.5m张拉段,每隔2m设置一道架线环,保证锚索顺直、居中。 锚索锚固段架线环与紧箍环每隔0.7m设置,前端为保证锚索顺利下锚加设导向帽,导向帽用ф8钢筋弯折焊接并用8号铁丝绕制。 锚索杆体的制作、存储在施工现场的专门作业棚内进行;在锚固段长度范围,杆体上不得有可能影响与注浆体有效粘结和影响锚杆使用寿命的有害物质,并应确保满足设计要求的注浆体厚度。 钢绞线应采用切割机切断;杆体制作时应按设计要求进行防腐处理。 加工完成的杆体在存储、搬运、安放时,应避免机械损伤、介质侵蚀和污染。钢绞线锚索杆体的制作要求: 应清除油污、锈斑,严格按设计尺寸下料,每根钢绞线的下料长度误差不应大于50mm. 应平直排列,注浆管应与杆体绑扎牢固,绑扎材料不宜采用镀锌材料。 锚索杆体存储的要求: 杆体制作完成后应尽早使用,不宜长期存放;制作完成的杆体不得露天存放,宜存放在干燥清洁的场所。应避免机械损伤杆体或油渍溅落在杆体上。 当存放环境相对湿度超过85%时,杆体外露部分应进行防潮处理;对存放时间较长的杆体,在使用前必须进行严格检查。 ③安装锚筋 在杆体放入孔前,应检查杆体的加工质量,确保满足设计要求;安放杆体时,应防止扭压和弯曲。注浆管随杆体一同放入孔内。杆体放入孔内应与钻孔角度保持一致。

扩大头预应力锚索施工方案

扩大头预应力锚索施工方案 锚索成孔采用专业锚杆钻机带D150mm钢套管成孔至锚杆自由端长度,然后换用D60mm钻杆在专业锚杆钻机钢套管钻孔至扩大头锚杆锚固段末端深度(即锚杆长度:自由端和锚固段之和),然后插入注浆管进行分两次高压喷注加速凝剂水泥浆,其施工工序主要包括孔位放样、锚杆钻机带D150mm钢套管钻孔,锚杆钻机钢套管内D60mm钻杆钻孔、浆液配制、二次高压喷射注浆。 锚索杆体在地面加工后,采用人工抬运至施工点,直接下入孔中,然后连接注浆机压浆管注浆,注浆采用“两次”注浆工艺。待锚索头部腰梁施工约8天后(同时预应力锚索注浆后间隔时间不能小于8~10天)可进行张拉锁定。 一、扩大头锚杆施工工艺流程如下图示 扩大头锚杆施工工艺框图 二、锚索设计参数及施工要求 1、钻孔前应根据设计要求确定孔位并定出标志,孔位垂直方向允许偏差为土50mm,水平方向允许偏差为3%,钻孔直径150mm; 2、钻孔不宜采用泥浆护壁,成孔困难时应采用套管跟进; 3、钻孔应超过锚杆设计长度0.5-1.0m; 4、锚筋应严格按照设计要求下料,其允许偏差为50mm,其外露长度由施工单位根据张拉设备确定;

5、锚杆自由端要抹一层黄油,并套波纹管扎牢; 6、安装就位前,要认真清除钢绞线表面的污物; 7、锚杆水泥采用42.5R普通硅酸盐水泥,水灰比为0.4~0.5,为缩短试验时间,加入适量的速凝剂; 8、高压旋喷时浆压力不小于20MPa,拔管速度为0.1~0.2m/min。 9、锚固体设计强度为30MPa,达到70%后方可进行张拉锁定锚索; 三、锚索施工程序与工艺 1、测量放线。钻孔前先根据要求测放孔位,并用竹签进行标记。 2、钻孔 ①选择CH-90型锚杆钻机。 ②钻机就位后,应保持平稳,导杆或立轴与钻杆倾角一致,并在同一轴线上,倾角30度。 ③施工中根据地质条件可选择两种钻头,土层中选用三角合金钻头,岩层中选用专用圆柱型钻头。 ④成孔直径不小于150mm,钻进时采用带D150mm钢套管跟进钻孔,钻孔至锚杆扩大头部分始端时,换用D60mm钻杆在D150mm钢套管内钻至锚杆锚固段末端外1米处。在钻进过程中,应精心操作,精神集中,合理掌握钻进参数,合理掌握钻进速度,防止埋钻、卡钻等各种孔内事故。一旦发生孔内事故,应争取一切时间尽快处理。 ⑤钻孔完毕后,拔管至锚固段末6m,插入转杆进行高压旋喷注浆扩孔、长度6m,重新插入D60mm钻杆至锚固段末,插入预制好的6X7Ф5钢绞线、钢套管,先在钢套管内进行高压一次喷射注浆至孔口流出浆液为止,待4小时后进行高压二次注浆至孔口流出浆液为止。 造孔是锚固工程施工中至关重要的一环,如果造孔速度慢,会直接影响到工程成本和经济效益;如果造孔质量差,则会影响到锚杆的安装、水泥浆的灌注质量,进而影响到锚杆与水泥浆以及水泥浆与孔壁的粘结力,致使锚杆达不到设计要求。因此,在锚固孔的钻凿过程中,必须严格按设计要求施工,以确保锚固孔成孔质量。 锚固孔的质量必须符合规范要求。我国工程建设标准化协会编制的《土层锚杆设计与施工规范》(CECS22-90)规定:

锚索施工方案

目录
目录 ...............................................................................................................1 一、编制依据 ...............................................................................................2 二、编制原则 ...............................................................................................2 三、工程概况 ...............................................................................................2 四、预应力锚索工程施工方案 ...................................................................4
4.1 预应力锚索施工流程 .........................................................................4 4.2 预应力锚索施工顺序 .........................................................................5 五、施工计划 ...............................................................................................8 5.1 工期安排原则 .....................................................................................8 5.2 计划开工、完工日期 .........................................................................8 六、资源配置 ...............................................................................................9 6.1 劳动力配置 .........................................................................................9 6.2 主要机械配置 .....................................................................................9 6.3 材料供应 .............................................................................................9 七、质量、安全、环境保护措施 ...............................................................9 7.1 质量保证措施 .....................................................................................9 7.2 安全保证措施 ...................................................................................11
........................................................................................................... 11 ........................................................................................................... 12 7.3 环境保证措施 ...................................................................................14 ........................................................................................................... 14 ........................................................................................................... 14 ........................................................................................................... 14 ........................................................................................................... 15 ........................................................................................................... 15 ........................................................................................................... 15 ........................................................................................................... 15
一、编制依据
1、本标段地质详勘报告;
2、本场地管线调查资料;
3、建筑地基基础设计规范;
4、广州地区建筑基坑支护技术规定(GJB02-98);
5、建筑基坑支护技术规程(DBJ/T15-20-97);
6、建筑基坑支护技术规程(JGJ120-99);
7、建筑桩基技术规范(JBJ94-94);
8、混凝土结构工程施工质量验收规范(GB50204-2002);
9、岩土锚杆(索)技术规程(CECS22:2005) 精心整理