aLF English - E01
aLF (adidas Lean Fulfillment)
General guideline on how to apply each level when making the evaluation
Level 0: The component is not in place at all or there are major inconsistencies in implementation --- score 0
Level 1: The component is in place but there are minor inconsistencies in implementation --- score 1.0
Level 2: The component is fully in place and effectively implemented --- score 2.0 Level 3: The component is fully in place, effectively implemented and exhibits improvement in execution over the past 12 months --- score 4.0
Management Trust (1)
1A: Factory continuous Improvement Deployment Actions are planned with targets annually, all KPI information is well extended to all levels L0: No formal Policy Deployment Plan exits
L1: Policy Deployment plan exits within the organization but is not
cascaded down to all levels
L2: PDP is formalized, includes specific Lean Objectives/targets, with
accountability for completion & timing extended through the entire
organization.
L3: L2 plus evidence of refinement over the past 12 months.
1B: The Factory Senior Managers are actively leading the Deployment of Lean Practices
(Senior managers are the senior managers on site at the location being
evaluated)
L0: No evidence of senior management leading or participating in
activities
organized
Kaizen
L1: Involvement consists primarily of periodic reviews/meetings in group
settings to review Lean targets
L2: Senior management participates fully in organized Kaizen activities.
L3: L2 plus evidence of improvement in execution over the past 12 months
1C: Meaningful Incentives that reward Organization & Individual Lean Progress are in Place
L0: No recognition of lean progress contribution exits within the
organization
L1: Recognition of lean progress contribution is present but not formalized, benefits are non financial.
L2: Members of the organization are recognized for & share directly and
individually in the financial benefits of Lean progress
L3:L2 plus evidence of improvement in execution over the past 12 months 1D: Policies & Agreements are in place and followed to protect the Income & working conditions of individuals made surplus by Lean Progress L0: No policies/agreements are in place
L3: Publicized Policies/agreements are in place and being followed with a
continuing history sufficient to establish stability & believability.
People (2)
2A: Lean Training during paid time is conducted for all individuals within the organization
L0: No Lean Training is made
L1: Lean Introduction and skill improvement training is made
L2: Formal Lean training Programs are conducted to all levels of the
organization with defined subjects. Training is scheduled, schedule is
followed, training effectiveness is measured.
L3:L2 plus evidence of refinement over the past 12 months
2B: Organization is structured to Correspond to the Structure of the Value Stream through the business
L0: Organization reports by function, without cross-functional
accountability
L1: Organization corresponds to the value stream but with limited cross-
accountability
functional
L2: Organization is structured that each function team is assigned within a defined value stream.
L3: L2 plus evidence of refinement or improvement in execution over the
past 12 months
2C: Team (CI/IE or another form of kaizen team—formal or informal) is organized and accountable for Continuous Improvement activities within their segment of the value stream
L0: No team organization/accountability exits
L1: Team organization is in place but with indefinite authority and/or
accountability.
L2: Team accountability is identified and has the authority to implement
activities with the full support of senior
improvement
continuous
Management
L3: L2 plus evidence of refinement over the past 12 months
Information (3)
3A: Data Collection and its Use are the responsibility of the Individuals Most Closely Associated with that Part of the Process and is shared across the organization
L0: Minimal or No Data is collected. Data is not accurate or is not available
L1: Data exits but is incomplete or difficult to access. Collection is
performed by non-operating personnel unassociated with that part of
the process/value stream
L2: Operating data accurate, recorded, analyzed and used by the
operating personnel responsible for the part of the process/value stream
L3: L2 plus evidence of refinement over the past 12 months
Supplier/Organization/Customer (4)
4A: Both suppliers (Tier 2) and customers (adidas) participate at the earliest possible stage and in regular reviews of the Development / Commercialization / Production'
L0: Neither customers & suppliers are included in the teams or process
review
L1: Occasional involvement by suppliers and customers in the team or review
process
L2: Both customers & suppliers (materials, chemical, machinery etc.) are
appropriately represented and participate in regular process reviews
L3: L2 plus evidence of refinement over the past 12 months
Product (5)
5A: Product engineering and production Process are Conducted by Fully Integrated Teams. Cost, technical performance Specifications are clearly understood, Measurable, and agreed by all Stakeholders (adidas, T1&T2).
L0: The component is not in place at all or there are some major
inconsistencies/contradictions in implementation
L1: The component is in place but there are some minor inconsistencies in implementation
L2: All stakeholders are represented on the product/process teams. Cost, technical performance specifications for product & Process are clearly
understood and agreed to by all stakeholders
L3: L2 plus evidence of refinement or improvement in execution over the
past 12 months
5B: Product & Process development fully adhere to DFM (Develop for Manufacturing), and are consistent with Lean Principles (shorten lead time & waste reduction).
L0: DFM is not in place at all or there are major
inconsistencies/contradictions in implementation
L1: DFM is in place but there are minor inconsistencies in implementation L2: Product development fully adheres to DFM, and are consistent with principles
Lean
L3: L2 plus evidence of refinement over the past 12 months
5C: Provision is made for Continuity of Team Knowledge for the Duration of Product/Process Launch
L0: No provision is made for the continuity of team personnel, document
control system is unreliable
L1: Continuity is dependent upon integrity of document control system,
some personnel continuity
L2: Provision is made for continuity of team knowledge for the duration of the product/process launch. Constancy of team personnel assigned is
maintained in addition to integrity of document control system.
L3: L2 plus evidence of refinement over the past 12 months
5D: Lead Times for Development/Comm. are Measured and being Continually Shortened.
L0: Development/Comm Lead times are not measured or do not undergo examination for improvement
L1: Development/Comm activities are measured by means of program
time line charting
L2: Development/Comm Lead times are formally measured and being
Shortened
Continually
L3: L2 plus evidence of refinement or improvement in execution over the
past 12 months.
Process Flow (6)
6A: The work environment is clean, well organized and audited regularly against Standardized 6S Practices
L0: Procedures are not in place or there are major inconsistencies in
implementation
L1: Procedures are in place but there are minor inconsistencies in
implementation or not followed
L2: 6S is fully in place, effectively implemented and followed with a
program
structured
L3: 6S program is fully in place, effectively implemented and shows
improvement in execution over the past 12 months.
6B: An effective Planned Preventative Maintenance System is in Place with the Appropriate Maintenance Conducted at the Prescribed Frequencies for All Equipment
L0: Maintenance is conducted on a breakdown basis only
L1: Some planned maintenance is conducted, no predictive maintenance
place
in
L2: An effective planned maintenance system is in place with the
appropriate maintenance conducted at the prescribed frequencies for all
equipment and predictive maintenance being practiced where appropriate L3: L2 plus evidence of refinement and improvement in execution over the past 12 months
6C: Specifications are accurately catalogued and Standard Operations are accurately routed, timed and have been value engineered.
L0: Specifications and/or standard operations are not recorded or in use
L1: Specification & SO in use but are inaccurate, missing or outdated.
L2: Manufacturing activities correspond to specifications & SO for the
complete process. Evidence of value engineering in Spec or SO present
L3: L2 plus evidence of refinement over the past 12 months
6D: Value stream is fully mapped and Products are Physically Segregated into product families
L0: Value stream is not defined or not recorded
L1: Value stream is partially or inaccurately mapped or lack of product
segregation is seen
L2: Up to date value streams are mapped for all product families, product
segregation is in place
L3: L2 plus evidence of refinement over the past 12 months
6E: Production Sequence is Load-Smoothed to Customer Pull, and Demand is leveled Over the Manufacturing Planning Period.
L0: Production scheduling is reactive to immediate customer orders
without regards to smoothing or leveling. Obvious fluctuations present in
levels and manpower requirements.
production
activity
L1: Some machines/cells load planning is done over a production planning period. Deviations from production plan occur regularly.
L2: Production sequence is load-smoothed to production plan, and
demand is leveled over the manufacturing planning period
L3: Production sequence is load-smoothed to customer pull, and demand is leveled over the manufacturing planning period
6F: Process Flow is controlled by Visual tools.
L0: No visual tools used in the process flow
L1: Partial implementation of visual controls
L2: Production activities are controlled by visible indicators within the
flow
process
L3: L2 plus evidence of refinement over the past 12 months
6G: Process is in statistical Control with Capability Requirements Being Met and Process Variability Continually Reduced
L0: Statistical methods not in use
L1: Some statistical recording done, Statistical tools not being used to
reduce process variability or to correct root cause of variability
L2: Process is in statistical control with capability requirements being met
and process variability continually reduced.
L3: L2 plus evidence of refinement over the past 12 months
6H: Preventative Action, using a Disciplined Problem Solving Method, is taken and Documented in Each case of Product or Process Nonconformance.
L0: No consistent method of root cause analysis is in use.
L1: Root cause analyses are performed but documentation is weak or
incomplete. Preventative action is inconsistent
L2: Preventative action, using a disciplined problem solving method, is
taken and documented in each instance of product or process
Nonconformance
L3: L2 plus evidence of refinement and improvement in execution over the past 12 months
6I: Production flow starts Only upon Receipt of shipment order. Process Flows at Takt Time Rate, in single unit Quantities.
L0: Pull techniques not in use
L1: Partial Implementation. Inventory accumulation present
L2: Process flows at takt time rate in single unit quantities throughout the stream.
value
L3: L2 plus evidence of refinement and improvement in execution over the past 12 months
6J: Procedures are in Place and Being Followed that Result in Continually Shorter Changeover times and smaller lot sizes.
L0: Changeover procedures and methods are not recorded
L1: Partial implementation
L2: Changeover activities are planned and executed in a consistent
manner. Changeover histories are recorded
L3: L2 plus continually shorter changeover times and smaller lot sizes
6K: Factory Layout Requires Continuous Synchronized Flow of Material and in Factory Product Travel Distance is Continually Reduced
L0: Process being conducted by batch method
L1: Flow exits but is not synchronized or work-in-process accumulation is
present, in excess of calculated minimum
L2: Flow is synchronized without excess work-in-process accumulation
L3: Demonstration of L2 plus evidence of successive reductions in product travel distance by flow path improvement
6L: Documented standard work methods and line balance techniques are used to distribute work evenly throughout the cell
L0: Use a standard work methods / Line balance not observed
L1: Standard work methods / Line balance are defined but loosely
followed or not displayed, or correctable imbalances in the worker loading observed.
are
L2: Accurate Standard work methods are displayed and followed at each
workstation, no obvious imbalance is observed.
L3: L2 plus evidence of successive redistribution of individual worker loads as either takt times or product are altered in response to changing order
demand.
adidas CI : Sept 2006