海洋石油开发用英语

海洋石油开发用英语
海洋石油开发用英语

采油工艺及设备 1 单词及短语

1. The tripping pump shall be used for

stripping crude or crude oil washing.扫舱泵可用于原油舱或原油洗舱。

2. The stored crude is periodically

off-loaded through a metering unit to an export tanker moored side by side to the EPSU.库存原油通过计量装置后,定期输往旁靠的外输油轮。

3. Sampling valve of approved type

shall be fitted on main deck for each crude oil tank.每个原油舱在主甲板上都装有型号经过认可的取样阀。

4. FPSU is arranged with the special

ballast tanks at both sides (port and starboard), a forepeak

ballast tank, an aftmost tank are to be performed by ballast pumps. FPSU 的压载舱布置如下:布置在左舷和右舷的专用压载舱,一个艏尖压载舱,一个艉尖压载舱及为于机舱双层底的压载舱。

5. The ballasting and disballasting

for special ballast tanks and aftmost tank are to be performed by ballast pumps.专用压载舱和艉尖舱的压载由压载泵承担。

6. The hydraulically operated butterfly valve shall have an

actuator with locking device at closed position.液压蝶阀的执行机构应能锁定在关位。

7.

The hydraulic oil rump shall be stopped at low level in oil tank and the alarmbuzzer and lampoon the control panel shall be switched on.液压泵在油箱低油位时停泵,控制盘上的蜂鸣器和指示灯开始报警。 8. The solenoid valves shall be operated on the valve remote control console in the central control room by push button.在中控室的阀门遥控盘上,通过按钮来操作电磁阀。 9. Temperature alarm for casing, bearing and bulkhead

gas-tight seat of crude export and stripping pumps shall be provided and indicated on cargoes control console in CCR.原油外输泵,扫舱泵的壳体,轴承及气密隔舱装置的温度报警应设在中控室的货油控制台上。 10. Remote level and temperature gauging system is controlled by the computer, draft measurement with trim and list shall also be

integrated in the system.液位及温

度遥测系统由计算机控制,横倾和纵

倾的吃水深度测量也包括在此系统

中。

11.Tank washing by sea water is a

thorough washing and is carried

out when man needs entering the

crude oil tank.海水洗舱是彻底的洗

舱,在人员需要进入原油舱时采用该

种洗舱方式。

12.The flow of the cleaning fluid into the tank cleaning passes through

a turbine ,which installation of

the machine body and a vertical rotation of the nozzles.洗舱液进

入洗舱机后穿过一个旋转的涡轮,涡

轮的转动经过齿轮箱转换后变成机体

的水平方向的转动及喷嘴的垂直方向

的转动。

13.The oil content monitoring system shall monitor the discharge of

effluent into the sea and shall

stop any discharge of oily mixture automatically when the oil content

of effluent exceeds the figure permitted by regulations.污水含油

监测装置将监测排海污水液体,当油

份浓度超标时,会自动停止排放。14.The high velocity valve will open automatically when the inert gas

pressure in crude oil tanks up to

1400mmH2O column.当油舱惰气压力

达1400mm水柱时,高速释放阀将自动

打开。

15.The oxygen content of inert gas

supply to cargo tanks must be less

than 8%.供给货油舱的惰气其含量必

须低于8%。

16.Sounding pipes, vent pipes and

filling pipes shall be tested

after the installation on board in

accordance with DNV rules.测深,

放空和深入管线在船上安装之后,应

根据DNV规范进行试验。

17.By operating the three-position

change valve in different three positions, the winch can accomplish the operation of lowering and stopping, hoisting as well as capsizing the pneumatic accommodation ladder.通过操作三

位换气阀,气动舷梯在绞车的牵引下,

可以进行,停止,提升及翻转。

18.For lowering the rescue boat, first switching off the power supply, then raise the bobweight and let the brake release, the boat will be lowered by its own weight and the drums of winch shall turn reversely.放救助艇时,首先切断电

源,然后抬起重锤松开刹车,艇身靠

自身重量下滑,绞车滚筒反转。

19.During lowering the lifeboat, the manual handle should be removed

from the squared end of the shaft.

放救生艇时,手柄应当从传动轴的方

头上移开。

20.Before the operation of a lifeboat, make sure that the lubricating oil, diesel and cooling water are in

normal positing.操作救生艇前,要

确保机油,柴油和冷却水的液位正常。

21.When launching the lifeboat, release the Hydro-static Release

unit and let the lifeboat

launching automatically into the water. 放救生阀时,先松开静水压力

释放器,让筏自动划入水中。

22.Cast the lifebuoy overboard by

hand.用手将救生圈抛出舷外。

23.When the fender is floated on the sea, release the brake of hoisting winch by remote control device and make the wire in slack condition.

当碰垫浮在水面时,通过遥控装置松

开提升绞车的刹车,让钢丝绳呈松软

状态。

24.Pull up the davit arm up to stowont position by control the hydraulic valve, then set the stopper pin.

通过操作液压阀,收起吊架至垂直位

置,然后插上止停销。

25.Release the lashing device of fender.松开碰垫的系固设施。

26.The most important components of the hydraulic deck machinery plant

are the screw pump and the hydraulic motors.甲板液压机械的

最重要的部件是螺杆泵和液压马达。

27.On general, the hydraulic plants are so designed that one pump operates one or two (or several) hydraulic motors connected in series.通常,甲板液压系统设计成一

台或两台(或几台)串接的液压马达。

28.The hydraulic fluid delivered by the pump causes a rotor in the hydraulic motor to rotate, which rotation is used for the winch (windlass, capstan).泵送的液压油

造成液压马达的转子转动,带动绞车

(锚机,绞盘)运动。

29.The expansion tank is always

connected to the suction side of the pump which is designed to compensate automatically for any fluctuation in volume of the hydraulic fluid.膨胀罐始终和泵的吸口相连,用于自动补偿液压油的容

积波动。

石油钻井英语词汇

对照实物确认的钻井词汇 一、井口与井控 1.套管头升高短节(上下由法兰连接,中间是三通或四通)casing spool 2.油管悬挂器tubing hanger 3.油管悬挂器上边接有阀门的盖子tubing bonnet 4.(可焊接的)导管头(接箍)conductor connector 5.(可焊接的)套管头(接箍)casing connector 6.井口帽blanking cap & plug 7.三闸板防喷器triple slide-lok preventer 8.双闸板防喷器double slide-lok prevente 9.油/套管升高短节tubing/casing riser 10.整体式升高短节integral union riser 11.法兰×丝扣井口转换头wellhead adapter 12.井口四通两边的横向阀门wing valves 13.油管悬挂器上边的变径法兰大小头bonnet 14.上边是法兰的套管头casing flange 15.只上边是法兰,下边与表层套管焊接的套管头casing head 16.套管头内的卡瓦casing slips 17.(上法兰小,下法兰大)变径套管头casing spool crossover 18.与导管焊接的坐在圆井底的套管头landing head flange top 19.卡瓦密封套管悬挂器slips seal casing hanger

20.(上下是法兰,中间是四通的)油管升高短节tubing spool 21.柔性封隔闸板flexpacker ram 22.可变径闸板variable bore ram 23.剪切闸板shearing blind ram 24.卡瓦型套管悬挂器slip-type casing hangers 25.高负荷悬挂器high-load hanger 26.悬挂器断开式密封圈hanger isolation seal ring 27.井口封隔变径变压法兰(中间有几道密封圈,下边是低压,上边是高压)packoff/crossover flange 28.油管头(下法兰大,内带密封圈;中间是四通,上法兰小)tubing heads 29.底(下)变径法兰(下边内径大,上边内径小)basic adapter 30.单密封变径法兰(下内径大,上内径小)single seal bore adapter 31.变径大小头(下边是法兰,上边是本体上钻孔攻丝扣)coupling adapter 32.油管悬挂器转换大小头短节(上法兰小,下法兰大,下法兰内有丝扣)tubingsuspension adapter 33.双油管悬挂器dual completion tubing hanger 34.双密封孔连接法兰dual seal bore adapter 35.锁紧螺丝lockdown screw 36.(地面)单油管密封总成single packer completion 37.法兰式采油树盖子flanged tree caps 38.扰性油管悬挂器coiled tubing hanger

钻井英语常用词汇及术语缩写.

API(America Petroleum Institute美国石油学会BHA(bottom hole assembelly井底钻具组合BHP(bottom hole pressure井底压力BOP control room远程控制台 BOP(blowout preventer防喷器 BTC(buttress thread connection梯形扣 CP(circulating pressure循环压力 DC(drill collar钻铤 DL(dogleg 狗腿 DLS(dogleg severity狗腿严重度DP(drill pipe钻杆 DST(drill stem test中途测试ECD(equivalent circulating density循环当量密度ECD(equivalent circulating density当量循环密度EF(external flush外平 EMW(equivalent mud weight当量泥浆密度EUE(external upset end内加厚 FCP(final circulating pressure终了循环压力FH(full hole贯眼扣 GPM(gallon per minute加仑每分HCR(hydraulic control remote valve液动阀 HP(hydrostatic pressure静液柱压力HWDP(heavy weight drillpipe加重钻杆 IADC(international association of drilling contractors钻井承包商 ID(inside diameter内径 IF(internal flush内平扣 KOP(kickoff point造斜点 LOT(leak off test漏失实验 LTC(long thread connection长园扣

浅谈海洋石油平台变压器差动保护误动原因

浅谈海洋石油平台变压器差动保护误动原因 发表时间:2017-12-11T17:05:21.527Z 来源:《电力设备》2017年第23期作者:张利霞1 任冬2 [导读] 摘要:随着我国海上油气田的开发和利用,海上油气田规模在逐步扩大,海洋石油平台电力系统的供电范围也逐步扩大,对电力系统设计的可靠性要求也越来越高,而变压器是作为电力系统的重要组成部分,它的正常运行及工作是电力系统正常运行的有力保障,起了极大的积极作用。 (1湛江南海西部石油勘察设计有限公司广东湛江 524057; 2中海石油(中国)有限公司湛江分公司广东湛江 524057) 摘要:随着我国海上油气田的开发和利用,海上油气田规模在逐步扩大,海洋石油平台电力系统的供电范围也逐步扩大,对电力系统设计的可靠性要求也越来越高,而变压器是作为电力系统的重要组成部分,它的正常运行及工作是电力系统正常运行的有力保障,起了极大的积极作用。当然,在变压器的各个部件中,差动保护对其作用是非常明显的,变压器的主保护也是由它担任的。差动保护有着使用原理简单,保护范围清晰等优势,但是在差动保护的日常运行中,难免会因为各种原因而出现一些无法避免的差动保护误动现象。基于此,本文针对变压器差动保护误动原因进行了分析与探讨。 关键词:海洋石油平台;变压器;差动保护;误动原因 1变压器差动保护基本原理 1.1基本原理 一般情况下,变压器正常工作或者有区外故障发生时,由基尔霍夫电流定律可知,变压器的电流是不会发生变化的,因此,差动继电器装置是不会发生动作的。但是当变压器的内部发生故障时,变压器内部的电流就会发生故障,差动保护装置接触到的二次电流之和和故障点的电流成正相关,这时,差动继电器保护装置就会发生动作。 1.2主要作用 在海洋石油平台电力系统中变压器的差动保护装置主要对电路上的短路故障进行检测预防,该短路一般发生在双绕组变压器绕组内部和其引出线上,同时也会对变压器中的单相匝中的短路故障进行保护。电流互感器装置会接在变压器的两端,并且按循环电流的接法对二次侧进行相接,也就是说电流互感器的同极性端都向母线一侧涌入,则将同极性端子进行相连,并将电流继电器并联接入两接线之间。继电器中感受到的电流是两侧电流互感器值的差值,这也说明差动回路上进行差动继电器的连接。根据前文可知,理论上来讲,当变压器正常运行或者出现外部故障时,差动回路的电流是零。但是实际情况中,两侧机器存在系统误差,特性并不是完全一样,当正常运行或出现外部故障时,仍然会出现细小的不平衡电流Iumb(Ik=I1-I2=Iumb)经过。虽然该误差是无法避免的,但是应该确保该电流应该尽量的小,继电器的保护装置不会出现误动。当出现内部故障时,差动回路中的I2改变了以前的方向或为零,这个时候继电器中流过的电流为I1和I2之和,这个时候就会使继电器稳定的工作。 1.3保护范围 变压器差动保护的电流互感器中间的电气设备以及连接这些设备的导线构成了差动保护的范围。差动保护的操作较为简单,不需要和相邻元件之间进行配合。

常用钻井英语缩写

钻井英语缩写 1.DP drill pipe 钻杆 2.HWDP heavy weight (wall) drill pipe 加重钻杆 3.DC drill collar 钻铤 4.BHA bottom hole assembly 井下钻具组合 5.STB stabilizer 钻杆扶正器 6.PNMDC pony non-magnetic drill collar 短无磁钻铤 7.SMDC short non-magnetic drill collar 短无磁钻铤 8.PDM positive displacement motor 螺杆9.BOP blowout preventer 封井器 10.BOPE blow out preventer equipment 封井器设备 11.IBOP inside blowout preventer 内防喷工具 12.CSG casing 套管 13.TBG tubing 油管

14.JNT/JT joint 单根 15.XO cross-over 配合接头 16.IF internal flush 内平 17.FH full hole 贯眼 18.REG regular 正规 19.IU internal upset 内加厚 20.EU external upset 外加厚 21.EUE external upset 外加厚 22.IEU internal&external upset 内外加厚 23.OH open hole 裸眼 24.WOB weight on bit 钻压 25.RPM revolutions per minute 转速/分钟 26.SPM strokes per minute 冲程/每分钟 27.ECD equivalent circulating density 当量泥浆密度 28.MT metric ton 公制吨 29.DST drill stem test 钻

简化钻井英语

钻井现场常用英语 改编自《海洋石油钻井常用英语手册》钻井现场常用对话 Carry out drilling operation in accordance with the drilling program. 按钻井程序进行钻井作业. Prepare bell nipple. 准备”喇叭口”短节. Make up 2 joints of drill pipe. 接两根钻杆. Break out this connection. 卸开该接头. Mix gel fluid for drilling conductor hole. 为钻导管井眼配制高粘度泥浆. Make up bottom hole assembly. 组合下部钻具 Check and reset crown-saver on every tour. 每个班都要检查并重新调整天车防碰装置. Number stands on trip out and trip in. 起下钻时给立柱编号. Pick up BHA and run to bottom. 将下部钻具下到井底. Pick up stands. 接立柱 Don’t drill faster than 15 minutes for 1 stand. 钻进速度别超过15分钟1根立柱 Drop TOTCO. 投(陶特)测斜仪 Resume drilling to T.D. 继续钻进到总深 Circulate 15 minutes.循环15分钟 Run in hole. 下钻 Put out of hole. 起钻 Make an inventory of all ring gaskets. 开一个所有垫圈的清单 Use air spanner. 使用气动扳手

石油钻井英语

行业英语之实用词汇

现场实用词汇短语 一、甲方乙方 1. 承包商人员 ( Contractor’s Personnel ) Equipment Supervisor 设备总监 Materials Supervisor 材料总监 Senior Toolpusher 高级队长 Junior Toolpusher 值班队长 Driller 司钻 Sub Sea Engineer (SSE) 水下工程师 Assistant Driller (AD) 副司钻 Derrick Man 井架工 Floor Man (roughneck) 钻工 Crane Operator 吊车工 Mechanic 机械师 Electrician 电气师 Repairman 修理工 Welder 焊工 Radio Operator 电报员 Warehouse Man (stock Keeper) 材料员 Medic 医生

Safety Supervisor 安全监督 Interpreter (translator) 翻译 Chief Steward 管事 Cook 厨师 2、作业者及服务公司人员 ( Operator’s Personnel and Service Company Personnel) Drilling Superintendent 钻井监督 Company Man (Operator’s Representative) 公司代表 Geologist 地质师 Mud Logging Engineer (Mud logger) 泥浆录井工程师 Sample Catcher 捞砂工 Mud Engineer 泥浆工程师 ROV Engineer 潜水工程师 Cementer 固井工 Cement Engineer 固井工程师 Testing Engineer 试油工程师 Coring Engineer 取芯工程师 Wireline Logging Engineer电测工程师

海洋石油平台微电网的建模分析

Journal of Electrical Engineering 电气工程, 2016, 4(4), 187-194 Published Online December 2016 in Hans. https://www.360docs.net/doc/512413433.html,/journal/jee https://www.360docs.net/doc/512413433.html,/10.12677/jee.2016.44024 文章引用: 龚华麟, 张金泉, 杨志强, 张欢. 海洋石油平台微电网的建模分析[J]. 电气工程, 2016, 4(4): 187-194. Modeling Analysis of Micro Grid of Offshore Oil Platform Hualin Gong 1, Jinquan Zhang 2, Zhiqiang Yang 2, Huan Zhang 2 1State Grid Chengdu Electric Power Supply Company, Chengdu Sichuan 2 School of Electrical and Information, Southwest Petroleum University, Chengdu Sichuan Received: Nov. 18th , 2016; accepted: Dec. 2nd , 2016; published: Dec. 8th , 2016 Copyright ? 2016 by authors and Hans Publishers Inc. This work is licensed under the Creative Commons Attribution International License (CC BY). https://www.360docs.net/doc/512413433.html,/licenses/by/4.0/ Abstract Offshore oil platform micro grid is a very important part of offshore oil platform, and its stability plays an important role in the safety of offshore oil platform. Therefore, establishing mathematical model of offshore oil platform of the micro grid and studying its stability helps monitor and access the safety state of offshore oil platform of the micro grid, and this provides early warning strategy and suggestions for the electrical engineers and management personnel operating platform and does good for improving the safe operation level of the offshore platform. These actions are of much theoretical value and realistic meaning. This paper first introduces the characteristics of offshore oil platform of the micro grid, then analyzes the main components of gas turbine, sets up the model by PSCAD, and establishes the model according to the circuit structure of the micro grid diagram. It carries out a series of simulation in different operating conditions and different motor load proportion by assuming the motor as the main load first and gets relevant conclusions. Keywords Offshore Oil Platform, Micro Grid, PSCAD, Modeling Analysis 海洋石油平台微电网的建模分析 龚华麟1,张金泉2,杨志强2,张 欢2 1成都供电公司,四川 成都 2 西南石油大学电气信息学院,四川 成都 Open Access

钻井现场常用英语专业词汇

Accumulator 储能器 Active tank 循环池 Adjusting bolt (刹把)调节螺栓Admission pipe 进气管 Agitator 搅拌器 Air chamber 空气包 Air line 气管线 Air-operated hoist 气动绞车Alternating current drive 交流电驱动Annular BOP 环形BOP Ato-muffler 消音器 Ball valve 球阀 Bell nipple 井口喇叭管 Bench vise 老虎钳 bit breaker 钻头装卸器 bit gauge 钻头规 blind ram preventer 盲板防喷器BOP control panel 防喷器控制盘BOP deck 防喷器平台 Bottom plug 底塞 Brake lever (brake handle) 刹把Brake line (brake staple) 刹带Bridge plug 桥塞 Buttress 梯形扣 Butterfly valve 蝶阀 By-pass 旁通 By-pass plug 旁通塞 Calipers 卡钳 Casing coupling 套管接箍 Casing cutter 套管割刀 Casing elevator 套管吊卡 Casing hanger 套管悬挂器 Casing head 套管头 Casing monkey board 套管平台Casing scraper 刮管器 Casing shoe 套管鞋 Casing slip 套管卡瓦 Casing spear 套管打捞矛 Casing spool 套管四通 Casing tong 套管大钳 Cat line 猫头绳 Cat line grip 猫头绳爪 Cat shaft 猫头轴 Cat-head 猫头 Cellar deck 井口甲板Cement 水泥 Cement basket 水泥伞 Cement plug 水泥塞 Cement retainer 水泥阻流环 Cementing bond log 固井质量检查Cementing head 水泥头 Cementing line 固井管线 Cementing pump 固井泵 Chain 链 Chain pipe tong 链钳 Chain tong 链钳 Chamber 房间,寝室 Chamber gate 阀箱,闸室 Charge pump 灌注泵 Check valve 止回阀,回压凡尔 Choke 节流器,阻流器 Choke line 阻流管线 Choke position indicator 节流阀位置指示器Choke valve 节流阀 Choke-line manifold 阻流管汇 Clutch 离合器 Conductor 导管 Cone 牙轮 Cone fisher 牙轮打捞器 Cone lock 牙轮卡死 Cooling-water pump 冷却水泵 Core barrel shoe 取心筒鞋 Core basket 取心爪 Core bit 取心钻头 Core catcher 取心爪 Core catch case 取心爪外套 Core drying oven 岩心烘箱 Crossover joint(x/o) 变换接头 Crown block 天车 Crown block beam 天车梁 Dead line 死绳 Dead line diaphragm 死绳固定器膜片Dead line anchor 死绳固定器 Degasser 除气器 Derrick 井架 Desander (desilter) 除砂器(除泥器)Direct current drive 直流电驱动Discharge line 排除管线 Double ram type preventer 双闸板防喷器Down hole tool 入井工具

钻井英语简写

钻井英语缩写 Abbreviation DP Drill pipe 钻杆 HWDP heavy weight drill pipe 加重钻杆 DC drill collar 钻铤 STB stabilizer 钻杆扶正器 SMDC short magnetic drill collar 短无磁钻铤PDM positive displacement motor 螺杆 NMDC nonmagnetic drill collar 无磁钻铤(钻具)BOP blowout preventer 封井器 CSC casing 套管 JNT joint 单根 XO cross-over 配合接头 IF internal flush 内平 FH full hole 贯眼 REG regular 正规 IU internal upset 内加厚 EU external upset 外加厚 IEU internal & external upset 内外加厚 OH open hole 裸眼 WOB weight on bit 钻压 RPM revolutions per minute 转速分钟 SPM strokes per minute 冲程每分钟 ECD equivalent circulating density 当量泥浆密度MT metric ton 公制吨 BHA bottom hole assembly 底部钻具组合 DST drill stem test 钻具测试 KS key seat 键槽 STDS stands 立柱 VIS viscosity 粘度 WL water loss 失水 PV plastic viscosity 塑性粘度 YP yield point 屈服值 FL filtrate loss 滤失 TVD true vertical depth 垂深 MD measured depth 测量井深 TD total depth 总井深 KOP kick off point 造斜点 DIR direction 定向 AZM azimuth 方位 DEV deviation 井斜 ROP rate of penetration 机械钻速 ID inside-diameter 外径

石油钻井专业英语词汇

目录 第一节钻井英语单词 (2) 第二节井场用语,钻井常用短语及句子 (10) 第三节钻井泥浆术语 (29) 第四节常用安全术语 (31) 第五节钻井设备英语 (33) 第六节石油钻井英语情景会话 (40) 附录一:平台人员、作业者及服务公司人员名称 (47) 附录二:主要设备名称 (48) 附录三:钻具、井口工具、打捞工具名称 (52) 附录四:材料和工具名称 (53) 附录五:常用缩写形式 (55)

第一节钻井英语单词 drilling crew 钻井队 drill floor,rig floor,floor 钻台drawworks 绞车 well-site, rig-site 井场 rig manager 平台经理 DC (drill collar) 钻铤 drilling engineer 钻井工程师 DP (drill pipe) 钻杆 toolpusher 带班队长 rotary table 转盘 driller 司钻 assistant driller 副司钻derrickman, monkeyman 井架工roughneck, floorman 钻工roustabout 场地工 liner 缸套 motor fire man 司机(motorman)wellhead 井口 circulation & solid system 循环固控系统 machinist 机械师,机工,机械大班electrician 电器师,电工,电器大班operation program 作业程序(指令) cathead 猫头 caravan 营房,大篷车 tong 大钳 elevator 吊卡 well depth 井深 slip 卡瓦makeup 上扣 spud in 开钻 breakout 卸扣 ROP (rate of penetration),drilling speed, penetration rate 钻速 trip 起下钻 diesel-engine 柴油机 loss circulation 井漏,循环漏失working uniform 工作服 brake handle, brake bar 刹把 water well condition 水井井况circulating tank, circulation tank 循环罐 normal drilling 正常钻进 reserve tank 储备罐 parameter 参数 trip tank 补给罐,尖底罐, 起下钻泥浆罐(起下钻计量罐) rotary speed 转盘转速(转速)shale shaker 振动筛 pump pressure 泵压 WOB (weight on bit) 钻压 mesh 目,网孔;啮合,编织 torque 扭矩 screen cloth 筛布 displacement 排量 safety meeting 班前会 pump stroke 泵冲 shift exchange 交班、(倒班)

钻井平台英语

海洋钻井英语 一. 承包商人员 ( Contractor’s Personnel ) Rig Manager 平台经理 Equipment Supervisor 设备总监 Materials Supervisor 材料总监 Senior Toolpusher 高级队长 Junior Toolpusher 值班队长 Driller 司钻 Sub Sea Engineer (SSE) 水下工程师 Assistant Driller (AD) 副司钻 Derrick Man 井架工 Floor Man (roughneck) 钻工 Barge Master (captain) 船长 First Mate (Barge engineer) 大副 Control Room Operator (CRO) 压载工 Ballast Control Operator (BCO) 压载工 Chief Engineer 轮机长 Head of Routabout 甲板班长 Crane Operator 吊车工 Routabout 甲板工 Mechanic 机械师 Electrician 电气师 Repairman 修理工 Motorman 轮机员 Welder 焊工 Radio Operator 电报员 Warehouse Man (stock Keeper) 材料员 Medic 医生 Safety Supervisor 安全监督 Interpreter (translator) 翻译 Chief Steward 管事 Cook 厨师 Steward 厨工 Laundry Man 洗衣工 二. 作业者及服务公司人员 ( Operator’s Personnel and Service Company Personnel) Drilling Superintendent 钻井监督 Company Man (Operator’s Representative) 公司代表 Geologist 地质师 Mud Logging Engineer (Mud logger) 泥浆录井工程师 Sample Catcher 捞砂工 Mud Engineer 泥浆工程师 ROV Engineer 潜水工程师 Cementer 固井工

海洋石油常用中英文对照词汇

A A-60 fire door A-60级防火门 a-hundred-year return period 百年一遇abrasive (喷砂用的)磨料abrasive paper 砂纸 AC generator 交流发电机 AC motor 交流电动机accelerated corrosion testing 加速腐蚀试验acceptance criteria 合格准则 access hole (for welding) = cope hole (焊接)工艺孔accommodation and power platform (APP) 生活动力平台according to = in accordance with = in line with = as per = in the light of 按照 acetylene gas 乙炔 acid electrode 酸性焊条 acid proof cement 防酸水泥additive 添加剂 adhere to 遵守(动词)adherence to 遵守(名词)adjacent columns 相邻立柱adverse combination of loads 载荷的不利组合adverse condition 不利条件aeronautical radio system 航空无线电系统AFC (approved for construction) 建造批准aforementioned 上述 aft winch 船艉绞车agitator 搅拌器 air blower 鼓风机 air compressor 空气压缩机 air driven pump 气动泵 air hoister 气动绞车 air manifold 气包 air tight test 气密性试验 air-hose 风带 aircraft obstruction beacon 航空障碍灯alarm buzzer 报警蜂鸣器alarm horn 报警喇叭aliphatic polyurethane 脂肪族聚氨脂漆allowable (working) stress 许用应力Aluminum alloy anode 铝合金阳极Aluminum ingot 铝锭aluminum paint 银粉漆aluminum sheet 铝皮 ambient air temperature 环境气温ambient temperature 环境温度

海洋石油平台电力组网工程同期技术应用研究

海洋石油平台电力组网工程同期技术应用研究 发表时间:2019-06-11T11:10:35.757Z 来源:《中国电气工程学报》2019年第3期作者:赵红涛[导读] 随着海上油田的滚动开发,海上电网规模的不断扩大,同期技术的应用将会越来越广泛,同期点的设置也会越来复杂。基于此,本文以某电网为例分析了海洋石油平台电力组网工程同期技术的应用。电网工程中在设计电气主接线时,当开关两侧出现不同源电源时需要设置同期点。海洋石油平台电力系统随着电力组网工程的日益发展,同期点已不仅局限于发电机出口、母线联络开关等处。海洋电网各电站中心在何处实现组网互联,减少并网冲击,如何设置同期点可 便于操作而又经济变得极为重要。 1电力组网的必要性 1.1平台间可互供电力、互为备用,减少事故及大型负荷启动备用容量,提高电网运行的经济性;同时增强其抵抗事故能力,实现事故情况下的相互支援,最终提高电站安全水平和供电可靠性,避免因电站平台出现问题造成整个平台供电的中断。 1.2能承受较大的冲击负荷,如注水泵、压缩机等冲击负荷,从而有利于改善提高电能质量。 1.3可减少备用机组数量,节省投资及运行维护成本。两平台可通过共享一台备用电站,从而节省投资及平台的占用空间。 2电网同期技术的重要性 电力系统同期并车三要素:频率、电压、相角。在电力组网工程实施前,海洋石油平台电力系统通常为放射性网络结构,即一个电站中心平台或FPSO设置若干台发电机组作为电站中心,通过变压器为低压400V、230V系统供电,或通过升压变压器、海缆为油田群内其他终端平台供电。该系统同期点一般设置于发电机出口断路器,同期功能由发电机控制系统完成;发电机设置为3台或以上时发电机出口母线及对应低压400V系统母线一般设置为双母线分段形式,在中、低压系统母联处设置同期点。以往同期功能通常由继电器或PLC实现,通过装置自动或人员手动调节发电机组电压与频率,在合适相角差角度(一般为±5°)内实现合闸并车操作。海洋平台实施电力组网工程后,电网通常由两、三个甚至更多的电站中心互联而成,仅发电机出口及母联开关具备同期功能显然无法满足电网操作的需求,必须在电站中心互联路径关键节点设置电网同期点,以完成各电站平台均已起机带生产的情况下电网的并车。而电网内进行同期操作时,由于同期点两端均已是具备一定规模的电力系统,为了减少并网的冲击应尽量减小合闸时两侧的相角差,以往的同期继电器或PLC控制的相角差±5°无法完美解决,因此建议在电网同期点使用准同期技术,安装准同期装置,实现0°相角差合闸,以保证电网的稳定。 3同期点的设置原则与方法 海洋平台电力系统实施电力组网后,多个电站中心互联,联网主线路双端各连接对应的电站中心,因此需考虑设置并网同期点。 3.1双向供电回路。同期点设置的首要原则:设置在存在双向供电可能的回路。在海洋平台电力组网工程中,多个电站中心互联的主线路通常为35kV海缆或电缆连接(部分组网回路为10.5kV或其他电压等级),其组网主连接线路的开关断路器可考虑设置为同期点并安装准同期装置,同期点同时可作为电网解列点,当系统发生震荡稳定性遭到破坏时能迅速合理的解列为两个或多个部分,以防止故障的进一步扩大,从而减少损失。 海洋平台电力组网工程中存在大量双向供电可能的开关节点,从实际设计角度出发,并非所有双向供电开关均需设置为同期点,需结合电网操作的便利性与必要性进行考虑。 3.2考虑操作便利与供电恢复操作的原则。海洋平台电力组网工程中存在多个双向供电可能开关节点时,如何选择其中哪个节点设置为同期点,需遵循电网操作的便利、供电恢复操作合理的原则。 通常海洋平台电站中心平台在电力组网实施前具备独立发电机并供其周边负荷平台用电孤岛运行模式,同期点的设置应考虑尽量设置在电力组网连接总出口处,以达到简化电网操作的目的,当电网局部组网或由于某些故障导致部分电力系统从电网中解列后,恢复联网时不应有复杂的倒换开关导致局部暂时性失电的问题发生。 图1

常用钻井英语缩写

标准文档 钻井英语缩写motor 螺杆 9.BOP blowout preventer 1.DP drill pipe 钻杆封井器HWDP heavy weight (wall) 2. 10.BOPE drill pipe 加重钻杆blow out preventer equipment 封井器设备3.DC drill collar 钻铤 11.IBOP inside blowout bottom 4.BHA hole assembly 井下钻具组合内防喷工具preventer 套管casing 12. 5.STB stabilizer 钻杆扶正器CSG 油管non-magnetic pony tubing 13.TBG 6.PNMDC drill collar 单根JNT/JT 短无磁钻铤joint 14. 7.SMDC short 配合接头cross-over 15.non-magnetic XO drill collar 短无磁钻铤内平internal flush IF 16. 8.PDM 贯眼full hole displacement positive FH 17.实用大全. 标准文档 18.REG regular 正规27.ECD equivalent circulating

density 当量泥浆密度19.IU internal upset 内加厚 28.MT metric ton 公制吨20.EU external upset 外加厚29. DST drill stem test 外加21.EUE external upset 钻具测试厚 30.l22.IEU interna&external KS key seat 键槽 31.KSW key seat wiper 内外加厚upset 键槽清洁器裸眼open hole OH 23. 32.STDS stands 钻压weight on bit WOB 24.立柱 33.VIS viscosity revolutions per minute RPM 25.粘度 塑性viscosity 34.PV 分钟/转速plastic strokes SPM 26. minute per 粘度冲程/屈服值yield point 每分钟YP 35.实用大全. 标准文档 36.FL filtrate loss 滤失45.AZM azimuth 方位 46.water loss 失水DEV deviation 井斜37.WL https://www.360docs.net/doc/512413433.html,D true vertical depth ROP rate of penetration 机械转速垂深 48.ID 测量inside-diameter 内径depth 39.MD measured 49.井深OD outside diameter 外径 50.FTG footage 40.TD total depth 总井深进尺 51. plug back total depth PPG pounds per gallon 41.PBTD 人工井底(密度)每加仑磅inch pounds per square 52. piece

关于海上平台电力系统研究

关于海上平台电力系统研究 发表时间:2019-07-18T09:37:45.573Z 来源:《科技尚品》2019年第1期作者:王玮鸿[导读] 文章介绍海上平台电力系统的发展历程,分析海上平台电力系统的结构以及与陆上电力系统的不同特点,并对目前海上平台电力系统应用和研究中的问题以及相应的解决思路和方法进行研究,以供参考。渤海石油管理局渤南作业公司渤中34-1油田1引言近年来随着我国经济的快速发展以及对石油资源的需求量不断增加,我国加大了对海洋资源的开发力度,其中对于海洋石油和天然气的开发和利用过对于缓解能源危机以及促进我国可持续发展战略的实施也具有重要作用。在目前的海洋石油资源开发过程中,海上平台电 力系统是海上油气平台的主要动力来源,文章就针对海上平台电力系统进行发展、结构、特点以及存在问题的介绍与分析,对其未来的发展前景进行展望。2海上平台电力系统的发展海上平台电力系统大致经历了以下发展阶段:首先就是上世纪60年代至90年代左右,在此阶段中主要的进展就是将船舶电力技术在海洋工程电力系统中进行应用,并且已经开始给海上固定或半固定工程平台来进行供电。其次就是上世纪90年代到本世纪初,此阶段的发展就是基于海上平台电力系统的本征原理来对电气设备结构和系统设计以及运行控制进行研究。此电力系统体系也逐渐完善并且变为海上油气平台群联合供电、特大型深海工程船舶的智能化供电以及远岸海岛供电的复杂大环网。最后一个阶段就是从本世纪初至今,此阶段就是基于其基本原理来引入大量的信息化技术以及清洁能源的实验等。经历上述三个阶段的发展之后,海上平台电力系统已经成为海上大联网,并且具有综合电力推进动能、新型风能、潮汐能发电、智能化操作等特点。3海上平台电力系统的结构和特点3.1结构海上平台电力系统主要有电源、配电装置、配电电网、负载等四个部分组成,其构建初期主要是作为辅助用电以及生活用电,而投产之后就可以为钻修井模块、采油、采气、油气处理、生活用电等供电。其系统结构如图3.1所示。图3.1 海上平台电力系统结构图3.2特点与陆地油田配电系统相比,其具有以下特点:首先就是具有较小的系统容量。通常是由多台同类型的发电机并联运行,单机容量和多机容量之和都比较小,但是在某些大容量的负载启动时可能会造成电网电压和频率发生较大的变化而影响电力系统的稳定性。其次就是具有较短的电网输电线路。这主要是由于此系统中的飞的那几端电压、电网电压以及负荷电压同属一个电压等级,因此输配电装置比较简单。而且电气设备设置比较集中,所用配电线路比较短且稳定,对发电机和电网的保护也比较简单。但是应用角度偶读变频控制装置,会存在较为严重的电网谐波污染问题。最后就是电气设备的工作环境比较恶劣。其工作环境不仅温度比较高而加速绝缘老化速度,湿度也较高容易导致绝缘受潮、发胀、分层和变形,加速金属部件腐蚀以及镀层剥落,此外,环境中的盐雾、霉菌和油雾等都会降低电气设备的绝缘性能和工作性能,甚至会由于平台和船舶的冲击和振动而造成设备损坏等故障,以及由于存在各种易燃易爆的气体还存在较大的危险性。 4面临的主要问题与未来展望4.1电源控制此系统主要以燃气轮机为主要电源形式,在运行中会进行一定量温室气体以及有害物质的排放,其运营成本也比较高。因此目前针对电源控制问题各国都在寻找清洁能源引入的方法。目前比较成熟的就是大规模引入风电技术,实现燃料的节约以及系统运行成本的降低。此外还有光伏以及海洋潮流等清洁能源形式的应用。但是在这些清洁能源应用中也存在随机性、波动性以及不可控性等特点,可能会对平台电力系统的电网频率和电压稳定性造成不利影响。针对此问题相关技术人员和专家做了较多的研究,提出了用电压源变换器-高压直流传输技术(VSC-HVDC)控制策略,以及采用CMS(condition monitoring systems)专门针对海上风电机组的状态监控以及基于可靠性的运行维护等方面进行研究,实现了风电场接入之后电网运行可靠性的显著提高。 4.2电力组网目前在海洋工程规模不断扩大的形势下,传统的一台一站模式已经无法满足生产需求,这就需要针对海上平台电力系统的特殊特点对其进行统一规划和电站资源的整合,形成海上油气田群电力组网。但是在此油气田群电网系统投入运行之后也发现许多励磁涌流、发电机自激励以及海缆充电功率过大等问题,目前针对此问题也提出采用能源管理系统来解决的方案,也就是EMS(energy management system),方案来实现投资的减少以及可靠性的提高。 4.3电能质量目前海上平台电力系统中的电能质量问题主要就是谐波和过电压的问题,前者主要产生于系统中的大容量变压器、电潜泵变频器以及UPS还有钻井设备等。针对此问题,部分学者进行变频调速系统谐波模型的建立来对负载静态特性和动态特性进行分析,并通过MATLAB 对内河船舶电力推进系统谐波分析进行数字仿真,通过新型推进变压器结构设施谐波抑制的新型感应滤波技术来对谐波进行有效抑制。后者就是在目前海上石油平台规模不断扩大以及海底电缆长度不断延长的情况下逐渐出现的问题。主要表现为工频过电压以及参数谐振过电压等现象。这就需要基于PSCAD/EMTDC仿真模型的建立和计算,采用:双机带空载海缆黑启动、防止新介入的海缆长度超过临界长度以及并联器黑启动等方法来对过电压问题进行抑制。 4.4未来展望随着我国对石油资源依赖率的不断增加,目前研究人员的工作重点就是确保海上电力系统的正常动力供给,还要兼顾环保以及经济利益。在提高系统安全、稳定以及高效的同时,明确可靠性指标,加强对海上平台电力系统可靠性的研究。此外还要结合目前海上平台电力系统构成的多微网系统的特殊物理结构和工作特性,实现具有交互、合作、协商等智能特征的海洋平台电力系统的多微网协调控制。5结语

相关文档
最新文档