第 1 章主厂房主要尺寸的确定

主厂房的尺寸的确定,即主厂房总长、总高和宽度的确定。主厂房的总长度包括机组段的长度(机组中心间距),端机组段的长度和安装场的长度,并考虑必要的水工结构分缝要求的尺寸。

由水轮机型号(ZZ(F23)-LH-700)可知转轮直径为7.0m。该电厂进厂公路位于右侧,为方便交通装卸,因此主厂房也布置在右侧,安装间位于主厂房的右侧。

1.1平面尺寸的确定

1.1.1尾水管层控制尺寸的确定

选用标准混凝土肘管。由《水电站机电设计手册》水力机械分册129 页表2-17 查得:

L−y =4.5 D1 ,L−y =4.5×7=31.5m

L+y =0.5×1.2D1 =0.5×1.2×7=4.2m

δ2 —尾水管边墩混凝土厚度,初步设计选 1.5m

L+x =L−x =0.5×2.42 D1+δ2 得L+x =L−x =9.97m

尾水管具体尺寸如图1-1所示:

图1-1

该尾水管由进口直锥段、肘管和出口扩散段三部分组成。尾水管的基本尺寸查《水电站机电设计手册》水力机械分册129 页表2-17查得

h=2.3 D1 =2.3×7=16.1m

h1 =0.593 D1 -b0/2=0.593×7-0.75=3.4m

L =4.5 D1 =4.5×7=31.5m

B5 =2.42 D1 =2.42×7=16.94m

D4 =1.2 D1 =1.2×7=8.4m

h4 =1.2 D1 =1.2×7=8.4m

h5 =1.27 D1 =1.27×7=8.89m

h6 =0.6 D1 =0.6×7=4.2m

L1 =1.62 D1 =1.62×7=11.34m

轴流式水轮机尾水管

由于跨度大要加设支墩,尺寸如下:

b5 =(0.1-0.15)B5得 b=(1.904-2.856)m 取b5=2.5m

1.1.2蜗壳层控制尺寸的确定

由网上查得n s=500

参考《水电站动力设备设计手册》P146

蜗壳层的尺寸由轴流式水轮机控制尺寸查得:

D M=D3=0.973 D1=6811mm

D m/D M=0.25+94.64/n s得D m=2991.94mm

H m/D M=6.94 n s(-0.403) H m=3862.65mm

H1/D M=0.38+5.17n s/100000H1=2764.24mm=h1+b0/2

H t/D M=0.24+7.82 n s/100000 H t=1900.95=h2

B/D M=1/(0.76+8.92 n s/100000)B=8465.07mm

C/D M =1/(0.55+1.48 n s/100000) C=12219.23mm

D/D M =1.58-9.05n s/100000 D=10453.18mm

E/D M =1.48-2.11n s/100000E=10008.42mm

F/D M =1.62-3.18n s/100000 F=10925.52mm

G/D M =1.36+7.79/n s G=9369.07mm

H/D M =1.19+4.69/n s H=8168.98mm

I/D M =0.44-21.47/n s I=2704.37mm

L/D M=1.44+105.29/n s L=11242.1mm

M/D M =1.03+136.28/n s M=8871.73mm

则蜗壳层在L+x和L−x 方向的控制尺寸为:L-x =B+A/2+δ1

δ1——蜗壳外部混凝土厚度,初步设计时一般可取1.2 −1.5m

L+x =C+δ1=12.2+1.5=13.7m

L-x =B+δ1=8.5+1.5=10.0m

1.1.3发电机层控制尺寸的确定

由发电机额定转速136.4rmp,单机容量75mw,查《水电站机电设计手册》P166表 3-11,选择水轮发电机型号为SF75-44/854,该电机为悬式机组,磁极22对。如图1-2所示:

其主要技术参数如下:

风罩内径D2: 12.6m

转子外径D3: 7.775m

定子铁心内径D i: 7.81m

定子铁心外径D a: 8.54m

机座外径D1:9.8m

下机架最大跨度D4:7m

水轮机机坑直径D5:6m

推力轴承装置外径D6:3.8m

励磁机外径D7:2650/3800

图1-2

L+x=L-x=Φ3/2+b/2+δ3=12.6/2+3.4/2+0.4=8.4m

式中:

b——两台机组之间风罩外壁的净距,

b=3.4m;

δ3——发电机风罩壁厚,一般取0.3−-0.4m,此处取0.4m;

1.1.4综合分析

机组段长度的确定:

L1= L+ x max+ L−x max=13.7+10=23.7m

端机组段长度的确定:

L2=L1+ΔL=23.7+3.5=27.2m

其中ΔL =(0.1−1.0)D 取ΔL=0.5D1得ΔL=3.5m

安装间长度的确定:

安装间长度以风罩,转子,下机架,机座,转轮五大部件布置为准。一般约为机组段长度的1.5倍。其宽度则同厂房宽度。

L安=1.5L1

则L安=1.5×23.7=35.55m

主厂房总长度

L=nL1+L安+ΔL=133.85 m

1.1.5 厂房宽度的确定

以机组中心线为界,将厂房宽度分为上游侧宽度B s 和下游侧宽度B x。则厂房总宽度为

B=B x+B s

在确定B s 和B x 时,应分别考虑发电机层、水轮机层和蜗壳层三层的布置要求。

(1)发电机层:首先决定吊运转子(带轴)的方式,若由下游侧吊运,则厂房下游侧宽度主要由吊运之转子宽度决定。若从上游侧吊运,则上游侧较宽。此外,发电机层交通应畅通无阻。一般主要通道宽2~3m,次要通道宽1~2m。在机旁盘前还应留有1m 宽的工作场地,盘后应有0.8~1m 宽的检修场地,以便于运行人员操作,本电站取0.8m。

(2) 水轮机层:上下游侧分别布置水轮机辅助设备(即油水气管路等)和发电机辅助设备(电流电压互感器、电缆等)。以这些设备布置后,不影响水轮机层交通来确定水轮机层的宽度。

(3)蜗壳层:由设置的检查廊道、进人孔等确定宽度。蜗壳和尾水管进人孔的交通要通畅,集水井水泵房设置应有足够的位置,以此确定蜗壳层平面宽度。

(4) 吊车标准宽度L k:当宽度基本确定后,最后要根据尺寸相近的吊车标准宽度L k 验证,厂房宽度必须满足吊车安装的要求。

初步拟订以下游侧做吊运通道,在发电机层上游侧布置调速器和油压装置等。

本电站上下游侧宽度主要由蜗壳的长度决定

B S=E+δ1=10+1.5=11.5m

取B S=12m

B x =D+δ1=10.45+1.5=11.95m

取B x =12.5m

B=B S+B x=24.5m

1.2立面尺寸的确定

厂房各层的高程,主要有主厂房基础开挖高程、机组安装高程、水轮机层地面高程、发电机层地面高程、吊车轨道顶的高程、厂房顶的高程等。各层高程的确定。

1.2.1水轮机的安装高程∇T 的确定

∇T =1444m

1.2.2主厂房基础开挖高程∇F 的确定

主厂房基础开挖高程∇F =∇T−h−∇h−b0/2

h——尾水管底板至水轮机导叶中心高度,

∇h——尾水管出口高度,∇h=1.5m

∇F =1444-16.1-1.5-1.4=1425m

1.2.3水轮机层地面高程∇1的确定

水轮机地面高程∇ 1 =∇T+L/2+h4

式中 L——蜗壳进口段高,L=11.2m;

h4——蜗壳顶混凝土层厚度,h4 =1.5m。

∇1=1444+5.6+1.5=1451.1m

1.2.4发电机装置高程∇G 的确定

发电机装置高程∇G=∇1+h5+h6

式中h5——发电机机墩进人孔高度,h5 =2m ;

h6——进人孔顶部厚度,h6=1.0m 。

∇G=∇1+h5+h6=1451.1+2+1=1454.1m

1.2.5发电机层楼板高程∇2的确定

查《水电站机电设计手册》水力机械分册 169 页得

定子支撑面到发电机层地面高程为4.02m

∇2=∇G+4.02=1454.1+4.02=1458.12m

1.2.6起重机的安装高程∇C 的确定

(1) 主厂房起重机的选择

起重机的型式和台数取决于水电站厂房类型,最大起重量和机组台数等条件,具有上部机构的厂房一般选用桥式起重机,主厂房起重设备的选择直接影响投资,厂方上部建筑物尺寸以及电站机组安装,检修的进度。

a.当最重吊运件的重量小于100 吨,机组台数小于4 台时,选用一台单小车桥式起重机,机组台数多于5 台,选用两台单小车桥式起重机。

b.当最重吊运件的重量为100-600 吨,机组台数小于4 台时,选用一台双小车或单小车桥式起重机,机组台数多于5 台时,因机组安装检修时吊运任务繁重,此时若用一台双小车桥式起重机,则应另设一台起重量较小的单小车桥式起重机供辅助吊运之用。或选用两台起重量为最重吊运件一半的单小车桥式起重机。

c.当最重吊运件的重量大于600 吨时,可选用一台或两台单小车桥式起重机。

(2) 重量估算

a.水轮机总重量估算

由转轮直径为7m,查《水电站机电设计手册》139 页图 2-15

得G=700 吨

b.转轮重量估算

由《水电站动力设备设计手册》31页可知

Gzz=135.76t

c.发电机重量估算

查《水电站机电设计手册》166页表3-11得:发电机G F =700吨,转子G Z =378吨,定子G d =190吨。

根据以上数据,查《水电站机电设计手册》334 页表7-16,选择两台400的单小车桥式起重机,配合厂房宽度尺寸,选其跨度为22m。

起重机及平衡梁绘图尺寸及各参数如下:

A、间隙距离

由《水电站机电设计手册》308 页,起重机端梁最外端与上下游墙的内侧距离一般应不小于700mm,由《水电站机电设计手册》333 页得轨道中心至起重机外端距B1=450mm,则起重机外端距上下游墙的内侧距离共为:

24.5-0.45×2-22=1.6m。取起重机外端距上下游墙各位0.8m,符合要求。

B、起重机尺寸

由《水电站机电设计手册》333 页表7-16 查得:

参数如下:

小车轮距 L T =5500mm

大梁底面至轨道面距离 F=300mm 起重机最大宽度 B=10380mm

小车长度B1=8400mm

轨道面至起重机顶端距离H=6450mm 轨道面至缓冲距离 H1=1200mm

吊钩至轨道中心距离:

L1 =3200mm L3 =4800mm

L2=5650mm L4 =2350mm

C、平衡梁尺寸

平衡梁

由《水电站机电设计手册》303 页表7-7 查得

L=12100mm L1=10500mm L2=1300mm H=2600mm h1=500mm h2=686mm

h3=1300mm S=120mm B=3000mm b1=600mm

b2=360mm D=320mm δ=40mm

D、吊物范围

a.横向:阻进器选择 A 型阻进器,阻进器宽0.6m 则吊物范围与厂房上下游墙距离为 0.6+B/2=0.6+10.38/2=5.79 m

b.纵向:用主钩起吊时,吊物范围与上游墙距离为 3.2+0.8=4.0m,与下游墙距离为 4.8+0.8=5.6m。

用平衡梁起吊时,吊物范围与上游墙距离为

4.0+L1/2=4.0+10.5/2=9.25m

与下游墙距离为5.6+L1/2=5.6+10.5/2=10.85m

(3) 确定最长起吊设备

查《水电站机电设计手册》169 页,发电机主轴高度为8.535m 定子支承面至下机架支承面的距离为0.56m

下机架支承面至法兰底面为1.08m

则发电机主轴法兰底面高程为1454.1-0.56-1.08=1452.46m

水轮机转轮底部高程为1444-2.76-3.86=1437.38m

则水轮机转轮带轴长为1452.46-1437.38=15.08m

8.535m〈15.08m

所以水轮机转子带轴为最长吊运设备(15.08m)

a.用主钩起吊时

起重机的安装高程∇C=∇2+h8+h9+h10+h

式中

h8——吊运部件与固定的机组或设备间的垂直净距,

h8=1 m

h9——最大吊运部件的高度,h9=15.08m;;

h10——吊运部件与吊钩间的距离,h10=1.2m ;

h ——主钩最高位置至轨顶面距离,h=0.9m

∇C=∇2+h8+h9+h10+h=1458.12+1+15.08+1.2+0.9=1476.3m

1.2.7屋顶高程∇R的确定

∇R=∇C+h12+h13+h14

h12——轨道面至起重机顶端距离

查《水电站机电设计手册》334页 h12 =6.45m

h13——为检修小车在上方留有一定的距离,一般为0.5m

h14——屋顶结构厚度 h14= 1.6m

∇R = ∇C + h12 + h13 + h14 =1476.3+6.45+0.5+1.6=1484.85m 1.2.8 厂房总高度 H 的确定

H总 = ∇R−∇F = 1484.75-1425 =59.85m

确定厂房各程的高程后,即可绘出厂房的大概结构。

如图一所示:其尺寸,形式以图纸为准。

第 2 章水电站厂房布置

厂房布置的基本要求是:

(1)应适应地质、地形、水文、气象等自然条件,并根据电站枢纽布置的具体情况、不同类型厂房的特点,全面考虑,合理布置。

(2)应满足设备安全运行,便于安装检修及操作管理,厂内各种设备布置协调,并考虑水工结构上的要求。

(3)应充分考虑设备进厂以及厂内吊装、运输的要求。

(4)应考虑电站初期运行要求,尽可能不设或少设临时设施,对于分期建设的电站,应考虑远、近期结合。

(5)应考虑防火、防淹、防潮及劳动保护等方面的要求,力求布置整

齐美观。

(6)在满足电波运行及安装检修要求的前提下,尽量减少土建工程量,节省投资。

2.1 立轴反击式机组的布置

2.1.1 尾水管层的布置

反击式水轮机的泄水设备——尾水管的顶部与基础底板之间的空间是尾水管层,布置有:

(1) 尾水管

为减少开挖量,采用弯肘形尾水管。它由直锥段、肘管段和扩散段几个部分组成。水轮机采用标准型尾水管。尾水管底板高程为1426.5 米,厚1.5 米,基础开挖高程为1425米。为减小扩散段结构跨度,设有支墩。厂内设有通往尾水管的通道和进人孔,进人孔的尺寸为直径650毫米。进人孔的位置,布置在尾水管的圆锥段。当停机时放空尾水管的水,检修人员从楼梯下去,然后水平进入廊道,打开设在尾水管直锥段的金属盖,利用梯

绳爬进尾水管内。

(2) 集水井、集水廊道和水泵室

主厂房内在下部结构部分的基础块体最低部位设置集水井或集水廊道,并在上方设水泵室,以便及时利用水泵排除基础渗水。蜗壳有水管通到尾水管,尾水管将水引入集水井或集水廊道,然后由水泵抽水向下游排出。出口高程设在下游水位以上。

2.1.2 蜗壳层的布置

蜗壳层是反击式水轮机的引水设备蜗壳及其周围的钢筋混凝土结构块体和空间部分。机组转轮直径7米,蜗壳为混泥土蜗壳,蜗壳的包角为225 度。

2.1.3 水轮机层的布置

(1) 水轮机机坑的布置

水轮机机坑应按下列要求进行布置:

a、应便于在水轮机机坑内检修、安装、维护导轴承和推力轴承。

b、当机组采用不吊发电机转子而拆出水轮机转轮进行检修时,此时机墩结构及布置尺寸应考虑转轮运出的通道,并设置必要的吊运装置以满足转轮拆装的要求。在决定机坑进人孔的位置时,应注意水轮机接力器和推拉杆对进入机坑通道的影响。进入水轮机机坑的门为一个。门宽为1.5 米,门的高度为 2 米。

2.1.4 发电机层的布置

(1) 水轮发电机

一般有定子外露、定子埋入和上机架埋入三种布置形式。定子埋入式和上机架埋入式使发电机层宽敞,同时由于提高了发电机层高程而增加了水轮机层高度,可增设一层作为出线层。这两种布置形式被广泛采用。本

电站采用定子埋入式。

(2) 机旁盘

它包括机组照明盘、励磁盘、制动盘、动力盘、水力测量仪表等,每台机组的机旁盘为5 块,每块尺寸为1.0m×0.8m×1.5m。布置在发电机层并靠近调速器操作柜且在同一侧,以便运行人员在机组启动时能观察到盘上的仪表。

(3) 励磁机和励磁盘

直接布置在同步发电机转子轴顶,励磁盘布置在发电机层。

(4) 楼梯

为运行人员经常从发电机层到水轮机检查巡视提供方便,在每台机组上游侧设钢筋混凝土楼梯一座。楼梯净宽2.0 米,坡度为35度。

(5) 交通道

在水轮发电机的上、下游侧留有2-2.5米的交通道,各种设备间也必须保持运行巡视和检修需要而留的1.5-2.0米的距离。

(6) 吊物孔

对于机组容量大,台数多的电站建议每台机组设置一个吊物孔,电站台数多容量不大时可考虑两台机组设置一个吊物孔。本电站所设置的吊物孔大小为4m×2m,且每台机组设置一吊物孔。

(7)尾水平台

本电站按千年一遇洪水校核,高程为1462.0m,高于发电机层平面的1458.12m,故在尾水平台的外侧设置挡水墙。具体尺寸见附图。

2.2 机组附属设备的布置

2.2.1 接力器的布置

接力器的布置形式大致有四种:

(1)直缸接力器布置在机坑内;

(2)直缸接力器布置在顶盖上;

(3)环形接力器布置在顶盖上;

(4)每一个导水翼采用一个接力器;

(5)摇摆式接力器布置在机坑内。

本电站选择第三种:环形接力器布置在顶盖上。

2.2.2 调速器和油压装置的布置

调速器和油压装置的布置,与接力器布置位置相适应,并尽量靠近。调速器、油压装置均布置在发电机层,它们之间的距离在满足操作、维护、检修方便的前提下,越小越好。电液调节器速器的电气柜,和机旁盘布置在一起。

2.3 厂房的采光、通风、交通及防火

水电站厂房须妥善考虑采光、通风、取暖、防潮、防火、交通运输等问题,以确保水电站的正常运行,并给运行人员提供良好的工作环境。

2.3.1采光

(1) 地面厂房

白天应尽可能采用自然采光。主厂房自然采光主要靠厂房下游侧的大窗,窗宽度不要太小,使照明均匀,窗的高度一般不小于房间进深的 1/4。本电站选择两排窗户,详情见附图。

晚上及厂房水下部分采用灯光照明,厂房顶部和侧面都装有足够功率,足够数量的电灯,以保证能充分的照明。并在各楼梯处安装应急灯。

2.3.2 通风

(1)地面厂房尽量采用自然通风。

(2) 当自然通风达不到要求,或当下游水位过高而不能有效地采用自然通风时,或在产生过多热量的房间(如变压器室、配电装置室等),或在产生有害气体的房间(如蓄电池室、油处理室等),装设人工通风。

(3) 盛夏酷热地区或人工通风仍不能满足厂内温度湿度要求时,采用局部或全部的空气调节装置。

2.3.3 取暖

冬天厂房内的温度不能过低,以保证机电设备的正常运行。热量不足以维持必需温度的房间,采用电辐射取暖或电热取暖。中央控制室装设空调,以便在冬季取暖、夏季降温。

2.3.4 厂内交通

(1) 厂房对外开有大门,以便运输大部件。

大门尺寸很大,本电站大门宽度为6m,详情见附图。采用旁推门。为了保持厂房内部的清洁、干燥与温度,不运输大部件时大门关闭。安排各种房门部位时要考虑防火的安全出口,安全出口的门净宽不小于0.8m ,门向外开。某些可产生负压的房间,如闸门室,门向里开,以便出现负压时门可自动开启。

(2) 主厂房内各层及副厂房布置机电设备的房间内都设有通道,以便运输设备和进行安装,并供工作人员通行。

a 发电机层及水轮机层设贯穿全长的水平通道。为了吊运各种设备,与通道相应布置吊物孔,如蝴蝶阀吊孔、水泵吊孔、公用吊孔等。

b 主、副厂房不同高程各层之间设斜坡道、楼梯、攀梯、转梯或电梯。

第 3 章厂房内部分设备的选择

3.1 调速器和油压装置的选择

3.1.1 调速器的选择

水轮机调速系统的基本任务是:使水轮发电机组稳定地以额定转速运行,在机组负荷变化工其他外扰作用下,保证机组的转速变化不超过一定的范围,并能迅速地稳定于新的工况,从而保证发电机输出的交流电频率满足用电设备的要求。水轮机调节是通过调速系统根据机组转速的变化不断地改变水轮机过流量来实现的。

(1) 导叶接力器容积计算

查《水电站机电设计手册水力机械》第254页

导叶接力器直径:

10

max 1

D b

H

D

dsλ

=

式中λ——计算系数。取为0.030;

b0——导叶高度。得:

d s=0.637 m

查表 6-5,在标准接力器系列表中,选择与之接近的直径650mm。接力器最大行程 S max(mm ) 可由下列经验公式求得

S max =(1.4−1.8)α0max

式中α0max为导叶最大开度。当D1<5m 时选用较小的系数。

取S max =1.7α0max查得α0max=400mm

得:S max= 1.7α0max =1.7×400=680mm

接力器的总容积:

发电厂电气部分毕业论文

长春工程学院毕业设计(论文) 目录 1 引言 (1) 2电气主接线的设计 (2) 2.1 主接线的设计方案的选择 (2) 2.3 发电机与主变压器选择 (4) 3厂用电接线设计 (6) 3.1 站用电压等级的确定 (6) 3.2 厂用电接线设计方案论证及确定 (6) 3.3 高压厂用变压器和高备变压器的选择 (8) 4短路电流计算 (9) 4.1 短路电流计算概述 (9) 4.2 元件电抗计算 (10) 4.3 各短路点短路电流计算 (11) 5电气设备配置 (18) 5.1 隔离开关的配置 (18) 5.2 电压互感器的配置 (18) 5.3 电流互感器的配置 (18) 5.4 避雷器、避雷针的配置 (19) 5.5 接地刀闸或接地器的配置 (19) 5.6 自动装置的配置 (20) 6电气设备的选择与校验 (20) 6.1 电气设备选择与校验 (20) 6.2 母线选择 (29) 7 高压配电装置的设计 (30) 7.1 高压配电装置的选型 (30) 7.2 高压配电装置设计 (31) 总结 (32) 参考文献 (33) 致谢 (34)

1引言 目前电力与我们生活息息相关,电力作为最重要的能源之一。如何经济有效的开发和利用电力能源是关系国计民生的关键。随着我国经济的飞速发展,电能的需求量也日益增加。目前电力生产主要以火力发电和水力发电两种形式,相比之下,水力发电成本低廉且没有火力发电带来的环境污染。很多优点决定水电能源在今后相当长的时间是解决能源危机的首选。然而我国电力在技术水平上还很落后,这就需要我们在设计中,能够开拓创新,开发出新技术、新设备。以提高电能在发送过程中的安全可靠系数,以保证电能高质量、高水平的输送。 此次设计是某水电厂的电气部分设计。电气设计工作是工程建设的关键环节。做好设计工作,对工程建设的工期、质量、投资费用和建成投产后的运行安全可靠性和生产的综合经济效益,起着决定性的作用。 本次设计:本期工程规模为2×300MW燃煤机组,在布置上不堵死再扩建的可能。电厂年利用小时数为5500小时,两台机组计划于2006年6月至12月陆续投产。本期工程安装2×300MW国产引进型燃煤机组。锅炉、汽轮机、发电机分别为上海锅炉厂有限公司、上海汽轮机有限公司、上海汽轮发电机有限公司产品。主厂房为左扩建方向,采用汽机房、除氧框架、煤仓框架、锅炉四列式布置。主厂房为钢筋混凝土结构,锅炉构架为钢结构。汽轮发电机组的机头朝向扩建端,纵向顺列布置。汽机房运转层采用大平台,两机之间设置检修场。主厂房柱距9米,两台机组合用一个集中控制室。 设计是经多方面查阅有关资料的基础上,综合运用所学理论知识,根据设计任务书提供的资料结合《电力工程设计手册》《设计规程》《电力工程设备手册》等资料进行设计的。主要内容包括有电气主接线方案的确定、短路电流的计算、电气设备的配置和选择、高压配电装置的设计、还有相关图纸的绘制。 毕业设计是大学几年整个教学环节的重要组成部分,是反应学生对所学知识的掌握程度;是在走向工作岗位前对所学知识进行的一次系统、全面的总结;同时将所学的专业理论应用于实践,用它解决实际问题,树立工程观念,结合工程特点,提高分析问题、解决问题的能力,并力争有所创新。

(完整版)水电站电气一次·某水电学院毕业设计论文

前言 毕业是教学过程中的一个重要环节,通过设计可以巩固本专业理论知识,掌握供配电设计的基本方法,通过解决各种实际问题,培养独立分析和解决实际工程技术问题的能力,同时对电力工业的有关政策、方针、技术规程有一定的了解,在计算、绘图、设计说明书等方面得到训练,为今后的工作奠定基础。本设计根据设计任务书可分为二大部分,第一部分为设计计算书,包括负荷计算、无功功率及补偿计算、短路电流的计算、设备选择及校验计算、配电变压器保护定值计算;第二部分为设计说明书,包括变电所位置和形式选择、变电所主接线设计、变电所主变压器台数和容量、变电所一次设备的选择与校验、变电所高、低压线路设计、变电所二次回路设计及继电保护的整定、防雷和接地装置设计;本设计基于本人掌握的供电知识基础,尚有正确和不完善的地方,敬请老师、同学指正!

第一章毕业设计任务书

1.1设计题目 10KV降压变电所电气设计 1.2设计目的 毕业设计是完成本专业教学计划的最后一个重要的教学环节,是对各门课程的综合运用和提高。通过毕业设计,巩固和加深学生所学专业理论知识,锻炼学生分析和解决实际工程问题能力。培养和提高学生综合使用技术规范、技术资料,进行有关计算、设计、绘图和编写技术文件的初步技能,为今后参加水电站和变电所电气设计、安装、运行、检修、试验打下基础。 通过本毕业设计,初步掌握一个小型水电站工程设计的思想、内容、方法和步骤。 1.3有关的原始资料 黄坪电站为低水头径流式水电站,座落于茶陵县虎踞镇黄坪村,距茶陵县城25km,装机容量5×1600 kw,年利用小水电网络规划和业主意向,电站出线等级为35kv,共三回路,一回路送到9km平水变并入茶陵县新组建小水电网,一回路送到近区新建的虎踞镇工业区,一回路备用。其输电导线型号为LGJ-120。 1.4 设计的总体要求 集中布置,明确要求,提倡讨论,独立完成,严禁抄袭,严禁拷贝现象。 第二章电气一次部分设计 2.1 电气主接线方案的拟定 分析设计原始资料,全面考虑所设计电站在系统中所处地位、所供负荷性质、地理位置以及电站本身的总容量和机组台数,拟出二至三个可行的方案,进行一般的技术经济比较,通过论证,确定一个合理的主接线方案。

水电站毕业设计论文

水电站毕业设计论文1000字 由于缺乏具体的背景信息和具体的要求,以下是一份基本的水电站 毕业设计论文,可以用作参考。 一、选题背景 水电能作为一种清洁、可再生的能源,越来越受到世界各国的重视,随着人们对环境保护意识的不断提高,水电能将会在能源领域发挥 更加重要的作用。毕业设计题目为水电站的设计,是对水电领域的 一次探索和研究。 二、项目概述 本项目选址在某地区的一条河流上,河流全长为30km,平均流量为500m3/s,水头高度约为80m。该水电站是一座中型水电站,装机容 量为50MW,是该地区的重要能源项目。 三、设计要求 1. 设计流量、水头高度、发电机额定容量、发电机数目、变压器容 量等主要参数。 2. 设计大坝、水轮机、发电机、高压开关柜及变电站、输电线路等。 3. 选用合理的电站建造标准和技术规范。 4. 设计完善的环保设施。 5. 确定建设投资和年度经济效益,设计方案必须在节约用地、节水 节电、节能环保等方面考虑综合效益。 四、设计方案 1. 水坝 根据地形、地质条件和河流流量等因素,选定重力式混凝土拱坝作 为大坝类型。根据当地气候条件,进行长时期温度变化及冻融循环 试验,保证大坝的稳定性和耐久性。 2. 水轮机

采用川崎三菱DPL型水轮机,因该型号水轮机具有高效、大功率、 耐用等特点,可以满足发电需求。为了提高水电站的发电效率,水 轮机的具体参数需要根据场地构造和发电机的额定容量进行精细计算。 3. 发电机 采用SIEMENS 1FC6型三相同步交流发电机,因该型号发电机具有高效、稳定、可靠等特点,可以满足发电需要。为了提高发电效率, 发电机的具体参数需要根据水轮机的转速和电网要求进行精细计算。 4. 变电站 采用220kV开关柜及变压器,配套高压开关柜。 5. 环保设施 在水电站建设过程中,请专业机构进行环境影响评价,提出相应的 改善措施。在建设过程中,建立健全的环境管理体系,完善环境保 护设施,尽量减少对环境的负面影响。 五、经济效益 1. 建设投资 水电站建设的总投资预计为5亿元,其中大坝投资2.2亿元,水电 机组及配套工程投资2.6亿元。 2. 年度经济效益 水电站的年度发电量约为2.6亿度,年收益约为1.2亿元,静态投 资回收期为4年,动态投资回收期为7年。 六、结论 本设计方案充分考虑了水电站的工程技术、经济效益和环境保护等 方面的问题,从可行性、可操作性、可持续性等多个角度对水电站 进行了整体设计和论证。最终,本设计方案的实施将对改善当地能 源供给、促进地方经济发展、提高环境质量等方面带来积极影响。

大峡水电站厂房和电气设计毕业论文

大峡水电站厂房和电气设计毕业论文

第 1 章主厂房主要尺寸的确定 主厂房的尺寸的确定,即主厂房总长、总高和宽度的确定。主厂房的总长度包括机组段的长度(机组中心间距),端机组段的长度和安装场的长度,并考虑必要的水工结构分缝要求的尺寸。 由水轮机型号(ZZ(F23)-LH-700)可知转轮直径为7.0m。该电厂进厂公路位于右侧,为方便交通装卸,因此主厂房也布置在右侧,安装间位于主厂房的右侧。 1.1平面尺寸的确定 1.1.1尾水管层控制尺寸的确定 选用标准混凝土肘管。由《水电站机电设计手册》水力机械分册129 页表2-17 查得: L−y =4.5 D1 ,L−y =4.5×7=31.5m L+y =0.5×1.2D1 =0.5×1.2×7=4.2m δ2 —尾水管边墩混凝土厚度,初步设计选 1.5m L+x =L−x =0.5×2.42 D1+δ2 得L+x =L−x =9.97m 尾水管具体尺寸如图1-1所示:

图1-1 该尾水管由进口直锥段、肘管和出口扩散段三部分组成。尾水管的基本尺寸查《水电站机电设计手册》水力机械分册129 页表2-17查得 h=2.3 D1 =2.3×7=16.1m h1 =0.593 D1 -b0/2=0.593×7-0.75=3.4m L =4.5 D1 =4.5×7=31.5m B5 =2.42 D1 =2.42×7=16.94m D4 =1.2 D1 =1.2×7=8.4m h4 =1.2 D1 =1.2×7=8.4m h5 =1.27 D1 =1.27×7=8.89m h6 =0.6 D1 =0.6×7=4.2m L1 =1.62 D1 =1.62×7=11.34m

发电厂电气一次系统设计-毕业论文

毕业设计(论文) 题目发电厂电气一次系统设计 系别电力工程系 专业班级电气07K1班 学生姓名××× 指导教师梁海平 ××××年六月

发电厂电气一次系统设计 摘要 发电厂是电力系统中生产电能、控制电力的流向和调整电压的电力设施。它通过其变压器将各级电压的电网联系起来,将电能输送出去。 本设计是对一高压侧110kV,2回出线;中压侧35kV,4回出线;低压侧10kV,12回出线的发电厂一次系统进行的初步设计。该发电厂属于小型发电厂,它除承担向系统供应电能的任务外,还提供地区负荷。 本设计首先进行了原始资料的分析。通过分析,了解该发电厂的类型、负荷情况等;然后,再依据发电厂的电压等级、出线数目及其负荷大小,拟定出多种接线方案,再通过初步技术和经济比较,确定一个最优方案;再根据选择主变的原理和所给的该发电厂各电压等级的最大负荷量,确定了主变容量、台数及型号;然后,选择各个短路点,进行短路电流计算,为下面的电气设备选择打下基础;再次,便是根据上述设计成果确定各电气设备,确定配电设备。 最后根据这地区的雷雨情况配置避雷与接地装置及配电装置,完成电气主接线、电气平面布置、防雷与接地图。 关键字:发电厂设计;短路计算;设备选择;防雷保护

A DESIGN OF ELECTRIC MAIN SYSTEM FOR POWER STATION Abstract Power Stations are producing electricity in the power system, controlling the power flow and adjusting the voltage. It will link all levels of voltage power grid through its transformer and will supply power to the transmission system. The tentative design is to the first system of the power station which has high-tension side 110kV, four output connections; middle-tension side 35kV, four output connections, low-tension side 10kV, twelve output connections. The power station belongs to one middle-size station. In addition to assume the supply of power to the power system also to content the region loads. The design has firstly been carried on the analysis of primary source. Passing through the analysis, we can understand the type of this power station, load condition and so on. Secondly, based on the voltage level of power station, load size and the number of outline, we can obtain a wide range of wiring, and then through the preliminary technical comparison, the two options identified. In the light of the principle of choosing main transformer,we can choose the main transformer’s number, capacity and type .Next, selecting each short circuit point and carrying on the calculation of short circuit current, it is the foundation that has been conquered in the selection of the electric installation of next. Then, based on the above results of designed we can determine the electrical equipment, through the economically optimal choosing the best plan and determining the distributed equipments of the power base on the design achievement mentioned above. According to the situation in this region of the thunderstorm, lightning protection and grounding device are configured. The final completion of the main electrical wiring, the electrical layout, lightning protection and access map are draw. Keywords: Power station design; Short current calculation; Equipment selection; Lightning Resistant protection; Distribution devic

水电厂电气一次设计及变压器保护设计电气工程及其自动化电力专业毕业设计毕业论文

水电厂电气一次设计及变压器保护设计 目录 绪论 ......................................................................................... 错误!未定义书签。第一章主接线方案确定 ......................................................... 错误!未定义书签。 1.1电气主接线概述 ............................................................. 错误!未定义书签。 1.2电气主接线方案拟定 ..................................................... 错误!未定义书签。第二章主要设备选择 ............................................................. 错误!未定义书签。 2.1导线的选择 ..................................................................... 错误!未定义书签。 2.2变压器的选择 ................................................................. 错误!未定义书签。 2.3给定发电机 ..................................................................... 错误!未定义书签。第三章短路电流的计算 ......................................................... 错误!未定义书签。 3.1短路电流计算的目的、步骤和规定 ............................. 错误!未定义书签。 3.2短路电流的计算 ............................................................. 错误!未定义书签。第四章电气一次设备的选择 ................................................. 错误!未定义书签。 4.1母线的选择 ..................................................................... 错误!未定义书签。 4.2断路器和隔离开关的选择 ............................................. 错误!未定义书签。 4.3互感器的选择 ................................................................. 错误!未定义书签。 4.4设备布置图 ..................................................................... 错误!未定义书签。第五章厂用电设计 ................................................................. 错误!未定义书签。第六章变压器保护的配置 ..................................................... 错误!未定义书签。 6.1变压器保护的配置原则 ................................................. 错误!未定义书签。 6.2变压器保护的配置整定 ................................................. 错误!未定义书签。结束语 ....................................................................................... 错误!未定义书签。致谢 ......................................................................................... 错误!未定义书签。参考文献 ................................................................................... 错误!未定义书签。 绪论

水电站厂房设计--毕业设计

目录 摘要 (1) Abs t r ac t (1) 前言 (2) 1 沙溪航电枢纽工程资料 (4) 1. 1 工程概况 (4) 1. 2 流域概况 (4) 1. 2. 1 自然地理概况 (4) 1. 2. 2 气象 (5) 1. 2. 3 工程泥沙 (6) 1. 3 工程地质 (7) 1. 3. 1 地形地貌 (8) 1. 3. 2 地层岩性 (8) 1. 3. 3 地质构造 (9) 1. 4 水库特性及动能指标 (9) 1. 5 枢纽布臵 (10) 2 厂房布臵方案比选 (11) 2. 1 厂房类型的选择 (11) 2.2 主厂房位臵的选定 (11) 3 水轮机选型 (12) 3. 1 水轮机容量及台数的选择 (12) 3.2 水轮机型号选择 (13)

3. 2 . 1 HL310 型水轮机方案的主要参数选择 (13) 3. 2. 2 ZZ560 型水轮机方案的主要参数选择 (14) 4 水轮发电机选型 (18) 4.1 水轮发电机主要尺寸估算 (19) 4. 1 . 1 极距τ (19) 4.1.2 定子内径 (19) 4. 1. 3 定子铁芯长度 (19) 4. 1. 4 定子铁芯外径(机座号) (19) 4. 2 平面尺寸估算 (19) 4. 2. 1 定子机座外径 (19) 4. 2. 2 风罩内径 (19) 4.2.3 转子外径 (19) 4. 2. 4 下机座最大跨度 (20) 4. 2. 5 推力轴承外径和励磁机外径 (20) 4. 3 轴向尺寸计算 (20) 4. 3. 1 定子机座高度 (20) 4. 3. 2 上机架高度 (20) 4. 3. 3 推力轴承高度,励磁机高度和永磁机高度 (20) 4. 3. 4 下机架高度 (20) 4. 3. 5 定子支座支承面至下机架支承面或下挡风板之间的距离 (20) 4. 3. 6 下机架支承面至主轴法兰底面之间的距离 (20) 4. 3. 7 转子磁轨轴向高度 (20)

电力系毕业设计开题报告(关于水电站电气一二次设计)[管理资料]

毕业设计(论文) 开题报告 题目安果水电站电气一二次设计 专业电气工程及其自动化(电力) 班级 学生 指导教师 2011 年

一、毕业设计(论文)课题来源、类型 本课题主要来源于多年的生产实际,结合本科毕业生所需要掌握的基本的设计能力提出来的。属于工程设计类。 二、选题的目的及意义 毕业设计是我们在校期间最后一个重要的综合性实践教学环节,是我们全面运用所学的基础理论知识、专业知识和基本的专业技能,对实际的问题进行综合的分析、研究、设计的过程。本课题主要研究的是关于水电站电气一二次的设计,着重在于锻炼我们对发电厂电气设计、继电保护、微机保护、计算机监控系统等课程的熟悉和运用的能力。 通过本次设计要掌握和巩固我们所学的专业课的理论知识,并且学会根据实际的要求运用理论知识去解决。熟悉电力系统电气一次和计算机监控自动化的设计步骤和设计技能,根据相关的技术规范,对电气一次设备的选型和校验,确保选型的正确,并且培养自己在实践工程中的应用能力、创新能力以及独立工作的能力。 计算机监控系统是发电站自动化的重要部分,可以说,没有计算机监控系统的发展,就没有现代电力系统的自动化。随着我国电力工业的迅速发展,各大电力系统的容量和电网的区域不断扩大,网络接线越来越复杂,使得电力系统自动化的地位越发的显著。对电站的自动化系统的要求也越来越高。电站的自动化设计与配置直接影响到电力系统自动化的安全运行。如果设计的不合理,就会影响电站的效率和速率,不利于自动化运行,增大了系统运行的负担,对于实现少人值守、无人值守有很大的影响,也对将要实现的智能电网造成很大的阻碍。因此,合理的选择设备的型号,进行正确的校验计算对电站一次设计,电站的正常安全运行有很重要的意义。编制正确的计算机软件程序,设计完整的自动化设备,为保证电力系统的安全、自动、迅速、经济运行有着非常重大的意义。 三、本课题在国内外的研究状况及发展趋势 1、电气一次设计的现状及发展

水电站电气设计研究论文

水电站电气设计研究论文水电站电气设计研究论文 近年来,水电站的电气设计一直是水电行业的一个重要研究领域。一方面,电气设计直接关系到水电机组的性能和稳定性,对于水电站的安全运行和经济效益具有至关重要的作用;另一方面,随着新能源产业的不断发展和政策的支持,水电站也面临着更多挑战和机遇,需要进一步优化电气设计方案,提高水电站的综合效益。 本文旨在对当前水电站电气设计的主要问题、设计目标和方法进行详细的探讨和总结,以期为水电站电气设计提供一些启示和参考。 一、当前水电站电气设计存在的主要问题 1. 电气系统耐受能力不足 水电站电气设备常常受到复杂的自然环境和负荷波动的影响,因此需要具有较强的耐受能力。然而,一些电气系统存在设计缺陷或操作不当等问题,导致设备容易受到电气干扰、过电压、短路等故障,给水电站的安全运行带来威胁。 2. 设备先进性和性能指标落后 传统的水电站电气设备大多采用机械式调速等老旧技术,随着新能源技术的发展和水电站的运行方式变化,这些设备已经不能满足现代化要求,缺乏先进性和性能指标。

3. 控制系统稳定性和精确度不高 水电站的控制系统如果不具有稳定性和精确度,无法满足调节水电机组的扬程、流量等参数,进而影响水电站的发电效率和稳定性。目前一些水电站的控制系统存在误差较大和反应速度不敏感等问题,需要进一步改进。 二、水电站电气设计的目标 1. 提高设备的运行可靠性和安全性 水电站电气设计的主要目标是提高电气系统的运行可靠性和安全性。为了实现这一目标,应考虑到水电站的场地环境、负荷能力、设备故障率等因素,合理设计电气系统的电缆线路、电动机、开关设备等,减少设备故障的发生,保证水电站的正常供电和运行。 2. 提升设备的性能和先进性 通过优化电气设计方案,提升水电站电气设备的性能和先进性,能够有效提高水电站的发电效率和经济效益。例如,采用数字化调速设备、变频器等技术替代机械式调速,实现水电机组自动化控制,能够提高水电站的发电效率和响应速度。 3. 提高控制系统的精确度和稳定性 水电站控制系统的精确度和稳定性对于发电效率和稳定运行至关重要。设计方案应该考虑到控制系统的响应速度、精确性、数据传输等因素,确保控制系统稳定运行,满足水电机组的调节要求。 三、水电站电气设计的方法

电气设计论文六篇

电气设计论文六篇 电气设计论文范文1 1.建筑电气设计的基本原则 充分满意建筑物的使用功能建筑物的电气设计最终目的是为了满意人们对于消费品的使用功能。一般考虑到的使用功能有:照明的亮度、显色指数;运输通道的畅通,色温、空调温度的舒适度等,也包括一些特别的工艺要求。这些大大小小的全部的要求都需要在建筑电气设计时得到充分的考虑,设计成果要充分的保证这些功能能够得到满意。并且随着生活水平的提高,人们用电量会有所提升这一点要做出肯定的猜测,电气的设计要留有肯定超额设计。不能够过于紧凑,以防消失用电高峰期或者突然的超负荷工作。充分考虑经济条件和节能环保在当今世界,节能环保是社会进展的主要趋势,所以在建筑电气设计时需要充分的考虑节能问题,以节能环保为设计理念和主要的原则。但是在节能设计的同时也应当考虑到经济性。在节能设计和经济效益之间肯定要找到一个平衡点,来达到最好的节能效果和经济效益,避开一边倒的情形发生。比如一些电气设计对于建筑功能的发挥没有多大好处,那么这些电能的损耗就是无用的,所以设计时要实行合适的方法来避开这些不必要的损耗。这也使得建筑电气的设计更加符合使用者的要求和更好的发挥建筑本身的功能。 2.建筑电气设计需要实现的目标分析 总体来说,建筑电气设计是为了满意使用者的需求。建筑电气的设计是以肯定时间内,使用者使用电负荷作为建筑用电数据作为参考,也要有

肯定超负荷的猜测,合理的设计出将来的电路。要确保电气设计能够使得电力设备正常的运作,并且在电力设计有效期内不会消失大量的电路的更改。同时对于建筑电能质量,建筑物内部用电设备工作状况要保证其正常的运作,以免影响人们的正常工作和生活。 二、建筑电气设计中的问题 1.平安是建筑电气设计的重要基础电力供应配置 电力是建筑一切电气设施的动力源泉。没有了电力,建筑也就是去了很大的价值。电力是稳定供应才能保证居民的正常生活。在现代化的建筑电气设计一般都至少有两个独立电源来确保电力的供应。两个电源相互独立,又相互备用。一旦一个电源消失故障,其他的独立电源就会连续供电,这样就不会影响到整个建筑的电力供应,也会更加平安。通常是不会消失停电导致的事故。比如电梯,加热设备等。对于一个建筑究竟需几个独立的电源,和每个电源负荷大小的问题,应当依据当地的电网条件打算。 2.供电线路的选择 随着社会的进展,人们的生活离不开电,同样建筑也离不开电,建筑没有了电就不能满意人们的需求。所以电力的供应是建筑必需设施。所以建筑的电气设计及其重要。平安性是建筑电气设计的基础。要做到建筑的电气设计的平安性,首先要考虑到供电线路的选择,在一般的居民建筑中,各种电路简单繁多,为了保证平安性和稳定性,供电电路的主线截面不能随便更改。假如线路截面变小,电路电阻就会变大功率过载的状况下将会导致电路发热,严峻的可能导致火灾的发生。所以供电线路的选择对于建筑电气设计的平安性是特别必要的。

水电站地下厂房设计分析论文

水电站地下厂房设计分析论文 棉花滩水电站位于福建省永定县汀江干流棉花滩峡谷中部福至亭处,地下厂房位于左岸山体内。厂区岩层为燕山早期第三次侵入的黑云母花岗岩,厂房部位断裂不发育,上覆新鲜~微风化岩体,厚度40~140m,通过厂房的主要断层有F7、F28、F29等,倾角较陡,规模小。据勘探钻孔统计,岩心平均采取率95%,RQD(岩石质量指标)80%,岩体纵波速4600~5600m/s,湿抗压强度165MPa。 地下厂房按2级建筑物设计,厂区地震基本烈度为6度,按规范规定,建筑物不进行地震设防。 1地下厂房位置选择 在选择地下厂房位置时,考虑了下面几个因素。 (1)厂房上游侧靠近水库处有F1断层,与厂房轴线基本平行。厂房应尽量远离F1,以确保厂房围岩稳定和减少渗水量。 (2)厂房靠山体侧的F3断层沿冲沟发育,F3影响范围内的不透水层埋藏很深,透水量较大。因此厂房应尽可能远离F3影响带。 (3)通过厂房的F7、F28、F29断层,与厂房轴线有较大的夹角,对厂房围岩稳定影响不大。而F12、F2断层与厂房轴线基本平行,F2断层靠河床侧正与厂房顶拱相切,对厂房围岩稳定不利,厂房应尽可能地避开。 综合以上因素,同时考虑主变室、尾水调压室及输水系统的布置,确定了主厂房位置。根据实际开挖揭露的地质情况来看,地下厂房位置选择是合理的。

2厂房纵轴线方向确定 2.1确定原则 (1)厂房纵轴线应尽可能垂直于岩体主要节理裂隙的走向或与其成较大的夹角,避免上下游边墙承受较大的侧向压力,以利于围岩稳定。 (2)轴线尽可能平行于初始地应力的最大主应力方向或与其成较小夹角。 2.2轴线方向确定 根据厂区节理玫瑰图及实测的三维地应力成果,在满足洞室稳定和输水发电系统总布置要求的前提下,厂房轴线方向确定为N40°E。理由如下。 (1)根据厂区节理玫瑰图分析,主要节理组方向为N15~30°W,次要节理组方向为N70~85°E。厂房纵轴线与主要节理组方向夹角为55~70°,与次要节理组方向夹角为30~45°。 (2)从实测的三维地应力成果看,最大主应力方向为N68.9°E,与厂房纵轴线方向夹角为28.9°,虽然夹角稍偏大,但其应力值为6.80MPa,属中低应力区,对厂房纵轴线方向选择影响不大。 3地下洞室群布置 除了开关站出线场和控制楼布置于地面外,主厂房、主变室、尾水调压室及其他洞室均布置于地下,形成了一个错综复杂的地下洞室群。 厂区枢纽布置采用主厂房、主变室、尾水调压室三大洞室平行布置的形式,因此,三大洞室的纵轴线方向与主要节理的夹角方向均较大,对顶拱和边墙稳定有利。主厂房与主变室间净距22m(1倍大洞室跨度),主变室与尾水调压

电气工程毕业论文范本

电气工程毕业论文范本 在电气工程的毕业生需要写好,那么应该如何写论文的内容呢?下面是分享给大家的电气工程毕业论文范本,希望对大家有帮助。 我国的电气工程自动化开展起步较兴旺国家来说较晚,但由于电气工程自动化的适用性很广,所以备受社会各个领域的欢迎,这也不断地对电气工程自动化提出了新的要求,为了适应社会的变化,满足人们不断更新的需求,电气工程相关单位就需要优化配置电气工程自动化的设计和应用。 1.1.设备运行效率的进步 设备的运行效率是在对电气工程自动化进展设计时需要重点考虑的,保证其运行效率是电气工程自动化设计的原那么之一。所以在进展电气工程自动化的设计时,首先要保证建筑物重的电气设备可以平安稳定的运行,在此前提下最大可能的去降低设计本钱;其次,为进步电气设备的利用效率,最大程度的减少运行设备的损坏,并且降低可能的设备维修费用和电气设备的整体本钱,在进展电气设备自动化的安装工作时,尽量选择质量较高、节能效果较好、负荷也较平衡的设备。 1.2.电气工程自动化设计的优化 电气工程自动化设计的优化工作是电气工程自动化设计的重要原那么之一,所以科学合理的设计是电气工程自动化的安装工作中非常重要的一项工作。而电气工程自动化的优化工作,首先要在满足业主对电气设备全体需求的前提下,最大程度地进步电气自动化整体的稳定性、可靠性以及平安性。另外电气工程自动化是一项系统的工程1,它的运行需要很多科技含量很高的设备,本身就有很

大的复杂性,所以要保证电气工程运行的整体平安性,首先要保证这些设备的平安性,这就需要把好电气设备自动化安装的关,而且这些高科技设备的安装要求一般都比较特殊并且复杂,比方防雷、防火、防水等的设置安装。 2.1.PLC控制系统可靠性的保证 由于PLC控制系统是电气工程自动化实现的重要途径之一,所以要想保证电气工程自动化的质量,PLC2系统的可靠性就变得至关重要了。PLC系统的可靠性主要是从进步其抗干扰性来得到保证的,其抗干扰性的保证主要从以下几个方面来实现的:(一)、从PLC安装与布线方面,首先PLC控制系统的布线应远离大功率装置以及大型动力设备等对其干扰较强的设备,同时注意一定不能与高压电器安装在同一个箱柜内。为了防止外界信号的干扰,输入与输出线、开关量与模拟量都要分开敷设。其中交流与直流输出也要分开,且不能并行,另外还要远离高压线与动力线。(二)、通过良好的接地方案也能保证PLC系统的平安可靠运行。一般主要有浮地、直接接地和电容接地三种接地方式。这三种方式均有自己的优缺点,在使用时,可根据本工程的实际情况进展选择。(三)、增强PLC系统可靠性的方法还有很多,比方对其电源和感性负载的处理等硬件措施,然而这并不能完全消除干扰性,所以还可以通过一些软件措施来进步抗干扰性。 2.2.注重综合性人才的培养 21世纪竞争的核心其实就是人才的竞争,所以想要在竞争非常剧烈的电气工程行业重站住脚,就必须注重对综合性人才的培养,这也是实现电气工程自动化的重要策略之一。首先根本的专业知识技能是必须含有的,尤其是在逐渐自动化的电气行业3,工作人员

水电站项目毕业设计报告

目录 第一章设计概况 (1) 一流域概况、开发任务 (1) 二设计任务 (2) 三设计前提 (2) 四设计内容 (3) 五设计原始资料 (3) 六设计成果 (6) 表1-12:xx水电站工程特性表 (7) 第二章兴利计算 (9) 一基本资料整理 (9) 二死水位的确定 (9) 三保证出力计算 (11) 四水电站必须容量选择 (11) 五水电站调度图绘制 (12) 六重复容量选择与多年平均电能计算 (14) 表2-5xx水电站各方案水利指标 (18) 第三章防洪计算 (19) 一水库调洪计算 (19) 二坝顶高程的确定 (20) 第四章经济计算 (21) 一投资估算 (22) 二年运行费用计算23 三下游防洪效益计算(负费用) (24) 四年费用的计算及评价 (25) 第五章设计小结 (26)

第一章设计概况 一、流域概况、开发任务 xx水电站位于湖南省xx县境内,上离xx县城73km,下距xx市130km。坝址控制流域面积83800km2,占xx总流域面积的93%,流域雨量充沛,水量丰富,坝址多年平均流量2060m3/s,年水量649×108m3,并有1925年以来的水文资料和核实的历史洪水资料。坝址位于xx干流最后一段峡谷出口处,岩性坚硬,地形地质条件良好。具备了修筑高坝的自然条件。 在xx规划中,xx水电站为xx干流最后第二个梯级,上游接xx及xx的xx(已建成)梯级,是一个以发电为主,兼有防洪,航运效益的综合利用水库,系湖南省xx的水电电源点。 xx水电站开发的主要任务如下: 1、发电 xx水电站建成后投入华中电网,主要供电范围为湖南省。 2、防洪 xx下游xx以西的xx、xx、xx三县及xx市所属平原河网地区,统称xxxx。这个地区地势低洼。全靠堤防保护,共保护人口106万,农田159亩。现有河道的泄洪能力2000m3/s,如遇1927、1931、1933、1935、1943、1949、1954、1969等年洪水重现,河道均不能完全承泄,防洪标准仅约为5年一遇。xx水库靠近xxxx,控制全面域面积的93%,解决xx防洪问题,是它的基本防洪任务。 3、航运

水电站厂房设计毕业论文设计

大学毕业设计 水电站厂房设计 学生姓名 指导教师 班级 专业 学院

目录 1 摘要 (1) 1.1中文摘要 (1) 1.2英文摘要 ............................................................................................ 错误!未定义书签。 2 前言 (2) 3 基本资料 (3) 3.1工程任务 (3) 3.2基本资料 (3) 4 厂房设计说明书 (5) 4.1厂区布置 (5) 4.1.1 考虑因素 (5) 4.1.2 方案比较 (5) 4.2水轮机型号的选择 (6) 4.2.1 水头计算 (6) 4.2.2 水轮机主要参数的确定 (7) 4.3尾水渠设计 (8) 4.4压力管道直径及蝶阀的确定 (9) 4.5损失计算 (9) 4.5.1沿程损失 (9) 4.5.2 局部损失 (9) 4.6蜗壳尺寸的确定 (11) 4.7尾水管尺寸计算 (13) 4.8水电站厂房尺寸设计 (13) 4.8.1 主厂房高程的确定 (13) 4.8.2 主厂房长度L的确定 (15) 4.8.3 主厂房宽度确定 (16) 4.9起重机选择 (17) 5 致谢 (18) 6 参考文献 (19) 7 附件..................................................... 错误!未定义书签。

1 摘要 1.1 中文摘要 本毕业设计承担水利水电枢纽工程中水电站厂房设计的部分工作。 根据已有的原始资料和该处地形图进行设计,主要内容有:水电站站址的选择,总体布置,水轮机型号的选择,蜗壳尺寸的确定,尾水管尺寸的确定,调速器和蝶阀的型号选择,水电站厂房尺寸的确定,尾水渠渠道布置、形式选择、开挖方量等,并根据要求绘制相应的平面布置图和剖面图。 水电站位于河南省xx县境内,位于xx支流老xx上,水力资源丰富,可供修建大中型水库和电站,流域下游为该县的主要产粮区和工业发展区。由于受电力不足的影响,严重制约了该地区的经济发展,为了解决该地区的用电紧张问题和合理开发老xx水力资源,拟定修建水利水电枢纽工程,以发电为主,结合防洪,城市供水,农田灌溉及水产等进行综合利用。 本电站的设计水头为29.24米,单机容量3200kW,共三台机组,总装机容量9600kW。 关键词:峰荷、装机容量、效率、水库、发电机、水轮机。

水电站电气设计研究论文(全文)

水电站电气设计研究论文 电气主接线及短路电流的计算复核 进行增效扩容改造的电站均已运行多年,送出工程及与系统连接地点已经确定,变动的可能性不大,对电站的接入系统不必再进行论证,所以只要现有主接线相对合理,在增效扩容改造中可维持原主接线方案不变,只需根据现行规范和短路电流计算成果,对机组容量进行复核和选择设备即可。对个别电站由于多次修改,改变了原设计的主接线形式,增加或减少了部分设备,改变了布置,形成现有不合理的接线方式,造成重复容量大、损耗高、继电保护复杂、设备配置不合理等,或现有接线方式不适应目前电力系统要求,对这种情况应在设计过程中对主接线方案进行优化比选,同时复核送出线路的输送容量和电压降是否满足增效扩容的要求,复核电站内部电流互感器变比、电气设备动、热稳定和开断电流等能否满足要求。基本原则是送出电压等级和接入系统点不改变,否则投入资金会相应增加比较多,浪费比较严峻。如果改变了主接线的接线方式或运行方式,涉及到电力系统的计量、保护方式和保护整定值等问题,需要与电力系统调度部门共同协商。早期投入的水电站当时电力系统容量较小,经过几十年的进展,电力系统的容量大为增加,结构也有很大的变化,XX络在不断加强,同时由于发电机的改造,电气参数也会发生变化。因此,有必要根据目前电力系统的参数,或今后5~10年电力系统进展规划和改造后机组的参数,对短路电流进行重新

复核计算。依据复核计算结果来复核现有电气设备的开断能力,或重新选择电气设备的型式和参数。一般情况下,严峻老化设备、高耗能设备和淘汰设备会随着机组增效扩容一起进行更换,以提高电站运行的安全性,减少维护工作量,增加电站经济效益,保证新更新的电气设备能适应电力系统的进展和长期安全稳定运行。 电气设备的选择与布置 1995年以前的中小型水电站,由于受当时技术水平和建设资金的限制,电气设备存在性能较差、安全性不符合现要求、维护工作量大以及备品备件难以购买等问题。例如,低压开关柜多为GGD型或更老的BSL型等,开关和保护设备为DW系列或DZ10系列,而更多的是采纳熔断器保护;10kV设备采纳GG-1开关柜配SN10少油断路器,或早期的真空断路器;35kV设备采纳DW6、DW8等系列的多油断路器,或GBC户内型高压开关柜;110kV设备采纳SW3、SW6及SW7少油型断路器;变压器采纳SLJ1或SF7型等。这些设备是目前GJ已明令禁止使用的产品,开断电流小,损耗大,不环保,由于诸多原因长期带病运行,严峻影响电站和电XX的安全,因此对这些电气设备进行更新换代是十分必要的。电气设备的选择应按照安全可靠、技术先进、维护简单方便和经济合理的原则进行,并应适应农村水电站的特点。对电气设备应根据增效扩容后的参数和短路电流计算结果来选取,而不应延用旧设备的参数来确定新设备的参数,

相关文档
最新文档