4. The Contractor 4.1

Contractor's General The Contractor shall design (to the extent specified in the Contract), execute and complete the Works in accordance with the Contract and with the Engineer's instructions, and shall remedy any defects in the Works.

The Contractor shall provide the Plant and Contractor's Documents specified in the Contract, and all Contractor's Personnel, Goods, consumables and other things and services, whether of a temporary or permanent nature, required in and for this design, execution, completion and remedying of

defects.

The Contractor shall be responsible for the adequacy, stability and safety of all Site operations and of all methods of construction. Except to the extent specified in the Contract, the Contractor (i) shall be responsible for all Contractor's Documents, Temporary Works, and such design of each item of Plant and Materials as is required for the item to be in accordance with the Contract, and (ii) shall not otherwise be responsible for the design or specification of the Permanent Works.

The Contractor shall, whenever required by the Engineer, submit details of the arrangements and methods which the Contractor proposes to adopt for the execution of the Works. No significant alteration to these arrangements and methods shall be made without this having previously been notified to the Engineer.

If the Contract specifies that the Contractor shall design any part of the Permanent Works, then unless otherwise stated in the Particular Conditions:

If the Contract specifies that the Contractor shall design any part of the Permanent Works, then unless otherwise stated in the Particular Conditions:

(a) the Contractor shall submit to the Engineer the Contractor's Documents for this part in accordance with the procedures specified in the Contract;

(b) these Contractor's Documents shall be in accordance with the Specification and Drawings, shall be written in the language for communications defined in Sub-Clause 1.4 [Law and Language], and shall include additional information required by the Engineer to add to the, Drawings for co-ordination of each Party's designs;

(c) the Contractor shall be responsible for this part and it shall, when the Works are completed, be fit for such purposes for which the part is intended as are specified in the Contract; and

(d) prior to the commencement of the Tests on Completion, the Contractor shall submit to the Engineer the "as-built" documents and operation and maintenance manuals in accordance with the Specification and in sufficient detail for the Employer to operate, maintain, dismantle, reassemble, adjust and repair this part of the Works. Such part shall not be considered to be completed for the purposes of taking-over under Sub-Clause 10.1 [Taking Over of the Works and

Sections] until these documents and manuals have been submitted to the Engineer . 4.2

Performance Security

The Contractor shall obtain (at his cost) a Performance Security for proper performance, in the amount and currencies stated in the Appendix to Tender . If an amount is not stated in the Appendix to Tender , this Sub-Clause shall not apply.

The Contractor shall deliver the Performance Security to the. Employer within 28 days after receiving the Letter of Acceptance, and shall send a copy to the Engineer . The Performance Security shall be issued by an entity and from within a country (or other jurisdiction) approved by the Employer , and shall be in the form annexed to the Particular Conditions or in another form approved by the Employer .

The Contractor shall ensure that the Performance Security is valid and enforceable until the Contractor has executed and completed the Works and remedied any defects. If the terms of the Performance Security specify its expiry date, and the Contractor has not become entitled to receive the Performance Certificate by the date 28 days prior to the expiry date, the Contractor shall extend the validity of the Performance Security until the Works have been completed and any defects have been remedied. The Employer shall not make a claim under the Performance Security, except for amounts to

which the Employer is entitled under the Contract in the event of:

(a) failure by the Contractor to extend the validity of the Performance Security as described in the preceding paragraph, in which event the Employer may claim the full amount of the Performance Security,

(b) failure by the Contractor to pay the Employer an amount due, as either agreed by the Contractor or determined under Sub-Clause 2.5 [Employer's Claims] or Clause 20 [Claims, Disputes and Arbitration], within 42 days after this agreement or determination,

(c) failure by the Contractor to remedy a default within 42 days after receiving the Employer's notice requiring the default to be remedied, or

(d) circumstances which entitle the Employer to termination under SubClause 15.2 [Termination by Employer], irrespective of whether notice of termination has been given.

The Employer shall indemnify and hold the Contractor harmless against and from all damages, losses and expenses (including legal fees and expenses) resulting from a claim under the Performance Security to the extent to which the Employer was not entitled to make the claim.

The Employer shall return the Performance Security to the Contractor within 21 days after receiving a copy of the Performance Certificate. 4.3

Contractor's

Representative

The Contractor shall appoint the Contractor's Representative and shall give him all authority necessary to act on the Contractor's behalf under the Contract. Unless the Contractor's Representative is named in the

Contract, the Contractor shall, prior to the Commencement

Date, submit to the Engineer for consent the name and

particulars of the person the Contractor proposes to appoint

as Contractor's Representative. If consent is withheld or

subsequently revoked, or if the appointed person fails to act

as Contractor's Representative, the Contractor shall similarly

submit the name and particulars of another suitable person

for such appointment.

The Contractor shall not, without the prior consent of the

Engineer, revoke the appointment of the Contractor's

Representative or appoint a replacement.

The whole time of the Contractor's Representative shall be

given to directing the Contractor's performance of the

Contract. If the Contractor's Representative is to be

temporarily absent from the Site during the execution of the

Works, a suitable replacement person shall be appointed,

subject to the Engineer's prior consent, and the Engineer

shall be notified accordingly.

The Contractor's Representative shall, on, behalf of the

Contractor, receive instructions under Sub-Clause 3.3

[Instructions of the Engineer].

The Contractor's Representative may delegate any powers,

functions and authority to any competent person, and

may''at any time revoke the delegation. Any delegation or

revocation shall not take effect until the Engineer has

received prior notice signed by the Contractor's

Representative, naming the person and specifying the

powers, functions and authority being delegated or revoked.

The Contractor's Representative and all these persons shall

be fluent in the language for communications defined in

Sub-Clause 1.4 [Law and Language].

4.4

The contractor shall not subcontract the whole of the works.

The Contractor shall be responsible for the acts or defaults of

any Subcontractor, his agents or employees, as if they were

the acts or defaults of the Contractor. Unless otherwise stated

in the Particular Conditions:

(a) the Contractor shall not be required to obtain consent to

suppliers of Materials, or to a subcontract for which the

Subcontractor is named in the Contract;

(b) the prior consent of the Engineer shall be obtained to

other proposed Subcontractors;

(c) the Contractor shall give the Engineer not less than 28

days' notice of the intended date of the commencement of

each Subcontractor's work, and of the commencement of

such work on the Site; and

(d) each subcontract shall include provisions which would

entitle the Employer to require the subcontract to be

assigned to the Employer under Sub-Clause 4.5 [Assignment

of Benefit of Subcontract] (if or when applicable) or in the

event of termination under Sub-Clause 15.2 [Termination by Employer]. 4.5

Assignment of Benefit of

Subcontract

If a Subcontractor's obligations extend beyond the expiry date of the relevant Defects Notification Period and the Engineer , prior to this date, instructs the Contractor to assign the benefit of such obligations to the Employer , then the Contractor shall do so. Unless otherwise stated in the assignment, the Contractor shall have no liability to the Employer for the work carried out by the Subcontractor after the assignment takes effect. 4.6

Co-operation

The Contractor shall, as specified in the Contract or as instructed by the Engineer , allow appropriate opportunities for carrying out work to: (a) the Employer's Personnel,

(b) any other contractors employed by the Employer , and

(c) the personnel of any legally constituted public authorities,

who may be employed in the execution on or near the Site of any work not included in the Contract.

Any such instruction shall constitute a Variation if and to the extent that it causes the Contractor to incur Unforeseeable Cost. Services for these personnel and other contractors may include the use of Contractor's Equipment, Temporary Works or access arrangements which are the responsibility of the Contractor .

If, under the Contract, the Employer is required to give to the Contractor possession of any foundation, structure, plant or means of access in accordance with Contractor's Documents, the Contractor shall submit such documents to the Engineer in the time and manner stated in the Specification. 4.7

Setting Out

The Contractor shall set out the Works in relation to original points, lines and levels of reference specified in the Contract or notified by the Engineer. The Contractor shall be responsible for the correct positioning of all parts of the Works, and shall rectify any error in the positions, levels, dimensions or alignment of the Works. The Employer shall be responsible for any errors in

these specified or notified items of reference, but the Contractor shall use reasonable efforts to verify their

accuracy before they are used.

If the Contractor suffers delay and/or incurs Cost from

executing work which was necessitated by an error in

these items of reference, and an experienced contractor

could not reasonably have discovered such error and

avoided this delay and/or Cost, the Contractor shall give

notice to the Engineer and shall be entitled subject to

SubClause 20.1 [Contractor's Claims] to:

(a) an extension of time for any such delay, if

completion is or will be delayed, under Sub-Clause 8.4

[Extension of Time for Completion], and

(b) payment of any such Cost plus reasonable profit,

which shall be included in the Contract Price.

After receiving this notice, the Engineer shall proceed in

accordance with SubClause 3.5 [Determinations] to agree

or determine (i) whether and (if so) to what extent the

error could not reasonably have been discovered, and (ii)

the matters described in sub-paragraphs (a) and (b)

above related to this extent.

4.8

Safety Procedures The Contractor shall:

(a) comply with all applicable safety regulations,

(b) take care for the safety of all persons entitled to be

on the Site,

(c) use reasonable efforts to keep the Site and Works

clear of unnecessary obstruction so as to avoid danger

to these persons,

(d) provide fencing, lighting, guarding and watching of

the Works until completion and taking over under Clause

10 [Employer's Taking Over], and

(e) provide any Temporary Works (including roadways,

footways, guards and fences) which may be necessary,

because of the execution of the Works, for the use and

protection of the public and of owners and occupiers of

adjacent

4.9

Quality Assurance The Contractor shall institute a quality assurance system

to demonstrate compliance with the requirements of the

Contract. The system shall be in accordance with the

details stated in the Contract. The Engineer shall be

entitled to audit any aspect of the system.

Details of all procedures and compliance documents

shall be submitted to the Engineer for information before

each design and execution stage is commenced. When

any document of a technical nature is issued to the

Engineer, evidence of the prior approval by the

Contractor himself shall be apparent on the document

itself.

Compliance with the quality assurance system shall not

relieve the Contractor of any of his duties, obligations or

responsibilities under the Contract.

4.10

Site Data The Employer shall have made available to the

Contractor for his information, prior to the Base Date, all

relevant data in the Employer's possession on

sub-surface and hydrological conditions at the Site,

including environmental

shall similarly make available to the Contractor all such

data which come into the Employer's possession after

the Base Date. The Contractor shall be responsible for

interpreting all such data.

To the extent which was practicable (taking account of

cost and time), the Contractor shall be deemed to have

obtained all necessary information as to risks,

contingencies and other circumstances which may

influence or affect the Tender or Works. To the same

extent, the Contractor shall be deemed to have

inspected and examined the Site, its surroundings, the

above data and other available information, and to have

been satisfied before submitting the Tender as to all

relevant matters, including (without limitation):

(a) the form and nature of the Site, including

sub-surface conditions,

(b) the hydrological and climatic conditions,

(c) the extent and nature of the work and Goods

necessary for the execution and completion of the Works

and the remedying of any defects,

(d) the Laws, procedures and labour practices of the

Country, and

4.11

Sufficiency of the

Accepted Contract

The Contractor shall be deemed to:

(a) have satisfied himself as to the correctness and

sufficiency of the Accepted Contract Amount, and

(b) have based the Accepted Contract Amount on the

data, interpretations, necessary information, inspections,

examinations and satisfaction as to all relevant matters

referred to in Sub-Clause 4.10 [Site Data].

Unless otherwise stated in the Contract, the Accepted

Contract Amount covers all the Contractor's obligations

under the Contract (including those under Provisional

Sums, if any) and all things necessary for the proper

execution and completion of the Works and the

remedying of any defects.

4.12

Unforeseeable Physical Conditions In this Sub-Clause, "physical conditions" means natural physical conditions and man made and other physical obstructions and pollutants, which the Contractor encounters at the Site when executing the Works, including sub-surface and hydrological conditions but excluding climatic conditions.

If the Contractor encounters adverse physical conditions which he considers to have been Unforeseeable, the Contractor shall give notice to the Engineer as soon as practicable.

This notice shall describe the physical conditions, so that they can be inspected by the Engineer, and shall set out the reasons why the Contractor considers them to be Unforeseeable. The Contractor shall continue executing the Works, using such proper and reasonable measures as are appropriate for the physical conditions, and shall comply with any instructions which the Engineer may give. If an instruction constitutes a Variation, Clause 13 [Variations and Adjustments] shall apply.

If and to the extent that the Contractor encounters physical conditions which are Unforeseeable. gives such a notice, and suffers delay and/or incurs Cost due to these conditions, the Contractor shall be entitled subject to Sub-Clause 20.1 [Contractor's Claims] to:

(a) an extension of time for any such delay, if completion is or will be delayed, under Sub-Clause 8.4 [Extension of Time for Completion], and

(b) payment of any such Cost, which shall be included in the Contract Price.

After receiving such notice and inspecting and/or investigating these physical conditions, the Engineer shall proceed in accordance with Sub-Clause 3.5 [Determinations]

to agree or determine (i) whether and (if so) to what extent

these physical conditions were Unforeseeable, and (ii) the

matters described in subparagraphs (a) and (b) above

related to this extent.

However, before additional Cost is finally agreed or

determined under subparagraph (ii), the Engineer may also

review whether other physical conditions in similar parts of

the Works (if any) were more favourable than could

reasonably have been foreseen when the Contractor

submitted the Tender. If and to the extent that these more

favourable conditions were encountered, the Engineer may

proceed in accordance with Sub-Clause 3.5 [Determinations]

to agree or determine the reductions in Cost which were due

to these conditions, which may be included (as deductions) in

the Contract Price and Payment Certificates. However, the

net effect of all adjustments under sub-paragraph (b) and all

these reductions, for all the physical conditions encountered

in similar parts of the Works, shall not result in a net

reduction in the Contract Price.

The Engineer may take account of any evidence of the

physical conditions foreseen by the Contractor when

submitting the Tender, which may be made available by the

Contractor, but shall not be bound by any such evidence. 4.13

Rights of Way and The Contractor shall bear all costs and charges for special

and/or temporary rights Facilities of-way which he may

require, including those for access to the Site. The Contractor

shall also obtain, at his risk and cost, any additional facilities

outside the Site which he may require for the purposes of the

Works.

4.14

Avoidance of Interference The Contractor shall not interfere unnecessarily or improperly

with:

(a) the convenience of the public, or

(b) the access to and use and occupation of all roads and

footpaths, irrespective of whether they are public or in the

possession of the Employer or of others.

The Contractor shall indemnify and hold the Employer

harmless against and from all damages, losses and expenses

(including legal fees and expenses) resulting from any such

unnecessary or improper interference.

4.15

Access Route The Contractor shall be deemed to have been satisfied as to

the suitability and availability of access routes to the Site. The

Contractor shall use reasonable efforts to prevent any road or

bridge from being damaged by the Contractor's traffic or by

the Contractor's Personnel. These efforts shall include the

proper use of appropriate vehicles and routes.

Except as otherwise stated in these Conditions:

(a) the Contractor shall (as between the Parties) be

responsible for any maintenance which may be required for

his use of access routes;

(b) the Contractor shall provide all necessary signs or

directions along access _. routes, and shall obtain any.

permission which may be required from the relevant

authorities for his use of routes, signs and directions;

(c) the Employer shall not be responsible for any claims

which may arise from the use or otherwise of any access

route,

(d) the Employer does not guarantee the suitability or

availability of particular access routes, and

(e) Costs due to non-suitability or non-availability, for the

use required by the Contractor, of access routes shall be

bome by the Contractor.

4.16

Transport of Goods Unless otherwise stated in the Particular Conditions:

(a) the Contractor shall give the Engineer not less than 21

days' notice of the date on which any Plant or a major item

of other Goods will be delivered to the Site; (b) t he

Contractor shall be responsible for packing, loading,

transporting, receiving, unloading, storing and protecting all

Goods, and other things required for the Works; and

(c) the Contractor shall indemnity and hold the Employer

harmless against and from all damages, losses and

expenses (including legal fees and expenses) resulting

from the transport of Goods, and shall negotiate and pay all

claims arising from their transport.

4.17

Contractor's Equipment The Contractor shall be responsible for all Contractor's

Equipment. When brought on to the Site, Contractor's

Equipment shall be deemed to be exclusively intended for

the execution of the Works. The Contractor shall not

remove from the Site any major items of Contractor's

Equipment without the consent of the Engineer. However,

consent shall not be required for vehicles transporting

Goods or Contractor's Personnel off Site.

4.18

Protection of the The Contractor shall take all reasonable steps to protect

the environment (both on off the Site) and to limit damage

and nuisance to people and property resulting from

pollution, noise and other results of his operations.

The Contractor shall ensure that emissions, surface

discharges and effluent from the Contractor's activities

shall not exceed the values indicated in the Specification,

and shall not exceed the values prescribed by applicable

Laws.

4.19

Electricity, Water and Gas The Contractor shall, except as stated below, be

responsible for the provision of all power, water and other

services he may require.

The Contractor shall be entitled to use for the purposes of

the Works such supplies of electricity, water, gas and other

services as may be available on the Site and of which

details and prices are given in the Specification. The

Contractor shall, at his risk and cost, provide any apparatus

necessary for his use of these services and for measuring

the quantities consumed.

The quantities consumed and the amounts due (at these

prices) for such services shall be agreed or determined by

the Engineer in accordance with Sub-Clause 2.5

[Employer's Claims] and Sub-Clause 3.5 [Determinations].

The Contractor shall pay these amounts to the Employer. 4.20

Employer's Equipment and Free-Issue Material The Employer shall make the Employer's Equipment (if any) available for the use of the and Free-Issue Material Contractor in the execution of the Works in accordance with the details, arrangements and prices stated in the Specification. Unless otherwise stated in the Specification:

(a) the Employer shall be responsible for the Employer's Equipment, except that

(b) the Contractor shall be responsible for each item of Employer's Equipment whilst any of the Contractor's Personnel is operating it, driving it, directing it or in possession or control of it.

The appropriate quantities and the amounts due (at such

stated prices) for the use of Employer's Equipment shall be

agreed or determined by the Engineer in accordance with

Sub-Clause 2.5 [Employer's Claims] and Sub-Clause 3.5

[Determinations]. The Contractor shall pay these amounts

to the Employer.

The Employer shall supply, free of charge, the "free-issue

materials" (if any) in accordance with the details stated in

the Specification. The Employer shall, at his risk and cost,

provide these materials at the time and place specified in

the Contract. The Contractor shall then visually inspect

them, and shall promptly give notice to the Engineer of any

shortage, defect or default in these materials. Unless

otherwise agreed by both Parties, the Employer shall

immediately rectify the notified shortage, defect or default.

After this visual inspection, the free-issue materials shall

come under the care, custody and control of the Contractor.

The Contractor's obligations of inspection, care, custody

and control shall not relieve the Employer of liability for any

shortage, defect or default not apparent from a visual

inspection.

4.21

Progress Reports Unless otherwise stated in the

Particular Conditions, monthly progress reports shall be

prepared by the Contractor and submitted to the Engineer

in six copies. The first report shall cover the period up to

the end of the first calendar month following the

Commencement Date. Reports shall be submitted monthly

thereafter, each within 7 days after the last day of the

period to which it relates.

Reporting shall continue until the Contractor has completed

all work which is known to be outstanding at the completion

date stated in the Taking-Over Certificate for the Works.

Each report shall include:

(a) charts and detailed descriptions of progress, including

each stage-of design (if any), Contractor's

Documents, procurement, manufacture, delivery to

Site, construction, erection and testing; and including

these stages for work by each nominated

Subcontractor (as defined in Clause 5 [Nominated

Subcontractors]),

(b) photographs showing the status of manufacture and of

progress on the Site; (c) for the manufacture of each

main item of Plant and Materials, the name of the

manufacturer, manufacture location, percentage progress, and the actual or expected dates of:

(i) commencement of manufacture,

(ii) Contractor's inspections, and

(iii) Test, and

(iv) shipment and arrival at the Site;

(d) the details described in Sub-Clause 6.10 [Records of Contractor's Personnel and Equipment];

(e) copies of quality assurance documents, test results and certificates of Materials;

(f) List of notices given under Sub-Clause 2.5 [Employer's Claims] and notices given under Sub-Clause 20.1 [Contractor's Claims];

(g) safety statistics, including details of any hazardous incidents and activities relating to environmental aspects and public relations; and

(h) comparisons of actual and planned progress, with details of any events o circumstances which may jeopardize the completion in accordance with the Contract, and the measures being (or to be) adopted to overcome delays. 4.22

Security of the Site

Unless otherwise stated in the Particular Conditions:

(a) the Contractor shall be responsible for keeping unauthorised persons off the Site, and

(b) authorised persons shall be limited to the Contractor's Personnel and the Employer's Personnel; and to any other personnel notified to the Contractor , by the Employer or the Engineer , as authorised personnel of the Employer's other contractors on the Site. 4.23

Contractor's Operations

on Site

The Contractor shall confine his operations to the Site, and to any additional areas which may be obtained by the Contractor and agreed by the Engineer as working areas. The Contractor shall take all necessary precautions to keep Contractor’s Equipment and Contractor’s Personnel within the Site and these additional areas, and to keep them off adjacent land. During the execution of the Works, the Contractor shall keep

the Site free from all unnecessary obstruction, and shall store or dispose of any Contractor's Equipment or surplus materials. The Contractor shall clear away and remove from the Site any wreckage, rubbish and Temporary Works which are no longer required.

Upon the issue of a Taking-Over Certificate, the Contractor

shall clear away and remove, from that part of the Site and

Works to which the Taking-Over Certificate refers, all

Contractor's Equipment, surplus material, wreckage, rubbish

and Temporary Works. The Contractor shall leave that part of

the Site and the Works in a clean and safe condition. However,

the Contractor may retain on Site, during the Defects Notifi-

cation Period, such Goods as are required for the Contractor to

fulfil obligations under the Contract.

4.24

Fossils All fossils, coins, articles of value or antiquity, and structures

and other remains or items of geological or archaeological

interest found on the Site shall be placed under the care and

authority of the Employer. The Contractor shall take

reasonable precautions to prevent Contractor's Personnel or

other persons from removing or damaging any of these

findings.

The Contractor shall, upon discovery of any such finding,

promptly give notice to the Engineer, who shall issue

instructions for dealing with it. If the Contractor suffers delay

and/or incurs Cost from complying with the instructions, the

Contractor shall give a further notice to the Engineer and shall

be entitled subject to Sub-Clause 20.1 [Contractor's Claims] to:

(a) an extension of time for any such delay, if completion is or

will be delayed, under Sub-Clause 8.4 [Extension of Time

for Completion], and

(b) payment of any such Cost, which shall be included in the

Contract Price.

After receiving this further notice, the Engineer shall proceed

in accordance with Sub-Clause 3.5 [Determinations]. to agree

or determine these matters.

菲迪克(FIDIC)简明合同格式-中英对照版

菲迪克(FIDIC)文献译丛中英文对照本 国际咨询工程师联合会 编译 中国工程咨询协会 1999年第1版 Agreement协议书 General Conditions通用条件 Rules for Adjudication裁决规则 Notes for Guidance指南注释 Short Form of Contract 简明合同格式 吕文学陈永强翻译 唐萍校译 王川徐礼章唐萍审订 (1999年第1版) (中英文对照本) (译者对译文的准确度承担全部责任, 正式使用发生的争端,以英文原版为准) 机械工业出版社

菲迪克(FIDIC)授权书 I herewith authorize CNAEC to translate FIDIC’s publications (but not the publications as edited by other organizations) into Chinese and publish them. I agree with your statement, as part of the agreement, that you will: a)Provide FIDIC with 10 copies of the translation per document, and b)Make a statement on the inside cover of the translation that the translator takes full responsibility for the accuracy of the translation and that in case of dispute, the original version in English shall prevail. Peter van der TOGT Publications manager [译文] 在此,我授权中国工程咨询协会把FIDIC出版物译成中文并出版(但是,不包括其他组织编写的出版物)。我同意你们的意见,作为协议的一部分,你们应: a)向FIDIC提供每份文件中译本10本; b)在译文的扉页上注明译者对译文的准确度承担全部责任,如果发生争端,以英文原版为准。 出版经理:Peter van der TOGT FIDIC is the French acronym for the International Federation of Consulting Engineers. FIDIC (中译菲迪克)是国际咨询工程师联合会的法文缩写。 FIDIC was founded in 1913 by three national associations of consulting engineers within Europe. The objectives of forming the federation were to promote in common the professional interests of the member associations and to disseminate information of interest to members of its component national associations. 菲迪克(FIDIC)是由欧洲三个国家的咨询工程师协会于1913年成立的。组建联合会的上的是共同促进成员协会的职业利益,以及向其成员协会会员传播有益信息。 Today FIDIC membership numbers more than 60 countries from all parts of the globe and the federation represents most of the private practice consulting engineers in the world. 今天,菲迪克(FIDIC)已有来自全球各地60多个国家成员协会,代表着世界上大多数私人执业咨询工程师。 FIDIC arranges seminars, conferences and other events in the furtherance of its goals: maintenance of high ethical and professional standards; exchange of views and information; discussion of problems of mutual concern among member associations and representatives of the international financial institutions; and development of the consulting engineering industry in developing countries. 菲迪克(FIDIC)举办各类研讨会、会议及其他活动,以促进其目标:维护高的道德和职业标准;交流观点和信息;讨论成员协会和国际金融机构代表共同关心的问题,以及发展中国家工程咨询业的发展。 FIDIC publications include proceedings of various conferences and seminars, information for consulting engineers, project owners and international development agencies, standard pre-qualification forms, contract documents and client/consultant agreements. They are available from the secretariat in Switzerland. 菲迪克(FIDIC)的出版物包括:各类会议和研讨会的文件,为咨询工程师、项目业主和国际开发机构提供的信息,资格预审标准格式,合同文件以及客户与工程咨询单位协议书。这些资料可以从设在瑞士的菲迪克(FIDIC)秘书处得到。 国际咨询工程师联合会 INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS

Fidic 红皮书主要名词中英文对照

1.General Provisions一般规定 Contract 合同 Contract Agreement 合同协议书1.6 Letter of Acceptance 中标函1.1.3 (a. 业主对承包商正式接受函,签字;b.双方商定的其他内容,双方签字) Letter of Tender 投标函(承包商的报价函) Specification 规范 Drawings 图纸 Schedules 明细表 Tender 投标书(a. 投标函;b. 投标者填写的各类明细表,投标保函等) Appendix to Tender 投标函附录 Bill of Quantities 工程量表 Daywork Schedule 计日工表 Parties and Persons 合同双方和人员 Engineer 工程师(natural/legal)(监理) DAB 争端裁决委员会(投标函附录列出) FIDIC 国际咨询工程联合会(International Federation of Consulting Engineers) Dates 日期Tests 检验Periods 期间Completion 竣工 Base Date 基准日期(提交投标书截止日期之前的第28天当天;与调价有关)Commencement Date 开工日期(工程师通知开工的日期) Time for Completion 竣工日期(指时间段,从开工日期开始计算) Tests on Completion 竣工检验 Taking-over Certificate 接收证书(证明工程按照合同实质竣工,进入缺陷通知期) Tests after Completion 竣工后检验 Defects Notification Period 缺陷通知期维修期 Performance Certificate 履约证书 Money and Payments 款项和支付 Accepted Contract Amount 中标合同金额(中标的承包商的投标价格,名义合同价格)Contract Prise 合同价格(a. b.包含根据合同进行的调整) Cost 费用(承包商现场内外全部合理开支,不包括利润) Final Payment Certificate 最终支付证书(承包商将从业主方拿到的最后的一笔工程款) Final Statement 最终报表 Foreign Currency 外币 Interim Payment Certificate 期中支付证书 Local Curency 当地币 Payment Certificate 支付证书(期中和最终) Provisional Sum暂定金额(相当于业主方的备用金)13.5 /14.2 Retention Money 保留金(现金保证金,保证承包商在工程的执行的过程中恰当履约)14.3/14.9 Statement 报表(完成工程量的合同价值及其他相关情况月报竣工报表最终报表) Works and Goods 工程和货物(eg. 材料,永久设备,施工机具…完成的工程火或其一部分)Contractor’s Equipment 承包商设备(承包商的施工机具) Goods 货物 Materials 材料 Permanent Works 永久工程

FIDIC黄皮书中文合同99年版

FIDIC电气与机械工程合同条件 (黄皮书) 第一部分通用条件定义及解释(条款1) 第一部分通用条件工程师和工程师代表(条款2) 第一部分通用条件转让与分包(条款3和4) 第一部分通用条件合同文件(条款5,6,7) 第一部分通用条件承包商的义务(条款8,9,10,11,12,13,14,15和16) 第一部分通用条件业主的义务(条款17) 第一部分通用条件劳务(条款18) 第一部分通用条件工艺和材料(条款19,20,21和22) 第一部分通用条件工程、运送或安装的暂停 第一部分通用条件竣工 第一部分通用条件竣工检验 第一部分通用条件移交 第一部分通用条件移交后的缺陷 第一部分通用条件变更 第一部分通用条件设备的所有权 第一部分通用条件证书与支付 第一部分通用条件索赔 第一部分通用条件外币和汇率 第一部分通用条件暂定金额 第一部分通用条件风险与责任 第一部分通用条件对工程的照管和风险的转移 第一部分通用条件财产损害和人员伤害 第一部分通用条件责任的限度 第一部分通用条件保险 第一部分通用条件不可抗力 第一部分通用条件违约 第一部分通用条件费用和法规的变更 第一部分通用条件关税 第一部分通用条件通知 第一部分通用条件争议与仲裁 第一部分通用条件法律及程序 第二部分专用条件

第一部分通用条件定义及解释(条款1) 定义 1.1在本合同中(如下文所定义),下列措词和用语应具有此处所赋予它们的涵义: 1.1.1“开工日期”是指下列日期中最迟的日期: (a)序言中规定的开工日期,或承包商收到下列付款或通知的日期; (b)支付条件中可能规定的开工之前的预付款; (c)为开始履行合同所需颁发任何进口许可证的通知; (d)关于合同生效所需的任何法律要求已经完成的通知; (e)在第二部分中规定的、作为开工先决条件所需的任何财务和行政管理方面的要求已经完成的通知。 1.1.2“条件”是指本合同条件的序言以及本合同条件的第一部分和第二部分。 1.1.3“合同”是指为实施工程业主和承包商之间达成的协议,包括条件、规范、业主的图纸和承包商的图纸、已标价的和填完的价格表、投标书、中标函以及中标函中明确编入的附加文件。 1.1.4“合同协议书”是指记录业主和承包商之间的合同条款的文件。FIDIC机电工程合同条件附有一个合同协议书的样本。 1.1.5“合同价格”是中标函中规定的、为实施工程而支付给承包商的那笔金额。 1.1.6“承包商”是指其投标书已被业主接受的当事人以及取得承包商资格的法定继承人,但不指承包商的任何受让人(除非业主向意)。 1.1.7“承包商的图纸”是指承包商根据第6条提交的所有的图纸、样品、图样、模型、操作和维修手册。 1.1.8“承包商的设备”是指为工程之目的所需要的任何性质的装置和物品,但不包括工程设备。 1.1.9“承包商的风险”是指第37.3款定义的风险。 1.1.10“缺陷责任证书”是根据第30.11款由工程师颁发给承包商的证书。 1.1.11“缺陷责任期”是指一年或第二部分规定的移交工程后的时间段。在该期间内,承包商根据第30条负责修复好缺陷和损害。 1.1.12“业主”是指序言中指定的当事人以及取得业主资格的法定继承人,但不指业主的任何受让人(除非承包商同意)。 1.1.13“业主的图纸”是指业主或工程师根据合同向承包商提供的所有图纸和资料。 1.1.14“业主的风险”是指第37.2款定义的那些风险。 1.1.15“工程师”是指业主任命的为了合同目的作为工程师去工作并在序言中被指定的人员。 1.1.16“工程师代表”是指工程师根据第 2.2款随时任命的工程师的任何代表。 1.1.17“最终支付书”是指工程师根据第33.10款向业主颁发的证书。 1.1.18“不可抗力”具有第44.1款赋予它的涵义。 1.1.19“外币”是指工程设备安装所在国之外的某一国货币。 1.1.20“严重读取”是指承包商违背最基本的勤勉之则的任何行为或失职,而该规则是一个有责任心的承包商在同样的地位和同样的情况下所应遵循的。 1.1.21“中标函”是指业主对投标书的正式接受函,包括业主与承包商商定的对投标书进行的任何调整或变动。 1.1.22“履约保证”是承包商据第10.1款为恰当地履行合同而提供的保证。 1.1.23“工程设备”是指按合同提供的,安装到工程上的机器、仪器、材料以及所有物品。 1.1.24“进度计划”是指承包商根据第1 2.1款提交的进度计划以及任何批准的对进度计划的修订。 1.1.25“暂定金额”是指根据第36.1款所述的那笔用于进行工作或提供货物或服务的金额。 1.1.26“风险转移日期”是指根据第38.1款将工程损失或损害的风险从承包商处转移给业主的日期。 1.1.27“价格表”是指由承包商连同投标书一起递交的已填完并且已标价的价格表,或其中任何部分或单个的价格表,上述价格表构成合同文件的一部分。 1.1.28“区段”是指合同中专门确定作为区段的工程的一部分。 1.1.29“现场”是指由业主提供或使之可用的、承包商工作所在的或运人工程设备的那个或那些场所以及经业主同意后承包商施工涉及到的、在工程周围的那部分场所(不只是为了通行)。

FIDIC新红皮书全文

FIDIC 施工合同条件 (1999年第一版) 用于业主设计的房屋建筑或工程 通用条件 专用条件编制指南 争端裁决协议书格式 投标函、合同协议书格式 周可荣刘雯 万彩芸王健译 说明:因时间较紧,本译稿未经仔细校对,仅供培训班使用,请勿复印传播。请勿正式引用。

引言 国际咨询工程师联合会(FIDIC)现于1999年出版下列四份新的合同标准格式的第一版: ●施工合同条件(Conditions of Contract for Construction) 推荐用于由雇主设计的、或由其代表—工程师设计的房屋建筑或工程(building or engineering works)。在这种合同形式下,承包商一般都按照雇主提供的设计施工。但工程中的某些土木、机械、电力和/或建造工程也可能由承包商设计。 ●永久设备和设计—建造合同条件(Conditions of Contract for Plant and Design-Build) 推荐用于电力和/或机械设备的提供,以及房屋建筑或工程的设计和实施。在这种合同形式下,一般都是由承包商按照雇主的要求设计和提供设备和/或其它工程(可能包括由土木、机械、电力、和/或建造工程的任何组合形式)。 ●EPC/交钥匙项目合同条件(Conditions of Contract for EPC/Turnkey Projects) 适用于在交钥匙的基础上进行的工厂或其它类似设施的加工或能源设备的提供、或基础设施项目和其它类型的开发项目的实施,这种合同条件所适用的项目(i)对最终价格和施工时间的确定性要求较高,(ii)承包商完全负责项目的设计和施工,雇主基本不参与工作。 在交钥匙项目中,一般情况下由承包商实施所有的设计、采购和建造工作:即在“交钥匙”时,提供一个配备完整、可以运行的设施。 ●合同的简短格式(Short Form of Contract) 推荐用于价值相对较低的建筑或工程。根据工程的类型和具体条件的不同,此格式也适用于价值较高的工程,特别是较简单的、或重复性的、或工期短的工程。在这种合同形式下,一般都是由承包商按照雇主或其代表—工程师提供的设计实施工程,但对于部分或完全由承包商设计的土木、机械、电力、和/或建造工程的合同也同样适用。 建议在国际范围内招标时使用上述格式作为合同基础。在某些国家和地区,特别是当合同条件用于其国内合同时,可能需要对这些格式进行一些改动。FIDIC是按照以英语为官方语言的情况编写的。 在编写本施工合同条件的过程中我们认识到,有许多条款是普遍适用的,但也有一些条款必须根据特定合同的具体情况予以变动。因此,我们将那些对大多数(并非全部)合同都适用的条款编入了通用条件中,以方便使用者将其纳入合同文件。 通用条件和专用条件共同构成了制约合同各方权力和义务的条件。对于每一份具体的合同,都必须编制专用条件,并且必须考虑到通用条件中提到的专用条件中的条款。 本版的通用条件是基于下列情况编写的: (i)期中支付和最终支付将按照测量的数值乘以工程量表中的费率和价格决定; (ii)如果通用条件中的某些词语需要用进一步的数据来说明,那么(除非其描述性很强,因而必须在规范中详细说明外)要参照此数据的条款应编入投标文件 附录中,数据由雇主事先写明或由投标者填入; (iii)如果通用条件中的某条款涉及某一事件,而对此事件不同的合同可能适于采用不同的合同格式,则编写此条款的原则应为; (a)要使用户感到,简单地删去或不引用某些他们不希望采用的规定,比在通用条件中没有包括他们的要求而必须在专用条件中编写附加的条文 更为方便; (b)而在原则(a)不适用的情况下,条款中应包含适用于绝大多数合同的规定。

FIDIC红皮书-施工合同条件__(中英文对照)

Fédération Internationale Des Ingénieurs-Conseils(红皮书--施工合同条件) General Conditions 1.一般规定 General Provisions 1.1 定义 Definitions 在包括专用条件和本通用条件的合同条件(“本合同条件”)中,以下措辞和用语的含义如下所述。除非上下文中另有要求,指当事人和当事各方的词包括公司和其它法律实体。 In the Conditions of Contract ("these Conditions"), which include Particular Conditions and these General Conditions, the following words and expressions shall have the meanings stated. Words indicating persons or parties include corporations and other legal entities, except where the context requires otherwise. 1.1.1 合同 1.1.1 The Contract 1.1.1.1“合同(Contract)”指合同协议书、中标函、投标函、本合同条件、规范、图纸、资料表、以及在合同协议书或中标函中列明的其它进一步的文件(如有时)。 1.1.1.1 "Contract" means the Contract Agreement, the Letter of Acceptance, the Letter of Tender, these Conditions, the Specification, the Drawings, the Schedules, and the further documents (if any) which are listed in the Contract Agreement or in the Letter of Acceptance. 1.1.1.2“合同协议书(Contract Agreement)”指第1.6款【合同协议】中所说明的合同协议(如有时)。 1.1.1.2 "Contract Agreement" means the contract agreement (if any) referred to in Sub-Clause 1.6 [Contract Agreement]. 1.1.1.3“中标函(Letter of Acceptance)”指雇主对投标文件签署的正式接受函,包括其后所附的备忘录(由合同各方达成并签定的协议构成)。在没有此中标函的情况下,“中标函”一词就指合同协议书,颁发或接收中标函的日期就指双方签订合同协议书的日期。 1.1.1.3 "Letter of Acceptance" means the letter of formal acceptance, signed by the Employer, of the Letter of Tender, including any annexed memoranda comprising agreements between and signed by both Parties. If there is no such letter of acceptance, the expression "Letter of Acceptance" means the Contract Agreement and the date of issuing or receiving the Letter of Acceptance means the date of signing the Contract Agreement. 1.1.1.4“投标函(Letter of Tender)”指名称为投标函的文件,由承包商填写,包括已签字的对雇主的工程报价。 1.1.1.4 "Letter of Tender" means the document entitled letter of tender, which was completed by the Contractor and includes the signed offer to the Employer for the Works. 1.1.1.5“规范(Specification)”指合同中名称为规范的文件,及根据合同规定对规范的增加和修改。此文件具体描述了工程。 1.1.1.5 "Specification" means the document entitled specification, as included in the Contract, and any additions and modifications to the specification in accordance with the Contract. Such document specifies the Works. 1.1.1.6“图纸(Drawings)”指合同中规定的工程图纸,及由雇主(或代表)根据合同颁发的对图纸的增加和修改。 1.1.1.6 "Drawings" means the drawings of the Works, as included in the Contract, and any additional and modified drawings issued by (or on behalf of, the Employer in accordance with the Contract. 1.1.1.7“资料表(Schedules)”指合同中名称为资料表的文件,由承包商填写并随投标函提交。此文件可能包括工程量表、数据、列表、及费率和/或单价表。 1.1.1.7 "Schedules" means the document(s) entitled schedules, completed by the Contractor and submitted with the Letter of Tender, as included in the Contract. Such document may include the Bill of Quantities, data, lists, and schedules of rates and/or prices 1.1.1.8“投标文件(Tender)”指投标函和合同中规定的承包商应随投标函提交的其它所有文件。 1.1.1.8 "Tender" means the Letter of Tender and all other documents which the Contractor submitted with the Letter of Tender, as included in the Contract. 1.1.1.9“投标函附录(Appendix to Tender)”指名称为投标函附录并已填写完毕的文件,附于投标函之后并构成投标函的一部分。 1.1.1.9 "Appendix to Tender" means the completed pages entitled appendix to tender which are appended to and form part of the Letter of Tender. 1.1.1.10 “工程量表(Bill of Quantities)”和“计日工计划(Daywork Schedule)”指资料表中如此命名的文件(如有时)。 1.1.1.10 "Bill of Quantities" and "Day work Schedule" mean the documents so named (if any) which are comprised in the

新版FIDIC合同

新编FIDIC合同条件应用中的几个实践性问题 FIDIC合同条件它虽然不是法律,也不是法规,但它是全世界公认的一种国际惯例。它伴随着世纪的进程经历了从产生到发展、不断完善的过程。FIDIC合同条件第1版于1957年、第2版于1963年、第3版于1977年、1988年及1992年作了两次修改,习惯对1988年版称为第4版。1999年国际工程师联合会根据多年来在实践中取得的经验以及专家、学者的建议与意见,在继承以往四版优点的基础上进行重新编写(下称新编FIDC合同条件)。中国工程咨询协会根据菲迪克授权书进行编译、出版,机械工业出版社于2002年5月首次印刷FIDIC合同条件第1版(中、英文对照)。 新编FIDIC合同一套四本:《施工合同条件》、《生产设备和设计—施工合同条件》、《设计采购施工(EPC)/交钥匙工程合同条件》与《简明合同格式》。此外FIDIC组织为了便于雇主选择投标人、招标、评标,出版了《招标程序》,由此形成一个完整的体系。笔者结合从事FIDIC合同条件法律服务的实践,在此提出新编FIDIC合同条件在中国应(适)用中的几个实践性问题,赐教于同仁。 一、新编FIDIC合同条件的应用选择 (一)新编的FIDIC合同条件与旧版本的应用选择 新编《施工合同条件》,用于由雇主或其他代表工程师设计的建筑或工程项目。由承包商按照雇主提出的设计进行工程施工,但该工程可以包含由承包商设计的土木、机械。电气和构筑物的某些部分。《施工合同条件》由通用条件、专用条件编写指南投标函、合同协议书和争端裁决协议书格式构成。通用条件与专用条件各20条。通用条件20条共158款(款下所设的项略),另附录争端裁决协议书一般条件。通用20条款目录分别是:1、一般规定〔1.1定义,1.2解释,1.3通信交 流,1.4法律和语言,1.5文件优先次序,1.6合同协议书, 1.7权益转让,1.8文件的照管和提供,1.9延误的图纸或指示,1.10雇主使用承包商文件, 1.11承包商使用雇主文件,1.12保密事项,1.13遵守法律,1.14共同的和各自的责任〕;2、雇主

FIDIC合同英文版红皮书99版本_secretpart 04_secret

4. The Contractor 4.1 Contractor's General The Contractor shall design (to the extent specified in the Contract), execute and complete the Works in accordance with the Contract and with the Engineer's instructions, and shall remedy any defects in the Works. The Contractor shall provide the Plant and Contractor's Documents specified in the Contract, and all Contractor's Personnel, Goods, consumables and other things and services, whether of a temporary or permanent nature, required in and for this design, execution, completion and remedying of defects. The Contractor shall be responsible for the adequacy, stability and safety of all Site operations and of all methods of construction. Except to the extent specified in the Contract, the Contractor (i) shall be responsible for all Contractor's Documents, Temporary Works, and such design of each item of Plant and Materials as is required for the item to be in accordance with the Contract, and (ii) shall not otherwise be responsible for the design or specification of the Permanent Works. The Contractor shall, whenever required by the Engineer, submit details of the arrangements and methods which the Contractor proposes to adopt for the execution of the Works. No significant alteration to these arrangements and methods shall be made without this having previously been notified to the Engineer. If the Contract specifies that the Contractor shall design any part of the Permanent Works, then unless otherwise stated in the Particular Conditions: If the Contract specifies that the Contractor shall design any part of the Permanent Works, then unless otherwise stated in the Particular Conditions: (a) the Contractor shall submit to the Engineer the Contractor's Documents for this part in accordance with the procedures specified in the Contract; (b) these Contractor's Documents shall be in accordance with the Specification and Drawings, shall be written in the language for communications defined in Sub-Clause 1.4 [Law and Language], and shall include additional information required by the Engineer to add to the, Drawings for co-ordination of each Party's designs; (c) the Contractor shall be responsible for this part and it shall, when the Works are completed, be fit for such purposes for which the part is intended as are specified in the Contract; and (d) prior to the commencement of the Tests on Completion, the Contractor shall submit to the Engineer the "as-built" documents and operation and maintenance manuals in accordance with the Specification and in sufficient detail for the Employer to operate, maintain, dismantle, reassemble, adjust and repair this part of the Works. Such part shall not be considered to be completed for the purposes of taking-over under Sub-Clause 10.1 [Taking Over of the Works and

FIDIC99版红皮书--施工合同条件

FIDIC施工合同条件(1999年第一版) 用于业主设计的房屋建筑或工程通用条件

引言 国际咨询工程师联合会(FIDIC)现于1999年出版下列四份新的合同标准格式的第一版: ●施工合同条件(Conditions of Contract for Construction) 推荐用于由雇主设计的、或由其代表—工程师设计的房屋建筑或工程(building or engineering works)。在这种合同形式下,承包商一般都按照雇主提供的设计施工。但工程中的某些土木、机械、电力和/或建造工程也可能由承包商设计。 ●永久设备和设计—建造合同条件(Conditions of Contract for Plant and Design-Build) 推荐用于电力和/或机械设备的提供,以及房屋建筑或工程的设计和实施。在这种合同形式下,一般都是由承包商按照雇主的要求设计和提供设备和/或其它工程(可能包括由土木、机械、电力、和/或建造工程的任何组合形式)。 ●EPC/交钥匙项目合同条件(Conditions of Contract for EPC/Turnkey Projects) 适用于在交钥匙的基础上进行的工厂或其它类似设施的加工或能源设备的提供、或基础设施项目和其它类型的开发项目的实施,这种合同条件所适用的

项目(i)对最终价格和施工时间的确定性要求较高,(ii)承包商完全负责项目的设计和施工,雇主基本不参与工作。在交钥匙项目中,一般情况下由承包商实施所有的设计、采购和建造工作:即在“交钥匙”时,提供一个配备完整、可以运行的设施。 合同的简短格式(Short Form of Contract) 推荐用于价值相对较低的建筑或工程。根据工程的类型和具体条件的不同,此格式也适用于价值较高的工程,特别是较简单的、或重复性的、或工期短的工程。在这种合同形式下,一般都是由承包商按照雇主或其代表—工程师提供的设计实施工程,但对于部分或完全由承包商设计的土木、机械、电力、和/或建造工程的合同也同样适用。 建议在国际范围内招标时使用上述格式作为合同基础。在某些国家和地区,特别是当合同条件用于其国内合同时,可能需要对这些格式进行一些改动。FIDIC是按照以英语为官方语言的情况编写的。 在编写本施工合同条件的过程中我们认识到,有许多条款是普遍适用的,但也有一些条款必须根据特定合同的具体情况予以变动。因此,我们将那些对大多数(并非全部)合同都适用的条款编入了通用条件中,以方便使用者将其纳入合同文件。 通用条件和专用条件共同构成了制约合同各方权力和义务的条件。对于每一份具体的合同,都必须编制专用条件,并且必须考虑到通用条件中提到的专用条件中的条款。

fidic施工合同条件中英文

fidic施工合同条件中英文 篇一:FIDIC土木工程施工合同条件(红皮书)_中英文 通用条件 General Conditions 1 一般规定 1. General Provisions 定义 Definitions 在包括专用条件和本通用条件的合同条件(“本合同条件”)中,以下措辞和用语的含义如下所述。除非上下文中另有要求,指当事人和当事各方的词包括公司和其它法律实体。 In the Conditions of Contract ("these Conditions"), which include Particular Conditions and these General Conditions, the following words and expressions shall have the meanings stated. Words indicating persons or parties include corporations and other legal entities, except where the context requires otherwise. 合同 The Contract “合同(Contract)”指合同协议书、中标函、投标函、本合同条件、规范、图纸、资料表、以及在合同协议书或中

标函中列明的其它进一步的文件(如有时)。 "Contract" means the Contract Agreement, the Letter of Acceptance, the Letter of Tender, these Conditions, the Specification, the Drawings, the Schedules, and the further documents (if any) which are listed in the Contract Agreement or in the Letter of Acceptance. “合同协议书(Contract Agreement)”指第款【合同协议】中所说明的合同协议(如有时)。 "Contract Agreement" means the contract agreement (if any) referred to in Sub-Clause [Contract Agreement]. “中标函(Letter of Acceptance)”指雇主对投标文件签署的正式接受函,包括其后所附的备忘录(由合同各方达成并签定的协议构成)。在没有此中标函的情况下,“中标函”一词就指合同协议书,颁发或接收中标函的日期就指双方签订合同协议书的日期。 "Letter of Acceptance" means the letter of formal acceptance, signed by the Employer, of the Letter of Tender, including any annexed memoranda comprising agreements between and signed by both Parties. If there is no such letter of acceptance, the expression "Letter

【精品】FIDIC全套完整合同条款条例1999(中英文对照)

FIDIC合同条款 (正规无改) 编 辑 前 可 删 除 此 页 合同特点:内容正规详尽(花费了太多时间) 收取一点点费用请不要介意

FIDIC合同条款1999(中英文对照) Fédération Internationale Des Ingénieurs-Conseils 通用条款 General Conditions 1.一般规定 1.1 定义 在包括专用条件和本通用条件的合同条件(“本合同条件”)中,以下措辞和用语的含义如下所述。除非上下文中另有要求,指当事人和当事各方的词包括公司和其它法律实体。 1.1.1 合同 1.1.1.1“合同(Contract)”指合同协议书、中标函、投标函、本合同条件、规范、图纸、资料表、以及在合同协议书或中标函中列明的其它进一步的文件(如有时)。 1.1.1.2“合同协议书(Contract Agreement)”指第1.6款【合同协议】中所说明的合同协议(如有时)。 1.1.1.3“中标函(Letter of Acceptance)”指雇主对投标文件签署的正式接受函,包括其后所附的备忘录(由合同各方达成并签定的协议构成)。在没有此中标函的情况下,“中标函”一词就指合同协议书,颁发或接收中标函的日期就指双方签订合同协议书的日期。 1.1.1.4“投标函(Letter of Tender)”指名称为投标函的文件,由承包商填写,包括已签字的对雇主的工程报价。 1.1.1.5“规范(Specification)”指合同中名称为规范的文件,及根据合同规定对规范的增加和修改。此文件具体描述了工程。 1.1.1.6“图纸(Drawings)”指合同中规定的工程图纸,及由雇主(或代表)根据合同颁发的对图纸的增加和修改。 1.1.1.7“资料表(Schedules)”指合同中名称为资料表的文件,由承包商填写并随投标函提交。此文件可能包括工程量表、数据、列表、及费率和/或单价表。1.1.1.8“投标文件(Tender)”指投标函和合同中规定的承包商应随投标函提交的其它所有文件。 1.1.1.9“投标函附录(Appendix to Tender)”指名称为投标函附录并已填写完毕的文件,附于投标函之后并构成投标函的一部分。 1.1.1.10 “工程量表(Bill of Quantities)”和“计日工计划(Daywork Schedule)”指资料表中如此命名的文件(如有时)。 1.1.2 当事各方和当事人 1.1. 2.1“一方(Party)”指雇主或承包商(根据上下文而定)。