排水沟工程数量计算

排水沟工程数量计算
排水沟工程数量计算

长 度宽度厚度高墙SG1750.70.10.40.2

SG2620.70.10.40.2

SG3970.70.10.40.2

SG4780.70.10.40.2

SG51100.70.10.40.2

合计422

挖方

SG1576000

1000000 K10.576 K273.9 K3SG2挖方

K4576000 K51000000 K60.576

137.8

SG3挖方

576000

1000000

0.576

21.4

合 计233.1

挖 方回填土M5浆砌砖C10砼底板1:2砂浆抹面伸缩缝之座盖板

43.28.112.0 5.360.0 2.7

35.7 6.79.9 4.349.6 2.2

55.910.515.5 6.877.6 3.4

44.98.412.5 5.562.4 2.8

63.411.917.67.788.0 3.9

243.145.667.529.5337.615.0

回填土

108000

1000000

0.108

13.9

回填土

108000

1000000

0.108

25.8

回填土

108000

1000000

0.108

4.054000

54000

43.7108000

000 00 0

相关文档
最新文档