Use of ASME B31.1-2014 and B31.3-2014 in Alberta

PWHT requirements

ASME B31.1-2014 和 B31.3-2014使用(阿尔伯塔省)

PWHT要求

译者:孙明菊 QQ:274245152

2015/12/3

This Information Bulletin IB15-008 Rev. 1 supersedes IB15-008 issued June 25, 2015.

此信息公告IB15-008版本1取代2015年6月25日发行的IB15-008

This information bulletin is issued to bring awareness of code changes and provide guidance to designers, owners and fabricators regarding the use of ASME B31.1-2014 Power Piping Code which was published on August 15, 2014 and ASME B31.3-2014 Process Piping Code which was published February 27, 2015.

发出此信息公告为引起对于标准更改的关注,并为使用2014年8月15日发布的ASME B31.3-2014工艺管道和2015年2月27日发布的ASME B31.1-2014动力管道的设计方、业主和制造商提供指导。

ASME B31.1 Power Piping Code and ASME B31.3 Process Piping Code establish rules for preheat and post weld heat treatment (PWHT) and provide exemptions from PWHT based on a material’s P Number, thickness, strength, and in some case alloy content. These rules were not consistent in earlier editions (prior to 2014) of these two codes in terms of preheat requirements, preheat temperatures, the thicknesses that require PWHT, the definition of the thicknesses that require PWHT, the material properties that turn on the PWHT requirements, the holding temperatures, the holding times, the heating and cooling rates, and the terminology used to describe the requirements.

ASME B31.1 和 ASME B31.3基于材料的P Number,厚度,强度,合金含量(某些情况下)制定了预热和焊后热处理的规则以及焊后热处理的免除。这些规则与这两个标准的早期版本(2014年以前版本)并不一致,在以下方面有不同:预热要求,预热温度,需进行焊后热处理的厚度要求,需进行焊后热处理的厚度定义,化学成分导致需焊后热处理,保温温度,保温时间,加热和冷却速率,和用

于描述要求的术语

To eliminate inconsistencies for preheat and PWHT, changes have been made to technical requirements and format in the 2014 editions of the ASME B31.1 and ASME B31.3 Codes. To achieve consistent rules for materials by P Number (P1, P3, P4,

P5A, etc.), these piping codes have been revised in many places.

为了消除预热和焊后热处理的不一致,2014年版的ASME B31.1和ASME B31.3中已经在技术要求和格式上作了修改。为了实现材料用P Number(P1,P3,P4,P5A等)分类后要求一致,这两个管道标准在许多地方进行了修正。 Revisions include:

修正包括:

Preheat temperature increase (e.g. P1 and P3 in both codes);

 预热温度升高(例如,P1和P3,两个标准均如此)

PWHT holding temperature (e.g. P5A and P5B in ASME B31.1 and P3, P4, P5A, P5B, P6, P9A, and P10I in ASME B31.3);

 焊后热处理保温温度(例如P5A以及P5B在ASME B31.1和P3,P4,P5A,P5B,P6 P9A和P10I在ASME B31.3);

PWHT holding time (increased for P9A, and P9B in ASME B31.3);

 焊后热处理保温时间(P9A和P9B在ASME B31.3有所升高);

The thickness that requires PWHT (revised for P1 in both codes);

 需要焊后热处理的厚度(P1有修正,两个标准均如此);

The governing thicknesses for exemption from PWHT (e.g. P3, P4, P5A) ;

 焊后热处理免除的主要组件厚度(例如P3,P4,P5A)

The minimum holding time requirements have been reduced to 30 minutes for

P15E material group and to 15 minutes for all other material groups;

 最小保温时间要求:P15E材料组已经降低到30分钟,所有其他材料组降低到15分钟; The hardness testing requirements have been deleted for all material groups;

 所有材料组的硬度测试要求已被删除;

The PWHT requirements for P10 material group were deleted from Table 331.1.1 of ASME B31.3;

ASME B31.3表331.1.1删除对于P10材料组焊后热处理的要求;

Requirements for PWHT of P7 material group were added to Table 331.1.1 of ASME B31.3.

ASME B31.3表331.1.1加入P7材料组焊后热处理要求。

Persons responsible for piping design (owners and designers) should carefully review the piping codes and their specifications in light of these changes.

管道设计者(业主和设计人员)应仔细阅读这些管道标准的变化。

One change in particular has raised concerns. These piping codes now provide an exemption from PWHT of P1 materials (all groups) with no limitation on material thickness.

一个特别的变化已引起关注。这两个管道标准目前提供所有P1材料(所有组)焊后热处理的免除,对于材料的厚度没有限制。

Concerns about this exemption include:

关于这项免除的问题包括:

Pressure piping systems constructed of P1 material without PWHT may not

perform adequately, particularly when exposed to certain process fluids.

 使用无焊后热处理的P1材料建造的压力管道系统可能无法充分满足使用要求,尤其是暴露在某些工艺流体中。

The stricter welding controls for preheat and multi-layer welding technique required during construction may not always be adequate or achievable, resulting in welded pressure piping systems that are more prone to service induced deterioration.

 施工过程中所需的焊接过程中更严格控制预热和多层焊技术可能并不充分或可以实现的,从而导致焊接的压力管道系统更容易出现工况造成的恶化失效。

These Codes have become less prescriptive. This leads to the need for more engineering analysis and good judgment. The Codes are relying on knowledgeable users (owners and designers) to specify PWHT (that is, to disallow the exemption) when they deem it necessary. Attention is directed to note 4 in Table 132.2 of ASME B31.1, or note 4 in Table 331.1.3 of ASME B31.3, which states ”(4) No exemptions are permitted for PWHTs required by the designer or the WPS”. Designers and owners of pressure piping systems made of P1 materials that will be constructed to ASME B31.1-2014 or ASME B31.3-2014 should review their piping specifications and designs to ensure PWHT is performed when required for service conditions, fabrication conditions, or other circumstances specified by the owner or designer.

这两个管道标准已经变得不那么强制规定。这导致需要更多的工程分析和良好判断。标准靠知识渊博的使用者(业主和设计者)规定焊后热处理(即不允许免除),当使用者认为焊后热处理是必要的。注意力应关注于ASME B31.1表132.2备注4或ASME B31.3表331.1.3备注4,其中规定“(4)当设计者或WPS要求进行焊后热处理时,不得免除”。

使用P1材料按照ASME B31.1或ASME B31.3标准建造的压力管道系统的设计人员和业主,应审查其管道规格书和设计以确保焊后热处理已实施,当设计人员和业主根据工况条件,制造条件或其他情况要求进行焊后热处理时。

Owner’s inspectors need to be aware of this change in PWHT requirements, in order to ensure that the piping system construction meets the intent of the engineering design with respect to PWHT.

业主的检查人员需要了解焊后热处理要求方面的变化,以确保管道系统建设在焊后热处理方面符合工程设计的意图。

Fabricators should review PWHT requirements with the designer and the owner, and obtain their concurrence before using the PWHT exemption. Fabricators will also need to review their WPSs. If the new PWHT exemption will be used in piping construction, a welding procedure that addresses the required preheat and multi-layer technique must be used.

制造商应与设计师和业主一起审查焊后热处理的要求,并在使用焊后热处理免除前取得他们的同意。制造商还需审查其WPS。如果在管道建造中使用新的焊后热处理免除,必须使用满足预热要求和多层焊技术的焊接工艺,。

For piping repairs, alterations and tie-in welds to existing piping systems built prior to the 2014 Edition of ASME B31.1 and ASME B31.3, the stricter requirements for PWHT should be applied in accordance with the original design specification and the original code of construction.

对于管道维修,改造和与2014年版ASME B31.1和ASME B31.3之前建造的管道连接的焊缝,应根据最初的设计规范和建造标准使用更严格的焊后热处理要求。

At this time, ASME B31.1-2014 and ASME B31.3-2014 may be used in Alberta, but these codes are not in-force under the Pressure Equipment Safety Regulation (PESR). The Pressure Equipment Sub-Council (PESC) reviewed the new PWHT requirements in ASME B31.1-2014 and ASME B31.3-2014 and recommended that both piping codes may be adopted under the PESR. The PESC also provided a comment that the 2014 Edition of the piping codes puts the responsibility on the owner to demand PWHT when required for the intended service conditions.

此时ASME B31.1-2014与ASME B31.3-2014可以在艾伯塔省使用,但根据这两个标准不是强制性的。压力设备分会(PESC)审查了ASME B31.1-2014与ASME B31.3-2014新的焊后热处理要求,认为这两个管道标准在承压设备安全法规(PESR)下均可使用。压力设备分会(PESC)还提供评论:2014年版管道标准规定由业主根据工况条件决定是否有焊后热处理要求。

焊后热处理基本知识

焊接接头焊后热处理基本知识培训 一、焊后热处理的概念 1.1后热处理(消氢处理):焊接完成后对冷裂纹敏感性较大的低合金钢和拘束度较大的焊件加热至200℃~350℃保温缓冷的措施。 目的、作用:减小焊缝中氢的有害影响、降低焊接残余应力、避免焊缝接头中出现马氏体组织,从而防止氢致裂纹的产生。 后热温度:200℃~350℃ 保温时间:即焊缝在200℃~350℃温度区间的维持时间,与后热温度、焊缝厚度有关,一般不少于30min 加热方法:火焰加热、电加热 保温后的措施:用保温棉覆盖让其缓慢冷却至室温 NB/T47015-2011关于后热的规定: 1.2焊后热处理(PWHT):广义上:焊后热处理就是在工件焊完之后对焊接区域或焊接构件进行的热处理,内容包括消除应力退火、完全退火、固熔、正火、正火加回火、回火、低温消除应力等。狭义上:焊后热处理仅指消除应力退火,即为了改善焊接区的性能和消除焊接残余应力等有害影响。 1.3压力容器及压力管道焊接中所说的焊后热处理是指焊后消除应力的热处理。焊后消除应力热处理过程:将焊件缓慢均匀加热至一定温度后保温一定的时间,然后缓慢降温冷却至室温。

目的、作用: (1)降低或消除由于焊接而产生的残余焊接应力。 (2)降低焊缝、热影响区硬度。 (3)降低焊缝中的扩散氢含量。 (4)提高焊接接头的塑性。 (5)提高焊接接头冲击韧性和断裂韧性。 (6)提高抗应力腐蚀能力。 (7)提高组织稳定性。 热处理的方式:整体热处理、局部热处理 1.4焊接应力的危害和降低焊接应力的措施 焊接应力是在焊接过程中由于温度场的变化(热涨冷缩)及焊件间的约束而产生的滞留在焊件中的残余应力。 1.4.1焊接应力只能降低,不可能完全消除,焊接残余应力形成的的危害:1)影响构件承受静载的能力;2)会造成构件的脆性断裂;3)影响结构的疲劳强度;4)影响构件的刚度和稳定性;5)应力区易产生应力腐蚀开裂;6)影响构件的精度和尺寸的稳定性。 1.4.2降低焊接应力的措施 1)设计措施: (1)构件设计时经量减少焊缝的尺寸和数量,可减少焊接变形,同时降低焊接应力 (2)构件设计时避免焊缝过于集中,从而避免焊接应力叠加 (3)优化结构设计,例将如容器的接管口设计成翻边式,少用承插式 2)工艺措施

热处理通用技术规范及作业指导书

热处理通用技术规范 编制: 审核: 批准:

热处理通用技术规范 1.目的 为确保公司生产的产品符合产品标准技术要求,根据公司质量手册和程序文件的规 定,特制定热处理通用工艺规范,用于指导热处理生产与过程控制。 2.适用范围 本规范明确了热处理生产的主要工艺和质量控制方式、方法、要求,适用于石油机械API SPEC7K转盘及其配件产品的各种热处理。 属于本公司的其他产品和外协产品的热处理也可参照本规范的基本要求执行。 3.主要热处理工艺 热处理是通过对工件的加热、保温和冷却,使金属或合金的组织结构发生变化,从而 获得预期的性能的操作工艺。热处理能最大限度的发挥材料潜力,改善和获得良好的机械 性能、加工性能、物理性能和化学性能等。 热处理作为生产过程特殊工序,在石油机械产品生产制造中有重要作用。 可以分为: a.整体热处理与表面热处理 整体热处理:如退火、正火、淬火、回火 表面热处理:如感应加热表面淬火、火焰加热淬火以及化学热处理(如表面渗碳、碳 氮共渗、氮化等) b.预先(或预备)热处理与最终热处理 预先热处理一般是为了获得良好的加工性能而采取的热处理工艺,如时效、退火(包 括去应力退火、球化退火等)、正火等,预先热处理有时也可以作为最终热处理。一般用于焊接结构件、铸件等。相对于最终热处理而言,某些重要、大截面钢件采用预先热处理(通常采用正火处理)是为使最终热处理产品有一个良好的组织保证。 3.1退火(Annealing) 将钢件加热到Ac3+30~50度或Ac1+30~50度或Ac1以下的温度后,一般随炉温缓慢冷却。主要是降低硬度,提高塑性,改善切削加工与压力加工性能;细化晶粒,改善力学 性能,为下一工序做准备;消除冷、热加工所产生的内应力。主要适用于合金结构钢、碳

焊后热处理管理规定

焊后热处理管理规定 (QB/SAR0308-2005) 1.0总则 1.1目的:对公司制造的压力容器产品(或泵压部件)焊后热处理过程实施有效监督和控制,确保产品(或承压部件)焊后热处理质量符合设计、使用和相关标准规定要求。 1.2编制依据 1.2.1《压力容器安全技术监察规程》; 1.2.2《锅炉压力容器制造监督管理办法》; 1.2.3《钢制压力容器》(GB150-1998); 1.2.4《锅炉压力容器产品安全性能监督检验规则》; 1.2.5本公司相关的管理规定。 1.3适用范围 本规程适用于公司制造的压力容器产品(或承压部件)的焊后热处理过程的监督和控制。主要包括以下内容: 1.3.1本公司自行进行的产品(或承压部件)局部(焊缝、热影响区)焊后热处理。 1.3.2本公司暂无能力实施需委托分包单位进行的产品(承压部件)整体焊后热处理。 2.0局部焊后热处理 2.1局部热处理范围 2.1.1压力容器产品的B、C、D类焊接接头,球形封头与圆角相连的A类焊接接头及缺陷补焊部位。 2.1.2局部热处理时,焊缝每侧加热宽度不小于钢材厚度的2倍;接管与壳体相焊时加热宽度不得小于钢材厚度的6倍。 2.1.3靠近加热区的部位应采取保温措施,使温度梯度不致影响材料的组织和性能。 2.2局部热处理控制 2.2.1由热处理工艺员编制热处理过程工艺卡,经热处理责任师审批后实施。 2.2.2由热处理签发热处理任务单,对需进行焊后热处理内容向热处理人员进行安排,必要时还应附有示意简图,并对热处理开始时间作出要求。 2.2.3热处理人员按接受的热处理任务单和工艺卡的规定要求,实施过程参数控制,确保热处理过程和质量符合规定要求。

钢制管道焊后热处理工艺规程完整

锅炉管焊接热处理工艺规程 1 总则 本工艺规程适用于低碳和低合金钢锅炉管道焊接接头消除残余应力的焊后热处理,不涉及发生相变和改变金相组织的其他热处理方法。 2 、引用标准及参考文献 NB/T47015—2011 《压力容器焊接规程》 SH3501—2011 《石油化工有毒可燃介质管道工程施工及验收规》 GB50236—2011 《现场设备、工业管道焊接工程施工及验收规程》 3、焊前预热 3.1材料性能分析 部分锅炉管道采用低合金耐热钢,材料具有良好的热稳定性能,是高温热管道的常用材料,由于材料中存在铬、钼合金成分,材料的淬硬倾向大,施工中采用焊前预热、焊后热处理的工艺措施,来获得性能合格的焊接接头。 3.2管道组成件焊前预热应按表1的规定进行,中断焊接后需要继续焊接时,应重新预热,焊接是保持层间温度不小于150℃。 3.3 当环境温度低于10℃时,在始焊处100mm围,应预热到50℃以上。 表1 管道组成件焊接前预热要求

4 设备和器材 4.1焊后热处理必须采用自动控制记录的“热处理控制柜”控制温度。4.2“热处理控制柜”需满足下列要求: 4.2.1能自动控制、记录热处理温度。 4.2.2控制柜、热电偶和补偿导线组合后的温度误差≤±10℃。 4.2.3柜所有仪表、仪器需经法定计量单位校验合格,使用时校验合格证须在有效期。 4.3热电偶 4.3.1焊接接头焊后热处理须采用热电偶测温控温。 4.3.2热电偶需满足如下要求: 4.3.2.1量程为热处理最高温度的1.5倍,精度等级为1.0;控温柜和补偿导线的组合温差波动围≤±10℃。 4.3.2.1按校验周期进行强制校验,使用时校验合格证须在有效期。 4.4加热器 4.4.1焊后热处理必须采用可实现自动指示控制记录的电加热绳或履带加热板加热。 4.4.2管壁厚大于25mm的焊接接头宜采用感应法加热。 4.5热处理设备由经培训合格的专人管理和调试,使用时应放置在防雨防潮的台架上。 4.6保温材料 热处理所用保温材料应为绝缘无碱超细玻璃棉或复合硅酸盐毡,且应有质量证明及合格证。

管道焊后热处理方案

管道焊后热处理方案

陕西陕化煤化工节能减排技改项目管道焊缝热处理方案 施工单位:陕西化建 编制人: 审核人: 批准人: 陕西化建陕西陕化煤化工有限公司节能减排技改项目项目经理部 2011-05-25

目录 1.适用范围。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。3 2.编制目的.。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。3 3.编制依据。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。3 4.工程概况。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。3 5.责任和义务。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。3 6.施工准备。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。3 7.热处理施工流程。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。4 8. 质量保证措施。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。6 9. 安全注意事项。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。7 10.劳动力安排。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。9 11主要施工措施用料一览表。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。9 12主要施工机械设备。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。10

热处理工艺规范(最新)

华尔泰经贸有限公司铸钢件产品热处理艺规范 随着铸造件产品种类增多,对外业务增大,方便更好的管理铸造件产品,特制定本规定,要求各部门严格按照规定执行。 1目的: 为确保铸钢产品的热处理质量,使其达到国家标准规定的力学性能指标,以满足顾客的使用要求,特制定本热处理工艺规范。2范围 本规范适用于本公司生产的各种精铸、砂铸产品的热处理,材质为各种低碳钢、中碳钢、低合金钢、中合金钢、高合金钢、铸铁及有色合金。 3术语 3.1退火:指将铸钢产品加热到规定的温度范围,经保温一段时间后, 降温出炉的操作工艺。 3.2正火:指将铸钢产品加热到规定的温度范围,经保温一段时间后, 从炉中取出,在空气中冷却下来的操作工艺。 3.3淬火:指将铸钢产品加热到规定的温度范围,经保温一段时间后, 快速冷却的操作工艺。 3.4回火:指将淬火后的铸钢产品加热到规定的温度范围,经保温一 段时间后出炉,冷却到室温的操作工艺。 3.5调质:淬火+回火 4 职责

4.1热处理操作工艺由公司技术部门负责制订。 4.2热处理操作工艺由生产部门负责实施。 4.3热处理操作者负责教填写热处理记录,并将自动记录曲线转换到 热处理记录上。 4.4检验员负责热处理试样的力学性能检测工作,负责力学性能检测 结论的记录以及其它待检试样的管理。 5 工作程序 5.1每次装炉前应对设备进行检查,把炉底板上的氧化渣清除干净, 错位炉底板应将其复位后再装,四周应留有足够的间隙,轻拿轻放,装炉应结实,摆放合理。 5.2装炉时大铸件产品放在下面,对易产生热处理变形的铸件,必须 作好防变形或反变形处理,力学性能试样应装在高温区,对特别小的铸件采用铁桶或其它框类工装集中盛放。 5.3炉车上的铸钢件入炉时,应缓慢推进,仔细观察铸钢件是否与炉 壁碰撞,关闭炉门,通电后应经常观察炉内工作状况。 5.4作好铸件产品后续热处理的准备工作,严格控制出炉温度,对水 淬铸件应控制入水时间,水池应有足够水量,以保证淬火质量。 5.5作业计划应填写同炉热处理铸件产品的材质、名称、规格、数量、 时间等要素,热处理园盘记录纸可多次使用,但每处理一次都必须与热处理工艺卡上的记录曲线保持一致。 6 不合格品的处置 6.1热处理试样检验不合格,应及时通知相关部门。

焊接作业指导书及焊接工艺

1.目的:明确工作职责,确保加工的合理性、正确性及可操作性。规范安全操作,防患于未然,杜绝安全隐患以达到安全生产并保证加工质量。 2.范围: 2.1.适用于钢结构的焊接作业。 2.2.不适用有特殊焊接要求的产品及压力容器等。 3.职责:指导焊接操作者实施焊接作业等工作。 4. 工作流程 4.1作业流程图

4.2.基本作业: 4.2.1.查看当班作业计划:按作业计划顺序及进度要求进行作业,以满足生产进度 的需要。 4.2.2.阅读图纸及工艺:施焊前焊工应仔细阅读图纸、技术要求及焊接工艺文件, 明白焊接符号的涵义。确定焊接基准和焊接步骤;自下料的要计算下料尺寸及用料规格,参照工艺要求下料。有半成品分件的要核对材料及尺寸,全部满足合焊图纸要求后再组焊。 4.2.3.校准:组焊前校准焊接所需工、量具及平台等。 4.2.4.自检、互检:所有焊接件先行点焊,点焊后都要进行自检、互检,大型、关 键件可由检验员配合检验,发现问题须及时调整。 4.2. 5.首件检验:在批量生产中,必须进行首件检查,合格后方能继续加工。 4.2.6.报检:工件焊接完成后及时报检,操作者需在图纸加工工艺卡片栏及施工作 业计划上签字。(外加工件附送货单及自检报告送检)。 5.工艺守则: 5.1.焊前准备 5.1.1.施焊前焊缝区(坡口面、I型接头立面及焊缝两侧)母材表面20~30mm宽范 围内的氧化物、油、垢锈等彻底清理干净,呈现均匀的金属光泽。

5.1.2.检查被焊件焊缝(坡口形式)的组对质量是否符合图纸要求,对保证焊接质 量进行评估,如有疑义应向有关部门联系,以便采取相应工艺措施。 5.1.3. 按被焊件相应的焊接工艺要求领取焊接材料,并确认焊接牌号无误。 5.1.4. 检查焊接设备是否运转正常,各仪表指数是否准确可靠,然后遵照本工艺提 供的工艺规范参数预调焊接电流、电压及保护气体流量。 5.1.5.合焊前应先行组对点焊,点焊的焊材应与正式施焊焊材相同,点焊长度一般 应为10-15mm(可视情况而定),点焊厚度应是焊脚高度的1/2(至少低于焊脚高度)。 5.1. 6.对于有焊前预热要求的焊件,根据工艺文件要求规范参数预热,温度必须经 热电偶测温仪测定,预热范围宽度应符合工艺文件的规定。 5.2.焊接过程 5.2.1.施焊过程应密切注视电弧的燃烧状况及母材金属与熔敷金属的熔合情况,发 现异常应及时调整或停止焊接,采取相应的改进措施。 5.2.2.多层焊时层间清渣要彻底,并自检焊缝表面发现缺陷及时修复,如焊接工艺 文件对层间温度有要求,必须保证层间温度符合工艺要求再焊下一层。 5.3.减少焊接应力变形的措施 5.3.1.刚性固定法:通常用于角变形较大的构件,施焊前加装若干块固定筋板其厚 度一般不小于8mm,对于较厚的焊件固定筋板的厚度应随之增大。

(热处理及焊后 热处理程序)

Heat Treatment and PWHT Procedures 热处理及焊后热处理程序

TABLE OF CONTENTS 目录 1.0SCOPE范围 (1) 2.0REFERENCES参考文件 (1) 3.0EQUIPMENT设备 (1) 4.0HEATING METHODS加热方法 (1) 5.0HEATING AND COOLING RATES加热和冷却速率 (1) 6.0HOLDING TEMPERATURES AND ALLOWABLE RANGES保温温度和容许范围 (2) 7.0INTERRUPTED POSTWELD HEAT TREATMENTS不规则的焊后热处理 (2) 8.0TEMPERATURE CONTROL AND RECORDING温度控制和记录 (3) 9.0RECORDING POSTWELD HEAT TREATMENT CYCLE焊后热处理记录周期 (4) 10.0HARDNESS TESTED REQUIRMENTS AFTER PWHT热处理后的硬度测试要求 (5) 11.0PRETECT DEFORMATION DURING HEAT TREATMENT热处理期间的防变形 (5) 12.0RECORDS记录 (5) Attachment and Appendix List 附件附录清单 ATTACHMENT1:PWHT REPORT附件1:焊后热处理报告 (5)

1.0S C O P E范围 1.1This procedure specifies detailed requirements for performing post weld heat treatment(PWHT) 该程序规定了进行焊后热处理的详细要求。 1.2This procedure was written to meet the requirements of ASME B31.3for heat treat temperatures,holding times,heating and cooling rates,and permissible heat treating methods when PWHT is required. 该程序是根据ASME B31.3中针对焊后热处理的处理温度、保温时间、加热和冷却速率以及允许的加热方法来拟写的。 2.0R E F E R E N C E S参考文件 Doc.No.Document Title ASME B31.3-2012Process Piping工艺管道 3.0E Q U I P M E N T设备 3.1Certification of equipment shall be provided upon request. 应当根据需要提供设备的证书。 3.2Calibration certificate of temperature indicator shall be submitted and approved before use. 使用温度指示器之前应当提交校准证书并获得批准。 3.3Recalibration reference paragraph9.2. 参考段落9.2中关于重校的内容。 4.0H E A T I N G M E T H O D S加热方法 4.1Gas heating method be utilized to perform PWHT 利用燃气加热法来进行焊后热处理。 4.2Any other PWHT method requires prior approval of customer before use. 使用任何其它焊后热处理方法之前都要客户的批准。 5.0H E A T I N G A N D C O O L I N G R A T E S加热和冷却速率 5.1.The rate of the heating at the temperature above300Deg.C(572°F)shall not exceed220Deg.C(428°F)/Hr.for pipe wall thickness up to and including25mm(0.984in)/T maximum.For maximum pipe wall thickness more than25mm(0.984in)/T,the heating rate shall be(5588/T Where T=pipe wall thickness in mm). 对于最大壁厚为25mm(0.984in)的管道,300℃(572°F)之后的加热速度不应超过220℃(428°F)/小时。对于最大壁厚超过25mm(0.984in)的管道,加热速度为5588/T(T=管道壁厚mm数)。 5.2The rate of Cooling from the Soak temperature to a temperature above300Deg.C(572°F)shall not exceed275Deg.C(527°F)/ Hr.For pipe wall thickness up to and including25mm(0.984in)/T in maximum.For maximum pipe wall thickness over than25mm (0.984in)/T,the Cooling shall be(6985/T Where T=pipe wall thickness in mm).

焊接热处理技术要求【大全】

不锈钢焊接热处理技术要求 内容来源网络,由“深圳机械展(11万㎡,1100多家展商,超10万观众)”收集整理! 更多cnc加工中心、车铣磨钻床、线切割、数控刀具工具、工业机器人、非标自动化、数字化无人工厂、精密测量、3D打印、激光切割、钣金冲压折弯、精密零件加工等展示,就在深圳机械展. 不锈钢在进行激光焊接的过程中,一般需要进行焊后热处理,特别是马氏体、铁素体不锈钢,选择正确的焊前预热和焊后处理是保证激光焊接机焊接质量的必要条件。那么到底不锈钢焊后热处理工艺是怎样的? 焊后热处理对不锈钢抗拉强度、蠕变极限的影响与热处理的温度和保温时间有关。焊后热处理对不锈钢冲击韧性的影响随钢种不同而不同,一般不锈钢焊后热处理工艺选用单一高温回火或正火加高温回火处理: 1、正火加高温回火 对于气焊焊口采用正火加高温回火热处理。这是因为气焊的焊缝及热影响区的晶粒粗大,需要细化晶粒,故采用正火处理。 2、单一高温回火 然而单一的正火不能消除残余应力,故需再加高温回火以消除应力。单一的中温回火只适用于工地拼装的大型普通低碳钢容器的组装焊接,其目的是为了达到部分消除残余应力和

去氢。绝大多数场合是选用单一的高温回火。热处理的加热和冷却不宜过快,力求内外壁均匀。 焊后热处理能够消除不锈钢松弛焊接残余应力;稳定结构的形状和尺寸,减少畸变;提高焊缝金属的塑性;改善疲劳强度;提高抗应力腐蚀的能力;防止延迟裂纹的发生等等,因此不锈钢焊后热处理是非常重要的。 (1)麻田散铁类不锈钢:此类不锈钢体心立方之结构(BCC)可将磁铁吸引,将其从奥斯田温度急冷而得,此之耐蚀性能最好,但材质硬则脆,接著加以回火可以增加延展性,但耐蚀性会降低,特别是在摄氏450度到650度之间回火,会使在结晶格间隙内之碳原子扩散析出与铬形成网状之碳化铬造成临近区域铬元素之消耗使铬成份降低,无法形成保护膜,而丧失耐蚀性,故需特别注意。以下是各种麻田散铁类不锈钢材之热处理温度。(a)403,410,416se之温度在650-750℃。 (b)414之温度在650-730℃。 (c)431之温度在6.(d)440-A,440-B,440-C,420之温度在680-750℃。(2)肥粒铁类不锈钢:此种不锈钢体心立方结构(BCC)可将磁铁吸引通常用在汽车工业或化学工业上,强度不会因热处理而改变,但可以冷加工方式增加强度。 (3)奥斯田铁类不锈钢:此种不锈钢面心立方结构(FCC)对磁铁不起作用,如前面所论此类材料易加工,故其加工后消除材料之残应力而可施予不同之热处理。 (4)析出硬化型不锈钢:此种不锈钢由高温淬火后在低温热处理,由於材料中含之铝,或铜元素析出沿著差排之滑面或晶界形成化合物(inter-metalliccompounds)而可以提高

合金钢管道焊后消应热处理作业指导书

合金钢管道焊后消应热处理作业指导书 QDICC/QB109-2002 1、适应范围 本工艺标准适用于非低温用碳钢、低合金钢及1Cr5Mo 钢等钢材的焊缝焊后消应热处理。 2、施工准备 2.1热处理所用保温材料应为无碱超细玻璃棉,应有质量证明书或合格证。 2.1.1热处理设备为可自动控制温度的固定盘柜式控制柜或手提式控制箱,并应配有自动打点记录仪,加热器采用绳状红外线加热器,热电偶为K型,其连接线为补偿导线。 2.1.2热处理设备应经检查合格,温度指示仪表及热电偶校验准确。 2.1.3挡雨、雪的遮盖物准备齐全。 2.2作业条件 2.2.1热处理前应对焊缝进行确认,确认项目包括: 1)焊接工作已完成; 2)焊缝外观符合质量标准; 3)其他要求的检验项目已检验合格,并已取得检验合格通知书; 4)除铬钼耐热钢以外焊缝的无损检测已检验合格,并已取得检验合格通知书;

3、操作工艺 3.1工艺流程: 施工准备→热电偶及加热器安装→热处理→硬度检验→资料整理 3.2热电偶及加热器安装 3.2.1每道焊口对称安装两只热电偶,热电偶安装在靠近焊缝边缘的30mm,管材与热电偶端部接触处应用砂轮机打磨露出金属光泽,热电偶安装采用细铁丝捆扎,为保证所测温度为管材实际温度,在热电偶与加热器之间点小块保温玻璃布进行隔离。 3.2.2电加热器缠绕宽度为焊缝两侧各100-125mm,一根加热器缠绕多道焊缝时,必须保证热处理部位的相似性,即:同材质、同规格、缠绕的圈数及宽度相同。 3.2.3加热器安装完毕后用无碱超细玻璃棉进行保温,保温厚度100-125mm,为降低温度梯度,加热器外部100mm范围内应予以保温。 3.3热处理工艺 3.3.1升温温度:300℃以下不控制,300℃以上升温速度为5125/δ.℃/h,且不大于220℃/h(δ为壁厚,单位为mm)。 3.3.2热处理温度见下表:升温期间任意两测温点温差不大于50℃。

焊后热处理的缺陷及预防

焊后热处理的缺陷及预防 [摘要] 热处理工艺在热处理技术规程中已有了较为完善的说明,但有关实际操作中的资料较少,本文主要介绍了在电 力建设施工中由于热处理不正确出现的缺陷以及在实际操作中怎样避免这些缺陷。 [关键词] 热处理缺陷热处理实际操作热电偶固定 随着机组向越来越大容量的发展,合金钢大量应用,对焊接热处理的要求越来越高,越来越严格。焊件经不正确的焊后热处理,会产生各种缺陷,有些缺陷可以经过重新热处理予以纠正,但有些缺陷却无法补救而造成废品。常见的缺陷有以下几种: 1、过热 1)特征:焊件在退火状态下的断口上呈现特别粗大的晶粒,在淬火的断口上呈现粗大的马氏体针状结构 2)产生原因:在加热过程中,不严格控制加热工艺所致,如加热温度过高或在高温下的停留时间过长,一般在正火或 高温退火工艺中易出现。 3)危害性:粗化的结构,极易出现裂纹,即使不出现裂纹,也会使焊件的强度、塑性、韧性大大降低。 4)预防及纠正:为预防过热,加热温度必须严格控制,同时在高温的停留时间尽量缩短。对过热程度严重的焊件可重 复二次退火或正火来纠正。 2、过烧 1)特征:除断口呈现粗大晶粒外,在晶粒间的边界处有熔化或氧化现象,即在晶间集聚着低熔点的杂质或氧化物。 2)产生原因:加热温度过高(大于1300℃)或在高温下保温时间过长。 3)危害性:产生过烧后会使焊件的强度、塑性、韧性急剧降低。 4)预防:必须严格执行热处理规范,且不允许氧化性火焰直接与焊件接触。产生过烧后,焊件无法补救。 3、变形与裂纹 1)特征:焊件的变形与宏观裂纹一般用肉眼可见。 2)产生原因:一是由于焊件的内应力产生,内应力的产生是由于焊件的加热冷却时内外温度不均匀造成体积膨胀或收 缩不一致而引起的热应力。二是由于内部A向M转变时体积变化的不均匀性引起的结构应力,当应力超过焊件的屈服极限时 发生变形。当超过焊件的强度极限时发生裂纹。 3)危害性:造成返工,增加生产工序,提高了成本,有时还造成焊件的报废。 4)预防:采取措施降低内应力。 4、硬度升高

焊接热处理作业指导书

热处理作业指导书 一、工程概况 1.1本工程为江苏常州中天钢铁集团有限公司热电厂一台240吨纯燃高炉煤气锅炉安装工程及相应的汽水、消防、电气、热控等配套系统。锅炉设备由上海锅炉厂有限公司设计制造。 二、编制依据 2.1西北电力设计院设计图纸 2.2《施工组织总设计》 2.3《小型火力发电厂设计规范》“GB50049-94” 2.4“DL5000-2000”《火力发电厂设计技术规程》及《火力发电厂施工图设计手册设计》 2.5《汽水管路支吊架手册》1983年版 2.6《电力建设安全操作规程》(火力发电厂部分)2002年版 2.7《电力建设施工及验收技术规范》(锅炉机组篇)1996年版 2.8《电力建设施工及验收技术规范》(焊接篇) 1996年版 2.9 《电力建设施工及验收技术规范》(管道篇) 1996年版 2.10《电力建设施工及验收技术规范》(DL/T821-2002射线篇、DL/T5048-95超声波篇) 2.11《火力发电厂焊接技术规程》DL/T869-2004 三、作业条件 3.1 技术准备 3.1.1焊接工艺经过评定,符合工艺要求。 3.1.2作业指导书编制并审批完成,开工报告审批完成。

3.1.3工程所用的材料到位并验收合格。 3.1.4施工人员及工机具设备到位(特殊工种持证上岗)。 3.1.5施工场地清洁无杂物,具备施工的条件。 3.1.6人员组织机构建立并开始行使职责。 3.1.7 检查该项作业的上道工序应具备的技术条件。 3.1.8 施工技术交底和安全交底完成,且交底与被交底人员进行了双签字 3.2热处理前先决条件 3.2.1热处理操作工必须经过专业培训,并具有相应资质的考核委员会签发的资格证书。 3.2.2所使用的热处理设备运转正常。 3.2.3检测、计量器具已经检查和校验,且在检定的有效期内。 3.2.4施工交底工作已经完成,所有操作和检验人员必须熟悉热处理程序和相应的施工措施中的各项规定和要求。 3.2.5焊后热处理应在施焊工作结束并完成焊接自检和专检合格后进行。 四、作业人员及机具配置 4.1作业人员配置、人员资格及职责:

压力管道焊接及焊后热处理施工工艺规范

1 适用范围 本规程适用于工业管道或公用管道中材质为碳素钢、合金钢、低温钢、耐热钢、不锈钢和异种钢等压力管道的手工电弧焊、氩弧焊、二氧化碳气体保护焊及其焊后的热处理施工。 2 主要编制依据 2.1 GB50236-98 《现场设备、工业管道焊接工程施工及验收规范》 2.2 DL5007-92 《电力建设施工及验收技术规范(焊接篇)》 2.3 SH3501-1997 《石油化工剧毒、可燃介质管道工程施工及验收规范》 2.4 GB50235-97 《工业金属管道工程施工及验收规范》 2.5 CJJ28-89 《城市供热管网工程施工及验收规范》 2.6 CJJ33-89 《城镇燃气输配工程施工及验收规范》 2.7 GB/T5117-1995 《碳钢焊条》 2.8 GB/T5118-1995 《低合金钢焊条》 2.9 GB/T983-1995 《不锈钢焊条》 2.10 YB/T4242-1984 《焊接用不锈钢丝》 2.11 GB1300-77 《焊接用钢丝》 2.12 其他现行有关标准、规范、技术文件。 3 施工准备 3.1 技术准备 3.1.1 压力管道焊接施工前,应依据设计文件及其引用的标准、规范,并依据我公司焊接工艺评定报告编制出焊接工艺技术文件(焊接工艺卡或作业指导书)。如果属本公司首次焊接的钢种,则首先要制定焊接工艺评定指导书,然后对该种材料进行工艺评定试验,合格后做出焊接工艺评定报告。 3.1.2 编制的焊接工艺技术文件(焊接工艺卡或作业指导书)必须针对工程实际,详细写明管道的设计材质、选用的焊接方法、焊接材料、接头型式、具体的焊接施工工艺、焊缝的质量要求、检验要求及焊后热处理工艺(有要求时)等。 3.1.3 压力管道施焊前,根据焊接作业指导书应对焊工及相关人员进行技术交底,并做好技术交底记录。 3.1.4 对于高温、高压、剧毒、易燃、易爆的压力管道,在焊接施工前应画出焊口位置示意图,以便在焊接施工中进行质量监控。 3.2 对材料的要求

不锈钢管道焊后稳定化热处理作业指导书

不锈钢管道焊后稳定化热处理作业指导书 QDICC/QB110-2002 1、适用范围 本工艺标准适用于不锈钢管道焊缝焊后稳定化热处理。 2、施工准备 2.1 施工用材料及机具要求: 2.1.1 热处理所用保温材料应为无碱超细玻璃棉,其氯离子含量不得超过25PPm。且应有质量证明书或合格证,捆扎热电隅的材料必须用不锈钢丝。 2.1.2 热处理设备为可自动控制温度的固定盘柜式控制柜或手提式控制箱,并应配有自动打点记录仪,加热器采用绳式红外线加热器,热电偶为K型,其连接线为补偿导线。 2.1.3 热处理设备应经检查合格,温度指示仪表及热电偶校验准确。 2.1.4 挡雨、雪的遮盖物准备齐全。 2.2 作业条件 2.2.1 热处理操作者应熟悉专业标准以及工艺、设备、测量仪表的使用。 2.2.2 热处理前应对焊缝进行确认,确认项目包括: a)焊接工作已完成。 b)焊缝外观符合质量标准。 c)其它要求检验项目已检验合格,并取得检验合格通知。

2.2.3 热处理设备及指示仪表检查合格。 3、操作工艺 3.1 工艺流程: 施工准备→热电偶及加热器安装→热处理→铁素体含量检测→资料整理 3.2 热电偶及加热安装 3.2.1 每道焊口对称安装两只热电偶,热电偶安装在靠近焊缝边缘的30mm内,管材与热电偶端部接触处应用砂轮机打磨露出金属光泽,热电偶安装采用不锈钢丝捆扎,为保证所测温度为管材实际温度,在热电偶与加热器之间垫小块保温玻璃布以进行隔离。 3.2.2 电加热缠绕宽度为焊缝两侧各100-125mm,一根加热器缠绕多道焊缝时,必须保证热处理部位的相似性,即:同材质,同规格,缠绕的圈数及宽度相同。 3.2.3 加热器安装完毕后用无碱超细玻璃棉进行保温,保温厚度100-150mm,为降低温度梯度,加热器外部100mm范围内应予以保温。 3.3 热处理工艺 3.3.1 300℃以下不控制升温速度,300℃以上升温速度为5125/δ℃/h,且不大于220℃/h。(δ为管壁厚度,单位mm) 3.3.2 热处理温度见下表:

关于焊后消氢及热处理

重要构件的焊接、合金钢的焊接及厚部件的焊接,都要求在焊前必须预热。焊前预热的主要作用如下: (1)预热能减缓焊后的冷却速度,有利于焊缝金属中扩散氢的逸出,避免产生氢致裂纹。同时也减少焊缝及热影响区的淬硬程度,提高了焊接接头的抗裂性。 (2)预热可降低焊接应力。均匀地局部预热或整体预热,可以减少焊接区域被焊工件之间的温度差(也称为温度梯度)。这样,一方面降低了焊接应力,另一方面,降低了焊接应变速率,有利于避免产生焊接裂纹。 (3)预热可以降低焊接结构的拘束度,对降低角接接头的拘束度尤为明显,随着预热温度的提高,裂纹发生率下降。 预热温度和层间温度的选择不仅与钢材和焊条的化学成分有关,还与焊接结构的刚性、焊接方法、环境温度等有关,应综合考虑这些因素后确定。另外,预热温度在钢材板厚方向的均匀性和在焊缝区域的均匀性,对降低焊接应力有着重要的影响。局部预热的宽度,应根据被焊工件的拘束度情况而定,一般应为焊缝区周围各三倍壁厚,且不得少于150-200毫米。如果预热不均匀,不但不减少焊接应力,反而会出现增大焊接应力的情况。 焊后热处理的目的有三个:消氢、消除焊接应力、改善焊缝组织和综合性能。 焊后消氢处理,是指在焊接完成以后,焊缝尚未冷却至100℃以下时,进行的低温热处理。一般规范为加热到200~350℃,保温2-6小时。焊后消氢处理的主要作用是加快焊缝及热影响区中氢的逸出,对于防止低合金钢焊接时产生焊接裂纹的效果极为显著。 在焊接过程中,由于加热和冷却的不均匀性,以及构件本身产生拘束或外加拘束,在焊接工作结束后,在构件中总会产生焊接应力。焊接应力在构件中的存在,会降低焊接接头区的实际承载能力,产生塑性变形,严重时,还会导致构件的破坏。 消应力热处理是使焊好的工件在高温状态下,其屈服强度下降,来达到松弛焊接应力的目的。常用的方法有两种:一是整体高温回火,即把焊件整体放入加热炉内,缓慢加热到一定温度,然后保温一段时间,最后在空气中或炉内冷却。用这种方法可以消除80%-90%的焊接应力。另一种方法是局部高温回火,即只对焊缝及其附近区域进行加热,然后缓慢冷却,降低焊接应力的峰值,使应力分布比较平缓,起到部分消除焊接应力的目的。 有些合金钢材料在焊接以后,其焊接接头会出现淬硬组织,使材料的机械性能变坏。此外,这种淬硬组织在焊接应力及氢的作用下,可能导致接头的破坏。如果经过热处理以后,接头的金相组织得到改善,提高了焊接接头的塑性、韧性,从而改善了焊接接头的综合机械性能。 消氢处理是在300~400度加热温度范围内保温一段时间。目的是加速焊接接头中氢的逸出,消氢处理效果比低温后热更好。焊接后及焊后热处理,焊后及时后热及消氢处理是防止焊接冷裂纹的有效措施之一,对于厚度超过100mm的厚壁压力容器及其他重要的产品构件,焊接过程中,为防止因厚板多道多层焊氢的积聚而导致的氢致裂纹,应进行2到3次中间消氢处理。 压力容器设计中对热处理的考虑

管道焊接及焊后热处理作业指导书

焊接及焊后热处理作业指导书 1 适用范围 本规程适用于工业管道或公用管道中材质为碳素钢、合金钢、低温钢、耐热钢、不锈钢和异种钢等压力管道的手工电弧焊、氩弧焊、二氧化碳气体保护焊及其焊后的热处理施工。 2 主要编制依据 2.1 GB50236-98《现场设备、工业管道焊接工程施工及验收规范》。 2.2 DL5007-92《电力建设施工及验收技术规范(火力发电厂焊接篇)》。 2.3 SH3501-2002《石油化工剧毒、可燃介质管道工程施工及验收规范》。 2.4 其他现行有关标准、规范、技术文件。 3 施工准备 3.1 技术准备 3.1.1 压力管道焊接施工前,应依据设计文件及其引用的标准、规范,并依据我公司焊接工艺评定报告编制出焊接工艺技术文件(焊接工艺卡或作业指导书)。如果属本公司首次焊接的钢种,则首先要制定焊接工艺评定指导书,然后对该种材料进行工艺评定试验,合格后做出焊接工艺评定报告。 3.1.2 编制的焊接工艺技术文件(焊接工艺卡或作业指导书)必须针对工程实际,详细写明管道的设计材质、选用的焊接方法、焊接材料、接头型式、具体的焊接施工工艺、焊缝的质量要求、检验要求及焊后热处理工艺(有要求时)等。 3.1.3 压力管道施焊前,根据焊接作业指导书应对焊工及相关人员进行技术交底,并做好技术交底记录。 3.1.4 对于高温、高压、剧毒、易燃、易爆的压力管道,在焊接施工前应画出焊口位置示意图,以便在焊接施工中进行质量监控。 3.2 对材料的要求 3.2.1 被焊管子(件)必须具有质量证明书,且其质量符合国家现行标准(或部颁标准)的要求;进口材料应符合该国家标准或合同规定的技术条件。 3.2.2 焊接材料(焊条、焊丝、钨棒、氩气、二氧化碳气、氧气、乙炔气等)的质量必须符合国家标准(或行业标准),且具有质量证明书。对焊接材料的具体要求详见《压力管道组成件、支承件及相关材料检验试验规程》,其中钨棒宜采用铈钨棒;氩气纯度不应低于

焊前预热及焊后热处理作业指导书

目录 1编制依据 (1) 2项目工程概况及工程量 (1) 3项目进度计划 (3) 4作业准备工作及条件 (4) 4.1作业人力、机械、工具、仪器、仪表等的计划 (4) 4.2作业环境的要求 (4) 4.3材料、设备供应计划 (4) 5作业程序及作业方法 (5) 6作业质量标准 (9) 6.1作业质量标准 (9) 6.2作业操作质量要点及保证措施 (10) 7作业的职业安全和环境控制措施 (10) 7.1本项作业一般安全和环境保护措施 (10) 7.2本项作业重要环境因素、重大风险 (11) 7.3本项作业重要环境因素、重大风险控制措施 (11) 7.4本项作业应急响应措施 (11)

1编制依据 1.1《阳煤集团和顺化工有限公司“18·30”尿素项目锅炉及三废炉安装施工组织设计》 1.2《电力建设施工质量验收及评价规程》(第七部分:焊接)2010版1.3《火力发电厂焊接热处理技术规程》DL/T819-2010 1.4《火力发电厂焊接技术规程》DL/T869-2004 1.5《特种设备焊接操作人员考核细则》TSG Z6002-2010 1.6《电站钢结构焊接通用技术条件》DL/T678-1999 1.7《电力建设安全健康与环境管理工作规定》2008-8-19 1.8图纸、说明书及有关技术资料 1.9《电力工程达标投产管理办法》(中国电力建设企业协会2006年版)1.10《工程建设标准强制性条文》(焊接部分2009年版) 2项目工程概况及工程量 2.1工程概况 阳煤集团和顺化工有限公司“18·30”尿素项目锅炉及三废炉安装工程的主体焊接热处理工程。 2.2项目工程主要工程量 见表一

焊接热处理规范

焊接热处理规范 1、预热 当管子外径大于219mm或壁厚大于等于20mm时,应采用电加热进行预热,预热升温 速度应符合热处理规程6.4.3的要求。预热宽度从对口中心开始,每侧不少于焊件厚度的3 倍,且不小于100mm. 2、后热 (1)有冷裂纹倾向的焊件,当焊接工作停止后,若不能立即进行焊后热处理,应进行 后热处理。温度350?,保温时间1-2小时。其加热宽度应不小于预热时的宽度。 (2)对马氏体型钢(如F12钢或P91钢等)的焊接,如要进行后热,应在马氏体转变 结束后进行。 3、焊后热处理 下列焊接接头应进行热处理: 1)壁厚大于30 mm的碳素钢管子与管件。 2)壁厚大于32 mm的碳素钢容器。 3)壁厚大于28 mm的普通低合金钢容器。 4)耐热钢管子与管件(热处理规程第6.2.2.1条规定的内容除外)。 5)经焊接工艺评定需做热处理的焊件。 4、升、降温速度应按下述原则控制:

对承压管道和受压元件,焊接热处理升、降温速度为6250/δ(单位为?/h,其中δ 为焊件厚度mm)且不大于300?/h.降温时,300?以下可不控制。 5、T91/P91钢焊接接头热处理工艺 对T91/P91钢焊接接头热处理工作,作为本工程热处理工作的重点。须严格执行工艺。 1)当焊缝整体焊接完毕,对T91钢和P91钢小径薄壁管的焊接接头可冷却至室温,而 对P91钢大径厚壁管的焊接接头冷却到100~120?恒温1小时后,应及时进行焊后热处理。 2)要求焊接接头焊后及时热处理。不能及时进行热处理时,应于焊后立即做加热温度 为350?,恒温时间为1小时的后热处理。 3)焊后热处理的升、降温速度以?150?/h为宜,对T91钢和P91钢小径薄壁管的焊接接头焊后热处理的升、降温速度为?300?/h.降温至300?以下时,可不控制,在保温层内冷却至室温。 4)T91/P91钢焊后热处理加热温度为760?1O?。对于T91/P91钢与珠光体、贝氏体钢的异种焊接接头,加热温度应按两侧钢材及所用焊丝、焊条等综合确定,不应超过合金 成分含量低材料的下临界点Ac1. 5)恒温时间:执行DL/T868-2004的规定。 6)焊接热处理过程曲线(P、W、H、T)参见下图。 6、意外情况的处理

焊接热处理施工工艺

钢结构焊后热处理工艺 1总则 1.1为了保证电厂厂房钢结局部焊接热处理质量,指导焊接热处理作业,特制定本工艺。 1.2本工艺适用于钢结构对接焊缝焊前预热、后热和焊后热处理工作。 1.3焊接热处理的安全技术、劳动保护应执行国家现行的方针、政策、法律和法规有关规定。 1.4 焊接热处理除执行本工艺的规定外,还应符合国家有关标准规范的规定以及设计图纸的技术要求。 2编写依据 2.1DL/T869 — 2004《火力发电厂焊接技术规程》 2.2DL/T819—2002 《火力发电厂焊接热处理技术规程》 2.3DL/T734 — 2000《火力发电厂锅炉汽包焊接修复技术导则》 2.4DL/T868 — 2004《焊接工艺评定规程》 2.5GB/T17394—1998《金属里氏硬度试验方法》 2.6GB/T16400—2003《绝热用硅酸铝棉及其制品》 3基本要求 3.1人员要求 3.1.1焊接热处理人员资格: a)焊接热处理操作人员应经专业操作技术培训考核合格并取得资格证书; b)接热处理技术人员经专业培训并取得资格证书; C)没有取得资格证书的人员只能从事辅助性的焊接热处理工作,不能单独

作业或对焊接热处理结果进行评价。 3.1.2 热处理技术人员的职责: a ) 熟悉相关规程,熟练掌握和严格执行 DL/T819 — 2002《火力发电厂焊接热 处理技术规程》; b ) 负责编制焊接热处理方案、作业指导书等技术文件; C )指导并监督热处理工的工作,收集、汇部、整理焊接热处理资料。 3.1.3 热处理工的职责: a ) 执行DL/T819 — 2002《火力发电厂焊接热处理技术规程》,严格按照焊接 热处理施工方案、作业指导书进行施工。 b ) 记录热处理操作过程并在热处理后进行自检。 3.2 施工设备和材料要求 3.2.1 热处理设备 a ) 热处理施工前,热处理设备应经调试合格,设备应满足工艺的要求,参数 调节灵活、方便,通用性好,运行稳定、可靠并满足安全要求; b ) 热处理应采用自动温度控制箱,并配有自动打印记录仪,设备的温度精度 应在士 5C 以内,计算机温度控制系统的显示温度应以自动记录仪的温度显示为 准进行调整,两者记录误差不大于 0.5%; C )焊接焊接热处理所用的计量器具必须经过校验, 并在有效期内使用。维修 后的计量器具必须重新校验; d )热处理应采用绳状或履带式远红外线加热器,在采用 K 连接线应采用补偿导线。 柔性陶瓷电阻加热器的技术要求应符合 《火力发电厂焊接热处理技术规程》附录 A 的规定。 3.2.2 施工材料 a ) 采用氧一乙炔加热时,应采用瓶装气体。 b ) 热处理用保温材料应采用无硬碱超细玻璃或硅酸铝纤维毡, 能应满足工艺及环保的要求,产品质量应符合 GB/T16400—2003 《绝热用硅酸 铝棉及其制品》的要求。 C )当用于不锈钢热处理保温时,其热处理材料中的氯离子含量不超过 2510, 且 型热电偶时,其 DL/T819 — 2002 保温材料的性