约克螺杆机组YEWS操作维护手册

约克螺杆机组YEWS操作维护手册
约克螺杆机组YEWS操作维护手册

YEWS100SA50D / YEWS170SA50D / YEWS210SA50D

STYLE D

Warning

Refrigerant with certain pressure is infused into this system

It is possible to damage the system severely if be with the incorrect operating procedure when in maintaining. All the maintenances should be performed by the maintenance technician of YORK in accordance with the Installation, Operation and Maintenance Manual of YORK.

IMPORTANT !

Please read carefully before proceeding!

General Safety Guidelines

This equipment is complex, when performing the installation, operation and maintenance, the personnel may be exposed to the following circumstances or dangers caused by components, including but not limited to: refrigerants, engine oil, compressive material, rotation part and high-low voltage, which will result in personal injury or even casualty if in improper handling. The operation/maintenance personnel have the responsibility to confirm these potential dangers to protect him from the injury while work safely. If these safety requirements are not followed, serve damages on the equipment and property will be caused, or even casualty on the personnel concerned.

This manual is just for the authorized operation/maintenance personnel, whom are professionally trained to handle the appointed work safely and correctly. Most important of all, please carefully read and master this manual and other references before any operation on this equipment. The operator is required to be familiar with and follow any relevant government standards and criterion.

Variability of this Document

York inherits the strategy of updating the product continuously, so that the information in this document can be correspondingly updated without prior notice. York is in no promise to provide the latest information to all the owners of this manual; however, the user can acquire these information from the nearest representative office of engineering system service of York.

It is the obligation of operation/maintenance personnel to determine the applicability of the corresponding equipment. If any question before operation, they will contact the customer to confirm whether the equipment have been updated and whether there is the latest available document or not.

Nomenclature

A50

Y E WS100S D

Style

Power supply

Refrigerant A-R134a

S-Standard unit

100-Unit model

Water cooled screw chiller

High efficiency

YORK

Section 1 Supplier Information Section 2 Product Introduction

Section 3 Transportation, Transferring and Storage Section 4 Installation Section 5 Control Center Section 6 Startup Commissioning Section 7 Operation Section 8 Maintenance Section 9 Trouble Shooting Section 10 Technical Data Section 11 Spare Parts

Section 12 Transferring Stop, Removal and Handling

Section 13 Installation Instructions for the HF68 Flow Switches

Table of Contents

1491117424485355616263

4

1.1 Introduction

York YEWS-D water chiller complies with the most rigorous design and manufacture standards, which ensures the high-quality, reliability and flexibility of various air-condition project.

This unit can be used for supplying the chilled water, however, be unsuitable for other applications beyond this manual.

This manual contains all the necessary information of operation and maintenance guide for correct installation and testing.

Please read this manual carefully before operating and overhauling the unit.

All the work elaborated in this manual (including installation, testing and maintenance) should be performed by the trained professional personnel.

The manufacturer should not burden any responsibility of injury or damage due to improper installation, testing, operation or improper maintenance, or disobeying the process and guidance in this manual.

1.2 Warranty

One year upon the date of startup and commissioning, or 18 months upon the date of shipment (subject to the prior arrival), Y ork guarantees to remedy the defect of the manufacturing process and material of all the equipment and parts, excepted as the guarantee period is extended in the Contract.

The warranty is limited to alter and transport any faulty parts or components, if this part is unavailable due to quality or manufacture problem, the compensation must be supported by the evidence, namely the fault occurs in the guarantee period and the unit is run in the specified parameters.

Section 1 Supplier Information

All the compensation for the warranty must show the unit model, series no. and order no., all of which are printed on the tablet of the unit.

Before getting the written consent of YORK International Inc., any alteration on the unit shall be prohibited, or the warranty should be invalid.

The following clauses should be obeyed to comply with the product warranty: the commissioning of startup should be performed by the authorized personnel of Y ork. Only the parts, lubricant and refrigerant recognized by York can be adopted.

In the regulated time, all the operation and maintenance required in this manual should be completed by the eligible trained personnel. The warranty should lost efficacy automatically for disobeying any above-mentioned clause.

1.3 Safety

The safety standards of YEWS-D water-chilling unit designed and manufactured by the factory passed the attestation of ISO 9000, which meet the limitation regulated in this manual and comply with the following standards: JB8654 Safety Requirements of Positive Displacement and Centrifugal Water-chilling (Heat Pump) Packages.

1.4 Safety Liability

We take the safety liability into account in designing and manufacturing the unit to ensure that it can meet the safety requirements. However, the followings must be placed in the first in operating any equipment: personal safety, other personnel and equipment safety . Please operate this machine correctly according to the processes in this manual.

1.5 About This Manual

The following words in this manual are used for

reminding the operating personnel to pay attention to the potential dangers.

The WARNING in this manual is used for

marking the dangers that may cause the

personnel accident. The guidance, simple

explanations and possible aftermath due to

neglecting these guidance should generally be

given, which are expressed in black on red

label.

CAUTION signs the dangers that may result in

the damage of machine, destroy of other

equipment, or environment pollution. The

guidance, simple explanations and possible

aftermath due to neglecting these guidance

should generally be given, which are expressed

in black on yellow label.

NOTE is used for highlighting the other useful

information, which has no special relation with

the safety, and they are expressed in black on

white label.

The contents of this manual contains the optimal operational approach and process recommended by Y ork, however, it is just for guiding, but not overriding the above-mentioned personal responsibility and local safety ordinance.

The copyright of this manual and other information presented together with the product will be in the possession of Y ork. The whole or part of them can not be translated without the written consent of representative of York.

1.6 Used Equipment

Applicability

This unit can be used for supplying the chilled water, however, unsuitable for other applications beyond this manual. It is possible to cause personnel injury or equipment damage if used for other purposes or in misoperation. The design limit appointed in this manual can not be exceeded in the operation.

Supporting structure

The solid supporting structure is required to supply for the unit to avoid the personnel injury or equipment damage.

Mechanical strength

The unit shall not burden load or pressure from the neighboring equipment, pipe or structure. The other parts are forbidden installing on the unit, for any external load or pressure may destroy the structure to further injury the operator or damage the machine.

General usage

The appropriate safety precautions should be adopted when operating the unit, or some dangers will happen easily and result in the injury. (Make sure that the password of the unit is just mastered by the authorized person, who knows the possible dangers and necessary safety precautions in the operation and maintenance process, and how to maintain the hot temperature, high voltage and electrical equipment much well, which is very important).

Pressure system

The unit contains the refrigerant vapor and liquid with certain pressure, so that the leakage may result in dangers or cause the injury in the running or unused. The user should ensure that the installation, operation and maintenance are very careful to avoid damaging the pressure system. Please do not attempt to close the spare parts of the pressure system except the professional personnel.

Electrical System

The unit must be earthed; therefore, the installation or maintenance is forbidden before shutting off the main switch, insulating the power of unit and any controlling power, all of which are completed via the special tools by the trained personnel. Please do not attempt to touch the inside of operation board, distribution board or other

CAUTION NOTE WARNING

electrical cabinet.

Refrigerant and lubricant

The refrigerant and lubricant used by the unit are generally non-toxic, nonflammable and no corrosive, which can not cause particular harm to the body, however, the gloves and safety goggles had better to be put on when in working. Taking leakage as an example, the people will suffocate in the limited or closed space, so that please pay attention to keeping good ventilation in the machinery room.

Cleaning under high temperature and high pressure

Do not clean any parts of pressure system under high temperature and high pressure (such as swash with the vapor), for which may result in pressure relief. The detergent and solution are also forbidden to avoid the corrosion.

1.7 Emergency stop

One switch of emergency stop is set on the electrical control cabinet, which is the red button. When the emergency happens, this switch can cut off the power of the controlling system, as well as lock the switch on the place of OFF.

1.8 Safety Signs

The following signs are stuck on each unit to show the guidance or the potential danger. The meaning of each sign is as follows:

In white on blue. Please read the instruction

firstly to be convenient for operation.

In black on yellow. W arning-hot surface

In black on yellow. W arning-please cut off all

the powers before dismantling/removing the

cover otherwise the fatal danger will happen.

In black on yellow, sign for general attention.

2.1 Introduction

York YEWS-D water-chilling unit is used for supplying the chilled water; all the units are designed to be installed in the room (machinery room).

2.2 Compressor

The semi-hermetic twin-screw compressor is adopted to ensure the high-efficient and reliable operation. The capacity control can be realized via the slide valve. The compressor is positive displacement with two spiral steel rotors. The motor with 50HZ can drive the male rotor directly with the rotational speed of 2975rpm, while the male rotor drives the female rotor, one flat of slim oil film is between the female and male rotor.

Each compressor is direct-driven and semi-closed twin-screw, and including the followings: twin-screw rotor made from the forged steel, while the unit of precision machining compressor is made from the cast iron. The high-efficient oil separator is placed inside the machine.

The inner discharge check valve can prevent the rotor from reversing when the machine stops.

The high-efficient semi-closed electrical machinery can cool the suction, which also is with the overload protection, thermoelectricity resistance and over-current protection.

The suction filter and full-flow oil filter are installed inside the compressor.

The refrigerant gas is sucked into the interspaces constituted between the 5 gear male rotors and 7 gear female rotors, and then the rotor further meshes to close the rotor spiral in the suction mouth and unmeshed the compressed gas in the discharge mouth along with the axis direction. Before the designed capacity leaves the rotor exhaust chamber, the steam capacity is compressed,

Section 2 Product Introduction

while the pressure increases. Because the cycle of the suction and discharge is superposed, the airflow can keep stable.

The rotor is inside the body of the compressor, while the body is made from the cast iron with precision machining to minimize the interspaces between the shell and rotor. The contact between the male and female rotor is mainly on pitch circle of each rotor, so that the rotor can not be abraded much and the reliability can also be increased. The compressor adopts the wearable bearing to decrease the power waste and strengthen the reliability, while four single cylindrical roller bearings burden the radial load; the angular contact ball bearing burdens the axial load. No matter under any pressure ratio, they can keep the correct orientation of the rotor, which can reduce the leakage and keep the efficiency. One check valve is set in the discharge port, which can be used for preventing the rotor from reversing due to the pressure grads of refrigerant when the unit is stopped.

The refrigerant vapor from the evaporator flows with the motor and cools it. The overloading protection includes the over heating protection and over-current protection.The inner oil separator separates the oil from the refrigerant to directly turn back the compressor to lubricate.

One inserted heater of 350W is set in the compressor, which is in constant temperature control; therefore, it can prevent the refrigerant from dissolving into the lubricant. Motor startup

The compressor motor adopts the star-shaped/triangle conversion starter, which includes 3 motor contactors and 1 startup relay and can restrict the startup electrical current in 33LRA around in the first 4~10 seconds, after completing the connection of the triangle, the electric current raise to the normal level.

The corresponding relay is electrified when the microprocessor gives out the compressor startup signal. The relay contacts switch to startup and connect the motor starter in the situation of start-shaped and keep 410 seconds.

Capacity control

The compressor should be started up in the minimal loading place, and reach the capacity control in full loading of 25100 via one continuous slide valve.

The spring of the capacity adjustment is automatically reset the minimal loading place to ensure the startup of the compressor motor in the minimal loading.

2.3 Oil Separator

The inside separator separates the majority of the oil and lubricate it directly, while a few of oil is separated to turn back the compressor.

The oil can only return the compressor by one oil filter with one removable filter cartridge; the oil is in high pressure, which leads back the oil to compressor to lubricate the bearing and rotor.

After that the oil is sprayed to the closed spiral near the suction rotor. The oil spraying is finished automatically due to the differential pressure between the discharge pressure and suction end, which not only lubricates the rotor and used as oil seal, but also reduce the leakage to ensure the compression of the refrigerant (capacity efficiency).

When the compressor is running, the oil level must be higher than the visible location of the sight glass, please stop to check the reason once lower than and to inject the oil according to the actual situation, while the oil level can not be higher than the upper sight glass of inner oil separator, please stop to check and determine whether the oil should be discharged or not according to the actual situation once higher.

2.4 Circuit of Refrigerant Each unit is with one independent refrigerating circuit, the liquid pipe includes: manual globe valve with infusing nozzle, throttling device and air bypass electromagnetic valve.

2.5 Condenser

The condenser is the shell and tube type, which can be washed. The heat exchanging pipe is the 19mm seamless copper tube with outer finned and expansion joints to the tube plate, with one super cooler in the inner.

The designed pressure of the water is 10bar. HG20615 flange is set on the water pipe joint to be convenient for connecting with the pipe. The designed pressure of the safety valve of refrigerant is 20. 7 bar, and the condenser is manufactured and inspected in accordance with the State Standards of China GB 151.

2.6 Evaporator

The flooded evaporator is adopted with the water inputs and outputs from the same side. The designed pressure of the safety valve of refrigerant is 20. 7 bar, and the condenser is manufactured and inspected in accordance with the State Standards of China GB 151.

The shell is wrapped with the soft aperture-closed heat preservation material in the thickness of 19mm. HG20615 flange is set on the water pipe joint to be convenient for connecting with the pipe.

2.7 Distribution Board and Control Panel

All the control and startup components for the unit are wired and completed the performances testing by the factory. The cabinet is designed according to IP23 and manufactured with the steel plate of powder spraying.

The distribution board and control panel is divided into the power, control and startup cabinet according to the electrical system. The power and control part are with the individual hinged door, and each door has the lock and sealing pad.

Each distribution board includes: compressor startup

contactor, control circuit, compressor contactor coil and components of compressor overloading protection.

The overload protection of compressor is running as follows: read the electrical current signal to the control mainboard via CT, and to protect once exceeding the setting value upon comparing with FLA value.

The power protection module of compressor provides the protection hyperlow / hyperhigh / phase sequence/phase out of input voltage.

The control panel contains: microcomputer keyboard, HMI and microprocessor panel.

2.8 Microprocessor Control

The microprocessor is with the following performances and displays: liquid crystal display with 120 characters, which can display text with 8 lines of Chinese character and English letters or digit code, back lighting with the LED to be convenient for reading. Sealing keyboard with 20 keys, which are divided into function keys and programme keys.

The standard controller includes: running signal contact, unit alarming contact, refrigerating pump and cooling pump control, automatic reset after break, system automatically optimization according to the running situation.

The software is memorized in the flash memorizer to avoid the faults of the water chilling unit due to breaking of alternating current power. The program set values is saved in EPROM memorizer. The timing clock of controlling system is provided by RTC, and the service life of the backup lithium battery is 5 years at least.

2.9 Current protection of motor

The motor protection of microprocessor provides the overcurrent protection to ensure that the motor is free from the damages due to excessive voltage and refrigerant and other overcurrent problems.

After 3 seconds upon starting the star-shape/triangle starter, if the current exceeds 115FLA trip point, the microprocessor will stop the system and lock to be the fault. It is required to reset the corresponding system switch to eliminate the fault and restart the system. Please check the motor, circuit and refrigerating system before restarting.

With measuring that the current is lower than 10 FLA(full loading), the microprocessor will also provide the under-current protection. The microprocessor will stop the running once under-current. The under-current protection will perform after 4 minutes of triangle starter startup to ensure that the system keeps running under the situations of without refrigerant, connecting of the motor protection components and mechanical high-voltage switch. It is required to reset the system switch once tripping due to under-current.

Components of motor protection

The electronic motor protection components provide the overheating protection, resistance of three phases PTC (Positive Temperature Coefficient) is installed in each phase of motor winding for protection. The resistance value of sensor will keep in 1K within 125. It will trip once coming up to 13K, so that the control circuit is in no electricity. When the motor cools down and the resistance of sensor reduces to 3.25K, the unit can be restarted again.

The signal will be output to the mainboard to stop the motor once the protection components trips.

2.10 Keyboard Control

Display

The parameters can be displayed in Chinese and English, and the following parameters for each circuit will be displayed:

Input/output temperature of chilled water

Input/output temperature of cooling water

Time and date, start and stop time at ordinary days, arrangement on holidays and status of access beyond in manual.

Compressor running time and startup times Compressor running status

Suction, discharge, oil pressure and discharge temper-ature of the system

Percentage of compressor current in full loading current Cutoff value and setting value: output temperature of chilled water, hyperlow of the suction, overhigh of the discharge and temperature, overhigh current or hyperlow, hyperlow of the chilled water

Setting value of unloading limit for overhigh discharge pressure and compressor current

Information for exceeding the running limit

Faults stop records over 50 times

Input

Setting the output temperature and temperature difference of chilled water

Clock

Setting the time, startup and stop schedule for ordinary days or holidays

Programming

Setting with the signals from YORK ISN or building automation system: hyperlow breaking value for output temperature of chilled water, restart timer for 180300 seconds, unloading point for average current, reset the setting value for output temperature of chilled water.

Additional functions (with password) to be convenient for the professional inspection and maintenance technician to programme.

Cutoff value: hyperlow suction pressure, overhigh discharge pressure, overhigh discharge temperature, unloading setting value for overhigh discharge pressure, percentage limit of compressor current.

2.11 Accessory and Selection

With the standard RS485 joint, YORK ISN building automation system can directly provide the commun-ication signal to the standard control panel.

Flow switch

Gate flow switch, the designed working pressure is 10.3bar and applies for the chilled water and cooling the water pipelines.

25mm spring shock absorber

The horizontal adjustable spring shock absorber is installed below the ground plate of the unit (on-site installation).

2.12 Performance Description

Low pressure refrigerant liquid absorbs the hot outside the pipe in the flooded evaporator and evaporate as the refrigerant vapor, after that the low-pressure vapor enters into the compressor, while in the compressor, the pressure and temperature raise as the high temperature and high pressure gas, which separate the mixed lubricant in the outer and inner oil separator, then the lubricant returns back to the compressor for cycling. The oil-free cooling steam in high pressure and high temperature enter into the condenser, while the cooling water absorbs the heat of condensation, the refrigerating vapor cools to be the over-cooling liquid, and then the refrigerant liquid enters into the throttling device and decrease the pressure and temperature to reach the evaporator, then the whole refrigerating cycle is finished.

F i g 2-1 F l o w C h a r t

Section 3 Transportation, Transferring and Storage

3.1 Delivery and Storage

In order to acquire the stable quality and utmost reliabil-ity, all units have been tested and inspected before leaving the factory. The complete unit is shipped, moreover, the refrigerant YORK L oil with certain pressure is injected. The unit can not be shipped with the export crate, excepted as otherwise are especially marked in the sales order.

If the unit needs to be stored before installation, please adopt the followings precautions:

Make sure that the unit is free from wind and rain.

Make sure that all the opens (such as pipe joint) are with the protective cover or blanking plate.

The unit should be stored in the place without many persons to reduce the dangers of accidental mechanical contusion.

Don't wash with the steam to avoid operation of relief valve.

Please remove the key to the control panel and hand over to the principal. Please inspect the unit periodically in the period of storage.

3.2 Inspection

Please remove the transportation package to inspect the unit and confirm that all the parts have been received and without any damage due to transportation. Any obvious broken must be remarked on the waybill of the forwarder, and claim for compensation according to the guidance on the notice.

3.3 Transferring

Before transferring the unit, please confirm that the applicable installed device and tools in the installing location, and which can burden the weight of the unit and all accessories.

The unit is designed to hoist with the wire rope, one beam showed in the following picture hoist the unit (hoisting hole on tube plate can adopt 6.8shackle), the hoisting component must be long enough for avoiding all the hoisting, also the damages caused by the hoisting chain. The hoisting component must reach the requirement of the unit weight.

Do not move the unit on the roller, or hoist the

unit by the fork-lift truck.

CAUTION

Fig 3-1 Rigging

The field for installing the unit must be the floor, mounting pad or foundation, of which the horizontality must be within 6mm and can burden the operation weight of the whole unit.

The unit must be placed in the machinery room with the temperature of 4.443.3??, there is enough space around and above the unit for the routine maintenance. The space for cleaning the evaporator and condenser should be retained at one end of the unit, as well as make use of the door opening or other suitable opening. Space for maintenance requirement The space requirement is as follows:

Back, side and upper part of the unit-610mm Front of the unit-914 mm

Pipe removal-See the below table:

4.3 Installation of Shock Absorber

The selected shock absorber can be bulk transported along with the machine.

Place the correct installation location upon the Foundation drawing (Refer to Section 10).

Fixation-Installation

Two methods for selection: rubber shock pad, spring shock absorber

Rubber shock pad: place each pad on its correct location respectively, and then set down the unit carefully on the shock absorber.

Spring shock absorber: place each pad on its correct location respectively, and then set down the unit carefully on the shock absorber.

Equally distribute the weight of unit on the spring via regulating the adjusting nut on the spring shock absorber

Section 4 Installation

4.1 Summary

This manual introduces how to install YEWS-D screw water cooled chiller. The standard unit for usage is generally installed well, and the pipes and circuits are prepared well, and the nitrogen or refrigerants has been infused. When it is installed on the site, it just requires completing the connections of chilled water pipelines, water pipe of condenser, safety pipelines of refrigerant gases and power, etc.

The business representative of Y ork will provide the services of installation inspection and initial startup in accordance with the requirements in the contract. If the followings are not obeyed, Y ork shall keep the right to stop the liabilities of Three Guarantees:

1. Prohibit to opening any valve or connector under any circumstances, for which will result in the leakage of the nitrogen or refrigerants.

2. Excepted that the business representative supervises of York, otherwise no removal or startup of the unit upon any reason.

3. No final power connection for the compressor motor or the controlling center.

4. No oil injection in the system.

5. Do not attempt to startup the system.

6. Please do not infuse the hot water or steam (the highest temperature is100F ??, 38??)into the evaporator once the chiller is powered on.

4.2 Arrangement Requirements

The YEWS-D unit is generally located in any plane inside the building because of its low noise and slight vibration the structure of the plane is just required to support the operation weight of the whole unit.

In order to reduce the influence on the surroundings from the vibration and noise, it suggests that the unit should be installed in the area, where the vibration and noise is insensitive.

Model

Space for removing the pipe YEWS100SA50D

2100mm YEWS130SA50D /170/2102650mm

(below the ceiling panel of the shock absorber). It will rise in counterclockwise rotation, while decrease in clockwise rotation. It should be rotated twice for one time till the unit base is in the horizontal position. 4.4 Pipe Connection General requirement

The following connection guide aims at guaranteeing the efficient running of the unit. If these are not obeyed, the damage on the unit or decrease of the performance may be caused, or even the warranty is invalid.

Do not exceed the maximum flow and pressure drop under any circumstances. See Section 10 for the detailed information.

The flow switch must be set on the output pipe of the evaporator/condenser, and connect with the control p- anel by the shielded cable. Please refer to the electrical connection for the detailed information. It is for preventing the damages on evaporator/condenser due to running in water-lack.

All the flow switches are required to be with the metal contact to comply with the situations of low voltage/current. The compulsory flow switch applies with the conditions with 10bar working pressure.

The chilled water pump should be installed on the input pipe of the evaporator.

The pipe and joint must be with the independent support without producing any pressure to the unit. The munity connection is suggested to adopt to reduce the vibration to the buildings. If the unit is installed the shock absorber, it must be required to adopt the munity connection, for during the process of running, the unit will translocate more or less.

The pipes and joints connected to the evaporator should be easy for teardown, which is convenient for cleaning and inspection on the appearance of heat exchanger joint. One filter should be respectively installed on the evaporator and condense, 40 eyes is the best. The location is on the pipe joint as close as possible, and with cutoff switch. The evaporator can not accept the over fast washing speed, the scraps produced from the washing can not be left in the evaporator. Bypass pipe and valve with suitable size are good for the cleaning of the pipe, and can also be used for isolating the evaporator, so that it can not disturb the flow of the other unit.

The thermometer and joint of pressure gauge should be installed on the input and output pipe of the evaporator. The joint for the drain pipe should be set on the low point of the pipe to drain the water out of the pipe, while joint of kicker port on the high point to exhaust the air in the pipe.

Please avoid the scrap remaining in the water pipes between the evaporator and filter, for which will cause the serious damages on the pipe bundle of the evaporator. both the installing personnel and user must insure that

the water quality is very good without any insoluble gas, otherwise the steel parts in the system will be oxidized.

Filter Pressure gauge 1 joint of drain pipe Thermometer

"Fig 4-1 Diagram of cooling water and chilled wa-ter pipe connection

Remark:

1The user should make the regular inspection on the water quality before installation and in the process of using. It is possible that the high efficient heat exchanging pipe of the heat exchanger will be corrupted to leakage or fouling severely once the water quality exceeds the allowable value.

2The items with the tendency of corrosion show that the water quality exceeds the allowable value in long-term, which will result in the corrosion and leakage of the heat exchanging pipe, so that the unit can not run normally and affect the normal usage.

3The items with the tendency of fouling show that the water quality exceeds the allowable value in long-term, which will result in the heat exchanging and fouling severely, so that the performances of the unit decrease.

4The water should be drained out if the unit needs to be stop for long time, it suggests that the heat exchanging pipe should be cleaned after each long-time stop.

5The responsibility produced from the water quality should be burdened by the user.

4.6 Pipe Arrangement

The following pipe connection guide is for each single unit; please connect the pipes according to the drawing for multiple units.

4.7 Pipe Connection Method and Size

Please refer to Chapter Ten for connection size of each model.

The standard pipe connection of all evaporator and condenser should be HG20615 welding flange joint.

4.8 Pipe of refrigerant relief valve

The evaporator and condenser are all with the relief valve to prevent that the refrigerant pressure in the container is over high, and then result in the action of the relief valve,

4.5 Water T reatment

The unit performance given in the design guide is based

2.

on the fouling coefficient 0.044m??/KW of the conden-2.

ser, 0. 017m??/KW of the evaporator. The dust, dirt and grease on the surface of heat transfer will affect the performances of the unit. The impurity in the chilled water system will increase the pressure drop of the evaporator and condenser, and decrease the flow, as well as cause damages on the pipe bungle of the evaporator. York suggests that you'd better consult with the expert of water treatment to confirm that the used water can not affect the carbon steel and steel material of the heat exchanger. The PH value of the chilled water should be maintained between 6.58.0. The water quality should comply with regulations of GB 50050.

and avoid the danger or injury on the personnel due to discharged high pressure steam or liquid. The indoor relief valve should be installed outside the building.

The diameter of the outlet pipe should be large enough, or it will easily hinder the action of the relief valve. Excepted as specialized in local rules, the allowable minimum inner diameter depends on the length of the pipe; the detailed value should be given in the following formula

5

D=1.447L

In the formula: D=minimum inner diameter of the pipe (cm), L=pipe length (m).

If several valves use one pipe of relief valve, the sectional area should be the sum of demand for each valve. No different type of valves is allowed on the same one public pipe. Please adopt the precautions to ensure that the output of the relief valve/vent pipe should be free-flowing.

4.9 Electrical Connection

In order to ensure the safety and normal running of the unit, the following notices should be obeyed. If disobeying, it is possible to result in the personal injury or equipment damage, even the invalid of the warranty.

It is prohibited to adding the controlling component (relay, etc.) in any part of the control panel, the power cord and control wire control panel, if disobeying the regulations; it is possible to result in the danger of electrocution. In addition, the electrical interference may cause the fault or damage on the unit or the controller.

After completing the connection, please do not connect the main power of the unit, for once the main power of the unit is connected, some inner components will be with the electricity. It should be completed only by the authorized personnel.

4.10 Cooling Water System

For the YEWS-D unit, the condenser should be connected with the cooling tower, however, some part can be cooled with the well water. For the water-chiller unit, it is necessary to control the flow and/or temperature of cooling water entering into the condenser to maintain the invariance of the condensation pressure and ensure the normal working of the unit.

Direct pressure control

For the YEWS-D unit, if necessary, the input water temperature/flow of the condenser should be controlled via feeling the pressure of the refrigerant directly.

The pressure of the refrigerant can also be used for controlling the efficiency of the cooling tower, which can also be used for controlling the wind door or wind turbine of the cooling tower, or control the flow of the cooling

Cooling tower

Pump

Cooling tower

or other cooli-

ng source

Cycling loop

Pump

water via tee bypass, as shown in the above diagram. It

aims at maintaining the low constant output pressure. However, for the R134a unit, it is beyond 3bar than the suction pressure. Therefore, the control can be realized via the certain setting value (higher than the expected suction pressure) the measure the suction pressure, or measuring out the suction pressure and with the pressure difference. No matter what situations, the flow and temperature of the cooling water should not exceed the allowable limit.

Inlet temperature control

For the system using the cooling tower, the simplest method is controlling the fanner rotation speed or wind valve (the pump should be equipped with the cooling tower of automatic adjustment), which should ensure the temperature of cooling water should be constant under the designed conditions, the water temperature of the inlet of condenser can be adjusted to be no less than 21

24 when the environment temperature is low.

If without the abovementioned methods or the cooling tower, the three ways recycling system can be adopted, which is based on the water temperature of input of condenser to be adjusted, showed in the above diagram. It aims at maintaining the low inlet temperature of the condenser, but not lower than 2124.

4.11 Power Connection

The standard unit is just used with the rating current of 380V350HZ, the minimum is 342V, while the maximum is 440V.

All the electrical wire should be in compliance with the local regulations. The suitable cable should be required to drill through the wire holes on the two sides of the unit.

The user has the responsibility to provide the overcurrent protection for the input current of Y ork unit according tot eh Chinese standards.

All the power of the unit should be passed one public isolated point (York will not provide it). Single-point supply lines connection

One power in 380V/3phase/50HZ with circuit protection in the scene should be provided to the unit, and then it is connected to the inlet terminal.

The power of control circuit should be outlet from the public power (emergency stop), then isolate the switch by supplying the electricity from the air breaker to the non-fuse and control the transformer.

4.12 Connection of Control Panel

The circuit with I/O switch input is 12VDC, while 220V AC for the switch output, and the circuit with I/O quantum analog input should be 5VDC and the shielded wire, just earth on the control panel. The shielded wire and power wire should be arranged separately to avoid the electrical interference. The power wire should be kept away in using the wire hole on the control panel.

The no-voltage contact must apply with 220V AC (the metal contact is suggested). If the no-voltage contact is one part of relay or contactor, the coil must adopt the standard resistance capacitance suppressor to restrain the interference. Make sure that the above precautions are followed to avoid the electrical interference, which may result in the fault on the unit or the controller, even damages.

The cable connected to these terminals can not exceed 7.5 meters.

4.13 Output Contact

Water pump starter

When the output of terminal 21 is 220V AC, the water pump can be started up. The contact combines with the routine startup and stop process to control the startup/stop of the pump.

Alarming contact

When the output of terminal 26 is 220V AC, the unit is in alarming status.

4.14 System Input

In order to provide reliable protection for power-cutting, the flow switch with the suitable model must be chosen. The flow switch for the chilled water is in series connected with the flow switch of the cooling water, and then connects with terminal 1 and terminal 13 on the mainboard.

Startup and stop with remote control

Connect the switch of remote control into terminal 8 and terminal 13 on the mainboard.

4.15 Connection Diagram

Electrical connection diagram

5.1 Safety Notice (1) Installation

After reading, please keep this technical manual well for reference at any time. Please also give this manual to other personnel operating this machine for reference.

Warning: Only the appointed accessory by our company can be used, and please ask man-ufacturer or authorized dealer to provide the corresponding technical installation, technical service. The aftermath of malfunction of controller or electric shock should be resulted from the improper installation of the controlling accessory. The user is prohibited to maintain the machine by himself, for the aftermath of electric shock or controller damage may be caused due to improper repair of the controller. Please consult with the manufacturer for any repair demand. (2) YORK-003 Control Panel

Notice: YORK-003 control panel must be installed on one stable panel without the

accumulative rain and snow, leaf or other wastes in the host. The intensive circuit generally passes through the installation center; also AC220V passes the control panel. As for the installation location of outdoor control panel, the principle of separation of strong and weak electricity should be followed to maintain the distance between the control panel and contactor is above 100mm. (3) XS08 Centralized Controller

Warning: XS08 centralized controller should be installed stably, otherwise, it may fall down to

cause body injury or damage on controller.

Warning: It is required to adopt the appointed wire to supply the electricity. Please do not share the electricity with other electric appliance to

Section 5 Control Center

avoid the danger due to overloading. It is required to use the fuse or breaker suited with the working pressure of controller. Please do not use the wire or fuse beyond the appointed grade.

(4) Earthing

Notice: The control panel of YORK-003 and shielding layer of transformer must be installed with the earthing wire. Please do not connect the earthing wire with the fuel gas pipe, water pipe, lightning protection conductor or earthing wire of telephone. It may result in the electric shock if it is earthed improperly. Please inspect re-gularly whether the connection between the ear-thing wire of controller and earthing end and earthing electrode of unit is firm or not.

(5) Operation

Warning: Do not press the key with the sharper to avoid damaging the controller. Do not twist or

drag the wire of the controller to avoid damaging the controller to further malfunction. Do not wipe the controller with the benzene, thinner or chemical cloth, otherwise, the controller may be decolored or the component should be in malfunction. Please immerse the cloth into the water with neutral detergent, then wipe after screwing out the water, the wipe the controller with dry cloth. Do not use much strength on the screen or connection part to avoid the color variation.5.2 Initialization Operation

Notice:After completing the installation and connectionof YEWS-D centralized controller, it

is required to perform the initialization operation before putting into running. (1) Situations For Initialization

When the centralized controller and control mainboard is interconnected to form the control system for the first

WARNING

NOTE

WARNING

NOTE

WARNING

NOTE

约克螺杆式,离心式冷水机组开停机操作规程(银杏物业市政第五办公区工部编制)

银杏物业五办中央空调约克离心式/螺杆式水冷机组操作规程 一,开机前准备工作:(螺杆机/离心机) 1.检查冷凝器/蒸发器制冷剂液位是否正常。 2.螺杆式机组需检查油气分离器油位是否正常。 3.检查机组供电电压是否在机组允许范围内(380V±10%) 4.检查机组蒸发器/冷凝器进出水阀门是否开启。 5.检查冷冻水/冷却水循环泵进出水阀门是否开启。 6.检查分水器/集水器供回水阀门是否开启。 二,螺杆式/离心式水冷机组启动程序: 1.启动各台机组相对应的冷冻水/冷却水循环泵,观察机组显示屏界面是否有水 流状态指示,此时机组进入自检程序应显示【系统就绪可以启动】。 2.启动各台机组相对应的冷却塔风机,检查各台机组相对应的冷却塔进出水是否畅通,风机是否工作正常。 3.螺杆机启动:将控制操作箱上旋钮开关向左旋转至ON位置,听见控制箱内继电器吸合“嗒”的声音即松开,机组进入50秒延时倒计数启动状态,倒计数结束机组自动启动。 4.螺杆机停机:将控制操作箱上圆形黑色旋钮开关向右旋转至OFF位置,听见控制箱内有继电器吸合“嗒”的声音及松开,机组即停机。 5.离心机启动:将控制操作箱上黑色长方形按键开关向右按下,听见控制箱内继电器吸合“嗒”的声音及松开,按键开关受弹簧机构控制返回初始状态,机组进入50秒延时倒计数启动状态,倒计数结束机组自动启动。 6.离心机停机:必须采用约克公司制定的离心机软停机操作规程,控制操作箱液晶触摸屏操作程序如下: ⑴【登入】 ⑵【输入使用者身份证明】 ⑶【0】 ⑷【√】 ⑸【输入密码】 ⑹【9675(YORK)】 ⑺【√】 ⑻按【软停机】 ⑼【开始软停机】 ⑽按【】 ⑾【是】 ⑿【√】 ⒀主机进入【停机前导流叶片在关闭中】进行自动卸载停机工作程序。 ⒁停机后将黑色按钮拨向【】位。 7.机组按正常操作程序停机后,让冷冻水/冷却水循环泵运行1分钟后即可停泵,在此期间可先停冷却塔风机。 8.螺杆机操作员密码:【登入】→【输入使用者身份证明】→【0】→【√】→【输入密码】→【1234】→【√】----即可进入修改冷冻水温度设定值。

约克 YS 螺杆冷水机组 Modbus通讯说明

YS螺杆冷水机组Modbus 通讯说明

目录 1通讯协议 (3) 1.1硬件设置 (3) 1.2功能号说明 (4) 1.2.1位状态的写( 功能号:0x05 ) (4) 1.2.2位状态的读取( 功能号:0x01 ) (5) 1.2.3字数据的读取( 功能号:0x03 ) (5) 1.2.4字数据的写入( 功能号:0x06 ) (6) 1.2.5字数据的写入( 功能号:0x10 ) (7) 2 .YS系统参数 (9) 2.1系统输入数字量状态 (9) 2.2系统输出数字量状态 (9) 2.3系统显示信息 (9) 2.3系统设定信息 (10) 3 .YS报警信息 (13) 3.1系统报警信息代码详解 (13)

1通讯协议 ModBus通讯协议分为RTU协议和ASCII协议,YS螺杆冷水机组采用ModBus RTU通讯协议。机组提供RS485接口,并可通过RS485把多台机组连成总线。 说明:当机组连成总线时,处于网络末端的机组通常需要启用终端电阻,处于网络其他位置的机组通常不需要终端电阻。主板两个串口之间分布有四个短路环,两个为一组,每组分属于靠近自己的串口,拔掉一组短路环,即靠近他的串口的终端电阻没有被启用。请视实际通讯状况取舍终端电阻。 1.1硬件设置 接口:RS-485/232/422 波特率:9600bps(19200 bps) 起始位:1 位 数据位:8 位 校验: 无校验(奇校验(ODD)) 停止位:1 位 错误校检:CRC(冗余循环码) 说明:括号内是YORK YS机组曾经采用的通讯方式。

1.2功能号说明 1.2.1位状态的写( 功能号:0x05 ) 呼叫: 局号(1-255) 功能号(0x05) 开始地址(高位) 开始地址(低位) 数据高位(00:off/FF:on) 数据低位(00) crc16(低位) crc16(高位) 回答: 局号(1-255) 功能号(0x05) 开始地址(高位) 开始地址(低位) 数据高位(00:off/FF:on) 数据低位(00) crc16(低位) crc16(高位)

(WI-FM-004)约克中央空调系统操作手册

北京XXXXX物业管理服务有限公司广州分公司XXXXX南方工厂B区综合设施管理项目部 B2中央空调操作流程 XXXXX/WI

目录 1.目的 (3) 2.范围 (3) 3.定义 (3) 4.职责 (3) 5.程序 (3) 6.相关文件.......................................... 错误!未定义书签。 7.相关记录.......................................... 错误!未定义书签。

1. 目的 指导运维对中央空调设备进行正确的操作及检查,保障中央空调设备的正常、高效、节能运行,为客户的生产和办公提供符合KPI要求的环境。 范围 本程序适用于XXXXX XXXXX南方工厂B区项目。 2.定义 无 3.职责 暖通工程师 1.负责制定设备操作程序; 2.制定教育培训资料及培训计划,并对运行和维护人员进行定期培训与考核; 3.处理设备重大故障,制定重大异常故障的改善方案及执行。 BMS 1.带领本班组技术员对设施运行进行监控及时发现问题、解决问题,并按照汇报程序及时向上级汇报; 2.监控设备运行情况,确保它们在高效方式下运行。 运行班长 1.监督运行技术员每日例行检查的完成情况,确保按照部门规定对设备设施进行日常检查; 技术员 1.严格执行本程序,确保信息及时有效地传递给运行值班长及主管; 部门经理: 1.负责与客户沟通和协调。 4.操作程序 启动: 1.确认现场冷水主机、冷却塔、冷冻泵、冷却泵在”自动“远程控制状态下且供电正常。 2.检查现场阀门正常开启状态。 3.进入“XXXXX南方工厂冷源系统界面” 自动运行: 1.将主机1-5锁定值设定为“UNL ock”。

约克螺杆机控制线路图(原版)

PRODUCT DRAWING YORK INTERNATIONAL CORPORATION P .O. Box 1592, YORK, PA 17405 CONTRACTOR _______________________PURCHASER ____________________________________________ORDER NO.__________________________JOB NAME _______________________________________________YORK CONTRACT NO._________________LOCATION _______________________________________________YORK ORDER NO.____________________ ENGINEER ______________________________________________ REFERENCE DA TE ________ APPROVAL DA TE ________ CONSTRUCTION DATE ________ Supersedes: Nothing WIRING DIAGRAM MILLENNIUM Y S (STYLE C) ROTARY SCREW CHILLER MICROCOMPUTER CONTROL CENTER WITH ELECTRO-MECHANICAL STARTER JOB DATA: CHILLER MODEL NO. YS _________________NO. OF UNITS __________________________ COMPRESSOR MOTOR ________________VOLTS, 3-PHASE,______________________________H Z REMARKS:_____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ FORM 160.47-PW1 (897)

约克水冷螺杆冷水机组运行与维护

约克水冷螺杆冷水机组运 行与维护 This manuscript was revised on November 28, 2020

约克中央空调冷水机组保养注意事项 使用注意事项 在使用空调之前,请仔细阅读“使用注意事项”。 “使用注意事项”内列举各种与安全有关的重要事项,恳请严加遵守。 1、请不要破坏已包扎好的保温材料,以免在使用过程中,管壁产生冷凝水漏湿吊顶, 造成不必要的损失。 2、风机盘管在使用过程中,不要关闭风盘上的阀门,以保障系统正常运行。 3、风机盘管在正常运转时,切勿打开前面板,避免高速运转的离心风轮打伤您。 4、不可将手指或别的东西插入出风口、进风口,以避免受伤害或损坏空调机。 5、不可损坏电源线,不可以拔出或插入电源插头来开关空调器。 6、不要直接用水冲洗空调机,否则易造成触电或其它事故。 7、请不要频繁开关机,空调可能因频繁启动受损。 8、机组长期停用时,盘管及系统内应充满水,以减小管路的腐蚀,但在冬季长期停用 时必须把机组及系统内的水全部放尽,以防盘管及供水管路冻裂。 9、在使用控制器面板过程中,不得使用锋利物操作,切勿施加过大的力,以免损坏控 制器面板,不得扭曲或拉扯控制器的电线,以免造成控制部件的失灵。 10、务必通过控制器来控制空调机组的运行状态,严禁拔、插电源来进行开关机组。 机房设备操作规程 ·在进行机房设备操作前,请仔细阅读本操作规程 本工程采用水冷螺杆冷水机组 + 城市热网作为冷热源,夏季冷水机组提供7-12℃冷水,冬季城市热网通过换热器提供50-55℃热水,冷热水共用两台循环水泵。夏季开启冷水机组、冷热水循环泵、冷却水泵、冷却塔风机运行制冷循环;冬季开启板式换热器、冷热水循环泵运行制热循环。 一夏季制冷循环操作规程: 1、冷水机组的开、停机顺序 要保证空调主机启动后能正常运行,必须保证: 冷凝器散热良好,否则会因冷凝温度及对应的冷凝压力过高,使冷水机组高压保护器件动作而停车,甚至导致故障。 蒸发器中冷水应循环流动,否则会因冷水温度偏低,导致冷水温度保护器件动作而停车,或因蒸发温度及对应的蒸发压力过低,是冷水机组的低压保护器件动作而停车,甚至导致蒸发器中冷水结冰而损坏设备。 因此,冷水机组的开机顺序为:(必须严格遵守) 冷却塔风机开冷却水泵开冷水泵开冷水机组停冷水机组的停机顺序为:(必须严格遵守) 冷水机组停冷却塔风机停冷却水泵停冷水泵停 注意:①停机时,冷水机组应在下班前半小时关停,冷水泵下班后再关停,有利于节省能源,同时避免故障停机,保护机组。 ②运行制冷循环前,应确认制热循环管道阀门已全部关闭。 2、冷水机组的操作 ①开机前的准备工作

约克中央空调系统操作规程制冷

中央空调系统操作规程 约克YSCACAS25CEE空调系统 夏季制冷操作规程 一、操作者职责: 1.操作前必须熟知螺杆制冷机组和相关设备。 2.根据本机说明要求开机和关机。 3.检查设备,做常规调整,维护机组。 4.记录运行数据并能识别不正常情况。 5.停机时保护设备不被损坏。 6.遵守国家制冷设备使用相关规定,机房内闲人免进。 二、准备工作: 1、开启配电柜电源给空调主机供电,使之提前预热8小时;查看 电压是否正常,查看是否缺相, 2、配合约克保养工程师检查主机制冷剂、油有无泄漏现象,以保 障机组正常运行; 3、清洗冷却塔;打开冷却塔供水阀门向冷却塔供水,检查冷却塔 水量是否充足;冷凝器循环水压力表显示应在左右;检查冷却 塔风机工作是否正常; 4、清洗冷水循环管路及冷却水循环管路过滤器; 5、开启配电柜电源给冷水循环泵和冷却水循环泵供电,查看电压 是否正常,查看是否缺相,开启冷水循环管路及冷却水循环管

路阀门;检查冷水循环泵及冷却水循环泵工作是否正常,检查 热水循环管路阀门是否已关闭; 6、检查集水器、分水器压力是否在(—)区间,以保证空调冷冻水 循环正常; 7、清洗室内空调末端系统回风过滤网; 三、开机运行操作: 1、启动冷水循环泵;检视进出机组的水压力是否正常,其压力表显示应在左右,启动冷却水循环泵;检视进出机组的水压力是否正常其压力显示应在左右,保证通过机组的水流量正常; 2、检查油分离器油位应在1/3—2/3视镜位置。 3、按主机控制面板上的“开机”按钮,机组进入启动程序; 4、当冷却水机组温度接近26℃时,开启冷却塔风机;并及时根据冷却水温度变化情况,启停冷却塔风机,(冷却水进水温度20—30℃); 5、机组运行人员每间隔一小时记录机组运行数据,有机组报警时增补一次相关参数的记录; 6、每日巡检机房,检查水管路是否有泄漏、异常震动现象,是否有不正常的噪音发生; 7、视使用情况不定期清洗新风系统过滤网,保证室内有足够的新鲜空气; 8、停机时:(1)按机组控制面板上的停机按钮,机组进入自动停机程序;(2)待主机停机结束以后,可以停冷却水循环泵及冷却塔风机;,冷冻水循环泵保持24小时正常运行。

约克YCWS压缩机维修手册

DXS系列半封闭螺杆压缩机操作维护手册A5N, B5N, C5N

目录1. 总论 1.1概述 1.2压缩机型号 1.3物理参数 1.4电气参数 1.5上紧螺栓扭矩、次序和位置 1.6拆下的零件 1.7吊装压缩机 1.8压缩机油路 1.9能量控制系统 2. 压缩机拆卸和安装 2.1概述 2.2操作 2.3断开电源 2.4在维修压缩机前回收制冷剂 2.5维修后抽真空 2.6能量调节电磁阀 2.7容量控制活塞与卸载弹簧 2.8油加热器 2.9油过滤器 2.10进气过滤器 2.11转子座与排气座 2.12螺杆转子 2.13轴承 2.14排气消声器与排气止回钮 2.15电机转子与定子 2.16维护要求 3.零件清单

1. 总论 1.1概述 DXS系列压缩机是一种半封闭喷油双螺杆压缩机。 约克DXS系列压缩机是为满足制冷和空调要求而设计的,使用R-22或R-407C冷媒的工业用螺杆式压缩机。不同螺杆转子直径的压缩机制冷量不同。 DXS系列压缩机采用了专利技术的新型转子型线,保证了压缩机在不同的工况条件下都具有高效率。半封闭式的电机直接安装在阳转子轴上,这种结构紧凑可靠。 DXS压缩机采用了连续的容量控制方式:压缩机在最小位置启动,受微处理器控制的容量调节阀通过一连续作用的滑阀在100%~20%的范围内实现无级调节。并且,停机时容量调节弹簧能自动复位到最小负荷位置,以确保压缩机电机在最小负荷下启动。 压缩机排气座内安装有油过滤器,润滑油进入压缩机后,经过滤器过滤进入各润滑点及转子腔。 在压缩机的排气口设置有内置的消声器及止回钮。消声器能有效地降低压缩机排气口的噪声源,同时优化气流,以获得最佳性能。止回钮能够防止停机时气流反冲使转子倒转。 当冷媒为R-22时,压缩机使用约克L润滑油。当冷媒为R407C时,建议使用约克E油或POE合成润滑油。 压缩机内各接合处采用O形圈,具有极好的密封性,保证压缩机达到 3.1MPa的设计工作压力。

YORK中央空调机组操作指南

YORK中央空调机组操作指南(YS) 1. 开机步骤: A. 启动机组前检查机组状态是否正常(无故障显示) B. 检查冷却及冷冻水侧阀门并确认开启; C. 检查冷却及冷冻水泵有无异常,并确认运行水泵; D. 检查冷却塔是否正常并确认运行; E. 检查冷却及冷冻水进出水压差达0.05Mpa;冷却水进水温度在 32摄氏度以下; F. 确认水泵运行5分钟后,水压稳定; G. 启动空调主机,记录运行参数. 2. 主机运行各参数极限值: A. 冷凝压力V1732KPA B. 蒸发压力>388KPA C. 电机电流<105%FLA D. 排气温度<105 C E. 油温V822C F. 滑阀位置<10% 3. 主机运行时故障及排除(发生故障时必须第一时间联系YORI T

家售后服务工程师陈工报修) A. 冷却或冷冻水流开关开路检查水泵是否运行正常,水阀 是否打开,水流开关调节是否正确; B. 低油位故障----检查油分离器油位是否过低(低于油位下视 镜);机组外部有没有漏油现象; C. 防重复启动------机组在300秒时间内不能重复启动2次; D. 冷冻水出水温度过低——检查冷冻水流量是否过小;温度探头 是否正常;负荷是否过小; 4?停机步骤: A. 确认主机运行正常并记录参数; B. 正常停机按”停止”开关,机组将减载后进行软停机;紧急情况 下按”急停”开关,机组将立即停机; C. 主机停止后,关闭冷却塔风机; D. 保持冷却及冷冻水泵运行5分钟后再停止; E. 保持控制中心控制电源正常供电,以保证油加热器正常工作; F. 确认主机无故障,并记录正常交班交接.

约克ycws压缩机维修手册

约克ycws压缩机维修手册 ____________________________________________________________________ _ DXS系列半封闭螺杆压缩机操作维护手册 A5N, B5N, C5N _____________________________ Page 1 of 25___________________________ ____________________________________________________________________ _ 目录 1. 总论 1(1 概述 1(2 压缩机型号 1(3 物理参数 (4 电气参数 1 1(5 上紧螺栓扭矩、次序和位置 1(6 拆下的零件 1(7 吊装压缩机 1(8 压缩机油路 1(9 能量控制系统 2. 压缩机拆卸和安装 2(1 概述 2(2 操作

2(3 断开电源 2(4 在维修压缩机前回收制冷剂 2(5 维修后抽真空 (6 能量调节电磁阀 2 2(7 容量控制活塞与卸载弹簧 2(8 油加热器 2(9 油过滤器 2(10 进气过滤器 2(11 转子座与排气座 2(12 螺杆转子 2(13 轴承 2(14 排气消声器与排气止回钮 2(15 电机转子与定子 2(16 维护要求 3(零件清单 _____________________________ Page 2 of 25___________________________ ____________________________________________________________________ _ 1. 总论 1(1 概述 DXS系列压缩机是一种半封闭喷油双螺杆压缩机。 约克DXS系列压缩机是为满足制冷和空调要求而设计的,使用R-22或R-407C 冷媒的工业用螺杆式压缩机。不同螺杆转子直径的压缩机制冷量不同。 DXS系列压缩机采用了专利技术的新型转子型线,保证了压缩机在不同的工况条件下都具有高效率。半封闭式的电机直接安装在阳转子轴上,这种结构紧凑可靠。

附++约克冷水机组操作法

附约克冷水机组操作法 1.设备结构 本装置压缩机为容积式、可变容积、直接启动、双螺旋转子的螺杆压缩机。电机直接带动阳转子,阴转子依靠阳转子来传动。转子间相互通过带压油封隔开,该油封可以防止高压气体泄漏到低压区域。 压缩机轴承是由可以耐磨损的部件组成,没有使用滑动轴承。通过压差使油喷射到压缩机内并达到润滑轴承、密封转子和带走压缩产生的热的作用。喷射到压缩机内的油压缩气体混合以满足蒸发器冷负荷的要求,并在油分分离出制冷剂气体。 位于阴阳转子之间的滑阀通过轴向移动来与压缩机制冷量匹配,滑阀通过压差来推动。 2.工作原理 螺杆式制冷压缩机属容积式制冷压缩机,它利用一对相互啮合的阴阳转子在机体内回转运动,周期性的改变转子每齿间的容积来完成吸气、压缩、排气过程。 由于每个齿槽空间的工作循环都要出现吸气、压缩、排气三个过程,压缩机高速运转时,几对齿槽的工作循环进行,从而使压缩机的吸气、排气连续、平稳。 3.工艺流程 来自蒸发器的低温低压的氟利昂气体进入螺杆式压缩机,在旋转中被阴阳转子压缩使气体体积减小。高温高压的氟利昂气体从压缩机进入油分离器经三级油分离,分离了油的制冷剂气体从油分离器进入冷凝器壳程,被冷凝器铜管内的冷却水降温,把氟利昂气体冷凝成氟利昂液体。液体氟利昂流经冷凝器底部的过冷器,过冷的氟利昂液体通过压差经节流阀进入蒸发器。氟利昂液体在蒸发器底部被分流,与流经蒸发器铜管内的冷冻水进行热交换,吸收管内冷冻水的热量变为低温低压气体回到压缩机。 油路系统:从压缩机来的高温高压氟利昂气体中所夹带的润滑油在油分离器内分离出,经油过滤器过滤后,从位于压缩机端口SB-2的复式接头进入油冷却器,在油冷却器内被来自冷凝器的过冷氟利昂液体冷却。冷却后的油离开油冷经引射块,从压缩机端口SB-3进入压缩机,润滑压缩机轴承和起到轴封的作用。油路系统的循环是依靠压差的作用进行的。

约克中央空调故障代码大全

约克中央空调故障代码大全(2) 内容摘要:E6低压保护 E7高压、压缩机过流报警 E8室内盘管温度探头报警 E9室外盘管温度探头报警 EA系统不制热或不制冷报警 Eb 一小时内压缩机启动越过6次 EF通讯错手操器 D0:防冷风最小温度 25℃ D1:辅助加热启动室温条件... 一:约克30匹商用空调故障代码 E1室内温度传感器不良 E2室内热交换器温度传感器不良 E3室外热交换器温度传感器不良 E4室外环境温度传感器不良 E5过欠压保护 E6防冻结保护 E7防高温保护 E8室外环境温度过低保护 E9过电流保护 KFR-50LW/AD、KFR-50LW、KF-50LW、KFR-5001LW机型 E1低压 e2房间温度感温头报警 e3高压,相序。系统不制冷报警 e4室外盘管感温头报警 e5室内盘管感温头报警 e6通讯故障 二:约克数码涡旋多联机中央空调系列

三:约克YBDB风管式中央空调故障代码EA系统不制热或不制冷报警 Eb一小时压缩机启动超过6次 EF通讯错误 E1室内风机故障 E2电源故障 E3房间温度探头报警 E4环境温度探头报警 E5辅助电加热过热报警 E6低压报警 E7高压,排气温度过高或压缩机过流报警E8室内盘管温度探头报警 E9室外盘管温度探头报警 四:约克Y系列中央空调故障代码 约克YGCC中央空调故障代码

故障 E1 1.低压报警 2.冷媒不足 E2 1.房间温度感温头报警 E3 1.压缩机报警输入 1. 若一上电就报警 检查过压保护及连接线是否完好,同时检查相序板,相序是否接错 2.高/低压报警 若运行30分钟后出现故障 检查室内管温传感器位置是否放正确 3. 室内风机反馈报警 若运行15秒后报警 检查室内风机反馈线是否连接正确。 4.辅助加热(室内风机)过热报警 检查过热保护器 E4 1.室外盘管管温头报警 E5 1.室内盘管管温头报警 E6 1.通讯错误 E7 1.室外环境温度探头报警 E8 1.PG电机无反馈信号 E9 1.系统冷媒不足(蒸发器高于25℃) 约克YBDB中央空调故障代码 E1室内风机故障 E2电源故障 E3房间温度探头故障 E4环境温度探头故障 E5辅助电加热报警

螺杆制冷机组说明书

目录 第一章总体介绍 一、螺杆式制冷压缩机结构简介 2 二、螺杆式制冷压缩机压缩原理 2 三、压缩机技术参数 3 四、压缩机的油分离系统 3 五、压缩机的润滑油系统 4 六、压缩机的油冷却方式 4 七、内容积比和能量调节 6 八、经济器 8 九、机组流程图及技术参数表 11 第二章安装 一、基础 29 二、机组安装 29 三、管路连接 29 四、电机与压缩机的找正 30 五、机组排污与检漏 33 六、冷冻机油的加入 33 七、抽真空 34 八、制冷剂的加入 34 第三章操作、维护和保养 一、操作 35 二、设备检修 37 三、长期停车的保养 40 四、故障指南 40 五、压缩机的检修 42 第一章总体介绍 一、螺杆式制冷压缩机结构简介 本手册适用于我公司的螺杆III、II型机,其所列的螺杆式制冷压缩机系一种开启式双螺杆压缩机。一对相互啮合的按一定传动比反向旋转的螺旋形转子,水平且平行配置于机体内部,具有凸齿的转子为阳转子,通常它与原动机连接,功率由此输入。具有凹齿的转子称为阴转子。在阴、阳转子的两端(吸气端和排气端)各有一只滚柱轴承承受径向力量,在两转子的排气端各有一只四点轴承,该轴承承受轴向推力。位于阳转子吸气端轴颈尾部的平衡活塞起平衡轴向力减少四点轴承的负荷的作用。 在阴、阳转子的下部,装有一个由油缸内油活塞带动的能量调节滑阀,由电磁(或手动)换向阀控制,可以在15%~100%范围内实现制冷量的无级调节,并能保证压缩机处于低位启动,以达到小的启动扭矩,

滑阀的工作位置可通过能量传感机构转换为能量百分数,并且在机组的控制盘上显示出来。 为了使螺杆压缩机运行时其外压比等于或接近机器的内压比,使机器耗功最小,压缩机内部设置了内容积比调节滑阀,由电磁(或手动)换向阀控制油缸内油的流动推动油活塞从而带动内容积比滑阀移动,其工作位置通过内容积比测定机构转换为内压力比值在机组的控制盘上显示出来。 螺杆式压缩机的结构见下图和本书后所附的压缩机剖面图。 螺杆式压缩机三维结构图 二、螺杆式制冷压缩机压缩原理 螺杆式制冷压缩属于容积式制冷压缩机,它利用一对相互啮合的阴阳转子在机体内作回转运动,周期性地改变转子每对齿槽间的容积来完成吸气、压缩、排气过程。 1、吸气过程 当转子转动时,齿槽容积随转子旋转而逐渐扩大,并和吸入口相连通,由蒸发系统来的气体通过孔口进入齿槽容积进行气体的吸入过程。在转子旋转到一定角度以后,齿间容积越过吸入孔口位置与吸入孔口断开,吸入过程结束。 2、压缩过程 当转子继续转动时,被机体、吸气端座和排气端座所封闭的齿槽内的气体,由于阴、阳转子的相互啮合和齿的相互填塞而被压向排气端,同时压力逐步升高进行压缩过程。 3、排气过程 当转子转动到使齿槽空间与排气端座上的排气孔口相通时,气体被压出并自排气法兰口排出,完成排气过程。 由于每一齿槽空间里的工作循环都要出现以上三个过程,在压缩机高速运转时,几对齿槽的工作容积重复进行吸气、压缩和排气循环,从而使压缩机的输气连续、平稳。 三、压缩机技术参数 四、压缩机的油分离系统 由于螺杆式制冷压缩机工作时喷入大量的润滑油与制冷剂蒸汽一起排出,所以在压缩机与冷凝器之间设置了高效的卧式油分离器。油分离器的作用是分离压缩机排气中携带的润滑油,使进入冷凝器的制冷剂纯净,避免润滑油进入冷凝器而降低冷凝器的效率。油分离器还有贮油器的功能。本机组采用卧式油分离器,从压缩机排出的高压气体,通过排气管进入油分离器,降低流速,改变方向,向油分的另一端排去。在这个过程中,大量的润滑油因为惯性及重力的作用沉降到油分底部,剩余的含有微量冷冻机油的气体再 轴承 转子 能量滑阀 轴封 机体 内容积比滑阀 吸气过滤网

约克水冷螺杆冷水机组保养手册培训讲学

使用注意事项 ◆在使用空调之前,请仔细阅读“使用注意事项”。 ◆“使用注意事项”内列举各种与安全有关的重要事项,恳请严加遵守。 1、请不要破坏已包扎好的保温材料,以免在使用过程中,管壁产生冷凝水 漏湿吊顶,造成不必要的损失。 2、风机盘管在使用过程中,不要关闭风盘上的阀门,以保障系统正常运行。 3、风机盘管在正常运转时,切勿打开前面板,避免高速运转的离心风轮打 伤您。 4、不可将手指或别的东西插入出风口、进风口,以避免受伤害或损坏空调 机。 5、不可损坏电源线,不可以拔出或插入电源插头来开关空调器。 6、不要直接用水冲洗空调机,否则易造成触电或其它事故。 7、请不要频繁开关机,空调可能因频繁启动受损。 8、机组长期停用时,盘管及系统内应充满水,以减小管路的腐蚀,但在冬 季长期停用时必须把机组及系统内的水全部放尽,以防盘管及供水管路冻裂。 9、在使用控制器面板过程中,不得使用锋利物操作,切勿施加过大的力, 以免损坏控制器面板,不得扭曲或拉扯控制器的电线,以免造成控制部件的失灵。 10、务必通过控制器来控制空调机组的运行状态,严禁拔、插电源来进行 开关机组。

机房设备操作规程 ·在进行机房设备操作前,请仔细阅读本操作规程 本工程采用水冷螺杆冷水机组 + 城市热网作为冷热源,夏季冷水机组提供7-12℃冷水,冬季城市热网通过换热器提供50-55℃热水,冷热水共用两台循环水泵。夏季开启冷水机组、冷热水循环泵、冷却水泵、冷却塔风机运行制冷循环;冬季开启板式换热器、冷热水循环泵运行制热循环。 一夏季制冷循环操作规程: 1、冷水机组的开、停机顺序 要保证空调主机启动后能正常运行,必须保证: 冷凝器散热良好,否则会因冷凝温度及对应的冷凝压力过高,使冷水机组高压保护器件动作而停车,甚至导致故障。 蒸发器中冷水应循环流动,否则会因冷水温度偏低,导致冷水温度保护器件动作而停车,或因蒸发温度及对应的蒸发压力过低,是冷水机组的低压保护器件动作而停车,甚至导致蒸发器中冷水结冰而损坏设备。 因此,冷水机组的开机顺序为:(必须严格遵守) 冷却塔风机开冷却水泵开冷水泵开冷水机组停 冷水机组的停机顺序为:(必须严格遵守) 冷水机组停冷却塔风机停冷却水泵停冷水泵停注意:①停机时,冷水机组应在下班前半小时关停,冷水泵下班后再关停,有利于节省能源,同时避免故障停机,保护机组。 ②运行制冷循环前,应确认制热循环管道阀门已全部关闭。

冰机操作维护手册

第七节片冰机维护保养操作规程 一、目的 确保制冰设备运转正常,不影响生产。 二、适用范围 适用于制冰设备的维护管理。 三、职责 1、设备科人员负责维护保养和对有关操作工的培训。 2、监控员负责检查、验收设备维护保养计划。 四、维护保养 1、制冰的设备包括:压缩机、壳管式冷凝器、冰筒、气液分离器、油分离器、吸气截止阀、排气截止阀、直角截止阀、DN38直角截止阀、DN25直角截止阀、干燥过滤器、FDF25M电磁阀、视液镜、震动电磁阀、压力控制器、低压压力表、高压压力表、380V水泵、球阀、制冰进水、水压控制器、热力液位控制器、油压差控制器 2、维护保养计划: 每天和每月维护保养一次。 3、维护保养要点: 每天检查以上设备设施正常运行的情况下,如发现有异常情况立即通知设备科长。并将检查的维护的结果填写到设备维护操作记录表中。 五、操作规程 1、打开水阀通入冷却水; 2、打开钥匙钮,控制电源预接通; 3、启动电源按钮 4、开启水泵、制冰按钮; 5、按下压缩机启动按钮,约10分钟制冰正常。 2、每天检查一次,并将检查结果填写到操作表中。 3、操作表必须到车间现场检查,现场填写。 六、相关文件、制度和记录 1、《TBF-4F立筒式制冰机产品说明书》由设备科长保存 2、《企业管理大全》第二部分第二篇第四章奖惩管理制度 七、考核频率、时间、对象、要求和标准 1、考核频率:每班一次 2、考核时间:班前、班中和班后 3、考核对象:责任人是设备操作工,连带责任人是设备承包人 4、考核标准:以10分制考核,或给予违反者经济处罚 八、相关记录的发放、回收、审核与保存 1、片冰机操作执行记录(BL-SB-13) 2、监控员发放→维修工填写→审核→企管科保存

约克螺杆机组YEWS操作维护手册

YEWS100SA50D / YEWS170SA50D / YEWS210SA50D STYLE D Warning Refrigerant with certain pressure is infused into this system It is possible to damage the system severely if be with the incorrect operating procedure when in maintaining. All the maintenances should be performed by the maintenance technician of YORK in accordance with the Installation, Operation and Maintenance Manual of YORK.

IMPORTANT ! Please read carefully before proceeding! General Safety Guidelines This equipment is complex, when performing the installation, operation and maintenance, the personnel may be exposed to the following circumstances or dangers caused by components, including but not limited to: refrigerants, engine oil, compressive material, rotation part and high-low voltage, which will result in personal injury or even casualty if in improper handling. The operation/maintenance personnel have the responsibility to confirm these potential dangers to protect him from the injury while work safely. If these safety requirements are not followed, serve damages on the equipment and property will be caused, or even casualty on the personnel concerned. This manual is just for the authorized operation/maintenance personnel, whom are professionally trained to handle the appointed work safely and correctly. Most important of all, please carefully read and master this manual and other references before any operation on this equipment. The operator is required to be familiar with and follow any relevant government standards and criterion. Variability of this Document York inherits the strategy of updating the product continuously, so that the information in this document can be correspondingly updated without prior notice. York is in no promise to provide the latest information to all the owners of this manual; however, the user can acquire these information from the nearest representative office of engineering system service of York. It is the obligation of operation/maintenance personnel to determine the applicability of the corresponding equipment. If any question before operation, they will contact the customer to confirm whether the equipment have been updated and whether there is the latest available document or not. Nomenclature A50 Y E WS100S D Style Power supply Refrigerant A-R134a S-Standard unit 100-Unit model Water cooled screw chiller High efficiency YORK

约克水冷螺杆式冷水机组YS介绍

约克水冷螺杆式冷水机组YS介绍 1、关于开闭式的比较 (1)安全可靠:A 闭式机在冷媒环境中运行易造成腐蚀,导致电击穿。 B 闭式机线径细,抗过载能力差。 C 冷媒冷却,如冷媒系统出现问题,影响电机散热,导致电机烧坏。 D 美国购买闭式机的保险费用是开式机的二倍,从第三方印证了开式机 的可靠性。 (2)更节能: A 最低12.8℃低冷却水温,节能效果显著,具有极佳的部分负荷性能。 B 电机散热在空气中,正常机房通风即可带走,而闭式机散热消耗系统 冷媒,消耗系统冷量。 C 开式机电机在空气中旋转比闭式机在冷媒蒸汽中旋转的阻力小,节能 3~6%。 (3)维修方便:闭式机一旦烧毁,事故是灾难性的。现场维修是不可能的,必须运回原厂进行维修,并需彻底清洁系统,费用需要4—5万美元,而且系统不 可能彻底清洗干净,存在再次烧机的隐患。 2、关于单/多机头的比较 (1)多机头应用的目的: A 细化部分负荷的调节能力 B 增大产品的冷量范围并降低机组成本:冷量越大的螺杆机要求有更精 确的机加工和装配能力。 约克可以生产的单机头的制冷能力为1100冷吨的螺杆压缩机,而有的厂家只能生产或购买单机制冷能力很小的机头,或者为了降低成本而不愿意生产大冷量的压缩 机。单机容量大对用户是有好处的:机组效率和部分负荷也会好。但机组的制造成本 也会相应提高。约克正是为了用户的利益而坚持采用这种单一大冷量压缩机的机组结 构型式。YORK的合资子公司FRICK是全球最大的螺杆压缩机生产厂家之一,具有 世界尖端生产能力,为YS产品提供按工业冷冻等级制造的螺杆压缩机产品。从而保 证机组的性能和可靠性。而多机头拼装的冷水机因为机头本身容量小,且为大批量生 产,所以成本相对降低。 (2)我们发现多机头的螺杆机,部分负荷的调节是分级的,不能象约克YS机组实现100~10%的无级调节,采用多机头的型式从另一方面来讲也是人为加大了一台冷水机 组的可调节级数,所以约克不需要采用多机头来回避这个问题。因为只有可调节级数 与冷量跨度越小的机组越能接近实际要求的冷量,从而避免能源的浪费,这和约克采 用无级调节冷量的节能方式是无可比拟的。 (3)对于螺杆机来讲,油路系统是非常重要的。如果多机头螺杆机的多个机头的油路没有分开,是共用的,那么如果机头处于没有全开的状态,油的供应是很难平衡的,极 易造成运行的安全隐患。多机头的配置,必然带来运动部件增加并增加系统的复杂性,也同时增加了机组出现故障的可能性。 3、关于单螺杆/双螺杆的比较 (1)双螺杆压缩机由一对互相啮合的螺杆组成,由阳转子带动阴转子不断旋转啮合,形成制冷剂汽体压缩的过程。而单螺杆由一个主动的转子和一个或两个从动的星轮组 成,转子转动带动星轮不断进行啮合压缩。单螺杆压缩机的主要部件之一星轮由工

约克 螺杆机方案

约克螺杆式冷水机组技术特点介绍 在大中型冷量范围内,长期以来主要使用的是离心机和螺杆机,这两种机型各有特点和使用范围。我公司本着“客户利益至上”的宗旨,针对每一个项目为客户提供最适合的空调机组。约克螺杆机生产能力居行业首位,作为工业冷冻用螺杆机的行业领导者,其技术运用于民用空调,这更大大提高了机组的安全稳定耐用性,具体特点如下。 一、高质量,安全可靠 工业级别设计压缩机,电机烧毁 几率降到最低: 约克旗下FRICK 压缩机是世界工 业用螺杆压缩机的最顶级品牌, 其丰富的设计经验与最先进的制 造工艺,使其成为全球工业用压缩机的主要供应商。而其应用于 民用行业,其工业设计级别的高可靠性是对用户的最佳保证; ? 专为R134a 冷媒设计的转子型线, 运行平稳 ? 转子与转子,转子与滑阀间的间隙精密,加工精度高 ? 全抗磨轴承设计,减少摩擦,寿命长 ? 压缩机按工业级标准设计,可靠耐用 ? 全支撑滑阀设计, 防止磨损 润滑系统: 1)机组运行时,利用系统正压差输送充足的润滑油; 2)沉浸式温度驱动油加热器在停机时可有效地将制冷剂从油中分离。自动回油系统将极少数留在蒸发器中的润滑油收回,使之流回压缩机。 制冷剂系统:

机组装有吸入滤网,可在维护和检修时防治外部碎屑进入系统,电机由制冷剂冷却,滤网保护以保护电机并延长使用寿命。 Skip-Fin 换热管设计是在机组中间隔板支撑架的地方采用比螺纹管厚一倍的光管最佳壁厚,并与支撑板紧密胀接,保证铜管在冷媒高速冲击下,不会因铜管与支撑板的碰撞产生破损,避免机组漏管产生冷冻水进入压缩机电机中的恶性事故。 二、高效率、节能显著 高效油分离器: 油在制冷剂压缩过程中发挥着润滑压缩机、密封转子、冷却高温部件的重要作用,但是在蒸发器和冷凝器中反而会恶化换热,导致系统性能急剧降低。因此制冷剂和润滑油从压缩机进入冷凝器之前需要完全分离,才能保证机组可靠效运行。 润滑油基本只在其润滑回路里循环,从而使换热效率最佳。 ? 油分离效率达到500ppm ? 分离效率是市场上类似产品的5至20倍 ? 减少进入蒸发器制冷剂的油含量,保证换热器高效的换热 ? 增加油的回流,保证压缩机系统充足供油 节能的电机冷却方式: 约克开式机组采用风冷冷却电机的方式,而约克的 半封闭式机组则采用“First Cost ”方式进行冷却(如右 图所示)。 压缩机在制冷原理中承担的角色是将蒸发器中低压低温的制冷剂气体压缩提升为高温高压的制冷剂气体,制冷剂气体在进入压缩机前先经过了电机的预热,则对压缩机做功起到了节能作用。 而蒸发器制冷剂气体温度低,对于电机散热则不需要太多的线圈,因此电机尺寸减小,