空冷器风机安装方式示意说明

低温-引风式空冷器风机安装示意图

高温-引风式空冷器风机安装示意图

鼓风式空冷器风机安装示意图

空冷器使用维护说明书(英文)

Air-water Coolers Installation Operation Maintenance Manual

CONTENTS 1 General 2 Installation and removal of cooler 3 Commissioning 4 Protective film 5 Standstill 6 Service control 6.1 General 6.2 Performance test 7 Cleaning 7.1 General 7.2 Cleaning of the water side 7.2.1 Mechanical cleaning 7.2.2 Hydraulic cleaning 7.2.3 Chemical cleaning 7.2.3.1 Chemical cleaning -Insitu 7.2.3.2 Chemical cleaning-Cooler removed 7.3 Cleaning of the air-side 7.3.1 General 7.3.2 Hydraulic cleaning 7.3.3 Chemical cleaning

1. General The water cooler is a finned tube heat exchanger .The hot air flows through the fins on the outside of the tubes and the cooling fluid flows through the tubes. The heat exchanger surface of the cooler consists of elliptical core tubes with rectangular threaded on fins or round core tubes with either wound-on fins or continuous flat plate fins. The bond between fin and tube is achieved either by mechanical means or by soldering. The core tubes are rolled into the tube sheets at each end of the tubes with roller. Side wall form an integral part of the cooler and are bolted to tube sheets. Water Headers (Namely connection and Return headers) are provided for water handling. The number of separation baffles conforms to the number of water passes. The headers are bolted to the tube sheets, gaskets interposed to form a seal. Plugs in the header are provided for cooler venting and draining. The materials for headers, tube, sheets and core tubes are chosen in accordance with the specification of the cooling water to be used and the recommended water velocity in the tubes. 2.Installation and removal of the cooler Read all the maintenance instructions before you begin bundling this product. The cooler should be installed where it is accessible for cleaning, but not where the general public has access to it. Only let trained personnel with profound knowledge of the product and the appropriate safety rules carry out any work on the cooler. Prior to installation of the cooler ,the transport covers of the air side and the blanks on the water connection flanges are to be removed .The air and water side sealing surfaces ,which are protected priot to shipping, must be cleaned by the use of turpentine. The cooler can either be mounted to the engine as a self mounted in the air duct as a cantilever unit. The air side connections are bolted to the air ducts using gaskets or sealing compound provided by the engine builder. The cooling water pipes are bolted to connection flanges on the connection header using gaskets also provided by the engine builder. To avoid deformation and stresses when installing the cooler all connecting surfaces must be parallel and the tolerances should be kept as small as possible. All connections are to be air and water tight. Transport lugs are provided on the side walls for

-风机安装施工标准做法

-风机安装施工标准做法

————————————————————————————————作者:————————————————————————————————日期:

15 风机安装施工标准做法 1 工艺原理 利用支吊架等将柜式、管道式风机固定在楼板下或设备基础上。 2 工艺流程 2.1 落地式风机安装工艺流程 基础验收减振器(垫)安装风机安装风机与风管连接 2.2 吊装式风机安装工艺流程 吊装位置确认吊架及减振器(垫)安装风机安装风机与风管连接 3 施工要点 3.1落地式风机安装 3.1.1对基础的强度、尺寸、预埋件等进行验收,基础边到风机底座边的距离尺寸以100mm为宜。减振器安装采用设计要求的胀锚螺栓或地脚螺栓固定。如设计无特别说明采用胀锚螺栓。 3.1.2风机设备安装就位前,按设计图纸并依据建筑物的轴线、边线及标高线放出安装基准线。将设备基础表面的油污、泥土和螺栓预留孔内的杂物清除干净。 3.1.3风机安装在有减振器的基础上时,地面要平整,各组减振器承受的荷载压缩量应均匀, 高度误差小于2mm,不偏心。 3.1.4每台风机减振器的型号、数量根据风机参数(外形尺寸、电机位置、风机运行重量等)确定。 3.1.5风机安装在无减振器基础上,风机支架下垫橡胶减振垫(厚度按照风机厂商技术要求选择),找平找正后固定风机。 3.1.6风机与风管连接 (1)风机与风管之间应采用帆布软接头连接,防排烟风机软接头材料为不燃材料。 (2)软接头尺寸应与风机进出口尺寸一致。当风管与软接头尺寸不一致时,采用变径将风管与软接头连接。 (3)风机进出口法兰与软接头法兰间采用螺栓连接,螺栓孔须机械加工。螺栓的大小、间距与同系统同尺寸风管法兰的连接一致。 (4)帆布与法兰的压边:压条宜采用1.0mm厚的镀锌钢板,压条及帆布在法兰连接端翻边5mm,采用铆钉固定,铆钉间距100mm为宜。

空冷器

一、空冷器基础知识 1.什么是空冷器? 答:空气冷却器是以环境空气作为冷却介质,横掠翅片管外,使管内高温工艺流体得到冷却或冷凝的设备,简称“空冷器”,也称“空气冷却式换热器”。空冷器也叫做翅片风机,常用它代替水冷式壳-管式换热器冷却介质,水资源短缺地区尤为突出。 2.空冷器主要由哪几部分设备或部件构成? 答: 空冷器主要由管束、风机、构架及百叶窗所组成。 3.空冷器如何分类? 答:以空冷器冷却方式分类,可分为:干式空冷器,湿式空冷器,干-湿联合空冷器,两侧喷淋联合空冷器;以空冷器管束布置型式分类,可分为:水平式空冷器,斜顶式空冷器,立式空冷器,圆环式空冷器;以空冷器通风方式分类,可分为:自然通风式空冷器、鼓风式空冷器、引风式空冷器。 4.空冷器翅片管有那些型式? 答:空冷器翅片管有L型翅片管,LL型翅片管,G型(镶嵌式)翅片管,KL 滚花型翅片管,DR型双金属轧制翅片管,TC型椭圆管套矩形片翅片管,T60型板翅片翅片管等结构形式。 5.空冷器管箱有哪些型式? 答:空冷器管箱有丝堵型管箱,可卸盖板管箱,集合管式管箱,可卸帽盖板管箱,全焊接圆帽管箱,整体锻造管箱等结构形式。 6.空冷器的风机有哪些基本型式? 答: 引风式风机的优点有:1.气流分布均匀,2.噪音较小,3.管束下部空间可以利用,缺点有:1.风机安装在管束的上部,受管束高温的影响,不利于维护风机。2.经管束后进入风机的空气温度较高,故引风式比鼓风式消耗功率约大10%。3.管束需从下部检修,操作不方便。 8.鼓风式风机有哪些优缺点? 答: 鼓风式风机的优点有:1.易于产生湍流,对传热有利。2.操作费用较低。3.可以从上部检修管束,操作方便。缺点有:1.气流分布不均匀。2. 管束上部敞开容易受日光和雨水的影响。 二、设计

空冷器知识

空冷器管束泄漏的处理方法 1.换热管堵漏 空冷器管束经过一段时间的运行后,由于腐蚀等原因造成穿漏,可以采用化学粘补、打卡注胶和堵管等修理方法处理。当换热管泄漏量小时,可在不停车的情况下将管外的翅片除去,然后再进行化学粘补包扎或打卡注胶堵漏;如果不能用上述方法消漏,则应将管束停车吹扫干净,拆开管箱上的丝堵,在换热管两端用角度3°~5°的金属圆台体堵塞,以达到消漏。 2. 换管 当空冷器管束非均匀腐蚀或制造缺陷而泄漏时,可采用换管消漏。首先将要更换的管子拆下,清洗管箱管孔。更换新管时,将管子中间稍拉弯曲,即可从两端管板孔穿入,穿入后进行胀接或焊接。空冷器翅片管的管子材料如何选用? 一般来说,翅片管的基管和翅片可采用各种金属材料进行组合,但在具体选用时既要考虑被冷介质的性质,操作条件,也要考虑材料本身的工艺性能、价格等因素。管子的材料一般用碳钢、不锈钢、铜、铝、钛、镍、铜合金、蒙乃尔合金以及碳钢-不锈钢双金属管,也有在碳钢管内衬一层搪瓷。 应用最多的是无缝钢管。在工作压力和温度较低而对防腐要求又不高的空冷器中,可采用高频焊接的有缝碳钢管,以降低造价。铝和铝合金管子只在低于0.2 MPa和150℃条件下使用。 空冷器风机的叶片制造材料主要有两种: 1.铸铝叶片 强度及耐温性均好,但总量因素使其只能用于薄翼型叶片,空气效率较低。 2.玻璃纤维增强塑料(玻璃钢)叶片

●强度好,耐温性差,一般为空腔薄壁结构或泡沫塑料填充,适用于各种叶型截面,制造精度 高,空气效率亦高。 叶片损坏原因: ●叶片安装不当 ●叶片材质缺陷 处理方法: ●重新装配叶片并调整好叶片的角度;每台风机叶片的安装角度应按空冷器单元或组的设计总 装图规定的角度,或按操作工况要求的角度安装。叶片角度误差不得大于±0.5°,安装角度的测量部位在叶片的标线位置(叶片出厂时,一般在叶片上涂有黄色或其他颜色标线位置标记)。 ●更换叶片 空冷器的检修维护 空冷器检修包括哪些主要内容: ?清扫检查管箱及管束。 ?更换腐蚀严重的管箱丝堵、管箱法兰的联接螺栓及丝堵、法兰垫片。 ?检查修复风筒、百叶窗及喷水设施。 ?处理泄漏的管子。 ?校验安全附件。 ?整体更换管束。 ?对管束进行试压。 ?检查修理轴流风机。 空冷器管束的维护注意事项 1.检查管束各密封面不得有泄漏现象.如有泄漏时,丝堵式管箱可将丝堵适当拧紧,仍无效果时,应停机更换垫圈或换丝堵(凡需更换垫片或螺接紧固件时,应先停机并将介质防空,然后进行). 2.翅片管端泄漏时,允许将管子重胀.重胀次数不得超过2次,并注意不要过胀.无法用胀接修复时应更换翅片管.作为临时措施,也允许用金属塞堵塞. 3.如需到管束表面上检查时,应在翅片管上垫以木板或橡胶板,以免损坏翅片. 4.铝翅片如被碰倒时,应用专用工具(扁口钳)扶直. 5.定期清除翅片上的尘垢以减少空气阻力,保持冷却能力.清除方法用压力水或压缩蒸汽冲刷. 6.检查管束热偿结构工作是否正常,浮动管箱移动必须灵活,不允许有滞卡现象. 7.定期维护时,应用蒸汽及水冲刷管束内部,务必将污垢除净.并应检查腐蚀厚度,其值不应超过规定值(碳钢为3毫米).检查后重新安装时.应更换丝堵垫片及法兰. 8.定期维护时,应在管束外表面(不包括翅片表面)涂一层银粉漆. 空冷器管束操作时应注意的事项 1.管内介质、温度、压力均应符合设计条件,严禁超压,超温操作. 2.管内升压、升温时,应缓慢逐级递升,以免因冲击驟热而损坏设备. 3.空冷器正常操作时,应先开启风机,再向管束内通入介质.停止操作时,应先停止向管束内通入介质,后停风机. 4.易凝介质于冬季操作时,其程序与3条相反. 5.负压操作的空冷器开机时,应先开启抽气器,管内达到规定的真空度时再启动风机,然后通入管内介质,停机时,按相反程序操作.冬季操作时,开启抽气器达到规定真空度后,先通入管内介质,再启动风机,以免管内冻结无法运行. 6.停车时,应用低压蒸汽吹扫并排净凝液,以免冻结和腐蚀. 7.开车前应将浮动管箱两端的紧定螺钉卸掉,保证浮动管箱在运行过程中可自由移动,以补偿翅片管

风机安装方法及注意事项

风机安装方法及注意事项 一、风机选用: 实验室通风工程中常用的风机有离心式风机、 轴流式风机、斜流式风机三种方式,根据实际情况及我公司多年来的经验,通风实验室设计方案将选用离心式风机。 二、风机安装: a、风机的基础要求水平、坚固,且基础高度≥200mm。 b、风机与风管采用软管(柔性材料且不燃烧)连接,长度不宜小于200mm、管径与风机进出口尺寸相同。为保证软管在系统运转过程中不出现扭曲变形,应安装的松紧适度。对于装在风机吸入端的帆布软管,可安装稍紧些,防止风机运转时被吸入,减少帆布软管的截面尺寸。 c、风机的钢支架必须固定在混凝土基础上,风机其钢支架与基础之间必须增加橡胶减振垫。全部风机及电动机组件都安装在整块的钢支架上,钢地架安装在基础顶部的减振垫上,减振垫最好用多孔型橡胶板。 d、风机出口的管径只能变大、不能变小,最后出风口要安装防虫网,偏向上出风时须增加风雨帽。

三、风道支架安装注意事项: a、凡风道支架上的螺栓孔一律采用钻孔,不得采用气焊割孔; b、带有斜支撑的托架,焊缝应为满焊; c、吊架中吊杆下料应准确,吊杆中间不宜出现搭接焊缝; d、当风道断面较小时,风道吊杆可采用膨胀螺栓固定在楼板上,当风道较大时,应采用钻孔固定的方式; e、支架在安装前,应在墙体、柱体和楼板面上弹出风道的中心线,然后再确定支架的水平位置及标高,可保证安装后的风道的水平度和平面中心位置; f、支架安装前,应对外露部分进行除锈、刷防锈漆处理; g、无特殊要求时,风道支架的间距一般为3m,但在不足3m的风道应在两端各安装一支架,在三通和弯头处宜加设支架; h、在风道支架上不得安装其它专业的管道或线缆。 四、混凝土基础施工注意事项: e、土建在浇注混凝土前,应与专业设计图纸复核基础的位置、基础顶面的标高、基础的几何尺寸、预留螺栓孔洞的位置和深度,基础顶面标高不宜出现正误差(即不宜调出设计标高)。 f、基础埋入地面以下的深度应按设计要求施工,一般不小于50mm,混凝土应密实,外表面光滑,混凝土强度等级符合设计要求。 g、风机固定后,应进行二次灌浆地脚螺栓孔。二次灌浆宜采用豆石混凝土,不得用水泥砂浆灌注孔洞。

空冷器检修施工方案

空冷器检修施工方案文件编码(008-TTIG-UTITD-GKBTT-PUUTI-WYTUI-8256)

附录E 编号: 空冷器检修施工方案 装置名称: 设备名称: 设备位号: 工作令号: 编制: 审核: 会签: 审批: 二○一年月日

目录 一、项目名称、概况 二、检修内容 三、施工验收标准、质量管理程序文件 四、施工组织及HSE、质量控制体系 五、主要施工工器具 六、施工方法和步骤 七、关键质量控制点及质量验收指标 八、人员配备及相关资质要求 九、检验仪器设备清单 十、HSE措施和注意事项 十一、施工网络进度、施工平面图 十二、备品备件表 十三、检修施工危害分析记录表 十四、检修施工作业环境因素表 十五、应急措施

一、项目名称、概况 1、设备简介 (1)设备名称: (2)设备位号: (3)设备型号: (4 2 二、检修内容 1、拆除与旧设备连接的所有管线与法兰。 2、清扫检查管箱、换热管及翅片。 3、更换腐蚀严重的管箱丝堵、管箱法兰的联接螺栓及丝堵、法兰垫片。 4、打开堵头,检查管箱内、管子胀口及管内部腐蚀及结垢。 5、检查修复风筒、百叶窗及喷水设施。 6、处理泄漏的管子。 7、整体更换管束。 8、新空冷器试压消漏。 9、吊车配合新旧空冷器拆装。 10、平台、梯子及钢结构拆装。 11、空冷器接管重新配管安装。 12、空冷器接水槽及接管恢复,重新焊接,试水消漏。 13、各连接阀门及油漆保温等恢复。

三、施工验收标准、质量管理程序文件 1、SHS 01010-2004 《空气冷却器维护检修规程》 2、HG 20201-2000 《工程建设安装工程起重施工规范》 3、SHS 01034-2004 《设备及管道油漆检修规程》 4、GB 50205-2001 《钢结构工程施工质量验收规范》 5、SH 3501-2011 《石油化工剧毒、可燃介质管道工程施工及验收规范》 6、GB 50235-2010 《工业金属管道工程施工及验收规范》 7、JGJ 46-2005 《施工现场临时用电安全技术规范》 8、SH 3505-1999 《石油化工施工安全技术规程》 9、Q/YPMC-M01-2012 《质量手册》 10、Q/YPMC-QP01~33-2012 所有相关程序文件和管理制度 四、施工组织及HSE、质量控制体系 1、施工组织 2、质量保证体系

风机安装技术交底

标准文案 2.施工准备 2.1 作业条件 (1) 参与施工人员应认真熟悉施工图纸、风机安装技术文件、质量标准,做好有关技术测量记 录准备,了解各熟悉施工现场条件。 (2) 作业班组做好施工机具、测量工具准备。使用前进行性能检查,量具必须是合格有效,不 得使用过期失效无检验合格证的测量器具。 (3) 对落地安装的风机基础进行验收,验收内容包括①对基础进行外观检查,不得有裂纹、蜂 窝、空洞、露筋等缺陷。②按要求对基础尺寸和位置进行复测,其允许偏差应符合下面要 求。③纵横中心线位置允许偏差为土 20mm ④基础标高偏差在 0-20mm 之间。⑤基础平面外 形尺寸允许偏差为土 20mm ⑥基础平面水平度每米范围内允许偏差不大于 5mm 全长范围内 允许偏差不大于10mm ⑦基础复查合格后,由土建单位向安装单位办理中间交接手续。 (4) 对施工现场吊装、安装作业面进行清理,确保施工的顺利开展。 2.2风机开箱检查 (1) 开箱检查应在建设单位、监理、厂商及施工单位有关人员参加下进行。 (2) 检查箱号、箱数是否与运输单据相符以及包装情况。 (3) 开箱后认真核对设备的名称、型号、和规格。设备及其零部件无变形、损坏、锈蚀、错乱或丢 失。手动盘车,检查叶轮与外壳无擦碰,摩擦。 (4) 核对装箱清单、设备技术文件、资料及专用工具,应妥善保管。如有缺损或与要求不符的情况 出现,应 及时由厂商更换。 (5) 填写现场设备开箱记录,会同各单位签字盖章,作为交接资料和设备的技术档案依据。 2.3机械设备 倒链、滑轮、绳索、撬棍、活动扳手,铁锤、钢丝钳、螺丝刀、水准仪、水平尺、钢板尺、钢 卷尺、线坠、平板车、脚手架、电钻、手动砂轮机、红外线放线仪、油桶、刷子、棉布、棉丝等。 3.施工工艺

直接空冷机组冷却风机运转状况与环境风的关系

直接空冷机组冷却风机运转状况与环境风的关系 林宝庆1潘宇峰2朱宝田1 (1西安热工研究院有限公司710032, 2山西华能榆社电力有限责任公司031800) 摘要对山西华能榆社电力有限责任公司300MW直接空冷机组在环境风速增大、风向发生变化和环境温度升高时运行工况的测试表明,空冷岛风机群冷却风机的运转状况发生了改变,耗功增加。获得了各工况的冷却风机运转状况和耗功与环境风速、风向、气温变化之间的关系,可指导直接空冷机组安全经济运行。 关键词直接空冷冷却风机环境风 The Relationships between Wind and Draft Fans Operation for the Direct Dry-Cooling Unit LIN Baoqing1, PAN Yufeng2 , ZHU Baotian1 ( 1Xi’an Thermal Power Research Institute Co.,Ltd , 2Shanxi Huaneng Yushe Power Co., Ltd) Abstract: They have been done that the tests of operation for direct dry-cooling 300MW unit in Shanxi Huaneng Yushe Power Co., Ltd. The tests indicate, draft fans operation change and their power consumption increase along with wind speed ,wind direction and temperature. This paper summarizes the relationships between draft fans operation , their power consumption ,and wind speed ,wind direction , temperature. These would guide the operation safely and economically for the direct dry-cooling unit. Keywords: direct dry-cooling , draft fan , wind

空冷说明书

操作使用说明书 控制箱温度调节机系列 宝鸡雷博精密工业有限责任公司 目录 一、适用范围 本机组主要用于对各种电气柜内的空气进行冷却、加热、除湿和净化处理,以保证电气元件在安全温度和湿度条件下可靠工作,延长其使用寿命。适用于机械、电力、轻工、仪器仪表、纺织等行业对温湿度有较高要求的各类控制箱、配电柜及其它电气装置,也可用于小空间的温度、湿度调节。 二、安装 (一)安装要求 1、机组应垂直安装在通风良好且远离灰尘处,另外应保证其外侧进出风口与墙壁或其它物体间距离在1m以上。 2、机组周围不应存在腐蚀性气体和易燃易爆等危险气体,安装位置附近也不应有高温热源和其它发热物体,并避免阳光直接照射到机组上。 3、机组可安装在控制箱正面、侧面(LA-□□B/Q型)或顶部(LA-□□C型),加热器组件应安装在控制箱内,具体位置由用户自行确定。安装部位结构件应能充分承受机组重量。

4、用户应按照产品样本规定,预先在控制箱上加工好机组的送回风口和安装孔。送回风口的位置应确保箱内空气流向合理,循环畅通,温度均匀性好。 5、机组应使用专用电路供电,电源线截面积应符合相关规定,并在电路上安装规定容量的空气开关或保险装置及漏电断路器。 6 7401234注:123123

4、加热指示(HEATER):冷热双制型机组进入加热状态时,该指示灯(绿色)亮。 5、设定/显示(SET/ENT):当揿一下该按键,数码管闪烁,表示需要设定温度,温度设 定图5控制面板 后具有掉电保护功能。设定温度最高为35℃,最低为25℃(具体见附录参数表)。温度设定后再按一下该按键,数码管重新显示箱内实测温度。 6、增量(△):调节设定温度,揿一下增加1℃,最高为35℃。 7、减量(▽):调节设定温度,揿一下减少1℃,最低为25℃。 (二)温控条件 (三)独立除湿条件(带独立除湿功能机型) 在高湿度条件下,当机组湿度传感器检测到的箱内空气相对湿度RH≥75%,并且箱内温度低于设定温度时,压缩机和风机周期性运转,对箱内空气进行除湿。 四、试运转 (一)运转前检查 确认机组固定牢靠,全部安装工作正确无误,供电电源符合要求,控制箱密封情况良好。 注:若因供电体制原因无法提供零线、需用地线代替零线时,地线的接地电阻应符合要求并可靠接地,但此时不得使用漏电保护开关。 (二)通电运转 1、向机组供电,机组控制面板显示正常,箱内侧风机工作,箱内空气开始循环。 2、调整箱内设定温度: (1)按下SET/ENT按键,数码管闪烁,显示设定温度; (2)若设定温度需要修改时,揿增量按键(△)或减量按键(▽),使设定值改变为所需要的值; (3)再按一下SET/ENT按键,显示箱内实际温度,同时保存设定值。 3、按操作说明要求,确认机组运行正常,电器部件工作可靠,无其它异常声音和现象。 4、在机组正常制冷运行20min后,控制箱内侧送回风口温差应达到5~8℃。 五、注意事项及维护保养

风机安装方案

赤峰新胜风力发电有限公司金风S48/750型风力发电机安装 现 场 学 习 总 结 编制:尹晓风 2006年8月

目录 一、工程概况 2 二、安装方法 2 1.安装步骤 2 2.设备安装 2 ⑴设备的卸车 3 ⑵基础环及设备的检查 3 ⑶电气控制柜的吊装 4 ⑷下塔筒的安装 4 ⑸上塔筒的安装7 ⑹机舱的安装7 ⑺叶片、轮毂的组装8 ⑻叶轮的安装9 3.电气安装12 ⑴电气控制柜的安装12 ⑵电气接线12 ⑶风机防雷接地15 三、主要施工机械机具、材料及劳动力计划15 1.主要施工机械机具15 2.主要施工材料16 3.劳动力计划17 四、安全施工管理措施18

一、工程概况 新胜风力发电有限公司一期100.5MW风力发电安装工程位于内蒙古赤峰市翁牛特旗灯笼河牧场,共有风机134台,我公司承担其中 67台的安装工作。 本工程所安装的风机为金风科技有限公司S48/750型风力发电机组,设备高度约50米,单体重量80吨。各部件组成及重量如下: 承担本次吊装工程的主吊车为KH 850-3型150吨履带吊,主臂长度69米,另有一台GT-550E型55吨汽车吊和一台TR-250M型25 吨越野吊做抬尾递送及辅助工作。 二、安装方法 1.安装步骤 设备的卸车→基础环及设备的检查→ 电气控制柜的吊装→下塔筒的安装→上塔筒的安装→机舱的安装{} 叶片、轮毂的组装(叶轮) →叶轮的安装→电气安装 2.设备安装

⑴设备的卸车 ①塔筒 塔筒的生产厂家有两家,分别为胜利油田和南京江标。南京江标为每个塔筒进行了编号,因此卸车时应对号入座。而胜利油田的塔筒则可以任意对应。 卸车时将平板车开至履带吊工作半径内,由履带吊将塔筒吊至地面。塔筒在地面存放时需在距两端法兰2米位置处加垫道木,以防止法兰变形。另在道木上铺垫碎布并在塔筒两端打眼儿,防止刮伤漆膜及塔筒滚动。 也可由55吨汽车吊将塔筒吊至地面。 ②机舱 机舱自重较大,且为玻璃钢外壳,不能直接吊装,可通过机舱顶部的四个吊装孔,将绳索伸至机舱内部,利用生产厂家设计好的四个吊点及吊耳,由履带吊或55吨汽车吊将机舱吊至地面。 ③叶片 叶片重量较小,卸车工作可由25吨越野吊完成。叶片上有厂家设计好的吊装位置,在此位置用单根吊装带锁紧叶片即可将其吊至地面。为便于叶片的运输,厂家为叶片设计了鞍座,卸车时要将鞍座一起吊至地面,以便于叶片的存放。 ⑵基础环及设备的检查 设备卸车完毕后要对其进行检查,以确定设备是否完好、合格。 首先检查零部件是否齐全,设备外观是否完好,看设备漆膜是否

空冷配电间设计及选型

空冷配电间设计及选型 空冷系统配电是整个空冷设备中的一部分,它承担着给空冷岛及其附属设备供电的任务,通过其可以控制空冷风机电机转动来冷却翅片管内的各种介质,在化工、炼油、石化、传统能源发电厂、垃圾焚烧发电厂和钢厂等领域有着举足轻重的地位。使用空气不仅是一种低投资成本、低运行成本的选择,而且可以减少江河湖泊水的温升,有利保护保护环境,尤其是当今越来越重视环保,减少对水资源的浪费,保护绿水青山,空冷配电部分在空冷设备里起着供给、监测、控制电能的作用,使其整个空冷设施能够达到节能、高效、稳定的目的。 标签:空冷配电间;配电柜;干式变压器 Abstract:Air cooling system distribution is a part of the whole air cooling equipment,which is responsible for supplying power to the air cooling island and its auxiliary equipment. It can control the rotation of the air cooling air electromechanical machine to cool all kinds of media in the finned tube. It plays an important role in the fields of chemical industry,oil refining,petrochemical,traditional energy power plant,waste incineration power plant and steel plant. The use of air is not only a choice of low investment cost and low operating cost,but also can reduce the temperature rise of rivers and lakes,and is beneficial to the protection of the environment. Especially,nowadays,more and more attention is paid to environmental protection and the waste of water resources is reduced. To protect green water and green mountains,the air cooling distribution plays the role of supplying,monitoring and controlling electric energy in the air cooling equipment,so that the whole air cooling facility can achieve the purpose of energy saving,high efficiency and stability. Keywords:air cooled distribution room;distribution cabinet;dry transformer 空冷器的配电间通常布置在空冷岛下面或这是侧面较近的区域,当然也有布置在距离空冷设施较远的地方,这种主要是同整个工程的配电设备布置在一起,便于维护。下面对于空冷配电间和用电设备设计和选型谈一些浅显的看法。 1 空冷配电间整体设计 空冷配电间通常来说是布置在空冷岛下方或者附近的一个房屋,它需要根据相关标准满足现行国家关于防火要求、遮阳和对视间距和距离的规范、规程、规定,设置在较高且不容易积水的地方,所以电缆隔层的底部要高于同层的建筑底部,来避免区域形成积水。空冷配电间通常有低压变压器、配电柜、变频柜、直流屏的设备及材料。这些设备常规布置在同一房间内,供电从主厂房引至空冷配电间内的低压变压器高压侧,经过变压器至配电柜和变频柜,再经过配电柜和变频柜至用电设备。

空冷器安装施工程序

空冷器安装施工程序 SDB/RP/CTRU/JS/03

目录 1.0 目的及适应范围...................................................... 2.0 编制依据............................................................ 3.0 人员及职责.......................................................... 4.0 施工程序............................................................ 5.0 施工记录............................................................ 6.0 修订注释............................................................

1.0 目的及适应范围 本程序规定空冷器现场处置、安装。需要时,该工作由安装工程师结合厂家代表一起完成。 2.0 编制依据 项目标准和规范 批准的施工设计图 厂家产品合格证和质量证明书 3.0 人员及职责 设备安装工程师负责空冷器安装的现场技术管理工作;吊装工程师负责空冷器吊装的技术管理工作。 4.0 施工程序 4.1 施工程序 空冷器安装程序如下: 施工准备→设备检查→设备就位→找平找正→调整间隙→接电试运 4.2 设备检查验收 空冷器到货后及时开箱检查、报验,出厂合格证书,质量证明书及安装说明书应齐全。设备附件齐全,外观质量完好无损,实物符合图样要求。 4.3 空冷器框架梁上安装空冷器的位置标高水平度螺孔尺寸及距离,均应符合空冷器 的图样要求。 4.4 空冷器安装 空冷器的侧梁上带有伸缩用的导滑螺栓,吊装时必须紧固,安装后立即松开。当空冷器的漏气间隙大于10毫米时,应采用有效的密封措施。空冷器的风机叶片,必须按制造厂装配标记进行组装,风筒的内壁于叶片尖的间隙,必须符合设计要求间隙均匀。 4.5 空冷器的电动机及传动机构安装、调整、试车应符合有关标准和技术文件规定。 5.0 施工记录 设备检验记录

直接空冷凝汽器 空冷岛运行维护手册 HAC_S-D01.1

直接空冷凝汽器空冷岛运行维护手册HAC/S-D01.1 哈尔滨空调股份有限公司

第一部分:总的安全措施 一.一般性说明 二.运行、检查和修理时的安全措施 三.启动时的安全措施 四.持续运行时的安全措施 五.停机时的安全措施 六.不遵守安全措施的危险 七.ACC 平台下的变压器(如有) 一.一般性说明: 本手册包括了关于ACC系统的运行、检查、维护的基本说明。有关操作人员必须遵守。该设备的功能为蒸汽冷凝器,必须由合格人员进行操作和检查,操作员应在开始使用前完整地学习本手册。严禁雇用不合格的员工,操作员必须明白所有安全措施。本手册适用于指定的运行工况,对于极端运行工况,应有特殊考虑。特殊运行工况要求操作员要更多的加以注意,对于本手册没有预计到的工况或问题,请及时与哈尔滨空调股份有限公司联系。 对于由于自然原因造成业主的全部或部分损失,由于业主的代理或雇员没有严格遵守本手册的每一个过程,指导和注意事项而造成业主的全部或部分损失,及擅自改动本手册而造成的业主的全部或部分损失,哈尔滨空调股份有限公司公司不承担责任。任何此类违反操作规程的行为也将免去哈尔滨空调股份有限公司公司对受影响的工作部分的保障。 二.运行、检查和修理时的安全措施: 进行任何工作时都应遵守安全措施及事故预防措施。任何工作开始前,所有设备应断电,并采取措施防止设备重新启动的事故。电机、风机、泵、执行机构应静止、断电,并从主控制室进行闭锁,防止发生误动。注意事故预防措施, 风机齿轮箱输出端和电机的轴承可在设备运行时从风机梁步道上给予加注润滑液,不可在风机运行时给齿轮箱换油。 警告:电厂内人员应戴安全帽、穿防护鞋。 要特别注意下列各项工作时,必须做好有关安装措施: 1.对风机采取任何操作前,必须关掉电机,切断电源并锁止。在电机梁上工作

风机安装施工标准做法

15风机安装施工规范做法 1工艺原理 利用支吊架等将柜式、管道式风机固定在楼板下或设备基础上。 2工艺流程 2.1 落地式风机安装工艺流程 基础验收减振器(垫)安装风机安装风机与风管连接 2.2 吊装式风机安装工艺流程 吊装位置确认吊架及减振器(垫)安装风机安装风机与风管连接 3施工要点 3.1 落地式风机安装 3.1.1 对基础的强度、尺寸、预埋件等进行验收,基础边到风机底座边的距离尺 寸以 100mm为宜。减振器安装采用设计要求的胀锚螺栓或地脚螺栓固定。如设计无特别说明采用胀锚螺栓。 3.1.2 风机设备安装就位前,按设计图纸并依据建筑物的轴线、边线及标高线放 出安装基准线。将设备基础表面的油污、泥土和螺栓预留孔内的杂物清除干净。 3.1.3 风机安装在有减振器的基础上时,地面要平整,各组减振器承受的荷载压 缩量应均匀 , 高度误差小于 2mm,不偏心。 3.1.4 每台风机减振器的型号、数量根据风机参数(外形尺寸、电机位置、风机 运行重量等)确定。 3.1.5 风机安装在无减振器基础上,风机支架下垫橡胶减振垫(厚度按照风机厂 商技术要求选择),找平找正后固定风机。 3.1.6 风机与风管连接 (1)风机与风管之间应采用帆布软接头连接,防排烟风机软接头材料为不燃材料。 (2)软接头尺寸应与风机进出口尺寸一致。当风管与软接头尺寸不一致时,采用变径 将风管与软接头连接。 (3)风机进出口法兰与软接头法兰间采用螺栓连接,螺栓孔须机械加工。螺栓的大小、间距与同系统同尺寸风管法兰的连接一致。 (4)帆布与法兰的压边:压条宜采用 1.0mm厚的镀锌钢板,压条及帆布在法兰连接端翻边 5mm,采用铆钉固定,铆钉间距 100mm为宜。 1 / 5

直接空冷机组空冷风机变频调速的节能分析

收稿日期:2008-07-02 梁伟平(1963-)男,河北保定人,博士,从事自动化领域的教学和科研工作。E -mail:lwp -123a@https://www.360docs.net/doc/f715514118.html, 速,在满足机组运行工况要求的前提下,使风机经常在需要的低转速下运行,噪声和磨损都比额定转速时低,有利于节约能源、环境保护、降低维修费用并延长设备寿命;实现电动机的软启动;对电动机提供各种保护功能;方便改变电动机的转向,实现部分空冷风机逆向运行;调速灵敏、线性度好。目前,采用变频器调整空冷风机转速已得到了较多的应用,实践证明这种变频调速方法具有很好的节能价值。 1空冷风机变频调速系统组成及结构 空冷风机变频系统的电源由变压器及PC 柜通 过母线分别送给每台空冷风机变频器,每台变频器安装于独立的变频控制柜内,以下介绍变频柜、柜内设备及控制回路情况。 1.1隔离刀熔 隔离刀熔为母线提供保护作用,另外当变频器 及电机检修时,可断开电源,提供明显的断开点。塑壳断路器也可起到相同的作用,与隔离刀熔相比,其缺点是结构复杂、故障率高。率取在额定转速的0%~110%。(2)通过正反转切换端子实现风机和电动机的正向和反向旋转。(3)实现过压、过流、接地、短路等保护功能。(4)实现电动机的软启动。 1.4交流输出电抗器 当变频器到电机的连线超过80m 时,建议采用 多绞线并安装可抑制高频振荡的交流输出电抗器,避免电机绝缘损坏、漏电流过大和变频器频繁保护。 1.5电动机 电动机需选用变频专用电动机,电动机功率根 据所选风机的不同为90~132kW 。 1.6变频器控制柜 变频器安置在一个就地控制柜内,柜内包括主 回路和控制回路、变频器与DCS 连接的用户接线端子、隔离刀熔、选择的输入/输出电抗器、可选择的输入/输出滤波器、保险丝、控制电路变压器及电机加热接触器等所有提供必要功能的设备。机柜外壳的防护等级,控制室内为IP32。机柜设计一般满足电缆由柜底引入的要求,特殊要求时电缆可由柜顶进入。机柜内端子排布置在易于安装接线的地方。在就

空冷器使用说明及注意事项参考

空冷器管束操作时应注意的事项 1.管内介质、温度、压力均应符合设计条件,严禁超压,超温操作. 2.管内升压、升温时,应缓慢逐级递升,以免因冲击驟热而损坏设备. 3.空冷器正常操作时,应先开启风机,再向管束内通入介质.停止操作时,应先停止向管束内通入介质,后停风机. 4.易凝介质于冬季操作时,其程序与3条相反. 5.负压操作的空冷器开机时,应先开启抽气器,管内达到规定的真空度时再启动风机,然后通入管内介质,停机时,按相反程序操作.冬季操作时,开启抽气器达到规定真空度后,先通入管内介质,再启动风机,以免管内冻结无法运行. 6.停车时,应用低压蒸汽吹扫并排净凝液,以免冻结和腐蚀. 7.开车前应将浮动管箱两端的紧定螺钉卸掉,保证浮动管箱在运行过程中可自由移动,以补偿翅片管热胀冷说的变形量. 空冷风机系统的维护保养及使用注意事项 1、日常巡检 运行中有无异常性声音和振动. 回转部件有无过热、松动. 2、定期维护保养 每三个月通过注油嘴加注锂基润滑油. 定期调整三角带的松紧度,并检查三角带胶带的磨损程度,磨损严重的应及时予以更换. 全面检查各零、部件的紧固状态一年一次.

风筒与叶轮的径向间隙检查一年一次. 叶片角度及叶片沿风机轴向跳动应每年检查、调整一次. 清除风机叶片表面油污,检查叶片损坏,半年一次. 3、使用注意事项 风机使用角度不得超过规定的调角范围以防电机过载. 加注黄油不应超过油腔的2/3,以免轴承过热. 每次检修和更换电机时,必须注意接线相应,应保证风机叶轮俯视顺时针方向旋转. 皮带传动机构的皮带应保持一定的张紧力。如过于松弛,则电机的动力无法有效的传递至风机,风机效率下降,甚至造成皮带飞出的事故。 如皮带过紧,摩擦阻力增大,容易造成电机超负荷,长时间运行还会造成电机,风机轴弯曲,轴承松动,致使振动,噪音增大,影响设备运行。 定期检查更换风机的皮带,确保风机使用正常。 兰州长征机械有限公司 2015年1月

相关文档
最新文档