作业前准备管理规定(中英文对照)

作业前准备管理规定(中英文对照)
作业前准备管理规定(中英文对照)

1 Purpose:

1.1为确保生产的顺利进行,明确作业前准备工作的内容与职责,特编制此规定。Define the responsibility of job set-ups verification for smooth product process.

2 适用范围Scope:

2.1 适用于沈阳名华内部注塑、预处理/喷涂及装配等主要工序生产前的准备验证管理。Verification of job set-ups on major processes such as injection, power wash,/painting and assembling in SYMH.

3 职责Responsibility:

3.1 制造部负责该文件的更新与下发;Product Department: responsible for the document update and issue.

3.2 制造部、物流部为该管理规定的执行部门。Product Dept. & Logistics Dept.: responsible for performing accord with this regulation.

4 定义Definition:无Nil

5 工作内容Content:

6. 相关文件Reference

6.1 首件确认流程FAA process

7 相关记录Sheet

7.1 作业前准备检查表Check list for job set-ups

7.2 设备点检表Equipment spot inspection sheet

7.3 首末件检验记录单First and last parts check sheet

7.4 预处理参数记录单Power washing parameter record

7.5 油漆线开机记录表Paint line job set-ups record

ISO22716标准(中英文对照)

INTERNATIONA STANDARD L国际标准ISO22716 First edition 2007-11-15 第一版本发行于 2007年11月15日 Cosmetics — Good Manufacturing Practices (GMP) — Guidelines on Good Manufacturing Practices 化妆品—良好生产规范(GMP)准则 ISO 22716:2007(E) 标准号 ISO22716:2007(E)

Contents Page Introduction (1) 1 Scope (1) 2 Terms and definitions (1) 3 Personnel (4) 4 Premises (6) 5 Equipment (8) 6 Raw materials and packaging materials (10) 7 Production (11) 8 Finished products (14) 9 Quality control laboratory (15) 10 Treatment of product that is out of specification (17) 11 Wastes (17) 12 Subcontracting (18) 13 Deviations (19) 14 Complaints and recalls (19) 15 Change control (19) 16 Internal audit (20) 17 Documentation (20)

目录 介绍 (1) 1 范围 (1) 2 术语和定义 (1) 3 员工 (4) 4 厂房 (6) 5 设备 (8) 6 原料和包材 (10) 7 生产 (11) 8 成品 (14) 9 实验室质量控制制 (15) 10 不合格品的处理.......................................................... .17 11 废弃物 (17) 12 外包 (18) 13 偏差 (19) 14 投诉和召回 (19) 15 变更控制 (19) 16 内审 (20) 17 文档 (20)

发料作业管理办法

(一)总则 1.仓库是企业物资供应体系的一个重要组成部分,是企业各种物资周转储备的环节,同时担负着物资管理的多项业务职能。仓管的主要任务是:保管好库存物资,做到数量准确,质量完好,确保安全,收发迅速,面向生产,服务周到,降低费用,加速资金周转。 2.仓管主要是根据工厂生产需要和厂房设备条件统筹规划,合理布局;内部要加强经济责任制,进行科学分工,形成物资分口管理的保证体系;业务上要实行工作质量标准化,应用现代管理技术和ABC分类法,不断提高仓库管理水平。 (二)物资验收入库存 3.物资入库存,保管员要亲自同交货人交接手续,核对清点物资名称、数量是否一致,按物资交接本上的要求签字,应当认识签收是经济责任的转移。 4.物资入库存,应先入待验区,未经检验合格不准进入货位,更不准投入使用。 5.材料验收合格,保管员凭发票所开列的名称、型号、数量、计量验收就位,钢材应涂色标志,入库存单各栏应填写清楚,并随同托收单交财务科记账。 6.不合格品,应隔离堆放,严禁投产使用。如工作马虎,混入生产,保管员应负失职的责任。 7.验收中发现的总是要及时通知科长和经办人处理。托收到而货未到,或货已到而无发票,均应向经办人反映查询,直到消除悬事挂账。 (三)物资的储存保管 8.物资的储存保管,原则上应以物资的属性、特点和用途规划设置仓库,并根据仓库的条件考虑划区分工,凡吞吐量大的落地堆放,周转量小的货架存放,落地堆放以分类和规格的次序排列编号,上架的以分类四号定位编号。 9.物资堆放的原则是:在堆垛合理安全可靠的前提下,推行五五堆放,根据货物特点,必须做到过目见数,检点方便,成行成列,文明整齐。 10.仓库保管员对库存、代保管、待验材料以及设备、容器和工具等负有经济责任和法律责任。因此坚决做到人各有责,物各有主,事事有人管。仓库物资如有损失、贬值、报废、盘盈、盘亏等,保管员不得采取“发生盈时多送,亏时克扣”的违纪做法。 11.保管物资要根据其自然属性,考虑储存的场所和保管常识处理,加强保管措施,达到“十不”要求,务使国家财产不发生保管责任损失。同类物资堆放,要考虑先进先出,发货方便,留有回旋余地。 12.保管物资,未经科长同意,一律不准擅自借出。总成物资,一律不准折件零发,特殊情况应经科长批准。 13.仓库要严格保卫制度,禁止非本库存人员擅自入库。仓库严禁烟火,明火作业需经保卫科批准。保管员要懂得使用消防器材和必要的防火知识。 (四)物资发放 14.按“推陈储新,先进先出,按规定供应,节约用料”的原则发材料。发料坚持一盘底,二核对,三发料,四减数的原则。对贪图方便,违反发料原则造成物资失效、霉变、大料小用、优料劣用以及差错等损失,保管员应负经济责任。 15.领料单应填明材料名称、规格、型号、领料数量、图号、零件名称或材料用途,核算员和领料人签字。属计划内的材料应有材料计划;属限额供料的材料应符合限额供料制度;属规定审批的材料应有审批人签字。同时,超费用领料人未办手续,不得发料。 16.调拨材料,保管员要审查单价、货款总金额并盖有财务科收款章时方可发料。发现价格不符或货款少收等,应立即通知开票人更正后发货。 17.对于专项申请用料,除计划采购员留作备用的数量外,均应由申请单位领用。常备用料,凡属可以分割折另的,本着节约的原则,都应折另供应,不准一次性发料。

一般作业安全管理办法

管理制度参考范本 ?般作业安全管理办法 B I时'间H 卜/ / 1 / 5

1目的 为加强在生产装置、辅助生产装置、油品罐区及其它要害部位( 以下简称生产区) 一般施工作业的安全管理,防止事故发生,制定本办法。 2适用范围 本办法适用公司所属各单位,同时适用进入公司作业的外来施工单位和人员。 3 术语或定义 3.1生产区一般作业:非本装置人员或施工队伍进入生产区进行的除特种施工作业( 用火、高处、起重、进入设备、临时用电、破土) 以外的施工作业,包括在生产区进行建筑施工、装置维修、设备防腐、管线保温、场地清理、厂区绿化等各种作业。在其它场所和部位施工作业可参照本办法执行。 3.2作业单位:实施一般作业的施工单位及其上级管理单位或一级承包商。 3.3属管单位:生产区一般作业所在车间或其它基层单位。 4 职责 4.1环安处:负责监督和检查一般作业属管单位、作业单位落实安全措施。 4.1属管单位:负责确定和落实生产区一般作业安全防范措施,指定一般作业安全监护人。 4.3作业单位:负责实施一般作业,负责按属管单位的要求落实 般作业安全防范措施,其一级承包商负责指定合格的安全监督人。 5工作程序或要求

5.1进入生产区实施一般作业,必须办理《生产区一般作业许可证》或《装置一般作业票》(样式附后)。 5.2《生产区一般作业许可证》审批工作程序 5.2.1《生产区一般作业许可证》或《装置一般作业票》由施工单位现场负责人向生产装置所属车间或基层单位(下同)提出作业申请。 5.2.2车间技术人员根据作业现场实际状况,确定安全措施并逐条检查落实,向作业人员书面交底,填写《生产区一般作业许可证》,交车间领导审批。 5.2.3福炼公司钳、电、仪车间及工程公司等单位人员进入生产区进行设备维修作业,可由该装置技术管理人员或当班班长填写《生产区一般作业许可证》,交车间值班干部审批或签发《装置一般作业票》。 5.2.4《生产区一般作业许可证》一式3 份,分别由审批单位、施工单位工作点负责人和作业所在岗位监护人员持有。 5.2.5《生产区一般作业许可证》最长有效期不超过15 天。规定时间内未完成作业,必须再次申办。 5.2.6 《生产区一般作业许可证》只对一般性施工作业有效。实施用火、进入设备、高处、临时用电、破土、起重等特种作业,必须办理相应的作业许可证。持特种作业许可证作业,不必办理《生产区一般作业许可证》。 5.2.7 进入生产区实施一般施工作业的队伍和人员,必须严格遵守生产装置或要害部位安全生产管理规定。 5.3一般作业必要条件 5.3.1 施工作业前,持《生产区一般作业许可证》通知装置当班班长和作业区域操作监护人员,经同意后方可开工。 5.3.2施工机具必须达到该装置区域或部位的防火等级要求,施工车辆进入生产装置必须配戴阻火器并持有装置进车票。

发料作业管理办法

发料作业管理办法 The document was prepared on January 2, 2021

五、发料作业管理方法 发料作业流程 使用说明 使用表单 发料通知单 领料单(检料用) 领料单(实领材料清单)

账卡 缺料单 1.管通知 2.1控根据生管发料通知单 打印领料单(检料用) 领料单(检料用)领送仓库 2.备料 2.1库管备料 2.2记入账卡 3.入账 3.1填写缺料单 3.2入电脑账 3.3打印领料单(实领材料清单)复印3份 缺料单: —联制造 —联物控 —联生管 领料单: —联制造 —联物控 —联物控→会计 4.领料 4.1现场核对数量 4.2现场签收 4.3物控将领料单汇总送会计 □作业流程说明 (一)领料 1.使用部门领用材料时,由领用经办人员开立“领料单”经主管核签后,向仓库办理领料。

2.领用工具类材料(明细由公司自行制定)时,领用保管人应拿“工具保管记录卡”到仓库办理领用保管手续。 3.进厂材料检验中,因急用而需领料时,其“领料单”应经主管核签,并于单据注明,方可领用。 (二)发料 由生产管理开立的发产单经主管核签后,转送仓库依工令及发料日期备料,并送至现场点交签收。 (三)材料的移转 凡经常使用或体积较大须存于使用单位者,由使用单位填制“材料移转单”向资料库办理移转,并每日下班前依实际用量填制“领料单”,经主管核签后送材料库冲转出账。 (四)退料 1.使用单位对于领用的材料,在使用时遇有材料质量异常,用料变更或用余时,使用单位应以“退料单”(办理移转的退料以“材料移转单” 代之)连同材料缴回仓库。 2.材料质量异常欲退料时,应先将退料品及“退料单”送质量管理单位检验,并将检验结果注记于“退料单”内,再连同料品缴回仓库。 3.对于使用单位退回的料品,仓库人员应依检验退回的原因,研究处理对策,如原因系由于供应商所造成,应立即与采购人员协调供应商处理。 材料领料单 年月日

作业准备验证管理办法

1 适用范围 适用于XXX公司所需的作业准备验证。 2 职责 2.1技术质量部下达作业验证计划,生产部负责组织作业准备验证。 2.2质量部负责组织有关产品的检验和试验及质量状况的统计。 2.3产品技术部、质量部、采购部、车间参与作业准备验证。 3 管理办法和要求 4.1作业准备验证时机 4.1.1产品调试生产作业时需进行作业准备验证并进行作业后的认可。 4.1.2形成产品的材料发生改变时。 4.1.3产品生产过程中发生作业内容和方式等更改时。 4.1.4运行间过长时间的停顿时,即本公司停止生产半年以上时间的产品,重新启动生产时。 4.1.5 作业设备发生变更时。 4.1.6外部客户要求对产品进行审核时。 4.2 作业准备要求 4.2.1 作业准备要对人、机、料、法、环、测等方面进行检查,如上岗人员资格、设备、工装、辅具完好情况、检具合格与否、作业指导文件是否有效、材料是否合格、环境是否整洁有序、标准样件是否合乎要求等。 4.3 作业准备验证方法 4.3.1产品初次生产作业时, 如新产品试生产结束后,批量生产前,由技术部组织各部门在生产现场验证,由质量员测量连续的5件并进行测量结果记录,如果5件全部在公差范围内则过程是受控的,如有一件未达到产品特性要求,则由车间工艺员重新调整过程至连续5件全部合格则作业准备验证通过,由技术部组织填写“作业准备验证指导书”,并附检验记录。 4.3.2运行间过长时间的停顿、作业更改和作业过程中发生对形成产品的

材料有改变时,由技术部组织质量部、采购部、生产部采用首件与末件或上一批次数 据和记录(质量记录、纠正措施等)比较的方法进行作业准备验证,由检查员填写首件比较记录,首件与末件或与上一批次数据和记录比较检验合格后,作业准备验证通过;如不合格,由技术部调整过程至合格。作业准备通过后,由技术部填写“作业准备验证指导书”,相关部门会签,并附检验记录。 4.3.3 量产后每班正式生产时,质量部采用首件与末件或上一批次数据和记录(质量记录、纠正措施等)比较的方法进行作业过程控制,由质量员填写首件比较记录,首件与末件或与上一批次数据和记录比较检验合格后,作业正常进行,检验记录由质量部保存。 5 相关记录 作业准备验证指导书及作业准备记录表

容器作业安全管理办法标准范本

管理制度编号:LX-FS-A81623 容器作业安全管理办法标准范本 In The Daily Work Environment, The Operation Standards Are Restricted, And Relevant Personnel Are Required To Abide By The Corresponding Procedures And Codes Of Conduct, So That The Overall Behavior Can Reach The Specified Standards 编写:_________________________ 审批:_________________________ 时间:________年_____月_____日 A4打印/ 新修订/ 完整/ 内容可编辑

容器作业安全管理办法标准范本 使用说明:本管理制度资料适用于日常工作环境中对既定操作标准、规范进行约束,并要求相关人员共同遵守对应的办事规程与行动准则,使整体行为或活动达到或超越规定的标准。资料内容可按真实状况进行条款调整,套用时请仔细阅读。 1 目的 为加强进入设备内部施工作业的安全管理,防止施工作业时发生缺氧、中毒、窒息、爆炸事故,保障企业职工生命安全和企业财产安全,制定本办法。 2 适用范围 本制度适用公司所属各单位,同时适用进入公司作业的外来施工单位和人员。 3 术语或定义 3.1 设备:加热炉、分馏塔、储罐、容器、槽车、油舱、水舱以及管道、烟道、排水管道、排水涵洞、下水井等。

3.2 进入设备作业:凡人员进入或探入上述设备、设施内部的作业统称为进入设备作业。 3.3 作业单位:实施进入设备作业的施工单位。 3.4 属管单位:设备所在单位或制度划定的单位。 4 职责 4.2 环安处:负责监督和检查进入设备作业属管单位、作业单位落实安全措施。 4.1 属管单位:负责确定和落实进入设备作业的安全防范措施,负责指定作业的安全监护人。 4.2 作业单位:负责实施进入设备作业,负责按属管单位的要求落实作业的安全防范措施,其一级承包商负责指定合格的作业监护人和安全监督人。 5 工作程序或要求

发料作业管理方法

发料作业管理方法

五、发料作业管理方法 发料作业流程

使用说明 使用表单 发料通知单 领料单(检料用) 领料单(实领材料清单) 账卡 缺料单 1.管通知 2.1控根据生管发料通知单 列印领料单(检料用) 领料单(检料用)领送仓库 2.备料 2.1库管备料 2.2记入账卡 3.入账 3.1填写缺料单 3.2入电脑账 3.3列印领料单(实领材料清单)复印3份缺料单: —联制造 —联物控 —联生管

领料单: —联制造 —联物控 —联物控→会计 4.领料 4.1现场核对数量 4.2现场签收 4.3物控将领料单汇总送会计 □作业流程说明 (一)领料 1.使用部门领用材料时,由领用经办人员开立“领料单”经主管核签后,向仓库办理领料。 2.领用工具类材料(明细由公司自行制定)时,领用保管人应拿“工具保管记录卡”到仓库办理领用保管手续。 3.进厂材料检验中,因急用而需领料时,其“领料单”应经主管核签,并于单据注明,方可领用。 (二)发料 由生产管理开立的发产单经主管核签后,转送仓库依工令及发料日期备料,并送至现场点交签收。 (三)材料的移转 凡经常使用或体积较大须存于使用单位者,由使用单位填制“材料移转单”向资料库办理移转,并每日下班前依实际用量填制“领料单”,经主管核签后送材料库冲转出账。 (四)退料 1.使用单位对于领用的材料,在使用时遇有材料质量异常,用料变更或用余时,使用单位应以“退料单”(办理移转的退料以“材料移转单”代之)连同材料缴回仓库。 2.材料质量异常欲退料时,应先将退料品及“退料单”送质量管理单位检验,并将检验结果注记于“退料单”内,再连同料品缴回仓库。

作业准备验证规定

1、目的 通过生产过程的作业准备验证,确保产品的质量满足顾客的需求。 2、适应范围 适用于生产中需要作业准备验证实施要求的活动。 3、术语: 无 4、职责: 4.1相关部门制造部负责指导、实施和管理。 4.2相关部门生产科配合做好作业准备验证运转和实施。 4.3相关部门质检科对作业准备验证监督、测量,并做出作业验证的结论。 5、管理内容和方法 5.1进行作业准备验证的依据: a)新产品的初步生产; b)原有产品因尺寸、材料发生重大变更重新生产时; c)产品的生产工艺改变后,首次生产; d)产品闲置一年后,又重新生产; 遇到上述任何一种情况,都必须进行作业准备验证。 5.2 作业准备验证的实施步骤: 5.2.1项目小组相关职能部门技术科在确认上述a、b、c三项中的任何一项时,必须以书面的形式通知相关部门生产科。 5.2.1.1当产品的加工尺寸发生重大变化、加工工艺发生更改时,由相关职能部门技术科发出《工艺文件更改通知单》,通知相关部门制造部,操作人员在接到通知后才能生产。 5.2.1.2 当材料规格发生变化或需用其他材料代用时,须重新通过工艺确认,并重新通过PPAP,得到顾客认可后方可正式生产。 5.2.1.3 当产品停止一年以内重新生产,由相关部门制造部通知车间做好作业准备验证,须重新通过工艺确认。当产品停止一年以上重新生产,当顾客有要求时,必须重新通过PPAP,得到顾客认可后方可正式生产。 5.2.2 相关部门生产科在安排生产计划中注明需要进行作业准备验证的需求。 5.2.3 相关制造部生产科应根据安排的生产时间,提前检查,落实材料准备,工装和文件的准备工作,并及时与车间和操作人员联系。

危险作业安全管理制度

危险作业安全管理制度 、目的 为加强危险作业风险管理,正确识别、评估和分析与作业相关的危险因素,以采取有效的预防和应急措施,特制定本制度。 二、适用范围 本制度适用于本单位员工进入受限空间作业、危险区域动火作业、高处作业、大型吊装作业等过程的控制。 三、职责 1、公司办公室、生产部是本程序归口管理单位; 2、办公室负责危险作业许可审批和现场监督及其作业票存档管理; 3、办公室、生产部负责人负责组织本单位特殊施工作业区域进行勘察,识别和评价可能的风险,制订有针对性的风险防范控制和应急措施; 4、施工作业单位根据相关规定、操作规程和作业票内容、要求组织施工,并做好风险防范和控制措施的落实。 四、控制程序 1 、危险作业许可的申请、审批、执行和关闭 1.1各类危险作业许可实施分类管理,实行危险作业许可审批。同一地点的同一作业项目可能同时涉及到多种类别的危险作业情况,应满足每种作业许可的要求。 1.2作业前的准备 办公室、生产部负责组织本单位特殊施工作业区域进行勘察,识

别和评价可能的风险,制订有针对性的风险防范控制和应急措施。 1.3作业许可的申请 由作业单位向安全生产管理管理部提交危险作业许可申请,填写 相应的危险作业票证。 1.4 作业票应明确以下内容: 1.4.1作业项目名称、地点(部位)、作业时间,作业内容、作业目的; 142作业的步骤、需要的工器具和动力资源等; 143与相关方的协商、技术交底或要求; 144主要危害及风险评价结果;作业现场易燃、易爆、有毒气体等需要监测的项目及监测结果; 1.4.5拟采用的防护措施、应急措施及应急设施; 1.4.6作业人员、现场监护人员的能力和资质; 1.4.7明确劳防用品的配备和穿戴规定; 1.4.8作业结束后的许可终止活动等。 1.5危险作业许可的审批 危险作业工作票由办公室、生产部等相关人员对危险作业场所进行安全检查,审批人员应对危险作业内容、相应的风险进行分析,对该危险作业采取的安全措施有效性进行审核,同时对危险作业及监护人员资质(特种作业人员必须经过专业培训,持证上岗,并有定期复 审记录)等情况进行详细审查,经确认后签字,作业票一式两份,审批人员与作业人员各持一份,定期归档。

管件标准中英文对照

管件标准中英文对照 Standard Code 规范代号 Standard Name 规范名称 ASME SA-234 中、高温用钢制碳钢和合金钢管道配件 Medium and high temperature used carbon and alloy steel pipe fittings ASME SA-420 低温用锻制碳钢和合金钢管配件 Low temperature forged carbon and alloy steel pipe fittings ASME SA-403 锻制奥氏体不锈钢管配件 Forged Durimet pipe fittings ASME B16.9 工厂制造的钢制对焊管件 Factory-Made wrought steel pipe fittings ASME B16.11 承插焊和螺纹锻钢管件 Socket-welding and Threaded forged fittings ASME B16.28 锻钢对焊小半径弯头和回弯头 Wrought steel butt-welding short radius elbows and returns ISO 5251 不锈钢对焊管件 Stainless steel butt-welding fittings MSS SP-43 锻制不锈钢对焊管件 Wrought stainless steel butt-welding fittings MSS SP-75 锻钢制对焊管件 Forging butt-welding fittings MSS SP-79 承插焊异径插入件 Socket-welding reducing Inserts MSS SP-83 3000磅级的钢制承插焊和螺纹活接头 Class 3000 steel socket-welding and threaded unions MSS SP-95 缩渐管和圆堵头 Swaged nipples and round plugs MSS SP-97 承插焊、螺纹和对焊端的整体加紧式管座 SW 、TH and BW ends for integrally reinforced forged branch outlet JIS B2311 通用钢制对焊管件 Universal steel butt-welding pipe fittings JIS B2312 钢制对焊管件 Steel butt-welding pipe fittings JIS B2313 钢板制对焊管件 Steel plate butt-welding pipe fittings JIS B2316 钢制承插焊管件 Steel socket-welding pipe fittings DIN 2605 钢制对焊管件弯头和弯管 Steel butt-welding pipe fittings.elbows and bends DIN 2615 钢制对焊管件三通 Steel butt-welding pipe fittings.tees DIN 2616 钢制对焊管件异径管 Steel butt-welding pipe fittings.reducers

IATF16949作业准备验证及停工后验证规定

1目的 通过生产过程的作业准备验证和停工后验证,确保产品的质量满足顾客的需求。 2范围 适用于生产中需要作业准备验证和停工后验证实施要求的活动。 3术语 生产停工:制造过程空闲的状况,时间跨度可从几小时到几个月不等。 作业准备验证:在生产的各个阶段在开始作业前的准备验证,以评价该阶段工作是否具有正式执行的能力,验证的对象是作业前人、机、料、法、环的配置、协调能力。 4职责 技术部负责验证的指导和监督。 质量部实施作业准备验证和停工后验证,并做出验证的结论。 生产车间配合做好作业准备验证运转和实施。 5管理内容和方法 验证的时机 a)新产品的初步生产; b)原有产品因规格、材料发生变更重新生产时; c)作业更改,如作业方式、设备、模具、工装等变更后,首次生产时; d)发生过程的临时变更时。 同一产品生产计划或非计划停工后,又重新恢复生产,必须进行验证后才能正式生产。 验证的方法 按照规定的《作业准备/停工后验证记录》的检查项目,对作业准备进行评审,即是否使用了正确的作业指导书、控制计划、检验标准,以及机器设备参数设置是否按照作业指导书的要求设置。当评审结果符合规定要求时,得到技术部批准后,才能正式开始生产。 用本批生产的首件和前一批生产的末件进行比较,当本批首件的质量达到或超出前一批末件的质量水平时,才能正式开始生产。本批生产的首件和末件进行比较,当本批末件的质量达到或超出首件,才能进行下一班的生产。 ,也使用统计方法进行验证。 生产足够的产品以构成SPC所用容量的子组,对产品进行测量,并将结果绘制成控制图

表。如果这些测量结果落在控制限区域的中间1/3范围内,则作业准备可获批准。 验证的实施步骤: 技术部在确认上述时机中的任何一项时,必须以书面的形式通知制造部门进行作业准备验证 或停工后验证。 当产品的加工尺寸发生重大变化、加工工艺发生更改时,由技术部发出《工艺文件更改通知单》,通知制造部,操作人员在接到通知后才能生产。 当产品生产停工后重新恢复生产,由技术部通知车间做好作业准备验证,须重新通过工艺 确认。 制造部在安排生产计划中注明需要进行作业准备验证的需求。 制造部应根据安排的生产时间,提前采用评审法进行自我检查,生产过程的生产条件是否已完全具备,填写《作业准备验证记录表》。 进行生产作业准备验证时,生产车间操作人员按照《生产控制计划》工艺参数要求,调 试设备和工装,并开始试产首件产品。 操作人员按照《生产控制计划》和《作业指导书》要求自检,将认为合格的产品作为首件产 品报质量部检验员检验。 检验员将本次生产的首件产品与上班生产的末件产品在主要尺寸、外观质量和其它需要测量的项目上进行比较,对产品进行逐项检验,并填写《首件检验记录》。当确认不合格后操作员应检查设备、工装模具的情况,并重新生产首件,再重复上述过程,不合格品按《不合格 品控制程序》执行。 经检验合格的首件应放在指定位置,待本班生产任务完成后,操作人员应将认为合格的 末件产品报质量部检验员检验。 检验员将本次生产的末件产品与当班生产的首件产品在主要尺寸、外观质量和其它需要测量的项目上进行比较,对产品进行逐项检验,并填写《末件检验记录》。 末件检验合格,则可以放行该批产品。如不合格,应对该批产品按不合格品控制程序进行标 识。隔离,并按追溯要求进行挑选。 首件随产品流入下道工序。末件产品应放在指定位置,作为下一班验证的依据。 对于量产产品停工后的验证,除按上述进行评审检查和首件检验外,还需试生产小批量,进行过程能力分析,确定过程处于受控状态且能力充分时(Cpk≥),方可进行正常量产。

现场作业安全管理制度(通用版)

现场作业安全管理制度(通用 版) Safety management is an important part of enterprise production management. The object is the state management and control of all people, objects and environments in production. ( 安全管理 ) 单位:______________________ 姓名:______________________ 日期:______________________ 编号:AQ-SN-0340

现场作业安全管理制度(通用版) 一:工区日常作业实行“一单三卡” 1:班前填写日作业计划单,保证其与当日作业项目一致,与日作业计划一致。 2:班前工长对照“一单三卡”对参加作业人员进行安全技术教育。 3:作业负责人必须按规定携带“一单三卡”,并在作业过程中逐项对规。 4:作业防护: (1)日常作业必须设置现场防护和驻站防护员。 (2)驻站联络员必须提前40分钟进入行车室通报列车运行情况。

现场防护员未到严禁上道作业。 (3)驻站联络员与工地防护员应保持通讯畅通,随时通报列车运行情况,若联系中断,立即停止施工,下道避车。 (4)通讯条件不畅时应增设中间联络员。 (5)恶劣天气或作业区段较大可根据需要增设中间联络员。 5:防护员作业纪律: A:防护员应精神饱满,精力集中,不干与防护无关的事。 B:防护员任何情况下不得离岗。 C:驻站联络员在行车室不得大声喧哗。 D:防护员必须着装整齐,按规定携带防护备品。 E:防护员必须保持通讯设备畅通,随时通报列车运行情况,严格执行预报和确报制度。 6:严格执行“天窗修”制度。 二:工区作业人员应着装上道,按标准化作业,未定职人员不准单独上到作业。严禁违章作业和简化作业程序。 1:上道作业避车时,必须按规定提前下道或者进避车台及避车

合同中英文标准对照

Terms of payment: 支付条款 D/A: (documents against acceptance)商业单据是凭承兑交单交付款人,是指出口人的交单以进口人在汇票上的承兑为条件。 D/P: (documents against payment) 商业单据是凭付款交单交付款人,是指出口人的交单是以进口人的付款为条件。Down Payment: 首期付款 Irrevocable Letter of Guarantee: 不可撤销保证函 Pro forma invoice: 形式发票 Documentary L/C: 跟单信用证,是开证行凭跟单汇票或仅凭单据付款的信用证。 Clean L/C: 光票信用证,是开证行凭不附单据的汇票付款的信用证。 Bills of Lading(B/L): 提单 Compensation: 赔偿金 Process unit: 工艺设备 Delivery and terms of delivery: 交货及交货条款 General provisions: 一般规定 Components: 组件 Implementation: 履行,落实 Container vessel: 集装箱船 Incorporated parts: 配套件

DDP: 完税后交货 Packing and marking: 包装与标记 Design liaison and design review: 设计联络与设计总览Standards and inspection: 标准与检验 Erection, commissioning, and acceptance: 安装,调试与验收Liquidated damages and claims: 损失和赔偿金 Force majeure clauses: 不可抗力条款 Demurrage: 滞留费,滞留 Arbitration: 仲裁 Patent infringement, secrecy, licence: 专利侵权,保密,执照Termination for default: 违约终止 Coming into force: 合同生效 Miscellaneous: 其他事项 Contract amendments: 合同修订 Assignment and subcontract: 分配与分包 Termination for insolvency: 破产终止 Performance bond: 履约保证金 Change orders: 变更通知书 Governing language and unit of measurement: 合同语言与测量单位 Correspondence: 信件 Limitation of liability: 责任限制

发料作业管理方法范本

发料作业管理方法范本 LEKIBM standardization office【IBM5AB- LEKIBMK08- LEKIBM2C】

发料作业管理方法 发料作业流程 使用说明 使用表单 发料通知单 领料单(检料用)

领料单(实领材料清单) 账卡 缺料单 1.管通知 2.1控根据生管发料通知单 列印领料单(检料用) 领料单(检料用)领送仓库 2.备料 2.1库管备料 2.2记入账卡 3.入账 3.1填写缺料单 3.2入电脑账 3.3列印领料单(实领材料清单)复印3份缺料单: —联制造 —联物控 —联生管 领料单: —联制造 —联物控 —联物控→会计 4.领料

4.1现场核对数量 4.2现场签收 4.3物控将领料单汇总送会计 □作业流程说明 (一)领料 1.使用部门领用材料时,由领用经办人员开立“领料单”经主管核签后,向仓库办理领料。 2.领用工具类材料(明细由公司自行制定)时,领用保管人应拿“工具保管记录卡”到仓库办理领用保管手续。 3.进厂材料检验中,因急用而需领料时,其“领料单”应经主管核签,并于单据注明,方可领用。 (二)发料 由生产管理开立的发产单经主管核签后,转送仓库依工令及发料日期备料,并送至现场点交签收。 (三)材料的移转 凡经常使用或体积较大须存于使用单位者,由使用单位填制“材料移转单”向资料库办理移转,并每日下班前依实际用量填制“领料单”,经主管核签后送材料库冲转出账。 (四)退料 1.使用单位对于领用的材料,在使用时遇有材料质量异常,用料变更或用余时,使用单位应以“退料单”(办理移转的退料以“材料移转单”代之)连同材料缴回仓库。

IATF作业准备验证及停工后验证规定

1 目的 通过生产过程的作业准备验证和停工后验证,确保产品的质量满足顾客的需求。 2 范围 适用于生产中需要作业准备验证和停工后验证实施要求的活动。 3 术语 生产停工:制造过程空闲的状况,时间跨度可从几小时到几个月不等。 作业准备验证:在生产的各个阶段在开始作业前的准备验证,以评价该阶段工作是否具有正式执行的能力,验证的对象是作业前人、机、料、法、环的配置、协调能力。 4 职责 技术部负责验证的指导和监督。 质量部实施作业准备验证和停工后验证,并做出验证的结论。 生产车间配合做好作业准备验证运转和实施。 5 管理内容和方法 验证的时机 遇到以下任何一种情况,都必须进行作业准备验证: a)新产品的初步生产; b)原有产品因规格、材料发生变更重新生产时; c)作业更改,如作业方式、设备、模具、工装等变更后,首次生产时; d)发生过程的临时变更时。 同一产品生产计划或非计划停工后,又重新恢复生产,必须进行验证后才能正式生产。 验证的方法 评审法 按照规定的《作业准备/停工后验证记录》的检查项目,对作业准备进行评审,即是否使用了正确的作业指导书、控制计划、检验标准,以及机器设备参数设置是否按照作业指导书的要求设置。当评审结果符合规定要求时,得到技术部批准后,才能正式开始生产。 首、末件比较法 用本批生产的首件和前一批生产的末件进行比较,当本批首件的质量达到或超出前一批末件的质量水平时,才能正式开始生产。本批生产的首件和末件进行比较,当本批末件的质量达到或超出首件,才能进行下一班的生产。 适当时,也使用统计方法进行验证。 生产足够的产品以构成SPC所用容量的子组,对产品进行测量,并将结果绘制成控制图表。如果这些测量结果落在控制限区域的中间1/3范围内,则作业准备可获批准。

八大危险作业安全管理制度

八大危险作业安全管理制度 (一)动火安全管理制度 1.目的 建立动火证办理和使用,落实动火证中的安全措施程序,确保动火作业中的人身和设备安全。 2.适用范围 适用于厂内一切动火作业。 3.职责 3.1安全部负责动火证的办理,以及监督检查动火单位在动火作业中对动火证上要求的安全措施的落实情况。 3.2动火单位负责在动火前对作业证上的安全措施进行落实,确保动火安全。 4.工作程序 4.1禁火区的划分 公司安全部门登记审批划定“固定动火区”,固定动火区以外,一律为禁火区。在禁火区动火,必须办理动火证制度。 4.2动火许可证的办理、使用 4.2.1在禁火区,除生产工艺用火外,其他可产生火焰、火花和赤热表面的作业均属动火作业,必须办理动火手续,严禁无动火证动火,否则从严论处,电工必须持有效动火证后,接电焊机,否则从严论处。 4.2.2申请动火单位,应根据动火安全规定落实动火中的各项动火措施,安排好动火监护人(不得少于2人且至少有一名男职工)后方可申请动火。 4.2.3动火证由申请动火单位指定专人或动火项目负责人办理,动火证由公司安全部门审批,特别危险区动火,报分管生产副总审批。 4.2.4安全部门向动火负责人及其了解动火前准备工作情况时,都必须如实回答,否则,从严处理。 4.2.5必须在动火证批准有效时间和区域内进行动火工作,凡延期或补充动火都有必须重新办理“动火证”。 4.2.6动火人到达动火地点后,首先要检查动火证中的各项措施是否落实,如有

一项不落实,有权拒绝动火。 4.2.7“动火证”由动火人随身携带,不得转让,不得涂改或转移动火地点。4.2.8动火证审查批准,必须到现场审查,确认安全,可靠,方能开具“动火证”。 4.3动火中落实的安全措施 4.3.1将动火设备内的可燃、易燃物质彻底清理干净,然后用蒸气或空气吹扫或水洗,并保持足够的时间和次数,保证容器内无可燃、爆气体或液体,最后还要放满清水。 4.3.2切断动火容器设备相连管道,并加设备盲板,进行彻底隔绝动火,车间易燃易爆物料必须清理干净。 4.3.3进入塔、油罐容器动火,应作爆炸分析和含氧量测定,合格后方可动火,并必须到安全部门开具罐内安全审批单,方可进入容器。 4.3.4能拆下的管道,阀门、水容器等应尽量拆下,拿到安全地带动火,更换下的设备、仪表、配件如需重新使用,在动火期间安装的,应清洗干净后方可进行。 4.3.5动火前应整体考虑,与制造部门联系,如有威胁的动火安全的相邻部门及其他,制造部门应通知采取安全措施。 4.3.6动火前动火负责人应定出应急措施,备好监火灭火器材,监火一律使用指定专用灭火器,如需动用其他灭火器,需经安保科同意。 4.3.7动火工具必须完好,安全附件齐全良好,符合安全要求,氧气瓶和乙炔瓶离明火10米以上,乙炔瓶与氧气瓶应距在5米以上,如违反规定出现事故,由动火人员负责。 4.3.8动火附近的下水井、水沟、电缆沟、排水沟应清除易燃、易爆物或予封闭隔离,5级以上大风不准室外高处作业。 4.3.9电焊回路线应接在焊件上,如不能直接接在焊件上,应尽量缩短回路线距离。动火过程中跑、冒、滴、漏易燃物等其他紧急情况时,应停止动火。恢复正常,且应批准后方可继续动火。 4.3.10室内动火应将门窗打开,周围设备遮盖,附近不准有石油醚、酒精等挥发性强的易燃物,用于生产或敞开存放,擦洗设备等,同时易燃易爆物料在动火期间不得通过动火现场。一个车间动火,相邻车间需做好相应的防护措施,防止火灾蔓延。 4.3.11非特殊情况,严禁带料,带压和开车动火。

仓储作业管理办法示范文本

仓储作业管理办法示范文 本 In The Actual Work Production Management, In Order To Ensure The Smooth Progress Of The Process, And Consider The Relationship Between Each Link, The Specific Requirements Of Each Link To Achieve Risk Control And Planning 某某管理中心 XX年XX月

仓储作业管理办法示范文本 使用指引:此管理制度资料应用在实际工作生产管理中为了保障过程顺利推进,同时考虑各个环节之间的关系,每个环节实现的具体要求而进行的风险控制与规划,并将危害降低到最小,文档经过下载可进行自定义修改,请根据实际需求进行调整与使用。 一. 目的: 加强仓库管理和场地规划,为公司财务及销售等提供 准确的库存记录,确保产品生产的配套齐全,保障物资的 计划管理和生产的正常进行。 二. 适用范围: 本规定适用于公司仓库所有物资的出、入、在库管 理。 三. 职责: 3.1 生产部仓库负责所有物资的入库、出库、在库管 理。 3.2 生产部仓库负责每月对仓库所有物资进行盘点, 做到帐、卡、物的一致。

四,定义: 无 五,入库流程规范 (一)采购入库 1,供应商到货,由采购或者物料计划提前2小时在ERP中提交《采购到货单》(采购订单)。以便仓库做好收货准备 2,所有供应商送货,仓库均按ERP《采购到货单》及供方《送货单》确认收货。仓库收货时核对ERP到货单,确认规格,型号,数量,包装相符合后签收。并将物品放入来料待检区。 没有《采购到货单》及供方《送货单》的到货,仓库应该予以拒收。 3,收货确认无误后审核ERP《采购到货单》,并在收货完成后1小时内在ERP中报检

作业准备验证管理办法

作业准备验证管理办 法

1 适用范围 适用于XXX公司所需的作业准备验证。 2 职责 2.1技术质量部下达作业验证计划,生产部负责组织作业准备验证。 2.2质量部负责组织有关产品的检验和试验及质量状况的统计。 2.3产品技术部、质量部、采购部、车间参与作业准备验证。 3 管理办法和要求 4.1作业准备验证时机 4.1.1产品调试生产作业时需进行作业准备验证并进行作业后的认可。 4.1.2形成产品的材料发生改变时。 4.1.3产品生产过程中发生作业内容和方式等更改时。 4.1.4运行间过长时间的停顿时,即本公司停止生产半年以上时间的产品,重新启动生产时。 4.1.5 作业设备发生变更时。 4.1.6外部客户要求对产品进行审核时。 4.2作业准备要求 4.2.1作业准备要对人、机、料、法、环、测等方面进行检查,如上岗人员资格、设备、工装、辅具完好情况、检具合格与否、作业指导文件是否有效、材料是否合格、环境是否整洁有序、标准样件是否合乎要求等。 4.3 作业准备验证方法 4.3.1产品初次生产作业时, 如新产品试生产结束后,批量生产前,由技术部组织各部门在生产现场验证,由质量员测量连续的5件并进行测量结果记录,如果5件全部在公差范围内则过程是受控的,如有一件未达到产品特性要求,则由车间工艺员重新调整过程至连续5件全部合格则作业准备验证通过,由技术部组织填写“作业准备验证指导书”,并附检验记录。 4.3.2运行间过长时间的停顿、作业更改和作业过程中发生对形成产品的材料有改变时,由技术部组织质量部、采购部、生产部采用首件与末件或上一批次

据和记录(质量记录、纠正措施等)比较的方法进行作业准备验证,由检查员填写首件比较记录,首件与末件或与上一批次数据和记录比较检验合格后,作业准备验证通过;如不合格,由技术部调整过程至合格。作业准备通过后,由技术部填写“作业准备验证指导书”,相关部门会签,并附检验记录。 4.3.3 量产后每班正式生产时,质量部采用首件与末件或上一批次数据和记录(质量记录、纠正措施等)比较的方法进行作业过程控制,由质量员填写首件比较记录,首件与末件或与上一批次数据和记录比较检验合格后,作业正常进行,检验记录由质量部保存。 5 相关记录 作业准备验证指导书及作业准备记录表